cover
Contact Name
Dewa Ayu Adhiya Garini Putri
Contact Email
journal@undiknas.ac.id
Phone
-
Journal Mail Official
journal@undiknas.ac.id
Editorial Address
Jl. Bedugul No.39, Sidakarya, Kec. Denpasar Sel., Kota Denpasar, Bali 80224, Indonesia.
Location
Kota denpasar,
Bali
INDONESIA
Reinforcement Review In Civil Engineering Studies and Management
ISSN : -     EISSN : 29860520     DOI : 10.38043
Core Subject : Engineering,
The journal publishes original papers within the broad field of Civil Engineering and Planning which include, but are not limited to, the following: Transportation Planning and Policy, Highway and Traffic Engineering, Hydrology, Coastal and Harbor Engineering, Construction Management, Geotechnical Engineering, Structural Engineering, Surveying and Geo-Spatial Engineering, Modern Construction Materials, Sustainable Development & Construction, Disaster Mitigation & Management, Earthquake Resistant Design Practices, Environmental Engineering & Management, Urban & Regional Planning.
Articles 34 Documents
Analisis Kinerja Ruas Jalan Denpasar Gilimanuk Segmen Kecamatan Mengwi I Wayan Gede Darma Yoga
Reinforcement Review in Civil Engineering Studies and Management Vol. 2 No. 1 (2023)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/reinforcement.v2i1.4280

Abstract

Badung Regency is one of the districts that has a very high intensity level of vehicle movement. This is because the Badung district in general in the province of Bali is the entry point for land transportation traffic from western Indonesia, in this case from the islands of Sumatra and Java to the province of Bali. Jalan Denpasar Gilimanuk is one of the busiest national roads in the province of Bali, this is because Jalan Denpasar Gilimanuk is a road that acts as a connecting artery between the islands of Sumatra, Java, Bali and Lombok. Most of all types of logistics transportation involving the province of Bali pass through this Denpasar Gilimanuk road. Given its dense intensity, the Denpasar Gilimanuk road often experiences traffic jams, especially in the Mengwi District segment, Badung Regency. The method used in calculating the performance of this road section is to use the calculation method from MKJI (1997). In calculating the performance analysis of road sections using the MKJI method, it is influenced by several factors, namely basic capacity, road width, road separation, side barriers and city size. From the results of the analysis it was found that the peak traffic hours on Jalan Denpasar Gilimanuk were at 11.30-12.30, the traffic volume obtained from the field survey was 2889.6 pcu/hour. The road capacity obtained from the results of the analysis is 3446 pcu/hour. By comparing the value of the volume with the capacity (V/C Ratio) the value of the degree of saturation (DS) is 0.83. From the results of the analysis, when plotted into the table, Minister of Transportation Regulation No. KM 14 of 2006, it can be concluded that the service level for the Denpasar Gilimanuk road during peak hours is at the service level "D".
Survei, Investigasi, dan Desain (SID) Pengembangan Jaringan Irigasi Tersier pada Kelompok Tani Dewi Ratih I di Kabupaten Malang Zettyara, Devi; Safitri, Mona Shinta; Efendi, Medi
Reinforcement Review in Civil Engineering Studies and Management Vol. 2 No. 2 (2023)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/reinforcement.v2i2.4486

Abstract

Penelitian dengan judul “Survei, Investigasi, dan Desain (SID) Pengembangan Jaringan Irigasi Tersier pada Kelompok Tani Dewi Ratih I di Kabupaten Malang” memiliki tujuan utama untuk mendapatkan data dan informasi terkait jaringan irigasi tersier yang digunakan sebagai dasar pengelolaan aset secara sistematis. Selain itu, data dan informasi tersebut akan digunakan sebagai acuan dalam perencanaan sistem pengembangan jaringan irigasi tersier di wilayah penelitian. Kelompok Tani (Poktan) Dewi Ratih I adalah satu dari sekian banyak kelompok tani yang ada di Daerah Irigasi (DI) Kali Metro yang berada di bawah yurisdiksi Provinsi Jawa Timur. Poktan Dewi Ratih I terletak tepatnya di desa Ardirejo, salah satu desa di kecamatan Kepanjen. Poktan Dewi Ratih I memiliki luas pelayanan 50 hektar. Tahapan pertama pada penelitian ini adalah survei dan inventarisasi jaringan irigasi. Pada tahap ini akan diperoleh data mengenai jumlah, ukuran, jenis, kondisi, dan fungsi seluruh aset irigasi, serta luas areal yang terlayani irigasi dalam keberlangsungan manfaat sistem irigasi pada masing-masing daerah irigasi. Berdasarkan data tersebut, akan dibuat rencana desain pembangunan jaringan irigasi tersier. Hasil akhir yang didapatkan dari gambar tersebut adalah penambahan luas areal layanan Poktan Dewi Ratih I yaitu dari yang awalnya sejumlah 50 ha menjadi 75 ha, sehingga dapat disimpulkan dengan bertambahnya areal layanan, maka hasil panen juga akan ikut meningkat.
Penilaian Real Properti Berupa Tanah Kosong Di Kelurahan Labuan Bajo, Kecamatan Komodo, Nusa Tenggara Timur Ananda Putra, I Gusti Agung
Reinforcement Review in Civil Engineering Studies and Management Vol. 2 No. 2 (2023)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/reinforcement.v2i2.4634

Abstract

Penelitian ini difokuskan pada real properti berupa tanah kosong. Adapun tujuan dilakukan penilian properti tersebut adalah untuk kepentingan jual beli. Penelitian ini menggunakan pendekatan pasar dan metode perbandingan data pasar. Jenis data yang digunakan adalah data primer bersifat kuantitatif dan kualitatif yang dibagi dalam tiga jenis, yaitu: data umum, data khusus dan data pasar. Hasil penelitian menunjukkan bahwa nilai pasar obyek properti berupa tanah kosong yang berlokasi di Kelurahan Labuan Bajo, Kecamatan Komodo, Kabupaten Manggarai, Provinsi Nusa Tenggara Timur dengan menggunakan metode perbandingan data pasar sebesar Rp. 3.500.000/m2.
ANALISIS STUDI KOMPARASI BETON PRECAST PADA PROYEK PEMBANGUNAN JEMBATAN PANGSAN DI PT. SANUR JAYA UTAMA Lanang Manik Arya; I Nyoman Sugiartha
Reinforcement Review in Civil Engineering Studies and Management Vol. 2 No. 1 (2023)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/reinforcement.v2i1.4678

Abstract

Current technological developments greatly influence construction projects, both in material procurement and contract models. Specifically for dealing with natural disasters with short recovery times, a Design and Build contract model is used. In the Pangsan Bridge Construction Project, the contractor procured precast concrete beams (Girders) which were produced at the factory and the installation process was carried out at the project. This contract is determined by direct appointment and this Regulation has been issued in PERPRES No. 54 of 2010 Article 38 Paragraph 1 stipulates that direct appointment of 1 (one) provider of Construction work/Other Services can be done in the case of exclusive circumstances; and/or Procurement of special goods/specific construction work/other services of a special nature. The precast concrete girder beam measures 0.65 m x 0.90 m with a length of 15.6 m, and is molded into 3 parts whose strength has been calculated. In terms of processing time, it is faster and costs more than conventional concrete. With production outside the project completion time is 1,5 months faster at a higher cost of 4,5 billion The length of conventional concrete is due to the implementation method which must be sequential and interrelated with a smaller cost of 3,8 billion So to meet the short time, the precast method is used even though it costs more.
Pemanfaatan Limbah Keramik Sebagai Bahan Alternatif Campuran Agregat Kasar Pada Beton Arif, Arif Arizal Firmansyah; Putu , Ariawan; Darmayasa , I Gusti Ngurah Putu; Ariana, Komang Agus
Reinforcement Review in Civil Engineering Studies and Management Vol. 2 No. 2 (2023)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/reinforcement.v2i2.4689

Abstract

In every construction and renovation project, there is often waste that is rarely reused. The utilization of ceramic waste as a coarse aggregate in concrete can be an interesting alternative because ceramic waste shares characteristics and properties similar to coarse aggregate materials, such as hardness, and has the potential to reduce negative environmental impacts and the depletion of raw materials. Therefore, this research adopts an experimental method at the laboratory of the National Education University in Denpasar by creating five different variations of cylindrical specimens, each with three samples. The ceramic waste variations used are 0%, 10%, 15%, 20%, and 40%. By using an FAS value of 0.6, the slump value was obtained, where the larger the ceramic waste mixture value, the smaller the slump value, as this occurs due to the water absorption value in the ceramic waste being 10.51%. However, despite this, the slump value still falls within the planned range of 5.0 cm to 12.0 cm, and for the planned compressive strength value, which is 175 kg/m2, the highest average concrete strength value is found in the 0% variation, which is 16.01 MPa or equivalent to 192.83 kg/cm2. The concrete with a 10% variation has a compressive strength of 15.21 MPa or 183.25 kg/cm2, the concrete with a 15% variation has a compressive strength of 15.01 MPa or 180.82 kg/cm2, the concrete with a 20% variation has a compressive strength of 13.64 MPa or 164.38 kg/cm2, and the concrete with a 40% variation has a compressive strength of 9.87 MPa or 118.96 kg/cm2. This research can be used as additional literature or as an evaluation material for further research.
Pengaruh Komposisi Abu Sekam Padi Terhadap Kuat Tekan Beton Fany Hasbhi Noerangga; I Gusti Ngurah Putu Darmayasa; Putu Ariawan; Komang Agus Ariana
Reinforcement Review in Civil Engineering Studies and Management Vol. 2 No. 1 (2023)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/reinforcement.v2i1.4690

Abstract

Beberapa penelitian telah dilakukan terkait bahan pengganti dalam campuran beton, namun masih terdapat keterbatasan dalam menemukan bahan yang dapat sepenuhnya menggantikan komponen utama dalam pencampuran beton. Oleh karena itu, penelitian ini mengadopsi metode eksperimen di laboratorium Universitas Pendidikan Nasional Denpasar dengan membuat benda uji silinder berdiameter 15 cm dan tinggi 30 cm, yang kemudian menjalani tahap perawatan selama 28 hari. Variasi penambahan abu sekam padi dalam komposisi beton direncanakan sebesar 0%, 5%, 10%, dan 15%, dengan menggunakan faktor air semen sebesar 0,5. Sebanyak 16 benda uji dipersiapkan, dengan setiap variasinya memiliki 4 benda uji. Hasil pengujian kuat tekan menunjukkan bahwa nilai tertinggi dari rata-rata kuat tekan beton terdapat pada beton dengan komposisi abu sekam padi 5%, mencapai 15,19 MPa. Sementara itu, nilai terendah terdapat pada komposisi abu sekam padi 15%, yaitu sebesar 4,47 MPa. Meskipun demikian, nilai tersebut masih berada di bawah kuat tekan beton normal. Penelitian ini memberikan wawasan bahwa penambahan abu sekam padi dapat memengaruhi kuat tekan beton, dan hasilnya dapat bervariasi tergantung pada jumlah abu sekam padi yang ditambahkan. Meskipun nilai kuat tekan pada beberapa komposisi masih di bawah beton normal dimana beton normal memiliki nilai kuat tekan beton sebsesar 16,89 MPa, penelitian ini dapat menjadi dasar untuk pengembangan lebih lanjut dalam mencari bahan pengganti yang lebih efektif dalam campuran beton.
Pengaruh Penerapan Sistem Manajemen Mutu Iso 9001:2015 Terhadap Kinerja dan Produktivitas Karyawan PT. Tunas Jaya Sanur Denpasar Clarimond Rangga Pandanga Pandanga; I Nyoman Murdana
Reinforcement Review in Civil Engineering Studies and Management Vol. 2 No. 1 (2023)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/reinforcement.v2i1.4692

Abstract

Adapun judul pada penelitian ini adalah “Pengaruh Penerapan Sistem Manajemen Mutu Iso 9001:2015 Terhadap Kinerja Dan Produktivitas Karyawan Pt. Tunas Jaya Sanur Denpasar.” Tujuan utama dari penelitian ini adalah untuk mendapatkan pemahaman yang lebih mendalam tentang bagaimana ISO 9001:2015 berkontribusi terhadap Kinerja dan Produktivitas Karyawan. Penelitian ini menggunakan pendekatan kuantitatif dan melibatkan 16 responden. Pengumpulan data dilakukan melalui penyebaran kuesioner. Data yang terkumpul kemudian dianalisis dengan menggunakan teknik statistik, yaitu analisis regresi berganda yang dilakukan dengan menggunakan Ms. Excel dan SPSS 2023. Hasil analisis kuantitatif menunjukkan bahwa penerapan ISO 9001:2015 secara parsial berpengaruh positif dan signifikan terhadap Kinerja dan Produktivitas Pegawai. Hasil tersebut memberikan gambaran yang positif dan signifikan terhadap kinerja maupun produktivitas karyawan di PT. Tunas Jaya Sanur Denpasar.
Penerapan Metode Least Cost Analysis Untuk Optimasi Percepatan Waktu Pelaksanaan Proyek I Nyoman Indra Kumara
Reinforcement Review in Civil Engineering Studies and Management Vol. 2 No. 1 (2023)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/reinforcement.v2i1.4761

Abstract

Pada pelaksanaan proyek konstruksi di SMP 15 Denpasar mengalami keterlambatan akibat perubahan waktu kerja di minggu ke-14. Hal ini mengakibatkan pekerjaan konstruksi mengalami keterlambatan sebesar 5,51% pada minggu ke-17 yang seharusnya sudah mencapai 56,20%, namun realisasi di lapangan hanya mencapai 50,69% dengan waktu yang tersedia 61 hari. Jadi, perlu dilakukan percepatan dengan menambah waktu kerja (lembur) 3 jam per hari dengan metode least cost analysis. Analisis dimulai dengan mengidentifikasi sisa pekerjaan proyek hingga mendapatkan lintasan kritis, lalu melakukan crashing program dimulai dari cost slope terendah sehingga diperoleh perubahan waktu dan biaya yang optimum. Hasil analisis dengan metode least cost analysis didapatkan bahwa biaya sisa proyek akibat keterlambatan sebesar Rp. 922.060.863,3. Biaya yang diperlukan untuk mencapai waktu kontrak menjadi Rp. 908.571.018,01. Sedangkan waktu dan biaya optimum proyek didapat 60 hari dengan biaya sebesar Rp. 908.191.705,56.
Analisis Penambahan Serbuk Kayu Sebagai Kayu Sebagai Pengganti Terhadap Agregat Halus Widiatmoko, Paskalis Aprilio
Reinforcement Review in Civil Engineering Studies and Management Vol. 2 No. 2 (2023)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/reinforcement.v2i2.4833

Abstract

This study aims to analyze the impact of adding sawdust as a substitute for fine aggregate in concrete mixes, with percentage variations of 1%, 1.5%, and 2%. The experiments involved the preparation of concrete mixtures with specific proportions according to each sawdust variation, and the formation of cylindrical concrete samples with a size of 15 cm x 30 cm. A total of 12 cylindrical specimens were prepared for each variation, ensuring representativeness and reliability of the results. Subsequently, mechanical properties of the concrete were tested, including compressive strength, resistance to compressive load, and resistance to deformation. The expected compressive strength plan was 16.9 MPa, but the test results showed a decrease in concrete at 1% by 11.99 MPa, at 1.5% by 7.14 MPa, and at 2% by 5.65 MPa. Analysis of these results provides a focal point for planning strategies to improve the performance of concrete with sawdust and ensure that its use does not compromise critical compressive strength. The findings of this study are expected to provide guidance for the construction industry in integrating alternative, more environmentally friendly materials into daily construction practices.
Analisis Waktu Produktivitas Kerja Alat Berat Pada Proyek Hotel EX. AP INN Kuta Kumara, I Nyoman Indra; Ariana, I Komang Agus
Reinforcement Review in Civil Engineering Studies and Management Vol. 2 No. 2 (2023)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38043/reinforcement.v2i2.4858

Abstract

Kebutuhan penggunaan alat berat meningkat seirung adanya perkembangan pada dunia konstruksi karena alat berat merupakan sumber daya penting pada pelaksanaan proyek konstruksi. Di sisi lain, biaya besar diperlukan untuk pengadaan alat berat. Oleh sebab itu, pentingnya analisis pemilihan alat berat untuk mengetahui efisiensi produktivitas kerja alat berat pada pekerjaan konstruksi. Penelitian ini dilakukan dengan pengamatan langsung dilapangan untuk mendapatkan waktu yang dibutuhkan oleh setiap alat berat pada pekerjaan pembangunan hotel ex. AP Inn Kuta. Hasil yang didapatkan dari penelitian ini, yaitu excavator memiliki taksiran produktivitas (Q) sebesar 28,371 m3/jam, wheel loader memiliki taksiran produktivitas (Q) 83,296 m3/jam, dan dump truck memiliki taksiran produktivitas (Q) 28,183 m3/jam. Selanjutnya, hasil waktu produktivitas kerja alat berat pada proyek hotel ex. AP Inn Kuta pada pekerjaan mobilisasi alat berat excavator membutuhkan waktu 40 hari. Berdasarkan hasil analisis ini, durasi proyek yang dibutuhkan selama 40 hari. Durasi ini lebih cepat 5 hari dari waktu yang direncanakan.

Page 2 of 4 | Total Record : 34