cover
Contact Name
Rizky Stighfarrinata
Contact Email
risky_industri@unigoro.ac.id
Phone
+6285155335470
Journal Mail Official
risky_industri@unigoro.ac.id
Editorial Address
http://ojs.ejournalunigoro.com/index.php/jkti/about/editorialTeam
Location
Kab. bojonegoro,
Jawa timur
INDONESIA
Jurnal Teknologi dan Manajemen Sistem Industri
Published by Universitas Bojonegoro
ISSN : -     EISSN : 29648122     DOI : -
Jurnal Teknologi dan Manajemen Sistem Industri is an open access and peer-reviewed scientific journal published twice a year (March and September). It accepts articles from original research, case study articles, and scholarly review articles. This journal was published by the Industrial Engineering Study Program, Faculty of Engineering, University of Bojonegoro in March 2022 - now. The main topics in this journal are Management Science and Operational Research, Distribution Management and Logistics, Supply Chain Management, Business and management (Performance Management, Strategic Management, Human Resource Management, Marketing Management), Decision Science in business and management, and Halal Industry (Halal Food, Halal Logistics, Halal Marketing, Halal Packaging, Halal Financing, Halal Hospitality Services, and Business and Management from an Islamic/Muslim Perspective), Lean Manufacturing, Operations Improvement and Productivity, Innovation Management in Operations, Industrial System Technologies, Industrial System Management Product Design and Development, Operations in service industries, Quality Management, Total Productive Maintenance, Human Factors Engineering.
Articles 51 Documents
Pemeliharaan Mesin C3406 dengan Metode Total Productive Maintenance (TPM) di PT. Tiga Musim Mas Jaya Enik Sulistyowati; Aan Putra; Rizky Stighfarrinata
Jurnal Teknologi dan Manajemen Sistem Industri Vol. 4 No. 1 (2025): Jurnal Teknologi dan Manajemen Sistem Industri (JTMSI) - MARET
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56071/jtmsi.v4i1.1735

Abstract

This research aims to analyze the implementation of Total Productive Maintenance (TPM) method on Caterpillar 3406 machine at PT. Tiga Musim Mas Jaya to improve the effectiveness and reliability of production machines. The research methods used include field observation, interviews, and analysis of machine operational data such as operation time, downtime, production quantity, and product quality. Machine effectiveness is measured using Overall Equipment Effectiveness (OEE indicator which consists of availability, performance, and quality. The results showed availability value of 96.15%, performance of 95.00%, and quality of 98.58%, thus obtained OEE value of 90.04% which is categorized as very good according to Japan Institute of Plant Maintenance standard (?85%). The implementation of TPM is proven to reduce downtime, increase machine reliability, and support the achievement of production targets. Therefore, TPM is recommended as a sustainable maintenance strategy to improve company productivity.
Analisis Perawatan Mesin Caterpillar 3412 Menggunakan Reliability Centered Maintenance (RCM) Agung Firdausi Ahsan; Afif Firdaus
Jurnal Teknologi dan Manajemen Sistem Industri Vol. 4 No. 1 (2025): Jurnal Teknologi dan Manajemen Sistem Industri (JTMSI) - MARET
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56071/jtmsi.v4i1.1736

Abstract

This study analyzes the reliability of the Caterpillar 3412 engine used as the main drive for drilling units at PT. XYZ by applying the Reliability Centered Maintenance (RCM) method. The data include operating time, downtime, and maintenance records collected over a six-month period. The analysis stages consist of identifying Maintenance Significant Items (MSI), conducting Failure Mode and Effect Analysis (FMEA), and applying Logic Tree Analysis (LTA). The results indicate that the oil pump, water pump, and radiator are critical components with the highest MSI value of 2.60. Based on FMEA, the oil pump has the highest Risk Priority Number (RPN) of 252, followed by the water pump and radiator. The engine reliability value reaches 0.981, while the Inherent Availability exceeds 90%, indicating high operational readiness. The application of RCM effectively improves engine reliability and operational efficiency.
Analisis Perawatan Pompa Boster PP 900 menggunakan Metode Reability Centered Maintenance (RCM) di PT. XYZ M Lathif Asadulloh; Faisal Ashari; Anita Hakim Nasution
Jurnal Teknologi dan Manajemen Sistem Industri Vol. 4 No. 1 (2025): Jurnal Teknologi dan Manajemen Sistem Industri (JTMSI) - MARET
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56071/jtmsi.v4i1.1746

Abstract

Penelitian ini bertujuan meningkatkan keandalan dan efisiensi operasional pompa booster PP- 900 di PT. XYZ melalui penerapan metode Reliability Centered Maintenance (RCM). Metode ini digunakan untuk merancang sistem pemeliharaan yang berfokus pada fungsi dan risiko kegagalan setiap komponen. Analisis dilakukan menggunakan data data historis kerusakan dan downtime tahun 2023 untuk mengidentifikasi komponen kritis dengan Failure Mode and Effect Analysis dan Logic Tree Analysis. Distribusi waktu kerusakan dan perbaikan dianalisis menggunakan model distribusi Weibull guna memperoleh parameter keandalan, seperti MTBF, MTTR, reliability dan availability. Hasil menunjukkan bahwa bearing merupakan komponen paling kritis dengan tingkat kendala terendah (R = 0,59) dan MTBF 950,63 jam, sedangkan shaft dan motor penggerak memiliki kendala tertinggi (R = 0,89) dengan MTBF 4.277,85 jam. Berdasarkan hasil tersebut, disusun jadwal perawatan preventif dengan interval optimal untuk meminimalkan kegagalan mendadak dan downtime. Penerapan RCM terbukti efektif meningkatkan keandalan sistem pompa dan mendukung keberlanjutan operasional.
Penerapan Periodic Inspection terhadap Preventive Maitenance Pada Unit C15 PT. Tiga Musim Mas Jaya Sektor Migas Indika Bayu Kurniansyah; Rizky Stighfarrinata
Jurnal Teknologi dan Manajemen Sistem Industri Vol. 4 No. 1 (2025): Jurnal Teknologi dan Manajemen Sistem Industri (JTMSI) - MARET
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56071/jtmsi.v4i1.1749

Abstract

This study was conducted at PT. Tiga Musim Mas Jaya, an oil and gas drilling service company, aiming to evaluate the implementation of Periodic Inspection (PI) in the preventive maintenance system of Unit C15. Data were collected through field observations, interviews with field supervisors, and analysis of scheduled and unscheduled breakdown records over a six-month observation period. The results show that the implementation of Periodic Inspection significantly improved maintenance performance, with a Physical Availability value of 98.75%, Mean Time Between Failure (MTBF) of 144 hours, and Mean Time To Repair (MTTR) of 1.07 hours. In addition, PI Achievement and PI Accuracy both reached 100%, indicating consistent and timely inspection execution. These findings demonstrate that Periodic Inspection as part of preventive maintenance effectively enhances equipment reliability, operational readiness, and maintenance efficiency in the oil and gas sector
Peramalan Jumlah Kunjungan Pengguna Pelayanan Statistik Terpadu menggunakan Metode Time Series di Badan Pusat Statistik Agung Firdausi Ahsan; Heru Prastiyono; Nayla Farikha Zahra
Jurnal Teknologi dan Manajemen Sistem Industri Vol. 4 No. 1 (2025): Jurnal Teknologi dan Manajemen Sistem Industri (JTMSI) - MARET
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56071/jtmsi.v4i1.2078

Abstract

This study addresses the forecasting of visitor numbers to the Pelayanan Statistik Terpadu (PST) unit at the Badan Pusat Statoistic (BPS) Bojonegoro office using a time series approach. Forecasting visitor volume is essential for supporting service capacity planning, resource allocation, and enhancing the operational efficiency of data-driven public services. The study compares three forecasting methods—Seasonal Autoregressive Integrated Moving Average (SARIMA), Holt-Winters Exponential Smoothing, and Prophet—using monthly visitor data from January 2020 to May 2025. The dataset was divided into a training set (January 2020–December 2024) and a test set (January–June 2025). Model evaluation was conducted using R², Mean Squared Error (MSE), Root Mean Squared Error (RMSE), Mean Absolute Error (MAE), and Mean Absolute Percentage Error (MAPE) metrics. The results indicate that the Prophet model delivered the best performance, achieving an RMSE of 1.44, MAE of 1.34, and MAPE of 0.91—outperforming both Holt-Winters and SARIMA. Prophet's superior performance is attributed to its ability to simultaneously model long-term downward trends and annual seasonal patterns. The findings demonstrate that an adaptive, time series-based forecasting approach can support data-driven decision-making for regional public statistical services.
Manajemen Risiko Operasional terhadap Stabilitas Keuangan Bank: Tinjauan Literatur dengan Metode ISO 31000 Marsha Alifia Vesthi; Mochammad Nasruddin Zuhri; Yusuf Amrozi
Jurnal Teknologi dan Manajemen Sistem Industri Vol. 4 No. 2 (2025): SettingsVol. 4 No. 2 (2025): Jurnal Teknologi dan Manajemen Sistem Industri (JT
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56071/jtmsi.v4i2.1073

Abstract

The implementation of operational risk management in the banking sector is essential to maintaining financial stability, especially with increasing risks originating from information technology systems, human error and external factors. ISO 31000 provides a comprehensive framework for identifying, evaluating and managing risks that have the potential to disrupt the smooth operation of banks. This study aims to review the impact of ISO 31000 implementation on operational risk management concerning banks financial stability using a Systematic Literature Review (SLR) approach. The findings indicate that implementing ISO 31000 enhances operational efficiency, preserves the bank's reputation, and boosts customer and investor confidence through structured risk governance. Therefore, ISO 31000 becomes a vital component in risk management strategies within the banking sector to improve sustainability and competitiveness.
Identifikasi dan Analisis Kecelakaan Kerja dengan Metode JSA di Bagian Maintenance PT. XYZ Anita Hakim Nasution; Attila Daffa Aghfi Maulana -; Yusuf Amrozi
Jurnal Teknologi dan Manajemen Sistem Industri Vol. 4 No. 2 (2025): SettingsVol. 4 No. 2 (2025): Jurnal Teknologi dan Manajemen Sistem Industri (JT
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56071/jtmsi.v4i2.1738

Abstract

This study addresses occupational safety risks in the maintenance division of PT. XYZ, where hazardous industrial activities can cause workplace accidents and threaten worker health. It aims to identify and analyze potential hazards using the Job Safety Analysis (JSA) method to support effective risk prevention. Each maintenance activity was systematically broken down into specific work steps to facilitate hazard identification and risk classification. The results identified 22 potential hazards, comprising 13 low-risk, 7 medium-risk, and 2 high-risk hazards, namely hydrogen sulfide (H?S) gas exposure and entrapment. Recommended controls include implementing standard operating procedures (SOPs) and providing appropriate personal protective equipment (PPE). These findings demonstrate that JSA supports systematic hazard assessment and strengthens occupational safety awareness. However, observations were limited to one company location. Future research should examine additional industrial settings and evaluate the effectiveness of implemented risk controls in daily operations to improve workplace safety and health
Penilaian Risiko Kecelakaan Kerja Pada Penggunaan Flexible Hose Menggunakan Metode Hirarc di PT. Kutai Timber Indonesia Kota Probolinggo Danendra Rakha Proboananta; Septine Brillyantina; Sekar Ayu Wulandari; Cindiah Syahnaz
Jurnal Teknologi dan Manajemen Sistem Industri Vol. 4 No. 2 (2025): SettingsVol. 4 No. 2 (2025): Jurnal Teknologi dan Manajemen Sistem Industri (JT
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56071/jtmsi.v4i2.1976

Abstract

This study aims to identify potential hazards, assess risk levels, and propose risk control measures for the use of Flexible Hose in Production Area 2 of PT. Kutai Timber Indonesia, Probolinggo City, using the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) method. A descriptive method with an evaluative approach was employed. Data were collected through observations, interviews with operators and Occupational Safety and Health (OHS) officers, documentation, and source triangulation. The findings revealed several potential hazards, including hose connection leaks, physical hose damage, unstable hose supports, and hose placement near workers’ activity areas. Risk assessment results indicated that the identified hazards were classified as low and medium risk, requiring appropriate control measures. Recommended controls include replacing damaged hoses, improving hose arrangement, conducting regular inspections and maintenance, strengthening damage reporting procedures, and enhancing OHS supervision. These measures are expected to improve workplace safety and create a safer working environment.
Analisis Maintenance Choke Valve menggunakan Metode Failure Mode And Effect Analysis (FMEA) Ridzky Zul Asdi Ridzky Zul Asdi; Virgiawan listianto; Faisal Ashari
Jurnal Teknologi dan Manajemen Sistem Industri Vol. 4 No. 2 (2025): SettingsVol. 4 No. 2 (2025): Jurnal Teknologi dan Manajemen Sistem Industri (JT
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56071/jtmsi.v4i2.2148

Abstract

The oil and gas industry requires effective maintenance systems to ensure equipment reliability and reduce downtime. A choke valve controls fluid flow and pressure but is vulnerable to erosion, leakage, actuator short circuits, corrosion, and blockage. This study identifies failure modes, analyzes their causes and effects, and prioritizes choke valve maintenance using Failure Mode and Effect Analysis (FMEA). A quantitative descriptive study was conducted at PT Pertamina EP from January to June 2024. Data were collected through observations, interviews, failure records, maintenance reports, and downtime records. Risk was assessed using Severity, Occurrence, and Detection ratings to calculate the Risk Priority Number (RPN). Nine failure events were recorded, totaling 60.6 hours of downtime, averaging 6.73 hours per event. The trim was the most critical component, followed by the seal and actuator. Preventive maintenance, regular inspections, and suitable material selection are recommended to reduce failure risks and improve overall choke valve reliability.
Penerapan Metode HIRADC untuk Identifikasi dan Penilaian Risiko K3 Pada Proses Perbaikan Pipa Filter FT-9680B di PT. Pertamina EP Sukowati Field Enik Sulistyowati; Fandi Hafid Sugianto; Maulidatul Masudha
Jurnal Teknologi dan Manajemen Sistem Industri Vol. 4 No. 2 (2025): SettingsVol. 4 No. 2 (2025): Jurnal Teknologi dan Manajemen Sistem Industri (JT
Publisher : Universitas Bojonegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study applies Hazard Identification, Risk Assessment and Determining Control (HIRADC) to the repair of filter pipe FT-9680B at PT Pertamina EP Sukowati Field, Tuban, East Java. Data were collected through observation, interviews, and document reviews during an industrial internship in September 2024. Risk assessment used the AS/NZS 4360:2004 consequence–likelihood matrix, with controls determined according to the hierarchy of controls. A total of 24 hazards across seven work stages were assessed. Before control, 2 hazards (8%) were Extreme, 3 (13%) High, 8 (33%) Medium, and 11 (46%) Low. The main Extreme risks were H?S exposure during plant isolation and dropped loads during crane lifting. After proposed controls, no Extreme risks remained, while one High, five Medium, and 18 Low risks were identified. The total risk score decreased from 134 to 85 (36.6%). Residual H?S risk highlights the need to prioritize engineering controls, including fixed gas detection and positive isolation.