cover
Contact Name
Putu Aryastana
Contact Email
aryastanaputu@warmadewa.ac.id
Phone
+6281222788222
Journal Mail Official
paduraksa.sipil@gmail.com
Editorial Address
Jl. Terompong 24 Tanjung Bungkak Denpasar Bali, Indonesia
Location
Kota denpasar,
Bali
INDONESIA
Paduraksa : Jurnal Teknik Sipil Universitas Warmadewa
Published by Universitas Warmadewa
Core Subject : Social, Engineering,
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 2303-2693 (Print ISSN), 2581-2939 (Electronic ISSN) is a journal of civil engineering provides a forum for publishing research articles or review articles which published by Warmadewa University Press jointly with Progam Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa. This journal is also dedicated to provide an intellectual space of scholarly discussion how journal of civil engineering able to create the new global formation of civil engineering and similar issues. This journal has been distributed by Progam Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa started from Volume 1 Number 1 Year 2012 for Print and Oline from Volume 3 Number 1 Year 2014 to present. This journal encompasses original research articles, review articles, and short communications, including: Civil Engineering; Water Resources; Construction Management; Transportation; Structure; Geotechnics; Environment; Others Engineering
Articles 14 Documents
Search results for , issue "Vol. 12 No. 2 (2023)" : 14 Documents clear
Analisis perbandingan biaya, waktu, dan dampak lingkungan pada pekerjaan lapis pondasi atas menggunakan material recycle dan cut and fill (studi kasus: proyek pembangunan jalur lintas selatan Tulungagung -Trenggalek) Fahmi Firdaus Alrizal; Diah Listyaningsih; Ihsan Galang Saputra
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 12 No. 2 (2023)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.12.2.6698.195-202

Abstract

Nowadays, environmental issues in construction project activities that were previously ignored have become major problems as they trigger global warming. Consequently, green construction as a concept of sustainable development has begun to be implemented. It is sort of an effort to minimize the impact of damage to the environment. The construction project of the Tulungagung-Trenggalek southern route carried out material recycling from construction waste to top foundation layer material. The material processing will have an impact on the construction implementation. Therefore, it is necessary to have a study on a comparative analysis of costs, time, and environmental impacts on the work of the top layer using recycled materials and the cut-and-fill method. After using recycled materials, the cost was IDR 2,637,312,551.00, while the cut-and-fill method cost was IDR 2,535,283,401.00. The recycling method took 20 days, whereas the cut-and-fill method took 37 days. Material waste reached 5729.27 tons by the recycle method and 46586.82 tons by the cut-and-fill method. The recycling method caused emissions of 52774.4 kgCO2/liter, while the cut-and-fill method brought in 59935.34 kgCO2/liter. In conclusion, the recycling method can be categorized as a green construction method because it produces fewer emissions and waste than the cut-and-fill method. The recycling method can reduce the impact of environmental damage.
Analisis penerapan lean six sigma terhadap pengendalian pemborosan material, waktu dan biaya berdasarkan kualifikasi perusahaan konstruksi di Jawa Barat Gergorius Yohanes Iyai; Peter F. Kaming
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 12 No. 2 (2023)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.12.2.6854.203-217

Abstract

Application lean six sigma (LSS) in West Java is still more often used in the manufacturing industry, in order to provide good product quality for customer satisfaction. Therefore, this study aims to determine how far the application of LSS in West Java has been applied to the construction industry and to find out whether there are differences between each company's qualifications regarding how to control material waste, time waste and cost waste in construction projects after controlling LSS. The method used to answer the purpose of implementing LSS is a descriptive statistical test. While the methods used for different ways of controlling the wastage of materials, time and costs are Multivariate Analysis of Covariance (MANCOVA). The results of the descriptive statistical tests show that the application of LSS to large companies is included in the Very Good criteria (BS) with a score of 82%, for medium-sized companies it gets a value of 75% and small companies with a value of 74%, which means that its application is included in the Good criteria (B). The MANCOVA test results show that there is a difference between large and medium-sized companies in controlling material wastage. There is a difference between large and medium-sized companies in controlling time wastage. There is a difference between large companies and small companies in controlling time wastage. As for the wastage of costs, each company's qualifications in West Java do not have significant differences.
Analisis tipe gerakan tanah pada lereng Bendungan Bulango Ulu Kabupaten Bone Bolango menggunakan metode kinematika Moehammad Jasim Agi Saputra; Aang Panji Permana; Noviar Akase
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 12 No. 2 (2023)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.12.2.7343.244-249

Abstract

Bendungan Bulango Ulu merupakan salah satu proyek strategis yang dibangun di Desa Tuloa, Kecamatan Bulango Utara, Kabupaten Bone Bolango, Provinsi Gorontalo. Dalam membangun sebuah bendungan, analisis geologi dan kestabilan lereng menjadi sangat penting untuk menghindari risiko keruntuhan atau kegagalan struktur. Penelitian ini bertujuan untuk melakukan analisis geologi dan kestabilan lereng pada Bendungan Bulango Ulu dengan menggunakan metode kinematika. Metode kinematika digunakan untuk mengetahui tipe gerakan tanah pada lereng bendungan dan mengidentifikasi nilai probabilitas keruntuhan. Data geologi terkait dengan jenis litologi, petrografi, struktur geologi dan geomorfologi dikumpulkan melalui pengamatan langsung dan di laboratorium. Kemudian, data tersebut digunakan untuk mengetahui kondisi geologi, struktur geologi dan geomorfologi yang kemudian diinterpretasi hubungannya dengan kestabilan lereng. Hasil penelitian menunjukkan bahwa satuan geomorfologi yaitu satuan dataran alluvial dan perbukitan rendah structural. Litologi penyusun lereng bendungan bulango ulu tersusun dari satuan alluvial dan satuan granodiorite. Struktur geologi yang berkembang berupa kekar tarik dengan arah umum timur-barat (E-W) dan dipotong oleh kekar tension dengan arah umum utara-selatan (N-S). Tipe dan probabilitas gerakan tanah yang terjadi berdasarkan segmen yaitu pada lereng segmen A-B berupa Wedge (21.65 %), lereng segmen C-D berupa Wedge (12.27%), lereng segmen E-F berupa Wedge (15,12%), dan lereng segmen G-H berupa Wedge (21,8 %). Berdasarkan dari hasil analisis kinematika, lereng yang berada pada bendungan Bulango Ulu masuk kategori stabil. Penelitian ini merekomendasikan bahwa tidak perlu untuk melakukan perubahan geometri pada lereng bendungan dikarenakan lereng dalam keadaan stabil.
Analisa ketidakberaturan horizontal dan vertikal pada struktur gedung beton bertulang Nurul Hidayati; Hariyadi; Mukhta Riqi Sab’it Tibaq
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 12 No. 2 (2023)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.12.2.7653.235-243

Abstract

The behavior of regular and irregular building structures in resisting earthquake loads will certainly be different, so structural modeling must be done in such a way as to form a safe structure. The building in this study is L-shaped with an area of 2079.52 m2 with 6 floors and 28 m of total height. Earthquake load modeling in this study uses the equivalent static analysis method and design spectrum response about SNI concrete 2847-2019 and SNI earthquake 1726-2019. This study aims to investigate the behavior of multilevel reinforced concrete structures that experience horizontal and vertical irregularities due to earthquake loads as seen from the displacement and drift ratios that occurs is based on the results of numerical analysis. Based on the results of research on the geometry of the structure with vertical irregularities, it shows that the structure does not have Type 1a, Type 1b, Type 2, Type 3, Type 4, Type 5a and Type 5b irregularities. Thus the structure can be planned without considering the requirements to satisfy vertical irregularities. The geometry of the structure with horizontal irregularities shows that the structure has no irregularities in Type 1a, Type 1b, Type 3, Type 4 and Type 5. Meanwhile in Type 2 the structure is stated to have irregular inside angles, so the design force of the diaphragm on the structure must be increased by 25% at the planning stage.

Page 2 of 2 | Total Record : 14