Rancangan Sequence dan Penjadwalan Rolling Plan Three Months untuk Mencapai Target Produksi Batubara Desmawita; Deden Saputra; Doli Jumat Rianto; Marliantoni; Hisni Rahmi; Marisa Oktavia; Devit Rahmawati
Jurnal Sains dan Teknologi: Jurnal Keilmuan dan Aplikasi Teknologi Industri Vol. 25 No. 2 (2025): Regular Issue
Publisher : SEKOLAH TINGGI TEKNOLOGI INDUSTRI PADANG

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36275/abgk0w87

Abstract

PT. Era Perkasa Mining merencanakan target produksi batubara pada periode Oktober hingga Desember 2024, sehingga diperlukan perencanaan penambangan yang terstruktur untuk mencapai target secara optimal. Penelitian ini bertujuan menyusun rencana produksi berdasarkan batas pit limit yang memenuhi target teknis produksi. Metode yang digunakan meliputi perhitungan cadangan dan volume overburden dengan metode solid reserve menggunakan blok analisis 50 x 50 meter, kemudian dilakukan forecast produksi dengan mempertimbangkan kapasitas dan ketersediaan alat gali muat serta alat angkut yang tersedia saat ini. Data hasil perhitungan cadangan dan produktivitas alat diolah menggunakan software tambang untuk membuat mine scheduling serta desain sequence penambangan dengan memperhatikan rekomendasi geoteknik perusahaan. Hasil penelitian menunjukkan estimasi cadangan batubara sekitar 1.324.810 ton dan volume overburden 5.976.517 bcm, serta forecast produksi batubara/bulan mendekati target perusahaan dengan stripping ratio antara 3,44. Desain pit penambangan mengikuti standar geoteknik dengan tinggi bench 5 meter, lebar 3 meter, dan kemiringan single slope 50°. Terdapat perbedaan volume antara desain pit dan forecast, perencanaan ini tetap mengacu pada kapasitas alat yang tersedia dan target produksi. Perencanaan produksi yang tersusun secara sistematis dengan dukungan software tambang untuk membuat penjadwalan produksi serta pemanfaatan alat yang optimal akan membantu PT Era Perkasa Mining dalam mencapai target produksi batubara pada akhir tahun 2024.
Penurunan Kadar Fe Dan Mn Menggunakan Kapur Tohor (CaO) Pada Penetralan Air Asam Tambang Yolno Vernando; Afni Nelvi; Ahmad Fadhly; Dian Hadiyansyah; Hisni Rahmi
Jurnal Teknologi Infrastruktur Vol 7 No 02 (2025): Jurnal Teknologi Infrastruktur Vol 7 No 02 tahun 2025
Publisher : Fakultas Teknik Universitas Panca Bhakti

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The treatment of acid mine drainage at PT Bumi Bara Makmur Mandiri is conducted using an active treatment method. It was found that there is cloudy wastewater with a brownish and reddish-brown color in the settling pond. The objective of this study was to analyze the changes in pH, Fe and Mn concentrations in acid mine drainage samples using quicklime and to calculate the cost required for neutralizing the acid mine drainage. The neutralization process was carried out on a laboratory scale using an experimental method with 3 variations of quicklime doses: 0.2 g/l, 0.3 g/l, and 0.4 g/l. The results showed that quicklime is effective in reducing Fe and Mn value in acid mine drainage. The initial pH of the acid mine drainage was 6.05. The pH increased with the increase in the quicklime coagulant dose. The Fe concentration before the neutralization of acid mine drainage was 1.20 mg/l, which decreased to 0.15 mg/L for all given dose variations. The initial Mn concentration exceeded the environmental quality standard and showed a significant reduction at a dosage of 0.2 g/L, decreasing from 72.20 mg/L to 0.08 mg/L. Similar Mn concentrations were obtained at dosages of 0.3 g/L and 0.4 g/L, each resulting in 0.122 mg/L. The cost required to neutralize Fe and Mn was IDR 368,000 per day, or IDR 11,040,000 per month.
Analisis Produktivitas Alat dan Faktor yang Menghambat Produksi pada Kegiatan Pengupasan Overburden di Tambang Batubara Maisa Illahi Darni; Hisni Rahmi; Lydia Kartika Basaria Sitompul; Qurratul Ayun; Afni Nelvi; Ericson Ericson
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 3 No. 6 (2025): Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v3i6.1236

Abstract

Overburden removal at Pit B did not meet the production targets for June and July 2025, which were set at 570,698.8 BCM and 400,986.56 BCM, respectively, while the actual production achieved was 507,071.66 BCM and 312,128.23 BCM. This study aims to determine the theoretical productivity of loading and hauling equipment and to identify the factors that hinder the achievement of production targets. The primary data used in this study include the cycle time of loading equipment, the cycle time of hauling equipment, bucket fill factor, and delay time. The secondary data required consist of swell factor, number of passes, bucket capacity, and available working time. The productivity of the loading equipment was 332.58 BCM/hour, while the hauling equipment achieved a productivity of 53.16 BCM/hour, with a match factor of 0.74. This indicates that the loading equipment experienced waiting time during loading operations due to the hauling equipment not operating optimally or at full capacity. The factors inhibiting the achievement of production targets include a narrow, waterlogged, and uneven working face; hard overburden material; a road grade of 16%, which exceeds the standard maximum of 12%; a curve road width of 15 m, which is less than the ideal minimum width of 19.95 m; undulating haul roads; narrow haul road width; and dusty road conditions.