cover
Contact Name
Ardi Mardiana
Contact Email
aim@unma.ac.id
Phone
+6281212777182
Journal Mail Official
stima@unma.ac.id
Editorial Address
Jl. KH. Abdul Halim No. 103 Majalengka, Jawa Barat, Indonesia 45418
Location
Kab. majalengka,
Jawa barat
INDONESIA
SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
Published by Universitas Majalengka
ISSN : 25283820     EISSN : 30260833     DOI : https://doi.org/10.31949/stima
Prosiding SEMINAR TEKNOLOGI MAJALENGKA (STIMA) adalah publikasi ilmiah yang memuat hasil-hasil penelitian orisinal dan terkini dari para akademisi, peneliti, dan praktisi di berbagai bidang teknik dan manajemen. Prosiding ini memiliki sifat multidisiplin, berfokus pada integrasi ilmu pengetahuan dari empat cabang utama: Teknik Industri, Teknik Sipil, Teknik Mesin, dan Informatika.
Articles 465 Documents
PROSES STAMPING PART BRACKET LEVER SELECT CABLE MENGGUNAKAN MESIN STAMPING PRESS MEKANIK Zahran Akmal Rizqullah; Dony Susandi
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This internship report discusses in depth the process of making Bracket Holder Type 51 parts using a stamping press machine carried out at PT. Persada Selaras Indonesia. This bracket holder component has an important function in the automotive system, namely as a support and binder between vehicle parts to remain stable and safe during operation. In the production process through the stages of the planning process including the materials used by SPHC and the creation of working drawings, setting dies with a height of 45 mm upper dies and 40 mm lower dies so a total of 85 mm, shearing process with a force of 46.31 tons, blanking process with a force of 15.04 tons, piercing process with a force of 0.795 tons, bending process with a force of 1.089 tons and conducting quality control to ensure the product meets standards or not. In the operation of the machine, a machine inspection is carried out first to minimize errors such as workplace inspection, dies inspection, die holder inspection, equipment configuration, according to work instructions. After the engine inspection is carried out, the engine is operated with the following steps: raise the handle to the ON position, check the engine headlights, pump grease, place the key on the star power in the ON position, press the green button on the main motor star, activate the emergency button, select the operational mode (foot or hand). This report is expected to be a reference in the development of manufacturing processes in the automotive industry, especially in the use of stamping press technology to produce high-quality components.
IMPLEMENTASI SISTEM INFORMASI MANAJEMEN GUDANG BERBASIS WEB SEBAGAI UPAYA TRANSFORMASI DIGITAL UMKM Muhammad Faiz Fadhlurahman; Suhendri
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to develop a comprehensive web-based warehouse management information system as a strategic effort towards digital transformation for Micro, Small, and Medium Enterprises (MSMEs). Historically, MSMEs rely heavily on manual recording methods, which often lead to data discrepancies, delayed reporting, and operational inefficiencies. The proposed system is meticulously designed to manage master stock data, dynamically monitor incoming and outgoing goods, and generate real-time analytical reports. Employing the Waterfall software development life cycle, the system's architecture was implemented using PHP as the server-side scripting language and MySQL for relational database management, coupled with the Bootstrap framework for a responsive user interface. The empirical results indicate that the integration of a web-based system significantly improves operational efficiency, drastically reduces human data entry errors, and provides accurate, real-time inventory tracking, thereby supporting data-driven decision-making processes for the enterprise management. Furthermore, the integration of robust testing mechanisms, including Cyclomatic Complexity analysis in white-box Testing and extensive boundary value analysis in black-box Testing, ensures system reliability, security, and optimal performance in handling high-volume warehouse operations. Ultimately, the digitalization of the warehouse infrastructure significantly eliminates administrative bottlenecks, allowing the business to scale its operations seamlessly within a highly competitive market.
PELAKSANAAN PEKERJAAN PENGECORAN BOX GIRDER SEGMENTAL PADA METODE BALANCE CANTILEVER MENGGUNAKAN FORMWORK TRAVELLER (STUDI KASUS: JEMBATAN JUNGCTION SEDYATMO TOL KATARAJA DIVISI INFRASTRUKTUR 1, SEKSI 1) M. Nanda Fajar Arij Rachman; Yayat Hendrayana
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Practical Work is an academic activity designed to provide students with experience in applying theoretical knowledge to actual construction practices. This Practical Work was conducted at the Kataraja Toll Road Project, Infrastructure Division 1, Section 1, focusing on the implementation of segmental box girder casting at the Sedyatmo Junction Bridge. The construction employed the balance cantilever method supported by a formwork traveller, which enables segmental casting to be carried out progressively and symmetrically without using scaffolding beneath the bridge span. The objectives of this Practical Work were to understand the implementation stages of segmental box girder casting, the application of the balance cantilever method, and the use of the formwork traveller as the primary construction equipment. Data were collected through direct field observations, interviews, technical discussions with project personnel, documentation, and literature studies. The observed construction stages included traveller setting, reinforcement installation, tendon duct and anchorage installation, formwork installation, pre-casting inspection, cast-in-situ concrete placement, curing, tendon stressing, and traveller launching to the subsequent segment. The results indicate that the balance cantilever method using a formwork traveller supports systematic construction activities, maintains structural balance during casting, and contributes to geometric accuracy and construction quality.
PROSES PEMBUATAN WORM GEAR SHAFT MENGGUNAKAN MESIN BUBUT KONVENSIONAL Derizki Abi Setiawan; Engkos Koswara
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The manufacturing of a worm gear shaft is an important process in the manufacturing field, particularly in power transmission systems that require a high reduction ratio and the ability to withstand large loads. The worm gear shaft functions as a threaded shaft that works together with the worm wheel to produce smooth and stable rotation. This study aims to determine the process of manufacturing a worm gear shaft using a conventional lathe and to identify the stages of work, from material preparation to the finishing process. The methods used include material preparation, workpiece measurement, straight turning, stepped turning, worm-thread cutting, keyway milling, finishing, and inspection of the results. The material used is Stainless Steel 304, machined using a conventional lathe and a milling machine. The work stages were carried out systematically to obtain the dimensions and worm-thread profile according to the design. The results show that a conventional lathe can be used to produce a worm gear shaft with satisfactory results when the machining is carried out according to the correct procedure and cutting parameters, with a total machining time of 9.442 minutes (567 seconds). The accuracy of measurement, tool selection, and spindle-speed setting greatly affect the quality of the resulting worm thread.
ANALISIS KEBUTUHAN BIAYA PEMELIHARAAN DAN PERBAIKAN JALAN BERDASARKAN PENILAIAN METODE PCI Indra Permana; Eka Juliar Rahayu; ase Dian Heryadiana
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The condition of the Cirebon Bandung road pavement STA 55+000 to STA 56+000 has experienced road damage that has an impact on the comfort of road users, this damage condition is functional damage that includes comfort and safety for road users, therefore the need for road repairs aimed at comfort and maintaining performance and road life plans. In the Pavement Condition Index (PCI) Method, the main factors to determine the severity of each segment are 3 factors, namely the type of road damage, the level of damage to the road and the number or density of road damage. In the Pavement Condition Index Method is a method that has a numerical index whose value is from 0 to 100. For a value of 0 has a description of very bad road conditions and a value of 100 indicates that the road pavement is in perfect condition in the segment studied. Based on the results of the study of Cirebon Bandung Road STA 55+000 to STA 56+000 there are 2 types of damage namely Crocodile Skin Cracks. In the analysis results of the Pavement Condition Index Method, the average PCI value is 95% with a description of very good road conditions. The recommended repairs for Cirebon Bandung road pavement STA 55+000 to STA 56+000 are Patching repairs by replacing 3 layers, namely AC WC, AC BC and AC BASE depending on the level of road damage. The total cost of repairing Cirebon Bandung road STA 55+000 to STA 56+000 with Patching repairs is Rp. 38,530,867.92.