cover
Contact Name
INDRIATI MARTHA PATUTI
Contact Email
indri.m.patuti@ung.ac.id
Phone
+6282221477786
Journal Mail Official
tekniksipil@ung.ac.id
Editorial Address
Jl. B.J. Habibie, Moutong-Kec. Tilongkabila
Location
Kota gorontalo,
Gorontalo
INDONESIA
Composite Journal
ISSN : -     EISSN : 28075919     DOI : https://doi.org/10.37905/cj.v1i1.7
Core Subject : Engineering,
The journal aims to become an efficient means of publishing and distributing high-quality information from researchers, scientists, and engineers. The main scopes are as follows: Advances in Composite Materials, Computational Mechanics, Foundation and Retaining Walls, Slope Stability, Soil Dynamics, Soil-Structure Interaction, Pavement Technology, Tunnels and Anchors, Site Investigation and Rehabilitation, Ecology and Land Development, Water Resources Planning, Environmental Management, Earthquake and Tsunami Issues, Safety and Reliability, Geo-Hazard Mitigation, Case History and Practical Experience, Others
Articles 50 Documents
TINJAUAN KARAKTERISTIK MARSHALL CAMPURAN ASPHALT CONCTRATE WEARING COURSE (AC-WC) MENGGUNAKAN LIMBAH PLASTIK POLY ETHYLENE THEREPHTHALATE (PET) Alkam, Moh. Alkam; Desei, Frice L.; Achmad, Fadly
Composite Journal Vol. 3 No. 1 (2023): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v3i1.68

Abstract

Asphalt mixtures have several disadvantages, such as permanent deformation caused by too heavy pressure by truckloads and cracks caused by heat and humidity. In addition, plastic wastes that are increasingly piling up provide opportunities to be used in asphalt mixtures to improve the performance of asphalt mixtures. Concerning this issue, research about the substitution of plastic waste in asphalt mixtures is highly essential to be conducted. Moreover, this research was performed by substituting plastic waste into the asphalt and then mixing it into aggregate. The asphalt weight was taken from optimum asphalt content, while the mixture process was performed at the temperature of + 170°C by employing a high-speed mixing technique to keep the temperature stable during the mixing process. In comparison, the compaction was conducted at the temperature of + 150-160°C. At the same time, the test object was made as many as 25 samples to determine the optimum asphalt content and 25 samples for a mixture of asphalt with plastic waste. The type of plastic used in this research was Polyethylene Terephthalate (PET), with a percentage of plastic waste contents of 0,3%; 0,6%; 0,9%; 1,2%, and 1,5%. The research finding obtained that the highest stability value was 1.176,06 kg at 1,2% plastic content. Specifically, the stability values that met the interim specifications for asphalt plastic mixture were 981,02 kg; 1.152,78 kg; and 1.176,06 kg at plastic contents of 0,6%, 0,9%; and 1,2%, respectively. The highest flow was 3,62 mm at 1,5% plastic content, and the highest MQ was 331,26 kg/mm at 0,9% plastic content. At the same time, the addition of plastic content tended to increase VIM in plastic asphalt mixtures. The VIM values were 3,79%; 4,10%, 4,19%; 4,29%; and 4,33%, respectively. Likewise, the addition of plastic contents could increase VMA values in asphalt mixture where the VIM values were 19,08%; 19,34%, 19,42%; 19,51%; and 19,52%, consecutively. In contrast, adding plastic content to the asphalt mixture could decrease VFA and density values. In detail, the VFA values were 80,15%; 78,81%; 78,41%; 77,99%,, and 77,82% respectively, whilst the consecutive density values were 2,32 gr/cm; 2,32 gr/cm'; 2,31 gr/cm; 2,31 gr/cm'; and 2,31 gr/cm. Based on this analysis result, it could be inferred that 1,2% plastic content was suitable for use in asphalt mixtures with a stability value of 1.176,06 kg. This value increased by 38% from the stability value of conventional asphalt mixtures.
EVALUASI METODE LEAN CONSTRUCTION DAN PENJADWALAN CRITICAL CHAIN PROJECT MANAGEMENT (STUDI KASUS REKONSTRUKSI JALAN RUAS GORONTALO-BILUHU BARAT) Lige, Fifi Nabila; Utiarahman, Arfan; Tuloli, Mohamad Yusuf
Composite Journal Vol. 3 No. 1 (2023): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v3i1.71

Abstract

Construction project development requires careful planning, but the uncertainty that occurs in the procerss is very diverse. Inefficiencies such as schedule mismatch with the work process in the field must be minimized so that there is no significant waste of costs. Therefore, related parties need to take appropriate steps to identify and evaluate waste so that the planning time and the work process do not differ significantly, so as to reduce waste of costs and provide satisfactory results to the project owner. Thus, it is necessary to conduct research on lean construction mehod and critical chain project management scheduling to know the occurrence of waste so that anything that does not add value can be minimized or even eliminated. Based on the result of interviews, there are 73% value added activity and 27% non-value adding but necessary activity. The critical waste is waiting and unnecessary inventory. The risks that occur are incompatibility of planning designs with the field, delays in materials/tools, damage to materials/tools, work safety, traffic disturbances at the project site, low labor productivity, design change from planners, bad weather, and the COVID-19 pandemic. The estimated total project duration obtained using the Critical Chain Project Management (CCPM) method is 200 days from the initial duration of 266 days.
ALTERNATIF PENGURANGAN LIMPASAN AIR HUJAN DAN KONSERVASI AIR TANAH MENGGUNAKAN SUMUR RESAPAN (STUDI KASUS: KOMPLEKS LORONG MAESA KECAMATAN HULONTHALANGI KOTA GORONTALO) Olii, Rachma Ditha; Husnan, Rawiyah; Labdul, Barry Yusuf
Composite Journal Vol. 3 No. 1 (2023): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v3i1.85

Abstract

Sumur resapan adalah upaya untuk meningkatkan penetrasi air hujan ke dalam tanah dan mengurangi limpasan yang menyebabkan genangan ataupun banjir. Penelitian ini bertujuan untuk mengetahui besarnya nilai laju infiltrasi tanah, debit masukan sumur resapan, dan dimensi sumur resapan yang dibutuhkan di Kompleks Lorong Maesa. Lokasi penelitian berada di Kompleks Lorong Maesa. Analisis hidrologi menggunakan data hujan tahun 2011-2020 dari Stasiun Bone Alale, Boidu, dan Tumbihe. Pengujian permeabilitas menggunakan Metode Sumur Uji. Metode untuk menentukan laju infiltrasi menggunakan double ring infiltrometer dan untuk mencari infiltrasi konstan (fc) menggunakan Metode Horton. Metode Rasional digunakan untuk memperoleh debit banjir kawasan. Penentuan dimensi sumur resapan menggunakan Metode Sunjoto. Nilai laju infiltrasi konstan (fc) menggunakan metode double ring infiltrometer diperoleh 6 cm/jam, nilai koefisien permeabilitas tanah (k) adalah 5,833x10-4 cm/det. Intensitas hujan menggunakan Metode Mononobe yang dikomprasi dengan Sherman yaitu 22,33 mm/det. Nilai debit banjir kawasan sebesar 0,138 m3/det dan debit banjir satu unit rumah 8,3x10-4 m3/det. Direncanakan sumur resapan berbentuk lingkaran dengan diameter 0,8 m dan tinggi 1 m dengan Qresapan 1,32x10-3 m3/det. Pengurangan limpasan oleh sumur resapan untuk satu unit rumah sebesar 88,3% dan untuk total seluruh kawasan 47,57% sehingga debit banjir untuk satu unit rumah berkurang menjadi 1,0x10-4 m3/det dan debit banjir untuk kawasan berkurang menjadi 7,28x10-2 m3/det. Konservasi air tanah oleh sumur resapan untuk satu unit rumah yaitu 7,3x10-4 m3/det, untuk kawasan sebesar 6,6x10-2 m3/det. Biaya yang dibutuhkan untuk membuat satu unit sumur resapan berdiameter 0,8 m dengan kedalaman 1 m adalah Rp. 1.052.000 (Satu Juta Lima Puluh Dua Ribu Rupiah).
STUDI PERBANDINGAN GELOMBANG DI PPI DONGGALA DENGAN MENGGUNAKAN METODE GUMBEL DAN METODE WEIBULL Setiyawan; Nurkhalisah
Composite Journal Vol. 3 No. 2 (2023): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v3i2.92

Abstract

The Donggala Fish Landing Port (PPI) in Central Sulawesi, located in Labuan Bajo Village, Banawa District, Donggala Regency, suffered damage from the 2018 earthquake and tsunami that affected Palu, Donggala, and surrounding areas, necessitating repairs. This study aims to determine wave heights at PPI Donggala and predict future wave occurrences using the Gumbel and Weibull methods. The analysis uses secondary data, specifically hourly wind data from PPI Donggala. The significant wave height (Hs) was 0.98 meters with a significant wave period (Ts) of 4.74 seconds in 2017, occurring in the north. For the Gumbel method, wave heights for return periods were: 0.802 meters for 2 years, 0.894 meters for 5 years, 0.954 meters for 10 years, 1.031 meters for 25 years, 1.088 meters for 50 years, and 1.145 meters for 100 years. Using the Weibull method, wave heights were 0.778 meters for 2 years, 0.872 meters for 5 years, 0.943 meters for 10 years, 1.037 meters for 25 years, 1.108 meters for 50 years, and 1.179 meters for 100 years. The comparison of the Root Mean Square Error (RMSE) values between the Gumbel and Weibull methods yielded an identical value of 1.110 meters, indicating that both methods are equally accurate for this analysis. This study provides essential data for planning and repairing the Donggala Fish Landing Port's dock facilities to withstand future wave conditions.
Alternatif Desain Fondasi pada Gedung MTsS Al-Khairaat Desa Balamoa Pasca Gempa di Kabupaten Sigi T.A. Rampaminanga; S. Ramadhani
Composite Journal Vol. 4 No. 1 (2024): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v4i1.96

Abstract

Gempa yang terjadi pada tanggal 28 September 2018 menyebabkan salah satu sekolah di Kabupaten Sigi mengalami kerusakan. Sekolah tersebut adalah MTsS Alkhairaat Balamoa yang terletak di Jalan Poros Palu Bangga, Balamoa, Kecamatan Dolo Barat, Kabupaten Sigi, Provinsi Sulawesi Tengah. Akibat kerusakan tersebut maka perlu dilakukan rekonstruksi kembali dengan menggunakan RISHA. Saat ini konstruksi pondasi yang ada di gedung MTsS Al-Khairaat Balamoa menggunakan fondasi sumuran, karena kedalaman tanah keras berdasarkan hasil uji Cone Penetration Test (CPT) letaknya dangkal dan beban yang bekerja tidak besar, maka dicoba kaji menggunakan fondasi telapak. Penelitian ini bertujuan untuk menganalisis kapasitas dukung fondasi telapak berdasarkan nilai CPT dan memperoleh dimensi fondasi. Metode yang digunakan yaitu perhitungan daya dukung berdasarkan data CPT. Dimensi fondasi telapak yang direncanakan 0,8m x 0,8m. Berdasarkan hasil perhitungan diperoleh daya dukung tanah yang diijinkan tidak boleh kurang dari beban kolom terbesar (Pu) yaitu 6.289,82 kg.
MODEL POLA OPERASI WADUK BULANGO ULU Nani, Elma Tiani; Labdul, Barry Yusuf; Husnan, Rawiyah
Composite Journal Vol. 4 No. 2 (2024): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v4i2.131

Abstract

Waduk Bulango Ulu berada di Provinsi Gorontalo, pembangunan Waduk Bulango Ulu adalah untuk pemenuhan Kebutuhan air baku, air irigasi, dan PLTA, untuk memastikan apakah penggunaan sumber daya air termasuk penjadwalan dan pembebasan air untuk pemenuhan kebutuhan air baku, air irigasi, dan PLTA dengan menyesuaikan ketersediaan air pada musim hujan dan musim kering dapat memenuhi tujuan awal perencanaanya. Pada penelitian ini metode yang digunakan adalah simulasi pola operasi waduk dengan variasi musim basah dengan probabilitas debit (66,67%), musim normal dengan probabilitas debit (50%), dan musim kering dengan probabilitas debit (33,33%) sehingga dapat diketahui ketersediaan Waduk Bulango Ulu pada saat musim hujan dan musim kering untuk memenuhi kebutuhan air, karena itu perancangan dan pengoperasian waduk yang tepat sangat dibutuhkan karena kecenderungan persediaan air yang terbatas, sementara kebutuhan air terus meningkat dari tahun ke tahun sebagai dampak dari laju pertumbuhan penduduk. Hasil yang diperolah dapat dijadikan masukan bagi pengaturan pola operasi Waduk Bulango Ulu.
Analisis Efisiensi Material Pada Pelaksanaan Proyek Pembangunan Gedung Perkuliahan Terpadu IAIN Sultan Amai Gorontalo Atthabarani, Muhammad Alif; Sumaga, Arfan Usman; Tuloli, Moh. Yusuf
Composite Journal Vol. 4 No. 2 (2024): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v4i2.132

Abstract

Material merupakan elemen utama dalam konstruksi yang mempengaruhi kualitas dan ketahanan proyek. Berdasarkan hal tersebut maka dilakukan analisis efisiensi material guna mengurangi biaya, meningkatkan kualitas dan mempercepat penyelesaian proyek pembangunan Gedung Perkuliahan Terpadu IAIN Sultan Amai Gorontalo. Hasil analisis yang telah dilakukan menunjukkan pada pekerjaan bekisting plat lantai, kolom dan balok lantai 3 yang awalnya digunakan 1,5 kali pakai diubah mejadi 2 kali pakai setelah diefisiensi diperoleh penghematan anggaran sebesar Rp. 211.897.149,00. Pada pekerjaan plat lantai menghemat anggaran sebesar Rp. 60,599.149,00 atau 10,52% dari Rp. 674.577.191,97 menjadi Rp. 613.978.191,97 setelah diefisiensi. Sementara itu pekerjaan kolom menghemat anggaran sebesar Rp. 101.851.232,00 atau 16,46% dari Rp. 720.350.492,00 setelah diefisensi menjadi sebesar Rp. 618.499.262,00. Begitu pula pada pekerjaan balok anggaran sebesar Rp. 582.445.071,38 setelah diefisiensi sebesar Rp. 532.998.154,38 sehingga menghemat anggaran sebesar Rp. 49.446.971,00 atau 9,27%. Efisiensi material sangat penting untuk keberhasilan dan keberlanjutan, hal ini dipengaruhi oleh perencanaan, ketersediaan material, teknik konstruksi, dan pemenfaatan yang efektif. Dengan mengoptimalkan faktor-faktor ini dapat meminimalkan pemborosan, menghemat biaya, meningkatkan kualitas, memenuhi tenggat waktu proyek dan meningkatkan produktivitas.
Analisis Perbandingan Harga Satuan Pekerjaan Pasangan Bata Merah Pada Proyek Gedung Perkuliahan Iain Sultan Amai Gorontalo Ruftiani, Wulan; Banteng, Beby Sintia Dewi; Sumaga, Arfan Usman
Composite Journal Vol. 4 No. 2 (2024): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v4i2.133

Abstract

Tahap perencanaan proyek adalah tahap yang sangat penting, di mana manajemen biaya berfungsi untuk menyusun estimasi biaya proyek. Pemilihan metode analisis yang tepat menjadi kunci utama sebagai dasar dalam penyusunan estimasi anggaran biaya proyek. Penelitian ini bertujuan untuk membandingkan efisiensi harga satuan pekerjaan pasangan bata merah antara metode Analisis Harga Satuan Pekerjaan (AHSP) Permen PU No. 8 Tahun 2023 dan metode lapangan pada proyek pembangunan Gedung Perkuliahan IAIN Sultan Amai Gorontalo. Penelitian ini mengukur produktivitas tenaga kerja, koefisien tenaga kerja dan bahan, serta membandingkan harga satuan pekerjaan dari kedua metode tersebut. Data penelitian diperoleh dari pengamatan langsung di lapangan serta data sekunder dari perencana proyek. Hasil penelitian menunjukkan bahwa metode lapangan menghasilkan biaya yang lebih rendah dibandingkan dengan AHSP Permen PU No. 8 Tahun 2023. Total biaya menggunakan metode lapangan untuk pasangan bata merah sebesar Rp. 377,371,179, sementara menggunakan AHSP Permen PU No. 8 Tahun 2023 mencapai Rp. 408,009,535. Dengan demikian, metode lapangan lebih efisien dari segi biaya dibandingkan metode AHSP 2023.
Analisis Percepatan Waktu Pada Pembangunan Gedung Perkuliahan Terpadu IAIN Sultan Amai Gorontalo Menggunakan Crash Program Aisyah Rizki Putri; Sumaga, Arfan Usman; Tuloli, Mohamad Yusuf
Composite Journal Vol. 4 No. 2 (2024): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v4i2.134

Abstract

Penjadwalan mengatur jumlah waktu yang tersedia untuk menyelesaikan setiap aktivitas proyek yang diperlukan hingga mencapai hasil yang optimal dengan mempertimbangkan batas-batas yang ada. Keterlambatan sebuah proyek dapat menggunakan alternatif crash program berupa menambahkan sumber harian, seperti tenaga kerja atau peralatan, agar aktivitas proyek dapat selesai diwaktu yang lebih optimal. Pada penelitian ini alternatif yang digunakan pada proyek pembangunan Gedung Perkuliahan Terpadu IAIN Sultan Amai Gorontalo adalah dengan penambahan tenaga kerja untuk memperoleh waktu dan biaya optimal. Dari hasil analisis pada penelitian diperoleh efisiensi waktu sebesar 29% dengan pengurangan sebanyak 11 hari dari durasi normal 38 hari. Sementara total biaya berubah menjadi Rp. 1.867.028.999,60 sehingga mengalami pengurangan biaya sebesar Rp. 9.873.332,60 dari total biaya awal sebesar Rp. 1.876.902.332,20 dengan nilai efisiensi biaya 1%.
Analisis Ketersediaan dan Kebutuhan Air Bersih Masyarakat Popayato Eka, Eka Saputri; Husnan, Rawiyah; Labdul, Barry Yusuf
Composite Journal Vol. 4 No. 2 (2024): Composite Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37905/cj.v4i2.137

Abstract

Kecamatan Popayato dan Popayato Timur merupakan wilayah yang didominasi oleh pemukiman dan pertokoan. Pertumbuhan penduduk yang terus meningkat mengakibatkan bertambahnya konsumsi air bersih, sehingga dilakukan penelitian tentang analisis ketersediaan dan kebutuhan air bersih masyarakat Popayato. Metode analisis yang digunakan adalah dengan analisa proyeksi jumlah penduduk menggunakan metode geometrik, metode antartika, metode eksponensial serta pemilihan metode proyeksi penduduk. Analisis juga dilakukan pada kebutuhan air bersih berupa kebutuhan air domestik, kebutuhan air non domestik, kebutuhan air total, hingga kebutuhan air rata-rata. Hasil analisis menunjukkanBesarnya kebutuhan air total daerah Kecamatan Popayato dan Popayato Timur di tahun 2034 adalah 0,0385 m3/det. Neraca Air di Sungai Popayato maleo menunjukkan bahwa debit Sungai Popayato Maleo tidak terjadinya defisit debit jika dilihat dari data ketersediaan air yang ada dengan kebutuhan air masyarakat Kecamatan Popayato dan Popayato Timur.