REVIEW PROSES PERENCANAAN JANGKA PANJANG SISTEM TENAGA LISTRIK Handrea Bernando Tambunan; Anindita Satria Surya; Dhandis Rito Jintaka; Brian Bramantyo S.D.A Harsono; Denny Haryanto Sinaga; Aryo De Wibowo Muhammad Sidik; Adeguna Ridlo Pramurti
EPIC (Journal of Electrical Power Instrumentation and Control) Vol 4, No 1 (2021): EPIC
Publisher : Universitas Pamulang, Prodi teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32493/epic.v4i1.10879

Abstract

Salah satu tugas utama dari pemerintah kepada PT PLN (Persero) adalah melakukan pembangunan ketenagalistrikan yang bertujuan untuk menjamin ketersediaan tenaga listrik dalam jumlah yang cukup, kualitas yang baik, dan harga yang wajar. Untuk melaksanakan tugas tersebut maka disusunlah dokumen Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) yang meliputi rencana pengadaan tenaga listrik yang mulai dari pembangkitan, transmisi hingga distribusi untuk jangka waktu sepuluh tahun. Dikarenakan durasi yang sangat panjang maka diperlukan metode dan proses yang tepat, efisien dan optimal dalam merencanakan sistem tenaga listrik sehingga dapat terhindar dari deviasi yang tinggi antara perencanaan dan realisasi. Berdasarkan latar belakang tersebut maka perlu dilakukan review terhadap model perencanaan eksisting melalui metode komparasi sebagai alternatif perbaikan untuk mengoptimalkan proses perencanaan. Komparasi dilakukan pada beberapa negara seperti Austria, Belgium, Denmark, France, Germany, Italy, The Netherlands, Switzerland, United Kingdom, dan United States. Hasil penelitian menunjukkan bahwa perencanaan sistem tenaga listrik secara tipikal terdiri dari tiga fase mulai dari fase penentuan asumsi dan skenario, pemodelan, hingga persetujuan pemerintah. Fase awal dapat diperkuat dengan penambahan parameter negasi berupa pertumbuhan prosumer hingga efisiensi peralatan tenaga listrik, fase modeling dapat melibatkan akademisi, grup ekspert hingga lembaga riset, dan fase terakhir dapat diperkuat dengan peranan publik dan stakeholder yang terkait sehingga deviasi antara perencanaan jangka panjang dan realisasi dapat lebih rendah.Kata kunci : perencanaan; sistem tenaga listrik; RUPTL; PLN
REVITALISASI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA SISTEM MICROGRID PULAU TOMIA Putu Pramana; Kevin Gausultan Hadith Mangunkusumo; Handrea Bernando Tambunan; Dhandis Rito Jintaka
Jurnal Technopreneur (JTech) Vol 9 No 1 (2021): JURNAL TECHNOPRENEUR (Mei)
Publisher : UPPM Politeknik Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30869/jtech.v9i1.724

Abstract

Pulau Tomia merupakan salah satu pulau di Kabupaten Wakatobi, Provinsi Sulawesi Tenggara yang menggunakan konsep microgrid untuk melistriki masyarakatnya. Konsep microgrid tersebut mengintegrasikan Pembangkit Listrik Tenaga Disel (PLTD) dan Pembangkit Listrik Tenaga Surya (PLTS). Namun, saat ini kondisi sistem PLTS di Pulau Tomia tidak dapat memproduksi listrik karena terjadi permasalahan dan berdampak pada potensi energy not served (ENS) serta kerugian investasi dalam pembangunan sistem microgrid. Dalam makalah ini dijelaskan proses revitalisasi pada sistem PLTS di Pulau Tomia dengan harapan makalah ini dapat menjadi referensi pada proses revitalisasi PLTS di lokasi lainnya. Proses revitalisasi pada PLTS Tomia dilaksanakan melalui beberapa tahapan yaitu review desain eksisting PLTS Tomia, investigasi penyebab gangguan, inisiatif perbaikan, dan desain ulang PLTS Tomia. Dari hasil investigasi gangguan dapat diketahui bahwa penyebab tidak beroperasinya PLTS Tomia adalah gangguan pada rangkaian PLTS, Grid Tied Inverter (GTI), dan elemen penyimpan (baterai). Berdasarkan hasil analisa lebih lanjut, didapatkan inisiatif perbaikan yang dapat ditindaklanjuti dengan hasil terbaik dan cara yang termudah, yaitu melakukan desain ulang pada rangkaian combiner box PLTS dan mengimplementasikan konsep GTI modular. Hal tersebut dilakukan agar keandalan PLTS tetap terjaga jika salah satu GTI mengalami permasalahan. Hasil revitalisasi menunjukkan bahwa nilai kualitas daya berupa harmonisa tegangan dan arus yang dihasilkan oleh GTI telah memenuhi standar. Selain itu, PLTS Tomia hasil revitalisasi mampu menghasilkan potensi penghematan Biaya Pokok Produksi (BPP) Listrik yang semula adalah sebesar Rp. 3080/kWh menjadi Rp. 2983/kWh.
FRAMEWORK ASESMEN TEKNOLOGI DALAM PENGAMBILAN KEPUTUSAN STRATEGIS UTILITAS Brian Bramantyo Satriaji Dwi Adiputro Harsono; Putu Agus Aditya Pramana; Kevin Gausultan Hadith Mangunkusumo; Handrea Bernando Tambunan; Muhammad Ridwan; istiqomah istiqomah
Jurnal Technopreneur (JTech) Vol 10 No 1 (2022): JURNAL TECHNOPRENEUR (Mei)
Publisher : UPPM Politeknik Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30869/jtech.v10i1.896

Abstract

Perkembangan teknologi berperan penting dalam pengelolaan aset yang dimiliki oleh utilitas yang ada di Indonesia. Sebagai contoh, perkembangan teknologi insulator pasang luar untuk aset saluran transmisi udara dapat bermanfaat dalam meningkatkan efisiensi dalam proses pemeliharaan mengingat jumlah petugas pemeliharaan yang tidak sebanding dengan banyaknya aset saluran transmisi udara yang ada. Meskipun demikian, teknologi baru tersebut perlu melewati suatu proses asesmen sebelum diputuskan penerapannya pada aset yang ada. Pada makalah ini disajikan sebuah framework asesmen teknologi untuk teknologi insulator pasang luar saluran transmisi udara, yang terdiri dari asesmen dari sudut padang teknis (evaluasi parameter desain/dimensi terhadap referensi terkait), finansial (menggunakan pendekatan Net Present Value dari setiap biaya yang muncul), dan risiko (menggunakan pendekatan asesmen risiko). Hasil evaluasi teknis menunjukkan bahwa teknologi insulator A dan insulator B memiliki keunggulan dari sudut pandang unjuk kerja terhadap pengotor dibandingkan insulator eksisting. Secara finansial, kedua teknologi memberikan keunggulan ekonomis dibandingkan insulator eksisting untuk rentang waktu observasi 30 tahun. Meskipun demikian, potensi risiko kegagalan mekanis dan kegagalan elekstris memiliki nilai cukup tinggi oleh karena kedua teknologi tersebut belum pernah digunakan di saluran transmisi udara 500 kV di Indonesia. Oleh karena itu, perlu dilakukan pilot project untuk kedua teknologi insulator tersebut dengan mempertimbangkan mitigasi risikonya serta kajian engineering yang lebih lanjut.
Analisis Opini Pengguna Aplikasi New PLN Mobile Menggunakan Text Mining Handrea Bernando Tambunan; Tiva Winahyu Dwi Hapsari
PETIR Vol 15 No 1 (2022): PETIR (Jurnal Pengkajian Dan Penerapan Teknik Informatika)
Publisher : Sekolah Tinggi Teknik - PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33322/petir.v15i1.1352

Abstract

Media sosial pada saat ini menjadi suatu media yang sangat populer untuk menyampaikan opini oleh masyarakat di Indonesia. Melalui media sosial pengguna dapat dengan mudah mengungkapkan pengalamannya terhadap suatu produk, salah satunya adalah aplikasi New PLN Mobile dari PT PLN (Persero). Aplikasi tersebut menjadi platform digital untuk memenuhi berbagai kebutuhan pelanggan terkait pelayanan ketenagalistrikan. Salah satu metode yang dapat dipakai untuk menganalisa opini pengguna adalah menggunakan text mining dengan pendekatan word cloud, network explorer, jenis emosi, dan analisis sentimen. Hasil penelitian menunjukkan bahwa analisis word cloud memberikan frekuensi komentar terkait keberadaan aplikasi, pengalaman pelanggan, fitur baru, informasi pelanggan, hingga interaksi dan komunikasi pada media sosial. Selanjutnya analisis network explorer menunjukkan bahwa kata yang saling berkaitan adalah “aplikasi pln mobile” dan “kemudahan layanan gangguan”. Analisa jenis emosi mengekspresikan sebagian besar pelanggan terkejut (surprise) dengan adanya aplikasi aplikasi New PLN Mobile. Analisis sentimen menunjukkan bahwa sebagian besar kluster pelanggan menunjukkan sentimen yang sangat positif terhadap keberadaan aplikasi New PLN Mobile.
Initial location selection of electric vehicles charging infrastructure in urban city through clustering algorithm Handrea Bernando Tambunan; Ruly Bayu Sitanggang; Muhammad Muslih Mafruddin; Oksa Prasetyawan; Kensianesi Kensianesi; Istiqomah Istiqomah; Nur Cahyo; Fefria Tanbar
International Journal of Electrical and Computer Engineering (IJECE) Vol 13, No 3: June 2023
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijece.v13i3.pp3266-3280

Abstract

Transportation is one of the critical sectors worldwide, mainly based on fossil fuels, especially internal combustion engines. In a developing country, heightened dependence on fossil fuels affected energy sustainability issues, greenhouse gas emissions, and increasing state budget allocation towards fuel subsidies. Moreover, shifting to electric vehicles (EVs) with alternative energy, primely renewable energy sources, is considered a promising alternative to decreasing dependence on fossil fuel consumption. The availability of a sufficient EV charging station infrastructure is determined as an appropriate strategy and rudimentary requirement to optimize the growth of EV users, especially in urban cities. This study aims to utilize the k-mean algorithm’s clustering method to group and select a potential EV charging station location in Jakarta an urban city in Indonesia. This study proposed a method for advancing the layout location’s comprehensive suitability. An iterative procedure determines the most suitable value for K as centroids. The K value is evaluated by cluster silhouette coefficient scores to acquire the optimized numeral of clusters. The results show that 95 potential locations are divided into 19 different groups. The suggested initial EV charging station location was selected and validated by silhouette coefficient scores. This research also presents the maps of the initially selected locations and clustering.
Research trends on microgrid systems: a bibliometric network analysis Handrea Bernando Tambunan; Nur Widi Priambodo; Joko Hartono; Indra Ardhanayudha Aditya; Meiri Triani; Rasgianti Rasgianti
International Journal of Electrical and Computer Engineering (IJECE) Vol 13, No 3: June 2023
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijece.v13i3.pp2529-2545

Abstract

The numeral of academic publications in the microgrid system field has rapidly grown. A microgrid system is a group of interconnected distributed generation, loads, and energy storage operating as a single controllable entity. Many published articles recently focused on distributed generation, system control, system stability, power quality, architectures, and broader focus areas. This work analyzes microgrid: alternating current (AC), direct current (DC), and hybrid AC/DC microgrid systems with bibliometric network analysis through descriptive analysis, authors analysis, sources analysis, words analysis, and evolutionary path based on the Scopus database between 2010 and 2021. The finding helps find out the top authors and most impact sources, most relevant and frequently used in the research title, abstract, and keyword, graphically mapping the research evolved and identifying trend topic.
Research Mapping on Distributed Energy Systems Using Renewable Energy Handrea Bernando Tambunan; Agussalim Syamsuddin; Natalina; Mujammil A. Rahmanta; Fefria Tanbar; Wigas Digwijaya; Acmed Nurfanani
Fidelity : Jurnal Teknik Elektro Vol 5 No 2 (2023): Edisi Mei 2023
Publisher : Universitas Nusa Putra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52005/fidelity.v5i2.145

Abstract

The availability of energy is essential to support modern human activities worldwide, pushing global energy consumption to an unprecedented level within the last century. Several aspects, such as population, economy, greenhouse gas emissions (GHG) emission, gross domestic product, and labor growth, have a favorable relationship with energy consumption, which means an enlargement in energy consumption. On the other hand, distributed energy systems (DES) and renewable energy (RE) are popular alternative sources of energy production as part of the energy mix toward energy security and sustainability to tackle environmental issues. This paper aims to analyze and review the research trend of DES and RE in recent decades through bibliometric tools. Thus, the study addressed the following research questions: worldwide research’s prominent authors, relevant sources, the word associated with this research field, and thematic analysis through the Scopus database and Bibliohiny R-package. This work can help the academicians, researchers, and scientific community comprehend the study fields more rapidly.
Contribution of Disaster Response Team in Assisting Natural Disaster Mitigation in Cianjur Harurikson Lumbantobing; Aryo De Wibowo Sidik; Anggy Pradiftha Junfithrana; Anang Suryana; Handrea Bernando Tambunan; Muchtar Ali Setyo Yudono; Bayu Indrawan; Ilman Himawan Kusumah; Marina Artiyasa; Edwinanto; Yudha Putra; Yufriana Imamulhak
Jurnal Pengabdian dan Pemberdayaan Masyarakat Indonesia Vol. 3 No. 8 (2023)
Publisher : Peneliti Teknologi Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59247/jppmi.v3i8.194

Abstract

This article discusses the contribution of the natural disaster response team in assisting with natural disaster mitigation in Cianjur. The disaster response team consists of several experts in the field of electrical engineering, such as electrical technicians, telecommunications specialists, and electronics experts, who are ready to assist in facing natural disasters in the Cianjur region. The article explains the activities carried out by the disaster response team, ranging from pre-disaster preparedness to post-disaster management. Some of the activities performed by the disaster response team include the development and maintenance of electro-technological infrastructure, training and educating the community about natural disaster mitigation, as well as coordination with relevant agencies in disaster management. The results of these activities indicate that the contribution of the natural disaster response team is crucial in assisting with natural disaster mitigation in Cianjur. With the presence of this team, losses can be reduced, and the recovery of the affected areas can be expedited after a disaster. This article can serve as a reference for relevant parties in enhancing preparedness for facing natural disasters in other regions.
ANALISIS INSPEKSI LEVEL 2 TERHADAP KELAYAKAN OPERASI LIGHTNING ARRESTER DI GI CIANJUR DM, Dwigian Netha Putra; Yudono, Muchtar Ali Setyo; Tambunan, Handrea Bernando
Jurnal Informatika dan Teknik Elektro Terapan Vol 12, No 3S1 (2024)
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jitet.v12i3S1.5223

Abstract

Indonesia memiliki kepadatan sambaran petir yang tinggi, sehingga petir menjadi salah satu penyebab gangguan pada sistem ketenagalistrikan. Salah satu upaya untuk menjaga keandalan sistem transmisi dari petir adalah dengan menggunakan Lightning Arrester (LA) di gardu induk. Penting untuk mengetahui dan mendeteksi sejak dini penurunan kinerja LA dikarenakan peralatan sistem ketenagalistrikan yang beroperasi tanpa henti. Hal ini dapat dilakukan dengan menganalisis hasil uji thermovisi dan leakage current measurement (LCM) yang termasuk dalam inspeksi level 2 (online maintenance). Penelitian ini bertujuan untuk menganalisis hubungan antara thermovisi dan LCM terhadap kelayakan operasi LA sebagai pengaman terhadap petir dengan objek penelitian yaitu LA pada Bay Sukaluyu 1 & 2 di Gardu Induk Cianjur. Dari hasil analisa didapatkan bahwa berdasarkan thermovisi dan LCM LA Bay Sukaluyu 1 phasa R dan T, serta LA Bay Sukaluyu 2 phasa R, S, dan T masuk kategori layak operasi dikarenakan tidak ditemukan adanya perbedaan warna mencolok pada thermovisi dan persentase kondisi LA masih dibawah 90%, sedangkan untuk LA Bay Sukaluyu 2 phasa S masuk dalam kategori tidak layak operasi dikarenakan ditemukan adanya perbedaan warna mencolok pada thermovisi dan persentase kondisi LA melebihi 90%.
ANALISIS KEGAGALAN KERJA RELAY AUTO RECLOSE PMT 7AB3 DI GISTET SAGULING Ramadhani Pratama, Mochammad Firdian; Yudono, Muchtar Ali Setyo; Tambunan, Handrea Bernando
Jurnal Informatika dan Teknik Elektro Terapan Vol 12, No 3S1 (2024)
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jitet.v12i3S1.5224

Abstract

Sistem tenaga listrik meliputi pembangkit, transmisi (gardu induk dan saluran transmisi), serta distribusi. Gardu induk yang terhubung melalui saluran udara sering mengalami gangguan permanen atau temporer. Pada bay penghantar Bandung Selatan 2 di GISTET Saguling, terjadi gangguan temporer yang menyebabkan Pemutus Tenaga (PMT) 7A3 berhasil diaktifkan kembali oleh relay auto recloser, sedangkan PMT 7AB3 gagal beroperasi. Penelitian ini bertujuan untuk menginvestigasi gangguan pada bay penghantar Bandung Selatan 2 dan menganalisis kegagalan relay auto reclose PMT 7AB3. Analisis mencakup verifikasi kesesuaian antara pengaturan standar dan data setting pada relay serta pemeriksaan Programmable Scheme Logic (PSL). Troubleshooting dilakukan dengan memodifikasi program PSL, yaitu memutuskan hubungan masukan L5 AR BLK 7AB dari keluaran Block CB2 AR, sehingga fungsi AR Block tidak aktif. Langkah ini bertujuan untuk memastikan relay auto reclose dapat memberikan perintah agar PMT 7AB3 dapat diaktifkan kembali. Hasil analisis dan troubleshooting ini diharapkan dapat memperbaiki kinerja sistem proteksi dan memastikan kelancaran penyaluran energi listrik di masa mendatang.