cover
Contact Name
Ardi Mardiana
Contact Email
aim@unma.ac.id
Phone
+6281212777182
Journal Mail Official
stima@unma.ac.id
Editorial Address
Jl. KH. Abdul Halim No. 103 Majalengka, Jawa Barat, Indonesia 45418
Location
Kab. majalengka,
Jawa barat
INDONESIA
SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
Published by Universitas Majalengka
ISSN : 25283820     EISSN : 30260833     DOI : https://doi.org/10.31949/stima
Prosiding SEMINAR TEKNOLOGI MAJALENGKA (STIMA) adalah publikasi ilmiah yang memuat hasil-hasil penelitian orisinal dan terkini dari para akademisi, peneliti, dan praktisi di berbagai bidang teknik dan manajemen. Prosiding ini memiliki sifat multidisiplin, berfokus pada integrasi ilmu pengetahuan dari empat cabang utama: Teknik Industri, Teknik Sipil, Teknik Mesin, dan Informatika.
Articles 465 Documents
SISTEM INFORMASI MANAJEMEN PENDAFTARAN PASIEN BERBASIS WEB PADA PENGOBATAN ALTERNATIF SPESIALIS PATAH TULANG DESA GIRIMUKTI Mita Nurmala
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Patient registration in many small-scale alternative healthcare clinics in rural Indonesia still conducted manually using notebooks, leading to recording errors, slow data retrieval, and a high risk of data loss. Although previous studies have shown that web-based registration systems improve administrative efficiency, most focus only on registration and do not support the operational needs of alternative fracture treatment clinics. This study develops a web-based Patient Registration Management Information System for the Alternative Fracture Treatment Clinic in Girimukti Village, Majalengka. The system was developed using the System Development Life Cycle (SDLC) approach and modeled with Unified Modeling Language (UML). Data were collected through observation, semi-structured interviews, and literature review. The application was implemented using PHP and MySQL and evaluated through Black Box Testing and User Acceptance Testing (UAT). The results indicate that all system functions operated as expected, while UAT confirmed that users found the system easy to use and appropriate for daily administrative activities. The implementation reduced the average patient registration time from approximately eight minutes to two minutes and shortened patient record retrieval from around seven minutes to less than one minute. This study contributes an integrated registration management system specifically designed for alternative fracture treatment services, improving administrative efficiency, data accuracy, and accessibility of patient information.
ANALISIS SENTIMEN ULASAN PENGGUNA APLIKASI IDENTITAS KEPENDUDUKAN DIGITAL MENGGUNAKAN ALGORITMA NAIVE BAYES DENGAN PEMBOBOTAN TF-IDF Aprianti Safarani Aprianti Safarani; Budiman; Dadan Zaliluddin
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Research on the Digital Population Identity (IKD) application found a dominant negative sentiment of 74.81% based on an analysis of 10.308 clean reviews from 10,842 raw data collected through web scraping on the Google Play Store from January 2025 to March 2026. This indicates that the level of public satisfaction is still low. Technical obstacles during the registration process and system stability that is often disrupted after application updates are the main user concerns. This study successfully created a sentiment classification model with an accuracy of 87.88% and a negative class recall of 0.99 using the Naive Bayes algorithm and Frequency Term-Inverse Document Frequency (TF-IDF) weighting. The results of the word feature extraction recommend that the registration system architecture should be thoroughly evaluated, each software update should be thoroughly tested, and server capacity should be increased to provide a more stable and efficient user experience in the future in population administration services.
ANALISIS PENJADWALAN PRODUKSI ROTAN CV RAFFA ROTAN MENGGUNAKAN METODE FCFS DAN SPT Sandi Permana; Lia Milana; Whydiantoro
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

CV Raffa Rotan is a rattan furniture company operating a make-to-order production system in Majalengka Regency that has not implemented structured production scheduling, making it prone to delays and inefficient use of production time. This study analyzes and compares the production scheduling results of the First Come First Served (FCFS) and Shortest Processing Time (SPT) methods to determine which yields the minimum makespan. A descriptive quantitative approach was used, drawing on primary data from observation and interviews and secondary data from company documents across four periods, from the fourth quarter of 2025 through the third quarter of 2026, analyzed comparatively based on makespan and mean flow time in a two-workstation production system. Results show that SPT consistently reduced mean flow time, with an average reduction of 22.65% compared to FCFS across all periods. However, the makespan produced by SPT was consistently higher than FCFS across all four periods, with an average difference of 2.22%, since SPT does not account for workload distribution between stations separately. Thus, FCFS proved more effective in minimizing makespan in the two-workstation production system at CV Raffa Rotan and is recommended as the more suitable scheduling method for the company.
PROSES PEMBUATAN PART BRACKET CABLE CLAMP MENGGUNAKAN MESIN STAMPING PRESS DI PT. TRI JAYA TEKNIK KARAWANG Ridho Maulana Padmawidjaya; Dony Susandi
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This article describes the manufacturing process of the Bracket Cable Clamp using mechanical stamping presses at PT. Tri Jaya Teknik Karawang. The component is produced from SPCC steel according to JIS G 3141 with a working material size of 1.4 mm × 142 mm × 1219 mm. The production sequence consists of planning, material preparation, die selection and installation, die-height setting, blanking, three bending stages, two piercing stages, quality control, and final product inspection. Four dies are used: two single-station dies for blanking and the third bending stage, and two combination dies for bending stages 1-2 and piercing stages 1-2. The blanking and piercing operations use a 110-ton SHING TAI press, while the bending operations use a 150-ton AIDA press. Experimental die-height adjustment produced standard settings of 329 mm for blanking, 336 mm for bending, and 350 mm for piercing. Calculated forming forces were 25.7 kN for blanking, 7.13 kN for bending stages 1-2, 1.69 kN for bending stage 3, and 17.94 kN for piercing. The allowable punch-die clearance for 1.4 mm SPCC was 0.07-0.112 mm. Production observation recorded an average output of 300 pieces per hour with a cycle time of about 12 seconds per piece. Final inspection using visual checks, dimensional measurements, and a JIG fixture confirmed that accepted parts met the specified geometry and quality requirements.
PROSES PEMBUATAN PART BRACKET SELECT LEVER MENGGUNAKAN MESIN STAMPING DI PT.TRIJAYA TEKNIK KARAWANG Fazri Muzakir; Engkos Koswara
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This internship was conducted at PT. Trijaya Teknik Karawang with the objective of understanding the manufacturing process of the Bracket Select Lever using a Yushida P2 stamping press with a capacity of 110 tons. The internship methodology followed a flowchart consisting of observation, problem identification, literature review, planning, stamping process, and inspection stages. The Bracket Select Lever was manufactured using SPHC-PO steel with a thickness of 4.5 mm through the blanking, bending 1–2, and piercing processes, employing dies specifically designed for each manufacturing stage. The results of the internship indicate that the manufacturing process of the Bracket Select Lever was carried out in accordance with the established procedures. The accuracy of die setup, machine operation, and inspection process played a significant role in ensuring the quality of the final product.
EVALUASI SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK KONSTRUKSI BENDUNGAN PLTM DENGAN METODE IBPRP Ageng Suigh; Lia Laila Nurjamilah
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The implementation of the Occupational Health and Safety Management System (SMK3) in the Mini-hydropower Plant (PLTM) dam construction project in Talaga District, Majalengka Regency is crucial for minimizing work accidents. The purpose of this study is to analyze the level of application of OHS principles and identify potential hazards and work risks using the IBPRP (Hazard Identification, Risk Assessment, and Risk and Opportunity Control) method. The research was conducted using field observation methods and the collection of primary and secondary data from construction activities, including the use of Personal Protective Equipment (PPE), implementation of work procedures, and safety supervision. The results showed that the implementation of SMK3 in this project has run well, characterized by high awareness of the use of PPE such as helmets, safety shoes, vests, and gloves. Based on the results of the risk assessment, most of the potential hazards are categorized as small to medium risks and can be controlled through the application of appropriate work procedures and intensive field supervision. The OHS performance indicator of "Zero Accident" was successfully achieved because the application of the OHS system was carried out systematically starting from planning, implementation, to project evaluation. The implementation of OHS in the PLTM drainage project not only protects the safety of workers, but also improves overall work efficiency and productivity.
RANCANG BANGUN WEBSITE COMPANY PROFILE BERBASIS E-COMMERCE SEBAGAI MEDIA INFORMASI DAN PROMOSI DIGITAL PADA PABRIK GENTENG ANUGRAH JATIWANGI Romansah
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The development of information technology encourages businesses to use digital media for delivering information and promoting products more effectively. At Pabrik Genteng Anugrah Jatiwangi, product information, promotion, and customer orders were still handled through direct communication and WhatsApp, resulting in limited marketing reach and unstructured order management. This research aims to design and develop a web-based company profile as an information and digital promotion medium. The system was developed using the Waterfall method, consisting of requirement analysis, system design using Unified Modeling Language (UML), implementation, and testing. The application was built using PHP, the Laravel framework, and a MySQL database. The result is a company profile website integrated with e-commerce features, including company information, product catalogs, shopping carts, checkout, online payment, order history, and an administrator dashboard. Black Box testing showed that the main functions operated properly according to user requirements. In conclusion, the website supports information digitalization, simplifies product ordering, and expands the digital promotion reach of Pabrik Genteng Anugrah Jatiwangi.
SISTEM MANAJEMEN STOK BARANG BERBASIS WEB DENGAN PENDEKATAN REAL-TIME MONITORING DI MUBAROK FURNITURE Rubby Afkar Gustian; Suhendri
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Inventory management plays a crucial role in supporting the operational activities of a company. Mubarok Furniture still relied on manual inventory recording, resulting in delayed data updates, recording errors, and difficulties in monitoring stock availability accurately. This study aims to design and implement a web-based inventory management information system using a real-time monitoring approach to improve the effectiveness of inventory management. The research methodology included observation, interviews, documentation, and literature review, while the system development process consisted of requirements analysis, system design, implementation, and testing. The system was developed using PHP, Bootstrap 5, MySQL, and XAMPP. System evaluation was conducted through Black Box Testing and White Box Testing to assess both functional performance and program logic. The results indicate that the developed system is capable of managing inventory data, recording incoming and outgoing goods transactions, automatically updating stock information, and providing real-time inventory monitoring. Furthermore, the testing results demonstrate that all system functions operate according to user requirements and that the program logic performs as intended. Therefore, the proposed system improves the efficiency of inventory management, reduces the risk of human error, and supports decision-making processes at Mubarok Furniture.).
ANALISIS TINGKAT KERUSAKAN JALAN PADA PERKERASAN LENTUR SEBAGAI DASAR PENENTUAN PERBAIKAN JALAN DENGAN MENGGUNAKAN METODE PCI DI KABUPATEN MAJALENGKA (Study Kasus Pemeliharaan Jalan Jatiwangi Wanasalam (DAU) Paket VII (Tujuh) STA. 0+000 s/d 0+300) Vina Khalipatul Adibah; Arief Rijaluddin; er Lumban Toruan
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In general, roads are constructed as infrastructure to facilitate the mobility and accessibility of the community's socio-economic activities. The existence of roads is essential to support economic growth, agriculture, and other sectors. Good road conditions provide comfort and safety for vehicles traversing them; therefore, road repair and maintenance are necessary, as roads are a crucial factor in the movement of the economy and play a vital role in a region's progress and development. The Jatiwangi-Wanasalam road section in Jatiwangi District, Majalengka Regency spanning 850 meters exhibits significant damage, ranging from minor and moderate to severe across various segments. The objective of this study is to identify the types and severity levels of road surface damage and to propose repair measures based on the damage characteristics and required maintenance. The analysis process for this final project involved conducting a visual survey at the site, identifying damage types and severity levels, measuring damage dimensions, and analyzing the surface condition of the Jatiwangi-Wanasalam road by calculating the overall Pavement Condition Index (PCI) value. Subsequently, the surface condition was classified based on the PCI. The analysis results indicate that the Jatiwangi-Wanasalam road surface falls into the "poor" damage category, with a PCI value of 55.83. The appropriate repair alternative consists of a patching program followed by an overlay, and subsequent routine maintenance
PERAWATAN SOOTBLOWER INSERTABLE ROTATING (IR) PADA BOILER UNIT 3 PT PLN NUSANTARA POWER UP PLTU INDRAMAYU Aditiya Nathan Hidayat; Engkos Koswara
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study discusses the maintenance of an Insertable Rotating (IR-3Z) sootblower on Boiler Unit 3 at PT PLN Nusantara Power UP PLTU Indramayu. Ash and soot deposits on boiler heat-transfer surfaces can create slagging and fouling, reduce heat absorption, and disturb boiler performance. The study aimed to describe the IR-3Z maintenance sequence, identify the main problems found during field practice, and determine the actions required to restore equipment performance. Data were obtained through field observation, interviews with company personnel, literature review, technical data collection, and direct participation in maintenance activities. The results show that routine maintenance includes mechanical inspection, drive-system evaluation, cleaning, lubrication, component replacement, and post-maintenance testing. The main actions observed were replacement of the guide-bar retaining screw, grease filling on the main drive gear, replacement of gland packing, and replacement of the gooseneck. Based on the technical parameters, the lance travels 267 mm at 290 mm/min, requiring approximately 0.92 min for one movement, while the 2.3 rpm rotation speed produces about two rotations during the operating stroke. The work-practice findings report that 75% of the identified problems were related to component wear and 25% to drive-mechanism disturbances. Scheduled maintenance and compliance with safety procedures are required to maintain sootblower reliability and boiler heat-transfer performance.