cover
Contact Name
Widodo Kushartomo
Contact Email
widodokushartomo@gmail.com
Phone
+628176869150
Journal Mail Official
jmts@untar.ac.id
Editorial Address
Jl. Letjen S. Parman No. 1, Jakarta 11440
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
JMTS: Jurnal Mitra Teknik Sipil
ISSN : -     EISSN : 2622545X     DOI : http://dx.doi.org/10.24912/jmts
Core Subject : Engineering,
JMTS: Jurnal Mitra Teknik Sipil dikelola oleh Program Studi Sarjana Teknik Sipil, Fakultas Teknik, Universitas Tarumanagara. JMTS: Jurnal Mitra Teknik Sipil merupakan media publikasi hasil penelitian dan studi ilmiah dalam bidang Teknik Sipil yang diterbitkan 4 kali dalam setahun, yaitu pada bulan Februari, Mei, Agustus, dan November. Jurnal ini terbit pertama kali pada 1 Agustus 2018.
Articles 861 Documents
KEPENTINGAN RELATIF FAKTOR-FAKTOR INTEGRASI MANAJEMEN KOMUNIKASI PADA PROYEK KONSTRUKSI DI BANDA ACEH Dinda Rizka Ibdayanti; Cut Zukhrina Oktavani; Saiful Husin
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i1.20781

Abstract

Ineffective communication can lead to work delays, quality discrepancies, and cost overruns. Thus, effective communication is needed to support the success of construction projects. Poor communication is one of the causes of project failure with a percentage of 56%. On the other hand, effective communication is considered to increase the suitability of the plan in project completion by up to 17%. Communication is a core competency that must be implemented properly in order to achieve the same strategy, goals, and actions. The purpose of this study was to determine the relative importance of communication management integration factors in construction projects based on the Relative Importance Index (RII) analysis. RII analysis will sort the importance of factors based on the highest to lowest RII values. Data was collected by distributing questionnaires to project managers from large and medium qualified contractors in Banda Aceh City. The results of data analysis obtained 3 important factors to integrate communication management in construction projects, i.e.: competence (0.938); management (0.922); and strategy (0.911). If viewed from the sub-factors, there was 5 important sub-factors to integrate communication management in construction projects, i.e.: skill (0.958); attitude (0.950); task clarity (0.942); stakeholder involvement (0.933); and knowledge (0.925). Abstrak Komunikasi yang tidak efektif dapat menyebabkan keterlambatan pekerjaan, ketidaksesuaian mutu, dan kelebihan biaya. Sehingga, diperlukan komunikasi yang efektif sebagai penunjang keberhasilan proyek konstruksi. Komunikasi yang buruk menjadi salah satu penyebab kegagalan proyek dengan persentase sebesar 56%. Sebaliknya, komunikasi yang efektif dinilai dapat meningkatkan kesesuaian rencana dalam penyelesaian proyek hingga 17%. Komunikasi menjadi kompetensi inti yang harus dilaksanakan dengan baik agar dapat mencapai strategi, tujuan, dan tindakan yang sama. Tujuan dari penelitian ini adalah mengetahui kepentingan relatif faktor -faktor integrasi manajemen komunikasi pada proyek konstruksi berdasarkan analisis Relative Importance Index (RII). Analisis RII akan mengurutkan kepentingan faktor berdasarkan nilai RII tertinggi sampai terendah. Pengumpulan data dilakukan dengan penyebaran kuesioner kepada manajer proyek dari kontraktor kualifikasi besar dan menengah di Kota Banda Aceh. Hasil analisis data diperoleh 3 faktor penting untuk mengintegrasikan manajemen komunikasi pada proyek konstruksi, yaitu: kompetensi (0,938); manajemen (0,922); dan strategi (0,911). Jika ditinjau dari subfaktor terdapat 5 subfaktor penting untuk mengintegrasikan manajemen komunikasi pada proyek konstruksi, yaitu: skill (0,958); attitude (0,950); kejelasan tugas (0,942); keterlibatan stakeholders (0,933); dan knowledge (0,925).
ANALISIS INDIKATOR PENILAIAN PRODUKTIVITAS TENAGA KERJA KONSTRUKSI GEDUNG DI KOTA BANDA ACEH Malia Urrahmi; Cut Zukhrina Oktavani; Mubarak
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i1.20803

Abstract

The implementation of construction projects is required to produce good quality with the planned time. Thus, high productivity is needed so that construction projects do not experience delays. One of the resources defined as input in productivity and very influential in the project is labor, which is one of the important factors in supporting the quality and success of a construction project. The purpose of this study to identify indicators that affect labor productivity in building construction projects. This research uses mixed methods (mixed methods). The data collection method used is the distribution of questionnaires. The data obtained were analyzed using the Relative Importance Index (RII) method. The results of the RII obtained 12 (twelve) main indicators of labor productivity in building construction projects in Banda Aceh City, namely, clear duties and authorities (0.975); effective communication in the field (0.950); availability of tools (0.942); stress (0.933); briefing before doing work (0.925); clear and concise instructions (0.917); material availability (0.917); rework (0.908); body temperature (0.908); work accidents (0.908); work-to-work relations (0.908); and experience (0.908). Meanwhile, the main variables on labor productivity in building construction projects in Banda Aceh City are communication (0.947); worker management (0.903); technical (0.893); physiology (0.890); and the application of K3 (0.886). Abstrak Pelaksanaan proyek konstruksi dituntut untuk menghasilkan kualitas yang baik dengan waktu yang telah direncanakan. Sehingga, diperlukan produktivitas yang tinggi agar proyek konstruksi tidak mengalami keterlambatan. Salah satu sumber daya yang diartikan sebagai input dalam produktivitas dan sangat berpengaruh besar dalam proyek adalah tenaga kerja, dimana menjadi salah satu faktor penting dalam menunjang kualitas dan keberhasilan suatu proyek konstruksi. Tujuan dari penelitian ini untuk mengidentifikasi indikator-indikator yang mempengaruhi produktivitas tenaga kerja proyek konstruksi gedung.  Penelitian ini menggunakan metode campuran (mixed methods). Metode pengumpulan data yang digunakan adalah penyebaran kuesioner. Data yang diperoleh dianalisis dengan metode Relative Importance Index (RII). Hasil RII didapatkan 12 (dua belas)  indikator utama terhadap produktivitas tenaga kerja pada proyek konstruksi gedung di Kota Banda Aceh yaitu, tugas dan wewenang yang jelas (0,975); komunikasi efektif di lapangan (0,950); ketersediaan alat (0,942); stress (0,933); pengarahan sebelum melakukan pekerjaan (0,925); instruksi padat dan jelas (0,917); ketersediaan material (0,917); adanya pekerjaan ulang (0,908); suhu tubuh (0,908); adanya kecelakaan kerja (0,908); hubungan antar kerja (0,908); dan pengalaman (0,908). Sedangkan untuk variabel utama terhadap produktivitas tenaga kerja pada proyek konstruksi gedung di Kota Banda Aceh yaitu komunikasi (0,947); manajemen pekerja (0,903); teknis (0,893); fisiologi (0,890); dan penerapan k3 (0,886).
ANALISIS PERINGKAT FAKTOR KEPUTUSAN VALUE ENGINEERING PADA BANGUNAN SISTEM PENYEDIAAN AIR MINUM (SPAM) Niko Nathanael; Basuki Anondho
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i1.21245

Abstract

Water Supply System (WTP) is a provider of drinking water that was developed to fulfill the water needs in Indonesia. Currently, many construction projects uses value engineering to save costs. However, the implementation of construction projects in Indonesia especially the Water Supply System still very limited. Evaluation is one of the phase in value engineering that works to choose one alternative from various alternatives resulting from the creative phase. In decision making, the choice is influenced by several factors. Therefore, it is necessary identify the factors related to decisions on WTP buildings through a literature study, and then the results found are to be shared with WTP workers. The data processing uses relative importance index (RII) method to rank the influence factors. The calculation result of relative importance index (RII) shows that availability of water sources is ranked first with a score of 0,9371 and the factor labor that is needed is ranked last with a score of 0,8. With the result as the basis, hopefully it can be used as a reference to help the decision makers on WTP construction project and in taking decisions on other factors in choosing alternatives on Water Supply System buildings.   Abstrak Sistem Penyediaan Air Minum (SPAM) merupakan penyedia air layak konsumsi yang diperuntukkan untuk memenuhi kebutuhan air minum di Indonesia. Saat ini, banyak proyek konstruksi menerapkan rekayasa nilai untuk penghematan biaya. Namun, implementasi pada proyek konstruksi di Indonesia khususnya Sistem Penyediaan Air Minum masih sangat terbatas. Evaluasi merupakan satu tahap rekayasa nilai yang bertujuan untuk memilih satu alternatif dari berbagai alternatif hasil tahap kreatif. Dalam pengambilan keputusan pemilihan alternatif dipengaruhi oleh beberapa faktor. Oleh sebab itu, perlu adanya identifikasi terkait faktor pengaruh keputusan pada bangunan Sistem Penyediaan Air Minum melalui studi literatur, lalu hasil identifikasi faktor disusun menjadi kuesioner dan disebarkan kepada para pekerja SPAM. Pengolahan data menggunakan metode indeks kepentingan relatif (RII) untuk mengurutkan peringkat faktor pengaruh. Hasil perhitungan RII menunjukkan bahwa faktor ketersediaan sumber air merupakan peringkat pertama dengan nilai RII sebesar 0,9371 dan faktor jumlah tenaga kerja yang dibutuhkan merupakan peringkat terakhir dengan nilai RII sebesar 0,8. Berdasarkan hasil tersebut diharapkan dapat menjadi referensi bagi pengambil keputusan pada proyek bangunan SPAM dan pengambil keputusan dapat memperhatikan faktor-faktor lain dalam pemilihan alternatif pada bangunan Sistem Penyediaan Air Minum.
SIFAT MEKANIK BETON TANPA AGREGAT KASAR Daniel Christianto; Tiara Amira Utami; Metta Yoana
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i1.21637

Abstract

One of the transitional materials in concrete mixes is Reactive Powder Concrete (RPC). There are several mechanical properties that can be used as a reference when judging the quality of concrete. The modulus of elasticity is the ratio of normal stress to associated strain for tensile or compressive stress below the proportional limit of the material. The modification factor (λ) value that reflects the reduction in mechanical properties of lightweight concrete compared to normal weight concrete of the same compressive strength. Until now, references to concrete for mechanical properties are still only intended for normal concrete. In this study tensile, splitting, and elasticity tests would be carried out on RPC without coarse aggregate which refers to the American Society for Testing and Materials (ASTM) standards to analyze the mechanical properties of the concrete with a Universal Testing Machine (UTM) and compressor meter tool which aims to determine the modulus of elasticity and the value of λ of the sample being tested. After testing on cylindrical specimens, the specific gravity ranges from 1884,3945 kg/m3 to 2040,9558 kg/m3, the modulus of elasticity values are 20064,2870 MPa and 34787,6751 MPa, and the λ values range from 1,1944 to 1,8665. Abstrak Salah satu bahan transisi dalam campuran beton adalah Reactive Powder Concrete (RPC). Adapun beberapa sifat mekanik yang dapat dijadikan acuan untuk menentukan kualitas atau mutu beton. Salah satunya adalah modulus elastisitas, yang merupakan rasio tegangan normal terhadap tegangan terkait pada tegangan tarik atau tegangan tekan di bawah batas proporsionalitas material. Faktor modifikasi (λ), yang merefleksikan properti mekanis tereduksi dari beton ringan, semuanya relatif terhadap beton normal dengan kuat tekan yang sama. Acuan ketentuan sifat mekanik beton hingga saat ini hanya ditujukan untuk beton normal. Oleh karena itu, dalam penelitian ini dilakukan pengujian tarik, tekan belah, dan elastisitas pada beton tanpa agregat kasar jenis RPC menurut standar American Society for Testing and Materials (ASTM) untuk menganalisa sifat mekanik dari beton tersebut dengan mesin Universal Testing Mechine (UTM) dan alat kompresor meter yang bertujuan untuk mengetahui modulus elastisitas dan nilai λ dari sampel yang diuji. Setelah dilakukan pengujian pada benda uji silinder, didapatkan berat jenis yang berkisar antara 1884,3945 kg/m3 hingga 2040,9558 kg/m3, nilai modulus elastisitas sebesar 20064,2870 MPa dan 34787,6751, nilai λ yang berkisar antara 1,1944 hingga 1,8665.
FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS EXCAVATORS PADA PEKERJAAN GALIAN DI SOLO DAN MANADO Farry Yusak Mokoagow; Basuki Anondho
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i1.21744

Abstract

Managing heavy equipment in an efficient manner is one of the keys to achieving profitability in a project. Therefore, the planning of equipment, especially those related to the involvement of heavy equipment, should be considered carefully. Excavators are the main heavy equipment for carrying out the digging process in excavation work and can be said to be productive when used continuously without being idle. To achieve good machine management, it is important to consider the productivity value of the equipment and the factors that affect the equipment. With appropriate methods, construction projects can minimize the cost and duration of the project. Therefore, it is necessary to conduct specific research on what factors affect the productivity of excavators in excavation work. The results of the calculation and ranking of factors show that the factor of swell, bucket fill factors, and field conditions are the most influencing factors in the productivity of excavators in excavation work with each RII value of 0.976; 0.96; and 0.952. Followed by other factors such as weather, tools and management. Abstrak Pengelolaan alat berat dengan cara yang efisien merupakan salah satu kunci mencapai profitbilitas dalam suatu proyek. Oleh karena itu perencanaan peralatan khususnya yang berkaitan dengan keterlibatan alat-alat berat sebaiknya diperhatikan secara teliti. Excavators merupakan alat berat pokok untuk mengerjakan proses menggali pada pekerjaan penggalian dan dapat dikatakan produktif apabila digunakan secara terus menerus tanpa menganggur, Untuk mencapai manajemen alat berat yang baik, penting untuk dipertimbangkan nilai produktivitas peralatan dan faktor-faktor yang mempengaruhi peralatan tersebut. Dengan metode yang sesuai, proyek konstruksi dapat meminimalkan biaya dan durasi proyek. Maka dari itu perlu dilakukan penelitian secara spesifik mengenai faktor-faktor apa saja yang mempengaruhi produktivitas excavators pada pekerjaan galian. Hasil perhitungan dan pengurutan faktor menunjukan bahwa faktor kedalaman sudut putar, koreksi alat gali, dan kondisi lapangan merupakan faktor paling mempengaruhi dalam produktivitas excavators pada pekerjaan galian dengan masing-masing nilai RII sebesar 0,976; 0,96; dan 0,952. Disusul dengan faktor lainnya seperti cuaca, alat dan manajemen.
ANALISIS PERUBAHAN LEBAR EMBOSS TERHADAP KEKUATAN GESER DI BADAN LIGHT LIP CHANNEL MENGGUNAKAN MIDAS FEA Davin Siva; Sunarjo Leman; Arif Sandjaya
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i1.21747

Abstract

Cold Formed Steel (CFS) is often found in the world of construction. Because it uses a thin body, the construction weight is lighter, easy to form, and so on. However, the thin thickness of mild steel makes it susceptible to buckling on the walls. Therefore, many companies want to increase their strength by innovating the shape and model of CFS. Thus, embossing is made which can increase the strength of CFS in holding loads. This research discusses the effect of embossing width on the shear strength in the CFS body using finite element method with the help of MIDAS FEA application. The profile used in this research is a canal profile with a size 75 mm x 35 mm x 5 mm x 0,95 mm with a length of 500 mm. The models that used are plain model, model with stiffener, and models with embossing width variation of 2 mm to 10 mm with a spacing of 25 mm between embosses. The placement used is joints with a concentrated load that is given perpendicularly. The results of the analysis are the greater the width of the emboss, the smaller the shear strength obtained. Abstrak Cold Formed Steel (CFS) sering kali ditemukan dalam dunia pembangunan konstruksi. Dikarenakan menggunakan badan tipis maka berat konstruksi lebih ringan, mudah dibentuk, dan lain-lain. Namun, ketebalan baja ringan yang tipis mengakibatkan rentan terhadap tekuk pada bagian dindingnya. Maka dari itu, banyak perusahaan yang ingin menambahkan kekuatannya dengan menginovasi bentuk dan model dari CFS. Sehingga, dibuatnya emboss yang dapat meningkatkan kekuatan baja ringan dalam menahan beban. Penelitian ini membahas tentang pengaruh lebar emboss terhadap kuat geser di badan baja ringan dengan menggunakan metode elemen hingga melalui bantuan aplikasi MIDAS FEA. Profil yang digunakan pada penilitian ini yaitu profil kanal dengan ukuran 75 mm x 35 mm x 5 mm x 0,95 mm dengan panjang 500 mm. Model yang digunakan yaitu model polos, model dengan stiffener, dan model dengan variasi lebar emboss sebesar 2 mm hingga 10 mm dengan jarak antar emboss sebesar 25 mm. Perletakan yang digunakan yaitu sendi-sendi dengan beban terpusat yang diberikan secara tegak lurus. Hasil analisis yang didapatkan yaitu semakin besar lebar emboss maka kekuatan geser yang didapatkan akan semakin kecil.
MERUBAH RANGKAIAN KEGIATAN PARALEL MENJADI BERURUTAN DENGAN METODE ALOKASI SUMBER DAYA YANG TERBATAS Jason Felix; Onnyxiforus Gondokusumo
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Project work requires scheduling as a reference in the process. Scheduling has work carried out in parallel to shorten project work time, but sometimes parallel work can experience a shortage of resources, so that it can affect the duration of the project. One way to deal with this problem is by using the Resources-Constraint Project Scheduling Problem and Generalized Precedence Relations methods with the concept of Resource Allocation. The resource allocation method helps in converting parallel work into sequences with minimum increase in project duration, and also with limited resources. The results obtained after using the method listed, the most optimal addition of time due to this method is 14 days and with this additional time there is an equal distribution of resources in the 3rd to 9th week of the raft work on the Tokyo RiverSide. The final duration of project completion went from 71 days to 84 days, with a more stable histogram of workers adding workers. ABSTRAK Pekerjaan proyek membutuhkan penjadwalan sebagai acuan dalam pengerjaannya. Penjadwalan memiliki pekerjaan yang dilakukan secara paralel untuk mempersingkat waktu pekerjaan proyek, namun terkadang pekerjaan paralel dapat mengalami kekurangan sumber daya, sehingga dapat berpengaruh kepada durasi proyek. Salah satu cara untuk menghadapi permasalahan ini dengan penggunaan metode Resources-Constraint Project Scheduling Problem dan Generalized Precedence Relations dengan konsep Alokasi Sumber Daya. Metode alokasi sumber daya membantu dalam mengubah pekerjaan paralel menjadi berurutan dengan penambahan durasi proyek secara minimum, dan juga dengan sumber daya yang terbatas. Hasil yang didapat setelah menggunakan metode yang tertera, penambahan waktu akibat metode tersebut yang paling optimal adalah sebanyak 14 hari dan dengan penambahan waktu tersebut terjadi pemerataan sumber daya pada minggu ke-3 hingga minggu ke-9 pada pekerjaan raft di Tokyo RiverSide. Durasi akhir dari penyelesaian proyeknya dari 71 hari menjadi 84 hari, dengan histogram pekerja yang lebih stabil penambahan pekerjanya.
Redaksi Vol. 6 No. 1, Februari 2023 Arif Sandjaya
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kata Pengantar Vol. 6 No. 1, Februari 2023 Arif Sandjaya
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Daftar Isi Vol. 6 No. 1, Februari 2023 Arif Sandjaya
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract