cover
Contact Name
Moh Debby Rizani
Contact Email
dbyrizani@gmail.com
Phone
+628122507299
Journal Mail Official
giratory.upgris@gmail.com
Editorial Address
Jl. Sidodadi Timur No.24, Karangtempel, Kec. Semarang Tim., Kota Semarang, Jawa Tengah 50232
Location
Kota semarang,
Jawa tengah
INDONESIA
Jurnal Teknik Sipil Giratory Upgris
ISSN : 26217864     EISSN : 27164969     DOI : https://doi.org/10.26877/goratory
Core Subject : Engineering,
Jurnal ini bertujuan untuk menyediakan platform bagi para ilmuwan dan akademisi di seluruh dunia untuk mempromosikan, berbagi, dan mendiskusikan berbagai masalah dan perkembangan baru di berbagai bidang teknik sipil
Articles 8 Documents
Search results for , issue "Vol 4, No 2: Desember 2023" : 8 Documents clear
PERENCANAAN ULANG STRUKTUR GEDUNG LIMA LANTAI ASRAMA HAJI SEMARANG Majid, Ricky Abdul; Zhafira, Talitha; Umar, Wahyu Khoirul; Purwanto, Purwanto
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18035

Abstract

Due to the increasing number of Hajj pilgrims, the need for accommodating them has also risen. Therefore, a redesign is necessary to enhance the capacity of accommodating the pilgrims. The Analysis and Structural Planning of the Hajj Dormitory Semarang using ETABS software in compliance with the Indonesian National Standard (SNI). The redesign of the Hajj dormitory aims to augment the housing capacity for prospective Hajj pilgrims. The Revised Structural Planning for the Five-Story Hajj Dormitory Building Semarang aims to analyze and redesign the structure of the dormitory. This involves utilizing concrete quality of 24.9 MPa for the upper structure and 30 MPa for the lower structure, with main reinforcement using 420 MPa, while secondary reinforcement uses 280 MPa. The structural analysis approach involves inputting geometric data, loads, and material characteristics, including desired concrete and steel qualities, into the ETABS software. The analysis adheres to the SNI guidelines governing building loads, seismic resilience, and other structural safety factors. The analysis results provide insight into the structural response spectrum, with a mass participation of UX 99.98% and UY 99.19%. Control Base Shear Vdynamic Vstatic, with Eq Dx Eq Sx and Eq Dy Eq Sy, is 8623.266 8563.3067 and 7928.0409 7722.4166. The maximum story displacement due to dynamic seismic motion in the X and Y directions is 14.33 mm and 15.95 mm. Meanwhile, the story drift with an Inelastic Drift value less than 61.5 mm for safety building permissible deviation. The largest permissible deviations obtained for the X and Y directions are 18.816 mm and 20.554 mm.
ANALISA KEBUTUHAN LAHAN PARKIR PASAR PURI PATI Rohman, Syamsul; Suwandi, Putri Anggi Permata; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18030

Abstract

Puri Market, which is located on Jalan Colonel Sunandar, precisely in the center of Pati Regency, is a traditional market which is the basis for the people of Pati to sell and buy all life-sustaining needs. This needs to be taken into account considering that the existence of an activity center must have as few parking areas as possible. Therefore, this study was carried out with the aim of providing recommendations for parking characteristics, parking space capacity and planning the most optimal parking layout for Puri Pati Market. Conditions are reviewed on 1 weekend and 3 weekdays. Namely Sunday, Monday, Wednesday and Thursday. From 06.00 to 12.00. The data used in this research are primary data and secondary data. The results of the research are that the characteristics of motorbike parking spaces for the Puri Pati Market area are 345 SRP which is in accordance with the 1996 Directorate General of Land Transportation standards. At Puri Pati Market There are also no entrances and exits that use electronic parking. With the existing motorbike parking space capacity of 280 SRP at Puri Pati Market, it can still meet existing parking needs. From the calculations that have been carried out, it is known that the need for motorbike parking space at Puri Pati Market is 345 SRP. In planning the parking layout using a 90º angle in the motorbike and car parking area as planned, namely being able to accommodate 280 motorbikes and 100 cars. With a comparison using an angle of 60º, we get only 152 motorbikes and 80 cars per plot.
ANALISIS STABILITAS TIMBUNAN DENGAN MEMBANDINGKAN BRANKAL DAN GEOTEKSTIL Adhi, Bagas Wahyu; Setiyanto, Beni; Kurniawan, Andri; Pristyawati, Tantin; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18032

Abstract

Construction activities in road infrastructure development are never separated from earthworks which often become obstacles due to differences in land contours due to excavation and embankment work which is closely related to geotechnical engineering. Embankment and excavation are very interesting things to study because they are closely related to slope safety factors and require special handling. In this research, we examine the use of geotextiles by comparing the handling using safes on embankment stability using PLAXIS Version 8.2 software. The results of embankment stability analysis with safes, settlement at 1 year consolidation was 5.6 cm and settlement at 10 years consolidation was 5.7 cm. in accordance with applicable criteria. The results of the analysis using 2 layers of geotextile showed that the settlement at 1 year consolidation was 4 cm and at 10 years consolidation was 4.1 cm, which is in accordance with the applicable criteria.. Meanwhile, the results of the slope safety factor using bract treatment at 1 year consolidation were 1.475 and the safety factor for 10 year consolidation was 1.478, not in accordance with the design criteria of 1.5. The results of the safety factor using 2-layer geotextile treatment at 1 year consolidation was 1.853 and the safety factor for 10 year consolidation was 1.855, which is in accordance with the design criteria of 1.5.
KERUGIAN BBM AKIBAT TUNDAAN DAN PANJANG ANTRIAN DI PERSIMPANGAN JALAN RAYA DENGAN REL KERETA API SEBIDANG (Studi Kasus Jalan Hasanudin Semarang) Ananda, Fina Kurnia; Yaqin, Wafi Ainul; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18027

Abstract

Due to the high mobility of those passing by and the presence of trains that cross the intersection between the highway and the railroad, also known as level crossings, Jalan Hasanudin experiences heavy traffic during rush hour. Additionally, because of the large volume of train traffic at the Poncol station and the proximity of this intersection to the station, there is frequently a buildup of vehicles at the level crossing on Jalan Hasanudin. As a result, researchers will determine how Jalan Hasanudin Semarang performed. After conducting research, it was discovered that the highest vehicle queue length occurred on Monday, February 27 2023 from Jalan Hasanudin - Imam Bonjol at closing time 16.45 with a queue length of 123 meters and the highest stop delay occurred on Saturday, March 4 2023 from the direction of Jalan Hasanudin - Imam Bonjol with an average stop delay duration of 372.00 seconds. Therefore, the occurrence of long lines led to fuel losses for the drivers; their total gasoline loss over the course of the three research days was IDR 886,550.7. The researchers offer recommendations based on the findings of the research analysis to control street vendors and people near railroad tracks and railroad crossings that result in side barriers and long lines during stop delays, install traffic signs like those that prohibit stopping, prohibit parking, and prohibit raising and lowering passengers on roads, and so that there is no congestion along Jalan Hasanudin and around railroad crossings.
ANALISIS LAYANAN FASILITAS TERMINAL PENGGARON SEMARANG TERHADAP KEPUASAN PENGGUNA DENGAN METODE IMPORTANCE PERFOMANCE ANALYSIS (IPA) Navis, Ahmad Akbar; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18033

Abstract

Penggaron Terminal is a type B terminal in the Pedurungan District area which serves departments such as Mangkang, Karang Ayu, Solo, Wonosobo, Kebumen, Cepu, Purwodadi, and cities or regencies within the province of Central Java. This research aims to determine the level of service at the Penggaron terminal using the importance performance analysis (IPA) method. This research was conducted at the Penggaron type-B terminal for two weeks, the first week the questionnaires were distributed to respondents on Mondays and Sundays in the morning at 07:00-10:00 WIB and in the afternoon at 16:00-18:00 WIB. This research is included in the quantitative research with a descriptive research approach. Data collection uses primary data, namely data obtained from the answers of the respondents to the questions posed by the researcher. Secondary data from literature study in the form of documents, laws and regulations, journals, scientific papers, supporting data relating to the problem under study. Based on the results of data analysis and processing using the Importance Performance Analysis (IPA) method in the Cartesian diagram, the service facilities at the Penggaron bus terminal are dominant in quadrant 2, which shows high expectations and reality, and quadrant 4, which means expectations of low use and high reality. However, there are a small number of service facilities that are in the quadrant, which means that the expectations from users are high but the reality is low. So, based on user evaluation, the service at the Penggaron terminal is quite good.
PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) PABRIK TEMPE DENGAN DIGESTER ANAEROBIK DAN BIOFILTER ANAEROBIK DI WILAYAH SEMARANG (Studi Kasus Pabrik Tempe Dampyak Gunung Pati Kota Semarang) Rizani, Mohammad Debby; Ikhwanudin, Ikhwanudin; Lestiyanto, Yoga; Anggraeni, Yossi Dewi
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18130

Abstract

The tempe industry is a food industry that has the potential to pollute the environment from the liquid waste it produces. Liquid waste from the tempe processing process if it is immediately disposed of without going through the management process first will have an impact on environmental pollution. In Semarang City, precisely in Gunung Pati District, there is a medium-scale tempe processing factory. So far, the tempe factory's liquid waste is directly disposed of into a ditch behind the factory without processing the liquid waste first.This research is a quantitative research presented in the form of numbers and then explained in the form of descriptions. From the results of the wastewater quality test, the pollutant parameters BOD = 369 mg/L; COD = 28,000 mg/L; TSS = 0.991 mg/L; and pH = 4,3. According to the Regional Regulation of the Province of Central Java Number 5 of 2012 concerning Amendments to the Regional Regulation of the Province of Central Java Number 10 of 2004 this value still does not meet the requirements. The wastewater treatment plant that the researchers are planning is in the form of a holding tank; Equalization Tub; Anaerobic Digesters; Gas Holder; Initial Settling Tub; Anaerobic Biofilter using bioball filter media and steel nets as a barrier for bioballs where bacteria are grown; and Final Settling Tank. With an estimated effluent from the processing of BOD, COD, and TSS of 7.47225 mg/L; 189mg/L; and 0.00669 mg/L which means it meets the quality standard. From the planning results, it was obtained that the total budget plan for planning the tempe factory wastewater treatment plant was Rp. 111.280.021,49.
ANALISIS PERTUMBUHAN ARUS PETIKEMAS DI TERMINAL PETIKEMAS SEMARANG Arif, An Zaenal; Suwandi, Putri Anggi Permata; Kristiawan, Agung
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18034

Abstract

Terminal Petikemas Semarang is one of the Terminals under the management of Subholding PT. Pelindo Terminal Petikemas which has a special pier or terminal for container ship activities, where the Terminal Petikemas Semarang area is in the Pelabuhan Tanjung Emas area, Semarang. The purpose of this study is to determine the growth of container flows at the Terminal Petikemas Semarang for the next 10 years, namely the period from 2023 to 2032 based on projections carried out using the regression method by correlating container flows and the Gross Regional Domestic Product (GRDP) index of Java Province Middle in the period 2013 to 2032.
KAJIAN TINGKAT PENERAPAN GREEN CONSTRUCTION PADA PROYEK KONSTRUKSI GEDUNG FASILITAS PENDIDIKAN DI JAWA TIMUR Laila, Nurul Alfi Candra; Wiryasuta, I Ketut Hendra; Hardiyanti, Siska Aprilia
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18029

Abstract

The construction of educational facilities in Indonesia, especially in East Java, are increase. However, this development has an environmental impact due to construction activities that use heavy equipment, produce material waste, and are less efficient in managing energy. To reduce this impact, it is important to implement green construction. The purpose of this research is to assess the level of green construction. The Model Assessment Green Construction (MAGC) method is used to assess the level of green construction implementation, focusing on environmentally friendly construction criteria and related indicators. The data from the questionnaire results, evaluating the weights of aspects and factors, were processed using the Analytical Hierarchy Process (AHP) method, resulting in aspect weight of 0.336 and factor weight of 0.821. These weight values become multiplier factors in the MAGC calculation. The results of the MAGC calculation obtain a percentage of 36% from 11 educational facility building construction projects in East Java that meet the NGCIdeal criteria within the baseline range of 15.47 to 21.92.

Page 1 of 1 | Total Record : 8