Usulan Perancangan Alokasi Penyimpanan Komponen Instalasi Listrik Menggunakan Kebijakan Class Based Storage Untuk Mengurangi Waktu Delay Pada Aktivitas Gudang Pt Xyz Febianto Saputro; Luciana Andrawina; Budi Santosa
eProceedings of Engineering Vol 3, No 3 (2016): Desember, 2016
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT XYZ merupakan salah satu perusahaan dibawah Badan Usaha Milik Negara (BUMN) yang berfokus pada bidang penyedia tenaga listrik. Untuk dapat melakukan pemasangan tenaga listrik, perusahaan ini membutuhkan komponen-komponen yang dikirim dari vendor lalu di simpan di gudang. Terjadinya delay pada aktivitas gudang PT XYZ terjadi karena adanya proses non value added mencari lokasi komponen pada rak. Selain itu, penempatan komponen secara random membuat operator susah untuk mencari komponen dan penyimpanan menjadi tidak teratur. Langkah pertama yang dilakukan untuk mengurangi delay adalah memetakan aliran proses dan informasi dengan Value Stream Mapping (VSM) dan Process Activity Mapping (PAM). Setelah dilakukan pemetaan maka akan didapatkan waktu baku dan aliran proses yang terjadi pada gudang PT XYZ. Berdasarkan hasil PAM, didapatkan waktu non value added yang terjadi pada aktivitas mencari lokasi komponen yang cukup besar. Untuk itu akan dilakukan perancangan usulan perbaikan agar waktu delay pada aktivitas gudang XYZ dapat berkurang. Perbaikan yang dilakukan dengan melakukan klasifikasi berdasarkan FSN Analisis, Slotting, dan zonafikasi produk pada setiap komponen. Usulan perbaikan rancangan alokasi penyimpanan yang dipetakan menggunakan Value Stream Mapping (future state) menghasilkan pengurangan pada waktu delay sebesar 19% dan peningkatan pada aktivitas value added sebessar 18% dari total waktu aktivitas gudang yaitu 1241.52 detik. Kata kunci : Warehouse, Slotting, FSN Analysis, Zonafikasi, Class Based Storage
Usulan Kebijakan Persediaan Spare Part Menggunakan Metode Continuous Review (s,q) Dengan Mempertimbangkan Ketidakpastian Leadtime Untuk Meningkatkan Fill Rate Dan Meminimasi Biaya Persediaan Pada Pt.xyz Farih Jamil Rajabi; Luciana Andrawina; Budi Santosa
eProceedings of Engineering Vol 5, No 3 (2018): Desember 2018
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak : PT.XYZ merupakan salah satu perusahaan yang bergerak pada bidang perawatan (maintenance), perbaikan (repair) dan pembongkaran secara keseluruhan (overhaul) engine pesawat dan mesin-mesin industri di Indonesia yang berlokasi di kota Bandung. Dalam melakukan proses perbaikan engine TPE selama tahun 2017, PT.XYZ selalu mengalami keterlambatan proses penyelesaian perbaikan engine dikarena ketidaktersediaan spare part pada stockroom. Salah satu penyebabnya akibat ketidakpastian lead time pemesanan spare part dari vendor. Diperlukan usulan kebijakan persediaan spare part engine TPE bagian turbine dalam menentukan jumlah pemesanan optimum sehingga permasalahan stockout akibat ketidakpastian lead time bisa diminimalisir, sehingga dapat meningkatkan fill rate dan meminimasi total biaya persediaan. Pada penelitian ini usulan kebijakan persediaan spare part engine TPE bagian turbine menggunakan menggunakan metode continuous review (s,Q) dengan distribusi poisson dan laplace dalam memodelkan lead time demand untuk menentukan nilai reorder point dan ukuran lot pemesanan optimum. Hasil perhitungan kebijakan persediaan usulan dengan metode continuous review (s,Q) dengan distribusi poisson dan laplace dalam memodelkan lead time demand mampu meminimasi biaya persediaan sebesar 60% dan meningkatkan fill rate sebesar 30%. Kata Kunci : Kebijakan Persediaan; spare parts; MRO – maintenance, repair and overhaul; Continuous review (s,Q), fill rate. Abstrack- PT. XYZ is one of the companies engaged in maintenance, repair and overall overhaul of aircraft engines and industrial machinery in Indonesia located in the city of Bandung. During 2017, PT. XYZ always experienced delays in the completion of the TPE engine repair due to unavailability of spare parts in the stockroom. One of the causes is the uncertainty of lead time for ordering spare parts from vendors. Therefore, it is necessary to propose a policy to supply TPE engine spare parts, especially the turbine to determine the optimum order quantity. Thus the stockout problem due to uncertainty in lead times can be minimized so that it can increase the fill rate and minimize total inventory costs. This study proposed a turbine part, part of TPE engine spare part, inventory policy using the continuous review (s, Q) method with poisson and laplace distribution in modeling demand lead time to determine the reorder point value and optimum size lot ordering. The calculation results of the proposed inventory policy with the continuous review (s, Q) method with poisson and laplace distribution in modeling demand lead time can minimize inventory costs by 60% and increase the fill rate by 30%. Keywords : Inventory policy; spare parts; MRO – maintenance, repair and overhaul; Continuous review (s,Q), fill rate.
Usulan Kebijakan Pengendalian Persediaan Bahan Kimia Menggunakan Distribution Free Continous Review (q,r) Untuk Meminimasi Biaya Persediaan Pada Unit Pengolahan Air Pendingin Agung Wicaksono; Luciana Andrawina; Budi Santosa
eProceedings of Engineering Vol 6, No 1 (2019): April 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Unit Pengolahan Air Pendingin di PT. Pupuk Kujang Cikampek (selanjutnya disebut PKC) berfungsi menjaga kualitas airnya dengan menggunakan bahan kimia. Unit Pengolahan Air Pendingin belum menggunakan perhitungan baku. Kebijakan persediaan diambil dengan cara perkiraan semata. Keadaan ini mengakibatkan terhadinya overstock yang menyebabkan permasalahan bengkaknya total biaya persediaan. Peneliti diharapkan dapat memberikan usulan metoda kebijakan pengendalian persediaan yang tepat untuk meminimasi total biaya persediaan. Berdasarkan perhitungan menggunakan metoda Distribution Free Continuous Review (Q,r) With Service Level Constraint didapatkan total biaya persediaan sebesar Rp 207.944.636, sedangkan nilai aktual sebesar Rp 413.437.333. Berdasarkan analisis sensitivitas diketahui bahwa perubahan parameter pada biaya simpan memberi pengaruh lebih signifikan pada total biaya persediaan dibandingkan perubahan parameter biaya pesan. Berdasarkan pengolahan dan analisis data dapat disimpulkan; bahwa model Distribution Free Continuous Review (Q,r) With Service Level Constraint dapat digunakan sebagai usulan kebijakan pengendalian persediaan karena dapat menurunkan total biaya persediaan sebesar Rp205.992.697 (49,82%). Peneliti menyarakankan agar secara kontinyu dilakukan pemeriksaan tingkat persediaan pada saat adanya pemakaian bahan kimia, dan apabila tingkat persediaan telah menyentuh reorder point (r) kebijakan usulan, maka perlu dilakukan replenishment dengan quantity (q) yang sesuai dengan kebijakan usulan menggunakan Distribution Free Continuous Review (Q,r) With Service Level Constraint. Kata kunci: continuous review, overstock, kebijakan persediaan, service level, analisis sensitivitas Abstract Cooling Water Treatment Unit at PT. Pupuk Kujang Cikampek (called as PKC) functions to maintain the quality of its water by using chemicals. The Cooling Water Treatment Unit has not used standard calculations. Inventory policy is taken only by estimation. This situation resulted in overstocks which caused problems with the swelling of the total cost of inventory. The researcher is expected to be able to propose the right method of inventory control policy to minimize the total inventory cost. Based on calculations using the Distribution Free Continuous Review (Q, r) method with Service Level Constraints, obtained total inventorty costs of Rp 207,944,636, while the actual value is Rp 413,437,333. Based on the sensitivity analysis, known that the changes in holding cost parameter is more significant than changes in the ordering cost parameter. Based on data processing and analysis it can be concluded; that the Distribution Free Continuous Review (Q, r) with Constraint Service Levels can be used as proposal policy due to its saving of total inventory costs as much as Rp205,992,697 (49.82%). The researcher suggests that to monitoring continuously the inventory level of chemicals when using chemical, and everytime the inventory level is touching the reorder point (r) of proposal policy, it is necessary to replenish as much as quantity order (q) according to the proposal policy using Distribution Free Continuous Review (Q, r) method with Service Level Constraints. Keywords: continuous review, overstock, inventory policy, service level, sensitivity analysis
Penentuan Kebijakan Persediaan Menggunakan Metode Inventori Tak Tentu Berisiko Terkendali Dan Estimasi Kebutuhan Suku Cadang Menggunakan Rantai Markov Untuk Mengurangi Total Biaya Persediaan Hasna Nurhasanah; Ari Yanuar Ridwan; Budi Santosa
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT Trisula Textile Industries TBK merupakan sebuah perusahaan swasta yang bergerak di bidang industri tekstil khususnya untuk seragam dan fashion. Produk utama dari Trisula adalah kain atau fabric yang terbuat dari 100% polyester serta kombinasinya dengan rayon dan katun, yang telah dikenal di dalam dan luar negeri dengan merek Bellini dan Caterina. Melalui salah satu anak perusahaan dari Trisula yaitu PT MIDO Indonesia, kain-kain tersebut dirancang dan diproduksi menjadi seragam dan dikirimkan kepada pelanggan. Kegiatan produksi yang diterapkan oleh Trisula adalah berdasarkan pesanan atau make-to-order. Secara singkat proses produksi kain ini terbagi menjadi enam tahapan, yaitu texture, twisting, sizing, weaving, dyeing finishing, dan final inspection. Dari ke enam tahapan tersebut diketahui bahwa bagian produksi weaving memiliki waktu breakdown terlama. Setelah ditelusuri ternyata penyebabnya adalah suku cadang mesin Ishikawa 2001 yang seringkali tidak tersedia ketika sedang dibutuhkan. Untuk memfokuskan penelitian maka dilakukan critically analysis system agar peneliti dapat mengetahui subsistem kritis yang nantinya akan dilakukan perhitungan untuk kebijakan persediaan. Penelitian ini pun memperhitungkan perkiraan kemungkinan kebutuhan suku cadang kritis untuk satu tahun ke depan menggunakan rantai markov. Kebijakan persediaan akan dilakukan menggunakan metode inventori tak tentu berisiko terkendali. Pemilihan metode inventori tak tentu berisiko terkendali ini memberikan penghematan pada total biaya persediaan sebesar 64% jika dibandingkan dengan kondisi aktual. Kata Kunci: Persediaan, Critically Analysis System, Rantai Markov, Metode Inventori Tak Tentu Berisiko Terkendali Abstrack PT Trisula Textile Industries TBK is a private company engaged in the textile industry especially for uniforms and fashion. The main products of Trisula are fabrics made of 100% polyester and their combinations with rayon and cotton, which have been known at local and abroad with the brand Bellini and Caterina. Through one of the subsidiaries of Trisula, PT MIDO Indonesia, the facrics are designed and produced to be uniform to be sent to customers. The production activities applied by Trisula are order-based or make-to-order. Briefly the fabric production process is divided into six stages, namely texture, twisting, sizing, weaving, dyeing finishing, and final inspection. From the six stages, it is known that the weaving production section has the longest breakdown time. After being traced it turned out that the cause was Ishikawa 2001 spare parts which were often not available when needed. To focus the research, critically analysis system is carried out so that researcher can find out the critical subsystems which will later be calculated for inventory policy. This research also takes into estimating the possibility of critical spare parts needs for the next one year using the Markov chain. Inventory policy will be carried out using random inventory policy method. The selection of this method provides savings at total inventory costs for 64% when compared to actual conditions. Keywords: Inventory, Critically Analysis System, Markov Chain, Random Inventory Policy
Penentuan Kebijakan Persediaan Continuous Review (Q,S) Pada Sistem Distribusi Two-Echelon Untuk Minimasi Total Biaya Inventory Pada Pt. XYZ Nancy Putri Ramadhani; Ari Yanuar Ridwan; Budi Santosa
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT. XYZ merupakan perusahaan yang bergerak di bidang industri manufaktur yang terletak di Kota Surabaya, Jawa Timur. Perusahaan ini memproduksi bahan bangunan seperti coil sheet, atap spandek dan baja ringan untuk pembangunan suatu proyek. PT. XYZ berdiri pada tahun 2008, hingga saat ini telah memiliki 3 retailer yang terletak di Kota Bogor, Jawa Barat. Seiring bertambahnya konsumen PT. XYZ maka semakin besar pula permintaan yang harus dipenuhi oleh PT. XYZ. Akibat permintaan yang semakin besar maka bahan baku material mengalami stockout yang mengakibatkan service level perusahaan berada di bawah standar service level yang ada. Penelitian ini melibatkan 3 sku yang memiliki permintaan berdistribusi normal. Kebijakan persediaan yang diterapkan pada penelitian ini adalah continuous review (r,Q) dengan tujuan meminimalisir total biaya persediaan dan meningkatkan service level perusahaan. Hasil dari penilitian ini didapatkan terjadi penurunan total biaya persediaan sebesar 27,1% dengan nilai biaya persediaan existing rata-rata sebesar Rp38.968.278,- menjadi Rp28.400.720,-. Selain itu, service level pada PT. XYZ mengalami kenaikan dengan nilai pada kondisi existing rata-rata sebesar 82,14% menjadi 95,42%. Kata Kunci: Finished Goods, Continuous Review, Probabilistik, Service Level, Stockout Abstract PT. XYZ is a company engaged in the manufacturing industry located in the city of Surabaya, East Java. The company produces building materials such as coil sheet, spandek roof and mild steel for the construction of a project. PT. XYZ was founded in 2008, until now it has 3 retailers located in the city of Bogor, West Java. The demand of PT XYZ that must be fulfilled is increasing as the amount of consumer is increasing too. Due to the high demand, so the finished goods stockout occurs. This make the company's service level is below the standard. This study involved 3 sku of finished goods that have normal distributed demand. Inventory policy applied in this research is continuous review (r,Q) with the aim to minimize total cost of inventory and improve service level of company. The result of thisresearch wasfound to decrease total inventory cost by 27,1% with the average value of existing inventory cost Rp38.968.278,- to Rp28.400.720,-. In addition, service level at PT. XYZ has increased with the average value of existing conditions 82,14% to 95,42%. Keywords: Finished Goods, Continuous Review, Probabilistic, Service Level, Stockout
Container Loading Allocation To Improve Space And Loading Utilization Of Fleet Compartment Capacity By Using Genetic Algorithm Wirandy Fajar Saputra; Dida Diah Damayanti; Budi Santosa
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract PT. XYZ is the current leading automotive company, the supplier that is part of its subsidiary company provides services in form of supply and distribution of raw material. Based on data collected from January till March, the problem appears is the compartment fleet utilization that is far from the maximum capacity. According to the plan production control department, the desired average loading utilization is 16 ton per delivery, while the average loading utilization is 42% or 6,8 ton per delivery. In addition, there are also some deliveries exceeding maximum capacity allowed. Therefore in this research, the most suitable loading pattern is needed to improve utilization of fleet compartment with heterogeneous fleet and heterogeneous material dimension. Loading pattern is also needed as supporting tools for the department by considering weight limit, physical dimension of material and compartment fleet dimension, so that overloaded and unburdened deliveries can be avoided. The research is conducted in plan production control department to gain more information about the fleet, production demand, and raw material properties. Genetic algorithm is used as method for solving the problem and visualize the loading pattern by using Matlab. The calculation is conducted toward loading and space utilization of compartment fleet. From the research, the utilization of space can be optimized to 6% and loading utilization can be optimized up to 50%. Keywords – Container Loading Problem (CLP), Genetic Algorithm, Matlab
Perencanaan Kebijakan Persediaan Spare Part Mesin Fanuc Dengan Menggunakan Metode Expected Backorder (ebo) Untuk Meningkatkan Service Level Nur Aini Ajeng Juliawati; Ari Yanuar Ridwan; Budi Santosa
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Spare part merupakan salah satu komponen penting yang di butuhkan mesin saat mengalami kerusakan maupun saat dilakukannya perawatan, maka dari itu ketersediaan spare part harus tetap di jaga. Namun saat ini manajemen persediaan untuk spare part mesin fanuc di PT XYZ dapat di katakan belum baik karena masih terjadinya fenomena stockout pada tahun 2017. PT XYZ merupakan salah satu perusahaan otomotif yang bergerak dibidang manufaktur, perakitan dan distribusi sepeda motor. Fenomena stock out yang terjadi tersebut dapat menyebabkan perusahaan akan mengalami kerugian karena waktu down time mesin yang semakin besar yang menyebakan tidak terpenuhinya target produksi dari mesin fanuc. Tujuan yang ingin dicapai dalam penelitian ini yaitu meningkatkan service level dengan melakukan perancangan kebijakan safety stock, reorder point dan expected backorder yang optimal untuk spare part mesin fanuc di PT XYZ dengan menggunakan metode Expected Backorder (EBO). Hasil dari penerapan metode Expected Backorder (EBO) pada persediaan spare part mesin fanuc, memberikan peningkatan service level yang awalnya sebesar 78% menjadi 91% walaupun total biaya persediaan yang mengalami kenaikan hingga 63% dari total biaya persediaan aktual yang awalnya sebesar Rp93,464,799.60 menjadi Rp152,500,513.60. Hal ini terjadi dikarenakan adanya penurunan stock out atau penghematan biaya kekurangan dan adanya peningkayan biaya pesan dan biaya simpan. Kata kunci : Spare part, Stock out, service level Abstract Spare part is one of the important components that the engine needs when it is damaged or when doing maintenance, therefore the availability of spare parts must be maintained. However, at present the inventory management for spare parts of fanuc engines at PT XYZ can be said to be not good because of the occurrence of the stockout phenomenon in 2017. PT XYZ is an automotive company engaged in manufacturing, assembling and distributing motorcycles. The phenomenon of stock out that occurs can cause companies to experience losses due to the greater machine down time which causes the production target of the fanuc machine to not be met. The aim of this research is to improve service level by designing optimal safety stock, reorder point and expected backorder policies for fanuc machine spare parts at PT XYZ using the Expected Backorder (EBO) method. The results of the application of the Expected Backorder (EBO) method on the supply of spare parts for fanuc machines, gave an increase in service level that was initially at 78% to 91% even though the total inventory cost increased up to 63% from the total actual inventory cost which initially amounted to Rp93,464,799.60 to Rp.152,500,513.60. This happens because of a decrease in stock out or shortage cost savings and an increase in message costs and storage costs. Keywords: Spare Parts, Stock out, service level
Estimasi Kebutuhan Persediaan Suku Cadang Dan Operating Environment Dengan Menggunakan Metode Reliability Centered Spares (rcs) Pada Mesin Injeksi Plastik Di Cv Xyz Azylia Putri Denia; Judi Alhilman; Budi Santosa
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak CV XYZ merupakan salah satu perusahaan yang memproduksi spare part yang merupakan bagian dari shockbreaker yaitu spring guide. Mesin yang memiliki peranan penting di CV XYZ yaitu mesin injeksi plastik. Fungsi mesin injeksi plastik tersebut yaitu mengolah biji polypropylene yang kemudian akan diolah menjadi produk spring guide. Untuk menjaga mesin injeksi plastik agar dapat berfungsi secara normal, maka perlu dilakukan pemeliharaan (maintenance), jika tidak dilakukan pemeliharaan maka akan terjadi berbagai kerusakan. Kerusakan yang terjadi dapat diakibatkan oleh beberapa penyebab eksternal yaitu Maintenance Crew and Skill, Operator Skill, Environment Factors and Dust, System Temperature, dan Machine Oil Quality. Metode Reliability Centered Spares (RCS) digunakan untuk menentukan jumlah persediaan suku cadang yang harus disediakan oleh perusahaan agar tidak terjadi out of stock. Berdasarkan hasil perhitungan jika dengan memperhitungkan kovariat lingkungan, persediaan komponen yang dibutuhkan selama satu tahun yaitu selang 8 komponen, barrel 7 komponen, dan motor 6 komponen. Sedangkan jika tanpa memperhitungkan kovariat lingkungan, persediaan komponen yang dibutuhkan selama satu tahun yaitu selang 5 komponen, barrel 5 komponen, dan motor 4 komponen. Kata kunci: Maintenance, Mesin Injeksi Plastik, Reliability Centered Spares Abstract CV XYZ is one of a companies that produces spare part which part of shockbreaker. It is named spring guide. Machine that has important role in CV XYZ is a plastic machine injection. It’s function is to processed polypropylene seeds then it will be processed into spring guide product. To keep the plastic injection machine functioning normally, maintenance needs to be done. Damage that occurs can be caused by several external causes. They are Maintenance Crew and Skill, Operator Skill, Environment Factors and Dust, System Temperature, and Machine Oil Quality. RCS method is used to determined the amount of spare parts inventory that must be provided by company in order out of stock will not happened. According to the results if calculate covariates, component inventory needed for a year they are hoses 8 component, barrels 7 component, and motors 6 component. Whereas if without taking environment covariates calculation, component inventory needed for a year they are hoses 5 component, barrels 5 component, and motors 4 component. Keywords: Maintenance, Plastic Injection Machine, Reliability Centered Spares
Usulan Kebijakan Persediaan Produk Cat Dengan Menggunakan Metode Continuous Review (S, S) Untuk Meminimasi Total Biaya Persediaan Di Pt Xyz Fatia Mulyahati Yunus; Dida Diah Damayanti; Budi Santosa
eProceedings of Engineering Vol 6, No 2 (2019): Agustus 2019
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak PT XYZ merupakan perusahaan yang berlokasi di Kendari, Sulawesi Tenggara. Perusahaan ini menjual bahan material bangunan yaitu cat. Perusahaan menjual berbagai jenis cat seperti cat tembok, cat genteng, cat kayu dan besi untuk memenuhi kebutuhan pelanggan. Perusahaan memiliki anggaran atau budget untuk masing-masing biaya operasional warehouse, transportasi dan inventory. Perusahaan mempunyai batas budget yang harus dikeluarkan untuk biaya persediaan pertahun yaitu Rp22.023.220,00. Dalam kenyatannya, pengeluaran biaya persediaan perusahaan masih belum dapat sesuai dengan target budgetnya. Penyebab tingginya biaya total persediaan pada PT XYZ disebabkan oleh overstock dan lost sales. Faktor-fakor penyebab terjadinya overstock dan lost sales adalah belum adanya perhitungan mengenai kebijakan persediaan. Berdasarkan permasalahan tersebut diperlukan kebijakan persediaan sehingga permasalahan tingginya biaya persediaan dapat diminimalisir. Penelitian ini menggunakan metode continuous review (s, S) untuk menentukan jumlah pemesanan optimal, maximum inventory level, reorder point, safety stock untuk meminimasi total biaya persediaan.. Hasil dari penelitian ini didapatkan kuantias optimal sebesar 60 unit, reorder point sebesar 46 unit, safety stock sebesar 17 unit, dan maximum inventory level sebesar 106 unit dan mampu meminimasi total biaya persediaan dari Rp234.032.558,47 menjadi Rp21.220.947,89 dengan penghematan sebesar 90,9%. Total biaya persediaan usulan dapat berkurang dibawah target budget biaya persediaan yang telah ditentukan oleh perusahaan yaitu Rp22.023.220,00. Kata Kunci: Kebijakan Persediaan, Overstock, Lost Sales, Continuous Review (s, S) Abstract PT XYZ is a company located in Kendari, Southeast Sulawesi. This company sells building materials, such as paint. The company sells various types of paints such as wall paint, tile paint, wood paint and iron to meet customer needs. The company has a budget or budget for each warehouse, transportation and inventory operating costs. The company has a budget limit that must be spent on annual inventory costs, which is Rp22.023.220,00. In reality, the company's inventory costs are still not in accordance with its target budget. The reason for the high total cost of inventory at PT XYZ is caused by overstock and lost sales. Factors causing overstock and lost sales are the absence of calculations regarding inventory policies. Based on these problems inventory policies are needed so that the problem of high inventory costs can be minimized. This study uses the continuous review method (s, S) to determine the optimal number of orders, maximum inventory level, reorder points, safety stock to minimize total inventory costs. The results of this study obtained an optimal quantias of 60 units, reorder points of 46 units, safety stock of 17 units, and a maximum inventory level of 106 units and is able to minimize the total inventory cost from Rp234,032,558,47 to Rp21.220.947,89 with savings of 90.9%. The total proposed inventory costs can be reduced below the target inventory cost budget set by the company, which is Rp22.023.220,00. Keywords: Inventory Policy, Overstock, Lost Sales, Continuous Review (s,S)
Perancangan Sistem Real Time Monitoring Stock Berbasis Teknologi Rfid (studi Kasus Di Pt Tmmin Plant Sunter 1) Dian Ayu Detasari; Ari Yanuar Ridwan; Budi Santosa
eProceedings of Engineering Vol 7, No 2 (2020): Agustus 2020
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Teknologi RFID memungkinkan rantai pasok dapat tersinkronisasi dengan memberikan visibilitas. Penerapan teknologi RFID dapat memberikan informasi persediaan secara real time karena teknologi RFID memungkinkan pelacakan persediaan secara real time. Penggunaan teknologi RFID dapat meningkatkan efisiensi dan efektivitas manajemen pergudangan. Perancangan sistem real time monitoring stock berbasis teknologi RFID ini merupakan langkah kedua yang dilakukan PT TMMIN Plant Sunter 1 untuk perancangan sistem manajemen pergudangan cerdas berbasis RFID (RFID-based intelligent warehouse management system) setelah mengimpelentasikan teknologi RFID pada proses receiving. Sistem real time monitoring stock di perusahaan ini belum diimplementasikan karena masih dalam proses pengerjaan sehingga penulis melakukan analisa terhadap sistem saat ini dengan sistem usulan didukung oleh simulasi untuk mendapatkan waktu setelah sistem RFID dan membandingkannya dengan sistem eksisting yang menunjukkan bahwa dengan adanya sistem real time monitoring stock berbasis teknologi RFID dapat meningkatkan efisiensi proses kerja inventory control sebanyak 69%. Kata Kunci: RFID, Real Time Monitoring Stock, RFID-based Warehouse Management System, Aplikasi Sistem Pengendalian Persediaan Abstract RFID technology enables supply chains to be synchronized by providing visibility. The application of RFID technology can provide inventory information in real time because RFID technology enables inventory tracking in real time. The use of RFID technology can increase the efficiency and effectiveness of warehousing management. The design of RFID technology-based real time monitoring system is the second step taken by PT TMMIN Plant Sunter 1 for their design of RFID-based intelligent warehousing management systems (RFID-based intelligent warehouse management system) after implementing RFID technology in the receiving process. The system of real time stock monitoring in this company has not been implemented yet because it is still in the process of being worked on so that the authors analyzes the current system with the proposed system supported by simulations to get the time after the RFID system and compares it with the existing system which shows that with the real time stock monitoring system. based on RFID technology, it can increase the efficiency of inventory control work processes by as much as 69%. ISSN : 2355-9365 e-Proceeding of Engineering : Vol.7, No.2 Agustus 2020 | Page 6165Keywords: RFID, Real Time Stock Monitoring, RFID-based Warehouse Management System, Inventory Control System Application
Co-Authors Anggun Kharisma Putri Anissa Wulandari Annisa Salma Hanifah Ari Ridwan Ari Yanuar Ari Yanuar Ridwa Ari Yanuar Ridwan Astari Fitria Puspita Dewi Azylia Putri Denia Bagja Satiaraharja Bartolomeus Laudy Galih Arto Budiarto, Sulistyo Decky Ridho Sahertian Delva Gestio Destaria Madya Verawaty Destaria Madya Verawaty Dhiya Afwan Taufiq Dian Audina Jaufanti Dian Ayu Detasari Dida Damayanti Dida Diah Damayanti Dinda Sekar Putri Dinnurillah Febryanti Djoko Wahjuadi Dwiska Aini Nurrahma Elfrida Ratnawati Eriko Mahtamtama Fadiah Shabrina Winarno Farhan Ilhamul Latief Farih Jamil Rajabi Fatia Mulyahati Yunus Febianto Saputro Fitra Hananto Ghiyats Nur Syafiq Abdul Qadir Gita Purnama Sari Gita Purnama Sari Hafizh Rochmana Putra Hardian Kokoh Pambudi Harly Mifta Nurfala Hasna Nurhasanah Ifrah Fuady Iphov Kumala Sriwana Irfandi Juliansyah Jerrystama Abipradja Judi Alhilman Kadek Bella Rusiana Dewi Lia Avita Sari Luciana Andrawina M Rifky Vidiarta M. Taufiq Herdikatama Maya Putri Arumsari Maya Putri Arumsari Michael Panjaitan Mira Rahayu Muhammad Hilman Kusnawan Muhammad Riski Muhammad Wibisono Mutia Permatasari Nadya Nadya Nancy Putri Ramadhani Ni Kadek Cahya Wahyuni Nida F Maulanisa Nuansa Shella Tadestarika Nur Aini Ajeng Juliawati Nurul Hidayati Ony Azwida Sari Ovita Gustiana Paramaditya Arismawati Prafajar Suksessanno Muttaqin Priska Hesmono Punto Aji Wardhana Rachmadita Andreswari Raen Oktaviani Br.sembiring Rahmatya Dwi Arini Rahadina Ratna Wulan Sari Rifa Rizka Anisah Rio Aurachman Rudi Theo Satrio Shylvia Deviani Sofi Fauziah Tony Iqbal Rahmadika Ulfa Eka Khapso Valdy Septyano Vania Utami Variesta Putra Wibisana Vinia Delia Vito Pradana Pujadenta Wawan Tripiawan Wirandy Fajar Saputra Yuli Adam Prasetyo Yurinda Amalia