SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
Published by Universitas Majalengka
ISSN : 25283820     EISSN : 30260833     DOI : https://doi.org/10.31949/stima
Prosiding SEMINAR TEKNOLOGI MAJALENGKA (STIMA) adalah publikasi ilmiah yang memuat hasil-hasil penelitian orisinal dan terkini dari para akademisi, peneliti, dan praktisi di berbagai bidang teknik dan manajemen. Prosiding ini memiliki sifat multidisiplin, berfokus pada integrasi ilmu pengetahuan dari empat cabang utama: Teknik Industri, Teknik Sipil, Teknik Mesin, dan Informatika.
Articles 465 Documents
IMPLEMENTASI PREVENTIVE MAINTENANCE PADA MOULD ELBOW 3 INCH UNTUK MENCEGAH CACAT FLASHING Stephanus Andria; Asep Rachmat
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Unlike previous studies that focused on preventive maintenance strategies in general, this study analyzes the specific application of preventive maintenance to a 3-inch elbow mold—encompassing planning, welding, turning, and polishing stages—as a means to reduce the potential for flashing defects during the injection molding process.
ANALISA KEBOCORAN DAN PERBAIKAN POMPA SENTRIFUGAL 11-P-102 A CRUDE DESTILLATION UNIT DI PT. PERTAMINA INTERNATIONAL RU VI BALONGAN Fajar Maulana; Alwi Albaar
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Centrifugal pumps are vital equipment in the crude oil processing operations of the Crude Distillation Unit (CDU) at PT Pertamina International Refinery Unit VI Balongan. Pump 11-P-102 A functions to continuously transfer process fluids; therefore, its reliability has a significant impact on operational stability. During operation, leakage problems were identified, which have the potential to reduce pump performance, increase safety risks, and cause operational losses. This internship report aims to analyze the causes of leakage in centrifugal pump 11-P-102 A and to evaluate the repair methods implemented. The methods used include direct field observation, collection of operational data, literature review, and analysis of the mechanical seal condition, lubrication system, and pump operating parameters. Based on the analysis results, the leakage was caused by wear of the mechanical seal, influenced by operating conditions and service life. Corrective actions were carried out through mechanical seal replacement, alignment inspection, and performance testing of the pump after repair. The results of this internship indicate that after the repair was completed, pump 11-P-102 A was able to operate normally without leakage, thereby improving the reliability and operational safety of the unit. It is expected that the results of this analysis can serve as a reference for maintenance activities and the prevention of similar failures in centrifugal pumps within the CDU of PT Pertamina International RU VI Balongan.
Metode Pelaksanaan Pembangunan Jembatan Cipelang B Proyek Tol Cisumdawu Seksi 6A Andre Septian
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The construction of the Sungai Cipelang Bridge at STA. 56+470 on the Cisumdawu Toll Road Section 6A is a critical structure connecting sections separated by the Cipelang River in Ujung Jaya, Sumedang. This study examines technical problems in constructing this approximately 100-meter precast segmental box girder bridge. Field observations over a three-month period focused on six construction activities: pier head construction, wall box underpass concreting, scaffolding installation, top slab concreting, girder stressing, and girder erection. The methodology combined direct field observation, documentation analysis, and comparative evaluation against SNI 2847:2019 and ACI 347R-14. Results show that reinforcement spacing errors in the pier head were corrected through reinstallation and stricter supervision. Concrete segregation risk in the wall box underpass was managed by pouring in two stages of 3.2 meters each. Scaffolding instability was resolved through joint inspection and jack calibration. Top slab leakage was prevented using polyethylene membrane lining. Stressing errors were addressed through equipment recalibration, and erection challenges were overcome through improved survey coordination and rescheduling. These findings show that effective problem-solving in bridge construction depends on rigorous technical supervision, adaptive methodology, and inter-team coordination, offering practical insights for similar toll road bridge construction projects in Indonesia.
IMPLEMENTASI PROGRESSIVE WEB APP PADA APLIKASI PENGADAAN ATK BERBASIS LARAVEL Varhan Dani; Dadan Zaliluddin
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The office supply procurement process at CV Anugrah Pratama Sunarya was previously conducted manually, leading to challenges in inventory management, data recording, and order processing. This research aims to implement a web-based office supply procurement application integrated with Progressive Web App (PWA) technology to enhance the effectiveness and accessibility of procurement services. The system was developed using the Extreme Programming (XP) software development methodology, encompassing planning, design, coding, and testing phases. The application was built using the Laravel framework and a MySQL database, while PWA technology was implemented to enable installation on user devices, faster access, and an improved user experience through browser-based application features. System testing involved Black Box Testing to evaluate functional requirements and White Box Testing to analyze the application's logic and control flow. Implementation results demonstrate that all system functionalities—including product management, procurement transactions, inventory management, and order processing—operate in accordance with established requirements. Furthermore, the integration of PWA technology allows users to access the system more efficiently without the need for installation via app stores. Consequently, the developed system supports the digitalization of procurement activities and enhances the company's operational efficiency.
PROSES PRESS UPPER SEPATU SOCCER MENGGUNAKAN MESIN BLOW PER MINUTE (BPM) Destayasa Dwi Saputra; Asep Rachmat
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This internship was conducted at PT xxxxx, a company engaged in the manufacturing of sports and casual footwear. This report discusses the upper pressing process of soccer shoes using the Blow Per Minute (BPM) machine as a critical stage in the footwear assembling system. The objective of this study is to identify the stages of the upper pressing process and to analyze the operational parameters of the BPM machine that influence product quality and precision. The methods employed include direct observation in the production area, literature review, and on-site process data collection. The results indicate that the upper pressing process consists of material preparation (cleaning and roughing), adhesive application (cementing), heat activation, pressing using the BPM machine, cooling and stabilization, and quality control inspection. The main parameters of the BPM machine include air pressure, pressing time, and the number of blows per minute, all of which must be properly controlled to ensure uniform force distribution and the formation of strong adhesive bonding through a mechanical interlocking mechanism. Proper parameter control can minimize defects such as open bond, misalignment, and delamination, thereby improving production efficiency and ensuring product quality in accordance with industry standards.
PEMELIHARAAN SOOTBLOWER AIR PREHEATER (APH) PADA BOILER DI PT PLN NUSANTARA POWER UP PLTU INDRAMAYU Muhamad Erik Setyawan; Engkos Koswara
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Air Preheater (APH) sootblower is an important component in the boiler system of a Steam Power Plant (PLTU) that functions to remove ash deposits resulting from the combustion process on the APH heating elements. The accumulation of ash deposits (fouling) can reduce heat transfer effectiveness, increase flue gas pressure drop, and negatively affect the thermal efficiency of the boiler. Therefore, planned and proper maintenance of the APH sootblower is required to ensure optimal boiler performance. This Internship Report aims to examine the maintenance procedures of the Air Preheater (APH) sootblower in the boiler system at PT PLN Nusantara Power UP PLTU Indramayu and to identify common problems encountered during its operation. The methods applied include field observation, literature review, technical data collection, and direct involvement in maintenance activities, particularly corrective maintenance, gland packing replacement, and roller front support bracket replacement in accordance with the applicable Standard Operating Procedures (SOP) and Work Instructions (WI). The results of the observations indicate that proper maintenance of the APH sootblower is able to maintain the effectiveness of APH surface cleaning, reduce potential operational disturbances, and support improvements in the reliability and efficiency of the boiler system. Thus, the implementation of proper APH sootblower maintenance is an important factor in supporting operational continuity and the performance of the steam power plant at PLTU Indramayu.
POINT OF SALE BERBASIS NEXT.JS PADA LIFESIDE APPAREL Muhamad Epul Fauzy Syahrulloh; Tri Ferga Prasetyo
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The rapid advancement of information technology has encouraged micro and small enterprises to adopt digital systems to improve operational efficiency. Lifeside Apparel, a custom t-shirt printing business located in Rajagaluh, still managed sales transactions manually, causing problems such as data duplication, recording errors, difficulties in generating sales reports, and the absence of automatic invoice generation. This study aims to design and develop a web-based Point of Sale (POS) information system using the Next.js framework to support transaction management at Lifeside Apparel. The system development process applied the Extreme Programming (XP) method consisting of planning, design, coding, and testing stages. The developed system provides integrated features including product management, customer management, order processing, payment management, production monitoring, report generation, and automatic invoice creation. System testing was carried out using White Box Testing and Black Box Testing. The results indicate that all system functions operate according to the specified requirements, while the implemented system improves transaction recording accuracy, accelerates business processes, and facilitates sales reporting for decision making. Therefore, the developed POS system can effectively support digital transaction management in small and medium enterprises.
ANALISIS KINERJA JALAN DI AREA KULINER PASAR MAMBO MAJALENGKA AKIBAT HAMBATAN SAMPING Dini Widyanti; Andri Irfan Rifai; Adinda Fajatika
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Roads are one of the important transportation facilities for connecting various places such as industrial centers, famland, settlements, and also as a means of distributing goods and services to support the econonomy. The rapidly growing economic development in Indonesia has also resulted in an increasing number of private vehicles. This clearly has a significant impact on the balance between the number of vehicles on the road and the road’s capacity. The type of research used this time is qualitative research. Qualitative research is research that usually uses analysis and is descriptive in nature. The data collected consist of primary and secondary. Primary data is data obtained through direct surveys at the research site, giving an actual picture of the situation and conditions. Meanwhile, secondary data is data obtained by collaborating with relevant institutions, including data like: research location, road situation maps. The research location is on Jalan Ahmad Yani. From the discussion results, it can be concluded that the traffic volume at the Mambo Market four way intersection during peak hours, which is from 4;30 PM to 5:30 PM; is 103 vehicles/hour heading north, 102,25 vehicles/hour heading south, 124,95 vehicles/hour heading west, and 117 vehicles/hor heading east, with a side obstruction factor of 40,4 vehicles/hour.
ANALISIS GAYA TEKAN DAN PROCESS PLANNING PADA PROSES STAMPING BODY OIL FILTER SPIN-ON KBO011-0106B MENGGUNAKAN PENDEKATAN PERHITUNGAN MANUFAKTUR Aji Supriadi; Engkos Koswara
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The structural integrity of oil filter components is an absolute prerequisite in ensuring the durability of internal combustion engines in the automotive sector. As a component that functions as a Pressure vessel, the oil filter Body must be manufactured with high precision to avoid mechanical failure. This study aims to analyze the process planning and validate the Manufacturing Pressure requirements of the KBO011-0106B spin-on oil filter Body component. The research methodology integrates literature studies, production parameter observations at PT FSCM Manufacturing Indonesia, and modeling using ZWCAD software. The analysis was carried out on 0.6 mm SECD cold-rolled steel through mechanical force calculations at the Blanking, Deep drawing (two stages), and Trimming stages. The results show a total Pressure requirement of approximately 40 tons, which is technically very capable to be run on a hydraulic Press machine with a capacity of 200-310 tons. The analysis concludes that the applied Manufacturing flow has a very high safety factor, optimal operational efficiency, and meets OEM quality standards. This article provides a technical contribution in the framework of stamping parameter optimization for high-Pressure components in the automotive industry.
PEMELIHARAAN KONDENSOR UNIT 1 DI PT PLN NUSANTARA POWER UP INDRAMAYU Rama Prasetya Dienata; Engkos Koswara
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This article discusses the maintenance system for the Unit 1 condenser at PT PLN Nusantara Power UP Indramayu. The condenser is a crucial component in the steam power plant cycle, functioning to condense exhaust steam from the turbine into condensate water to maintain the plant's thermal efficiency. The primary focus of this report is to understand maintenance procedures and evaluate condenser performance efficiency based on operational field data. The methodology employed includes field observations, a literature review, and mass and heat balance calculations. Observations indicate that maintenance procedures are carried out in several stages, ranging from work document preparation and tube cleaning via the scrubbing method to leak detection. Based on the calculations, the actual condenser efficiency was recorded at 65.13%. This figure falls below the design efficiency standard of 80–100%, indicating a need for further maintenance on the heat transfer and vacuum systems to re-optimize the power generation unit's performance.