cover
Contact Name
Veri Hardinansyah Dja'far
Contact Email
admin@transpublika.co.id
Phone
+6281234560500
Journal Mail Official
admin@transpublika.co.id
Editorial Address
Bumi Royal Park Blok A-14 Bumiayu, Kedungkandang, Malang, East Java, Indonesia
Location
Kota malang,
Jawa timur
INDONESIA
International Journal on Advanced Technology, Engineering, and Information System (IJATEIS)
Published by Transpublika Publisher
ISSN : -     EISSN : 28285425     DOI : https://doi.org/10.55047/ijateis
Core Subject : Engineering,
International Journal on Advanced Technology, Engineering, and Information System (IJATEIS) is an international peer-reviewed journal dedicated to interchange for the results of high-quality research in all aspect of technology, science, engineering and information system. The journal publishes state-of-art papers in fundamental theory, experiments and simulation, as well as applications, with a systematic proposed method, sufficient review on previous works, expanded discussion and concise conclusion. Scope: The journal scopes include (but not limited to) the followings: Science: Bioscience & Biotechnology, Agriculture, Chemistry & Food Technology, Environmental, Health Science, Mathematics & Statistics, Applied Physics. Engineering: Architecture, Chemical & Process, Civil & structural, Electrical, Electronic & Systems, Geological & Mining Engineering, Mechanical & Materials. Information Science, Artificial Intelligence, Computer Science, E-Learning & Education Learning, Multimedia, Knowledge Technology, Information System, Internet & Mobile Computing, Machine Learning.
Articles 147 Documents
WASTE MANAGEMENT SYSTEM EFFECTIVENESS IN JARING HALUS VILLAGE, SECANGGANG DISTRICT, LANGKAT REGENCY Ramadhani, Tisya; Aisyah, Dara
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 3 (2022): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i3.405

Abstract

This study seeks to determine and characterize the efficacy of the waste management system in Jaring Halus Village, Secanggang District, Langkat Province. The method of research employed is qualitative research. Interviews, observation, and documentation were employed as data collection technique. The data were then examined using Duncan's theory, which includes the elements of goal attainment, integration, and adaptation. The North Sumatra Provincial Environment Service, the Langkat Regency Environmental Service, the village head and Jaring Halus Village Apparatus, and the Jaring Halus Village Community were among the 11 informants in this study who had knowledge of the waste management system. Based on the findings, it is clear that the waste management system in Jaring Halus Village, Secanggang District, Langkat Province has not been effective. Due to various difficulties, including the absence of solid waste services and monitoring, unsustainable Jumat Bersih and collaboration actions, and the community's continued practice of dumping trash into the sea. One positive outcome of integration has been increased sociability and cooperation among the multiple stakeholders. The waste management system adaptation dimension in the province of North Sumatra has not been as effective as in Langkat Regency, particularly Jaring Halus Village. Due to a lack of resources to support the deployment of the waste management system, the infrastructure is inadequate. Moreover, the capacity of human resources to teach the public remains insufficient.
ANALYSIS OF THE EFFECT OF SUPERVISORY CONSULTANT PERFORMANCE FACTORS ON THE CONSTRUCTION OF THE TRANS STUDIO BUILDING SURABAYA Rahman, Medio Duddian Wahyu; Oetomo, Wateno; Nugroho, Laksono Djoko
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 3 (2022): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i3.408

Abstract

This study aims to determine impact of Understanding Contract Documents, Understanding of Technical Specifications, Use of Materials, Use of Labor, and Use of Equipment on the performance of supervisory consultants. This research conducted with a quantitative method. The sources of data using primary data from interviews. The research population is 70 Consultants for the Construction Project of the Trans Studi Surabaya Building with the sample being the entire population. The data analysis technique using PLS program. The results found that understanding of contract documents and technical specifications has a positive significant impact on the performance of the Supervisory Consultant. Meanwhile, the use of materials, labor and equipment has a positive significant impact on the performance of the Supervisory Consultant.
ANALYSIS OF FACTORS CAUSED FOR DELAYING CONSTRUCTION ROAD REHABILITATION AND MAINTENANCE IN KEJAYAN PURWOSARI’S (LINK 197) PROJECT DUE TO COVID-19 PANDEMIC Ramadhani, Ardhi; Muhammadun, Haris; Oetomo, Wateno
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 3 (2022): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i3.427

Abstract

Implementation of Construction Projects that run within a limited time must be removed from the factors that cause project delays to run optimally and appropriately. This study aims to analyze the factors causing delays in road rehabilitation and maintenance in Kejayan Purwosari (Link 197) construction projects due to the Covid-19 pandemic. The study population consist of 80 people and the number of research samples is the total population. The data collection technique is done by distributing questionnaires. Techniques for analyzing research data using Partial Least Square (PLS). The results of the study prove that the factors of Manpower, Materials and Equipment have no significant effect on Project Delay. Meanwhile, the factors of Construction Method, Relationship and Time and Control have a significant effect on Project Delay.
THE LITERATURE REVIEW OF CONSTRUCTION PROJECT SCHEDULING METHODS AND EFFECTIVENESS FOR THE LAST 5 YEARS IN INDONESIA Rakasyiwi, Gilang Ramadhan; Witjaksana, Budi; Tjendani, Hanie Teki
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 3 (2022): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i3.446

Abstract

Resources in the project were definitely limited so planning must be thorough and perfect. To achieve this goal, developers, contractors, and project owners create a project implementation schedule as well as control the implementation of the project itself. Scheduling determines when activities will be started, postponed and completed, so that resource control will be adjusted to the needed that had been determined. In project planning, scheduling was very important in projecting the needed of manpower, materials, and equipment. This study aims to assess project scheduling in general based on literature sources in the form of previous research (journals). The method used in this study was a literature study related to scheduling studies based on construction projects. Data were obtained from several library sources in the form of research journals for the last 5 years related to the research topic. The results showed that each method was complementary, such as LoB combined with CPM or PDM. In scheduling a construction project, a combination of methods needed to be applied to suit the desired construction project.
THE CONTRACTOR SELECTION CRITERIA AFFECTING PROJECT PERFORMANCE CONSTRUCTION SEBA PIER PORT FACILITIES, SABU RAIJUA, NTT Khakimin, Achmad Lukmanul; Witjaksana, Budi; Tjendani, Hanie Teki
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 3 (2022): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i3.447

Abstract

The selection of contractors will affect the performance of the project to be implemented. The criteria for selecting a contractor consist of 3 factors, namely Factor 1 which includes accuracy, reputation, and cooperation relationships, Factor 2 which includes knowledge of work, work ability, initiative, and social ability as well as Factor 3 which includes work experience, control, and commitment. This study aims to analyze the criteria for selecting contractors that affect the performance of construction projects. This research was conducted using quantitative methods by conducting field surveys or field studies. The sample population in this study was Seba Pier Port Facilities Project, Sabu Raijua, NTT Owner as many as 57 people. The analysis technique in this study was Multiple Linear Regression Analysis. The results of the research and discussion can be concluded that The criteria for selecting a contractor that affects the performance of a construction project are price, financial capability, equipment support, and contractor performance. Meanwhile, the criteria for experience and occupational safety and health (K3) do not affect the performance of construction projects. Meanwhile, if the contractor had the appropriate benchmark price, financial capability, equipment support, and performance of the contractor, then the performance of the construction project will certainly be good.
STUDY OF THE CAUSES OF ROAD DAMAGE TO CAPTAIN HARUN TOHIR STREET, GRESIK EAST JAVA Ramadhani, Ardhi; Muhammadun, Haris; Oetomo, Wateno
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 3 (2022): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i3.457

Abstract

This study aims to make a study and technical planning of the road following the traffic of heavy vehicle loads through the Harun Tohir road. Road maintenance is an activity to maintain, repair, add or replace existing physical buildings so that their functions can be maintained or enhanced for a longer period. This maintenance guideline is intended to regulate the procedures for carrying out rigid pavement maintenance activities, and maintain stable serviceability conditions, to provide safety and comfort to road users. This guideline for the maintenance of rigid pavements includes descriptions of the types of damage that commonly occur in rigid pavements, their possible causes, follow-up consequences, recommendations for handling, and methods.
STUDY OF DRAINAGE, PANORAMIC HOUSING, CEMENGKALANG VILLAGE, SIDOARJO DISTRICT Ismanto, Ikko Bagus; Nugroho, Laksono Djoko; Oetomo, Wateno
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 3 (2022): AUGUST
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i3.458

Abstract

Panorama Residence housing which has an area of 8000 m2 is located in a plain area with a slope of about 0-1%. The survey results on the Panorama Residence Housing, Cemengkalang Village, Sidoarjo District, have an elevation of -0.20 m, slightly above the flood level – 0.30 m. This area has a high probability of flooding due to overflow from the Pucang River, which runs off (run-off water) from other areas if it rains with high intensity. Moreover, the Panorama Residence area is a dense residential area with roads and parking lots, so rainwater has a smaller chance of infiltrating and running off. After analysis, The flood discharge at the 25-year return period on the Pucang River was 72,561 m3/sec. At the same time, the cross-sectional capacity of the Pucang River was 64,402 m3/sec, so the cross-section of the Pucang River at the Panorama Residence Housing location experienced overflow. The run-off volume is 102.6 m3, while the total capacity is 565.68 m3, so the extended storage capacity is quite adequate. In rainy conditions, t = 30 minutes, the run-off volume that occurs = 30.96 m3, and the total channel length = 493.12 m, the total drainage channel capacity = 184.92 m3 is greater than the run-off volume, 30.96 m3.
DRAINAGE STUDY OF WAREHOUSE DEVELOPMENT PT. ANEKA INDUSTRI, SIDOARJO DISTRICT Ismanto, Ikko Bagus; Nugroho, Laksono Djoko; Oetomo, Wateno
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 4 (2022): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i4.459

Abstract

The PT. Aneka Industri warehouse is located on a level with a slope of approximately 0-1%. Survey results from PT. Aneka Industri Warehouse in Tambaksawah Village, Waru District, Sidoarjo Regency, showed a height of -0.20m, slightly above the flood level of -0.10m. The area is likely to flood due to the overflow of Afvoer Bunung, which flows out from other areas (runoff water) during heavy rains. In addition, the storage area is a dense industrial area, and the chance of rainwater infiltration and loss is small. According to the analysis, the flood discharge of Afvoer Buntung during the 25-year return period is 193,305 m3/s. Meanwhile, the cross-sectional capacity of Afvoer Buntung is 25.707 m3/s, so the cross-section of Afvoer Buntung at the storage site of PT. Aneka Industri is flooded. It rains for t = 30 minutes, total volume = 297.57 m3.
THE ANALYSIS OF CONTRACTOR SELECTION PRIORITY DETERMINATION FOR THE LONG SEMAMU – LONG BAWAN 2 ROAD CONTRUCTION PROJECT, NORTH KALIMANTAN Nugraha, Coki Adianta; Oetomo, Wateno; Muhammadun, Haris
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 4 (2022): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i4.460

Abstract

Road construction is one of the fulfillment of the government's duties in providing mobility facilities for people's land transportation to move from one place to another. The government, through contractors as road construction implementers, must work carefully, so it is important for the government to select road construction contractors who meet predetermined criteria so that the road construction process can take place optimally. This study aims to find priority criteria and alternative contractors in the process of selecting Long Semamu – Long Bawan Road Construction Contractors. This study uses a quantitative descriptive approach with the aim of determining the Criteria and Alternative Variables. The population of this study were employees of the Public Works Department as the Tender Team for the Selection of Road Construction Contractors as many as 32 people with the research sample being the total population. Data collection techniques were carried out by distributing questionnaires and interviews. Data analysis techniques for research aids use the AHP method with AHP data processing software (Expert Choice version 11). The results of the study prove that the Price Criteria is a priority criterion in the selection of road construction contractors. In addition, Contractor C is an alternative priority in road construction.
PLANNING FOR IMPROVEMENT OF KRIAN ROAD -KEMANGSEN Purnomo, Dwi; Oetomo, Wateno; Muhammadun, Haris
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 1 No. 4 (2022): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v1i4.466

Abstract

Pavement improvement on Kemangsen road is necessary to repair the old concrete pavement, which is corrugated/subside so that it hinders the movement of passengers and goods. Therefore, the improvement of road pavement must comply with predetermined standards. The general objective of the Road Pavement Improvement activity on the Kemangsen road section is to make a technical road plan that follows the heavy vehicle traffic that passes through the road section. The specific objective of the Road Pavement Improvement activity on the Kemangsen road section is to analyze the structure of the old concrete pavement and to plan for field survey-type road pavement improvements to be carried out in this Preliminary Survey is a visual inspection. The Krian–Kemangsen Road was the location where the study took place. Traffic analysis is very decisive in obtaining the optimal corridor and the priority for implementing its development. Land use in the planned alignment area is strongly influenced by the development of the surrounding area, which is expected to develop into a residential area. The consultant will carefully investigate the physical condition of the land because it greatly influences the implementation aspects of Road construction. The selection of construction methods and types of construction is expected to support and follow the natural characteristics around the location of the development plan so that the planning is more economical and environmentally friendly.