cover
Contact Name
Hariyadi
Contact Email
Hariyadi
Phone
-
Journal Mail Official
hariefamily@yahoo.co.id
Editorial Address
-
Location
Kota padang,
Sumatera barat
INDONESIA
Rang Teknik Journal
ISSN : 25992081     EISSN : 25992090     DOI : -
RANG TEKNIK JOURNAL, merupakan Jurnal Penelitian dan Kajian Ilmiah yang diterbitkan Fakultas Teknik Universitas Muhammadiyah Sumatera Barat yang terbit 2 (dua) kali dalam setahun.
Arjuna Subject : -
Articles 519 Documents
ANALISA PERBANDINGAN ANGGARAN BIAYA METODE SNI DAN BOW PADA PROYEK PEMBANGUNAN KANTOR OPERASI CEMENT MILL TUBAN 3-4 PT. SEMEN INDONESIA (PERSERO) TBK Nur Alfin; Sugiyanto Sugiyanto
Rang Teknik Journal Vol 5, No 2 (2022): Vol. 5 No. 2 Juni 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (553.295 KB) | DOI: 10.31869/rtj.v5i2.3120

Abstract

Pada saat ini, kontraktor umumnya membuat harga penawaran berdasarkan  analisa yang tidak seluruhnya berpedoman pada analisa BOW maupun analisa SNI. Para kontraktor lebih cenderung menghitung harga satuan pekerjaan berdasarkan dengan analisa mereka sendiri-sendiri yang didasarkan atas pengalaman-pengalaman terdahulu dalam menyelesaikan suatu pekerjaan konstruksi, walaupun tidak terlepas dari analisa BOW ataupun analisa SNI. Pelaksanaan sebuah proyek konstruksi sangat berkaitan dengan proses manajemen didalamnya. Pada tahapan itu, pengelolaan anggaran biaya untuk melaksanakan pekerjaan tersebut, perlu dirancang dan disusun sedimikian rupa berdasarkan  sebuah konsep estimasi yang terstruktur sehingga menghasilkan nilai estimasi rancangan yang tepat dalam arti ekonomis. Hasil dari penelitian ini menunjukkan bahwa perhitungan biaya pembangunan kantor operasi cement mill Tuban 3-4 PT. Semen Indonesia (Persero) Tbk. dengan biaya estimasi menggunakan metode BOW menghasilkan biaya sebesar Rp. 2.048.598.410, sedangkan hasil estimasi biaya menggunakan metode  SNI menghasilkan sebesar Rp. 1.878.500.266. Dari hasil perhitungan estimasi menggunaakan dua metode tersebut, perbandingan estimasi anggaran biaya antara metode BOW dan SNI diperoleh metode BOW lebih mahal 8,3% dari metode SNI atau senilai Rp. 170.098.144. Pada penelitian ini berdasarkan hasil evaluasi hasil perhitungan rencana anggaran proyek pembangunan kantor operasi cement mill Tuban 3-4 PT. Semen Indonesia (Persero) Tbk. dengan kedua metode, hasil estimasi biaya dengan metode SNI merupakan yang paling ekonomis, dikarenakan indeks koefisien  harga satuan upah dan bahan merupakan yang paling kecil dibanding metode BOW. Dengan analisa SNI, analisa ini memiliki kelebihan diantaranya dapat digunakan pada semua jenis pekerjaan konstruksi yang menggunakan peralatan modern/alat berat. Kata Kunci: Estimasi biaya, metode BOW, metode SNI, dan harga satuan biaya 
ANALISIS LOKASI EMBUNG BERDASARKAN KRITERIA SPI BERBASIS SISTEM INFORMASI GEOGRAFIS (STUDI KASUS WILAYAH KERJA BALAI PSDA SERANG LUSI JUANA) Anggi Puspita Dewi; Sri Sangkawati; Sutarto Edhisono
Rang Teknik Journal Vol 5, No 2 (2022): Vol. 5 No. 2 Juni 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (595.542 KB) | DOI: 10.31869/rtj.v5i2.3212

Abstract

Kekeringan yang terjadi di sejumlah kabupaten/kota di Jawa Tengah pada tahun 2015 mengganggu perannya sebagai penyangga pangan nasional. Pembangunan embung sebagai penanganan kekeringan jangka panjang pada pelaksanaannya terkendala masalah lahan, sehingga pelaksanaan konstruksi lebih diutamakan tanah negara. Perlu dianalisis apakah pembangunan embung di Wilayah Sungai Serang Lusi Juana telah sesuai dengan lokasi kekeringan. Analisis indeks kekeringan dilakukan dengan metode SPI pada 15 pos curah hujan dengan periode tahun 2002-2018. Pemetaan sebaran kekeringan dan lokasi rawan kekeringan dilakukan dengan teknologi Sistem Informasi Geografis menggunakan pendekatan interpolasi spasial. Penilaian kesesuaian embung baik eksisting maupun rencana embung terhadap lokasi rawan kekeringan dan kebutuhan air menunjukkan bahwa dari 26 total embung terdapat  satu lokasi embung yang masuk dalam prioritas-1, tiga lokasi embung masuk prioritas-2, empat belas embung masuk prioritas-3, lima lokasi embung masuk prioritas-4 dan tiga lokasi embung masuk prioritas-5. Program pembangunan embung perlu penyesuaian urutan penanganan, dengan mempertimbangkan kesesuaian terhadap lokasi rawan kekeringan dan kebutuhan air sebagai tambahan kriteria.
ANALISIS TINGKAT KEPUASAN PELAYANAN TERMINAL BANDARA APT PRANOTO SAMARINDA Pitoyo Pitoyo; Santi Yatnikasari; Sugiyono Sugiyono; Niswatun Arifah
Rang Teknik Journal Vol 5, No 2 (2022): Vol. 5 No. 2 Juni 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (371.671 KB) | DOI: 10.31869/rtj.v5i2.3044

Abstract

Bandara APT Pranoto merupakan Bandara yang dikelola oleh Kemenhub dan terletak di Kota Samarinda, Provinsi Kalimantan Timur. Aspek Pelayanan menjadi prioritas dalam penyelenggaraan jasa  penerbangan. Kualitas Pelayanan yang disediakan oleh pengelola penerbangan kepada penumpang pengguna jasa angkutan udara adalah hal yang sangat penting dalam menunjang keamanan, keselamatan dan kenyamanan penerbangan sehingga terciptanya suasana kegiatan jasa pelayanan yang prima. Untuk terciptanya pelayanan tersebut diperlukan fasilitas dan pelayanan yang memadai sesuai dengan kemampuan operasi bandara dalam menunjang penumpang.Berdasarkan Peraturan Menteri Perhubungan Nomor PM 178 Tahun 2015 tentang Standar Pelayanan Pengguna Jasa Bandar Udara, maka perlu diukur terkait tingkat kepuasan penumpang dan penilaian pelayanan penyelenggara jasa penerbangan. Pengumpulan data dilakukan dengan metode pengamatan terkait fasilitas dan juga survey kuesioner untuk menganalisis tingkat kepuasan penumpang dengan menggunakan Importance and Performance Analysis (IPA) serta mengevaluasi pergerakan penumpang dalam terminal.
PERBANDINGAN STUDI UJI KUAT TEKAN BATAKO MANUAL DENGAN BAHAN TAMBAHAN LIMBAH KERAK PENGOLAHAN MINYAK TANAH Umayya Ulfah; Liadira Kusuma Widya; Nunuk Candra Stiyanta
Rang Teknik Journal Vol 5, No 2 (2022): Vol. 5 No. 2 Juni 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (336.896 KB) | DOI: 10.31869/rtj.v5i2.3314

Abstract

Bahan bangunan batako semakin hari semakin mahal harganya maka perlu dilakukan satu langkah inovatif yang bisa menekan harga pembuatan bahan bangunan tersebut. Dengan pemanfaatan bahan bangunan yang lebih murah harganya, salah satunya yang dapat digunakan adalah kerak yaitu limbah dari pengolahan minyak tanah sebagai bahan tambahan pembuatan batako.Penelitian ini bertujuan untuk dapat mengetahui perbandingan uji kuat tekan batako manual dengan bahan tambah kerak limbah pengolahan minyak tanah. Penelitian ini dilakukan dengan metode eksperimental. Pada penelitian ini digunakan rancangan pebandingan campuran 1 pc : 6 ps (sebagai bahan kontrol), 1 Pc : 5,5 Ps : 0,5 Kr, 1 Pc : 5 Ps : 1 Kr, 1 Pc : 4,5 Ps : 1,5 Kr, 1 Pc : 4 Ps : 2 Kr dengan volume pasir lebih sedikit (kelompok eksperimen). Pemeriksaan benda uji terhadap kuat tekan dilakukan pada umur 7, 14, 21, dan 28 hari. Dimensi benda uji untuk pengujian kuat tekan 30 cm x 10 cm x 15 cm. Hasil kuat tekan yang terjadi pada masing-masing variasi masih memenuhi stndar yang ditetapkan oleh tabel mutu bata SNI-03-0348-1989, batako tipe konvensional atau batako tanpa penambahan kerak pada umur 7, 14, 21, dan 28 hari menunjukan nilai rata-rata 38,2 kg/cm2 – 47,5 kg/cm2, batako tipe konvensional ini termasuk pada tingkat mutu III. Batako tipe A dengan penambahan kerak 0,5 takaran mendapatkan hasil rata-rata 69,9 kg/cm2 - 89,2 kg/cm2, batako tipe C 64,5 kg/cm2 - 86,5 kg/cm2 , batako tipe D 60,8 kg/cm2 – 79,1 kg/cm2 , dengan rata-rata tersebut batako tipe A, tipe C,dan tipe D termasuk batako dengan tingkat mutu II. Sedangkan batako dengan tingkat mutu I terlihat pada batako tipe B dengan rata-rata 100,0 kg/cm2 -140,9 kg/cm2. Berdasarkan hasil penelitian dan pembahasan yang telah diuraikan sebelumnya, maka dapat diambil kesimpulan sebagai berikut. Kuat tekan batako dengan penambahan kerak lebih kuat dari pada batako konvensional. Batako dengan penambahan kerak lebih kuat dengan komposisi perbandingan 1 portland cement : 5 pasir : 1 kerak.
ANALISIS KONSUMSI BBM MOTOR DIESEL PADA UJI REM DENGAN DAYA 7.5 & 8 HP Muchlisinalahuddin Muchlisinalahuddin; Rudi Kurniawan Arief; Joko Pitoyo
Rang Teknik Journal Vol 5, No 2 (2022): Vol. 5 No. 2 Juni 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (805.376 KB) | DOI: 10.31869/rtj.v5i2.3313

Abstract

The choice of a diesel-fueled engine is often a problem among the public because there are often complaints that the old diesel-fueled motors are too wasteful with low house power, and it is often doubtful when buying a new engine with high house power, increasing fuel consumption. large, therefore we carry out testing to eliminate doubts in the community in order to get specifications that are in accordance with good power or power but efficient fuel consumption, therefore to get real and real evidence in the selection it is necessary to test 2 engine units with different house power, different types, and different production times, therefore a test of fuel consumption against time, load against time is carried out, using a 7.5 HP diesel engine with 8 HP provided that this 7.5 HP engine is an old engine and the 8 HP engine is a new engine, after By experimenting with fuel comparisons, it was found that the new engine with a larger house power capacity was in fact more efficient in fuel consumption than the old engine with a capacity of 7.5 HP with an average ratio of about 18.49%.
EVALUASI EFEKTIFITAS PENGEMBANGAN INFRASTRUKTUR JARINGAN LAN DAN INTERNET TERHADAP PROGRAM SEKOLAH PENGERAK DI SMAN 13 PADANG Syaflan Sandi Harta Putra; Ambiyar Ambiyar; Wakhinuddin Wakhinuddin; Nizwardi Jalius; Bulkia Rahim
Rang Teknik Journal Vol 5, No 2 (2022): Vol. 5 No. 2 Juni 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1180.176 KB) | DOI: 10.31869/rtj.v5i2.3064

Abstract

The Motivating School Program is an effort to realize the vision and mission of Indonesian Education in realizing an advanced Indonesia that is sovereign, independent, and has personality through the creation of Pancasila Lessons. The Motivating School Program focuses on developing holistic student learning outcomes that include competencies (literacy and numeracy) and character, starting with superior human resources (principals and teachers). To realize the Driving School Program, there are five driving school program interventions that must be carried out, 1) Consultative and asymmetric assistance, 2) Strengthening human resources in schools, 3) learning with a new paradigm, 4) Database planning, 5) Digitizing schools. School digitization is a priority aspect of the driving school program at SMAN 13 Padang. Needs analysis was carried out using field observations and interviews with the Principal and IT Admin. Observations and interviews are useful to get real problems in the field directly and accurately. The results of the analysis and evaluation of the development of LAN and Internet network infrastructure at SMAN 13 Padang provide an apology and a very positive impact in supporting the learning and teaching process with 93% traffic usage of internet facilities and 400 Mbps internet capacity usage in the school academic environment. This driving school program is very helpful in realizing the vision and mission of Indonesian Education. Keywords: Motivating School, Digital, Infrastrukture, Network, Internet
PENILAIAN MODEL ASSESMENT GREEN CONSTRUCTION PROYEK PEMBANGUNAN HOTEL SANTIKA PREMIERE PADANG Utami Dewi Arman; Rita Nasmirayanti; Afrilda Sari; Fera Oktafiani Putri
Rang Teknik Journal Vol 5, No 2 (2022): Vol. 5 No. 2 Juni 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (332.8 KB) | DOI: 10.31869/rtj.v5i2.3347

Abstract

Aktivitas proyek konstruksi dapat dianggap sebagai penyebab yang berkontribusi terjadinya kerusakan lingkungan. Konstruksi bagunan gedung hijau merupakan salah satu upaya dalam mengurangi kerusakan lingkungan yang ditimbulkan selama proses konstruksi. Penelitian ini bertujuan untuk mengidentifikasi capaian implementasi konsep bangunan gedung hijau pada Proyek Pembangunan Hotel Santika Premiere Padang. Penelitian ini merupakan penelitian kuantitatif. Data dikumpulkan melalui observasi lapangan dan survey kuisioner. Instrumen penilaian menggunakan Model Assessment Green Construction (MAGC) yang dikombinasikan dengan metode Analytical Hierarchy Process (AHP) untuk perhitungan bobot aspek dan faktor green construction. Berdasarkan hasil analisis dan pengolahan data, diperoleh Nilai Green Construction (NGC) sebesar 9,494 yang mendekati nilai NGC ideal sebesar 10,10 artinya dapat dikatakan bahwa pencapaian proyek pembangunan Hotel Santika Premiere Padang dalam menerapkan konsep green construction sebesar 94 % dalam proses konstruksinya yang artinya hampir mencapai ideal. Dengan maraknya pembangunan gedung di kota Padang, diharapkan kepada kontraktor-kontraktor lokal untuk dapat menerapkan konsep green construction selama tahap pelaksanaan kegiatan konstruksi serta mengupayakan capaian-capaian yang belum maksimal dalam penerapannya.
ANALISA KADAR LUMPUR AGREGAT HALUS DENGAN VOLUME ENDAPAN DI KOTA PAYAKUMBUH DAN KABUPATEN LIMAPULUH KOTA Fanny Yuliana Batubara; Synthia Ona Guserike Afner; Surya Eka Priana; Fatardho Zudri
Rang Teknik Journal Vol 5, No 2 (2022): Vol. 5 No. 2 Juni 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (171.792 KB) | DOI: 10.31869/rtj.v5i2.3218

Abstract

Daerah Payakumbuh dan Kabupaten Limapuluh Kota merupakan  daerah penghasil pasir sungai. Pasir sungai merupakan pasir yang bersumber dari penggaliaan atau penambangan, Sungai-sungai yang terjal memiliki aliran yang deras, sehingga deposit dari partikel batu-batuannya akan bervariasi cukup besar pada suatu jarak tertentu yang biasanya butir halusnya tidak banyak dan batu-batuannya cukup bersih. Penelitian ini dilaksanakan adalah untuk mengetahui banyaknya kadar lumpur pada agregat halus (pasir) yang ada di Payakumbuh dan Kabupaten Limapuluh Kota. Ada beberapa pengujian untuk yang dilakukan untuk mengetahui kualitas pasir. Salah satu pengujian yang dilakukan adalah dengan pengujian kadar lumpur dalam pasir dengan cara endapan lumpur. Dari data yang diperoleh dapat disimpulkan bahwa kondisi cuaca sangat mempengaruhi jumlah kadar lumpur pada pasir
GAME EDUKASI TAJWID BERBASIS ANDROID PADA MATA KULIAH PENDIDIKAN AGAMA DI STMIK INDONESIA PADANG Sotar Sotar; Arman Arman; Hardian Syahputra
Rang Teknik Journal Vol 5, No 2 (2022): Vol. 5 No. 2 Juni 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (712.192 KB) | DOI: 10.31869/rtj.v5i2.3308

Abstract

At STMIK Indonesia Padang, especially in the subject of Religious Education, the method of learning the recitation of recitation media which is still valid today is the process of learning directly or face to face by giving materials and examples of how to read recitation recitation correctly. But in the face-to-face process or directly there are still difficulties for students to understand the recitation of recitation as a result of the large number of students and not much time and meetings for discussions about recitation. With the development of technology, the Tajwid Science Game application program is required on mobile. The design method used in this study is the waterfall method. The system will be built using the Action Script 3.0 programming language. The results of this study are to design an Android-based Tajweed educational game that will have a positive impact on students and teachers, so that the definition of the rules of reading the Qur'an can be understood clearly and easily. With the mobile-based game application, it certainly will be a solution to be taken anywhere and is very interesting for students because they can play while learning.
ANALISIS FAKTOR YANG BERPENGARUH PADA PENERAPAN PENGENDALIAN WAKTU, BIAYA DAN MUTU PADA PROYEK PEMBANGUNAN GEDUNG DINAS KESEHATAN KOTA SEMARANG Hari Setijo Pudjihardjo; Bambang Tutuko; Agus Bambang Siswanto; Dicky Proklamanto Putra; Siti Zulifah
Rang Teknik Journal Vol 5, No 2 (2022): Vol. 5 No. 2 Juni 2022
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (328.318 KB) | DOI: 10.31869/rtj.v5i2.2938

Abstract

Proyek pembangunan saat ini sedang banyak dilakukan di seluruh tanah air Indonesia, jasa kontruksi saat ini banyak yang bersaing baik itu perusahaan BUMN maupun Swasta karena persaingan pasar bebas, untuk itu perlu dilakukan langkah-langkah untuk mengdadapi persaingan pasar bebas di bidang jasa kontruksi, salah satunya dengan meningkatkan kualitas kinerja manajemen, sehingga dapat menghasilkan suatu sistem bisnis perusahaan jasa kontruksi yang ideal. Pemerintah Kota Semarang sedang membangun Gedung Dinas Kesehatan Kota Semarang di kantor lama Jalan Pandanaran Kota Semarang. Gedung ini tidak hanya perkantoran, tapi juga lahan parkir bertingkat bagi kendaraan di sekitar Jalan Pandanaran. Gedung ini dibangunan setinggi 11 lantai yang meliputi basement untuk parkir, lantai 1 dan 2 untuk Puskesmas Pandanaran, lantai 3-5 untuk parkir, dan selanjutnya lantai 6-11 untuk gedung Dinas Kesehatan Kota Semarang. Pembangunan gedung setinggi 11 lantai itu akan dilaksanakan dengan sistem anggaran tahun jamak senilai Rp 70 miliar dari APBD Kota Semarang.