ANALISIS PERBAIKAN TANAH KERETA CEPAT KORIDOR JAKARTA – SURABAYA, SEKSI 2 CIREBON – SEMARANG Tri Kumala Hasan; Kresno Wikan Sadono; Muhrozi Muhrozi
Jurnal Karya Teknik Sipil Volume 7, Nomor 2, Tahun 2018
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak Pemerintah Indonesia berencana akan melakukan peningkatan kecepatan kereta api koridor Jakarta-Surabaya. Dari beberapa alternatif yang diusulkan terpilih alternatif 1 dimana menggunakan kereta diesel tilt train dengan kecepatan 160 km/jam. Dengan adanya beban kereta yang berbeda maka diperoleh beban kereta (q) sebesar 36,299 kN/m. Analisis ini mengambil lokasi pada daerah Batang (B4-05, B4-06, dan B4-07). Dari hasil analisis dengan interpretasi peta geologi, maka lokasi tersebut berada pada formasi Alluvium yang memiliki ketebalan lapisan tanah lunak yang besar dan berpotensi menimbulkan kegagalan konstruksi timbunan jalan rel. Dari hasil analisis stabilitas menggunakan bantuan software Slope/W didapatkan angka aman untuk masing-masing lokasi adalah 1,346; 1,226; 0,635. Dari analisis penurunan didapatkan penurunan untuk masing-masing lokasi 0,834 m, 0,744 m, dan 0,893 m. Kemudian dilakukan perbaikan tanah menggunakan metode embankment on pile dengan bahan terucuk bambu dan preloading PVD karena metode ini sudah diterima dan umum digunakan di Indonesia. Dengan adanya penambahan tiang bambu untuk jarak spasi 1 m dengan Panjang bambu 6 m, 8 m, dan 21 m pada masing-masing lokasi, dapat meningkatkan stabilitas menjadi 1,368; 1,441; dan 1,335. Kemudian dengan penggunaan metode preloading pvd dapat menjamin stabilitas pada tiap tahapan timbunan serta mempercepat waktu konsolidasi menjadi 282 hari pada lokasi B4-05, 156 hari pada lokasi B4-06, dan 410 hari pada lokasi B4-07.
PEMODELAN PEMILIHAN MODA DENGAN METODE STATED PREFERENCE, STUDI KASUS PERPINDAHAN DARI SEPEDA MOTOR KE BRT RUTE SEMARANG – KENDAL Muammar Fahmi; Uum Umyati; Bambang Riyanto; Kami Hari Basuki
Jurnal Karya Teknik Sipil Volume 4, Nomor 4, Tahun 2015
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (427.911 KB)

Abstract

Kendal regency as satellite city of Semarang has established a mutual relationship and completing each other. The economic development and population insde the rural area of Semarang and Kendal regency has raised up since the street of Jerakah - Mijen has been widened in 2004 - 2012. This can be seen during working hour in which Semarang - Kendal road was fully filled by vehicles especially motorcycle. Based on this, the research must be done to reduce the congestion that occurs around the Semarang - Kendal. This study aims to perform modal choice modeling with stated preference methods, so that the government can take better policies to support the operation of the BRT Semarang - Kendal route. The survey was conducted by spreading the questionnaire and interview that consist of socio-economic characteristic of the respondent, route characteristic, and questionnaire that is organized through stated preference technique with additional attribute namely, the margin of route cost and margin of time used of departure between motorcycle and BRT Semarang-Kendal route. Study sites were around the Semarang - Kendal and on the bus route Semarang - Kendal. From the research result, it is shown that the choice of vehicle is based on the margin of route cost, namely UBRT – USM = 1,2353 - 0,0007 (ΔX1). Meanwhile, the choice of vehicle based on the margin of time used is UBRT – USM = 2,61336 - 0,17441 (ΔX2). In addition, the choice of transportation mode based on margin of cost and time is UBRT – USM = 2,6683 - 0,7365ΔX1 + 0,00219ΔX2. The potential of the shifting of passenger from motorcycle to BRT based on the route cost is 74%. Whereas, based of time used is 50%, and 32% is based on both choices. In addition to modeling mode choice, we need to Traffic Demand Management (TDM) are both on regular lines Semarang - Kendal, because the fundamental purpose of building a BRT route Semarang - Kendal limited only to reduce congestion caused by the use of motorcycles in bulk.
PERENCANAAN SISTEM PENYEDIAAN AIR BERSIH PDAM KOTA SALATIGA Agus Priyanto; Suripin Suripin; Salamun Salamun
Jurnal Karya Teknik Sipil Volume 2, Nomor 1, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1156.188 KB)

Abstract

The planning of the drinking water network system to maximize the utilization of available water resources. It necessary to planned in Argomulyo Sub-District is with the population projections, the number of public facilities that are available, and water demand from 2011 to 2021. After water demand are known then can be designed water piping network system by adjusting the state service area and topography analysis with EPANET 2.0 Simulation. EPANET 2.0.
KAJIAN SUSUT BETON PADA STRUKTUR BETON BERTULANG YANG CEPAT BONGKAR PERANCAH STUDI KASUS GEDUNG ICT CENTER UNIVERSITAS DIPONEGORO Gardha Satria Fadillah; Rizki Amalia Putri; Sri Tudjono; Yulita Arni Priastiwi
Jurnal Karya Teknik Sipil Volume 6, Nomor 2, Tahun 2017
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1439.386 KB)

Abstract

Pembongkaran bekisting biasanya dilakukan setelah beton berumur 14 hingga 28 hari, namun pada Gedung ICT Center Universitas Diponegoro bekisting sudah dibongkar pada saat beton berumur 7 hari. Pada saat pembongkaran tidak terjadi keretakan, tetapi setelah beberapa waktu balok tersebut mengalami keretakan. Keretakan terjadi ketika hanya ada berat sendiri dan beban hidup belum bekerja. Belum diketahui penyebab keretakan yang terjadi sehingga dilakukan kajian apakah rangkak atau susut yang menjadi faktor penyebab timbulnya retakan yang terjadi. Kajian susut beton bertulang ini dimaksudkan untuk mengetahui apakah penyebab keretakan pada balok beton diakibatkan oleh susut beton atau faktor penyebab keretakan lainnya.Metode kajian dilakukan dengan menganalisis keadaan serta kondisi balok dan pelat pada gedung ICT Center dengan pembebanan berupa beban mati yang bekerja seperti beton cair yang belum mengeras, bekisting, dan perancah yang dimodelkan dalam 2 kondisi. Analisis dengan menggunakan program SAP2000 digunakan untuk menghitung regangan tarik akibat momen dan regangan susut yang tidak memperhitungkan pengaruh pengekangan tulangan akibat bongkar perancah pada usia beton baru mencapai 7 hari. Beton yang ditinjau adalah beton yang berumur 7, 14, 21, dan 28 hari pada daerah balok induk, balok anak, dan pelat lantai.Hasil analisis menunjukkan bahwa regangan saat bekisting dilepas yaitu umur 7 hari sampai dengan 28 hari, nilai dari regangan tarik di tepi semakin mengecil untuk umur beton yang bertambah. Hasil perhitungan regangan akibat susut menunjukan bahwa beton mengalami regangan susut pada saat 1 hingga 3 minggu setelah bekisting dilepas dan nilai regangan susut semakin kecil pada saat ditinjau terhadap beton umur 28 hari. Penjumlahan aljabar regangan tarik akibat momen dengan regangan akibat susut yang menghasilkan regangan total dibandingkan dengan batas crack. Didapatkan bahwa regangan total dari balok induk, balok anak 1, balok anak 2, dan pelat yang ditinjau pada kondisi 1 maupun kondisi 2 bernilai kurang dari batas crack, sehingga dapat disimpulkan bahwa beton tidak mengalami keretakan yang disebabkan oleh faktor susut pada beton
PERENCANAAN CHECK DAM KALI GUNG KABUPATEN TEGAL Anwar Eko Yulianto; Yunus Jonatan; Sutarto Edhisono; Abdul Kadir
Jurnal Karya Teknik Sipil Volume 3, Nomor 3, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (410.331 KB)

Abstract

Gung watershed is part of the watershed which located in Tegal regency with an area of 45.65 km2 where Gung River as its main river . Gung river conditions at this time had a reduction in the flow of flood discharge due to reduced cross-sectional area of the river (river capacities) due to sedimentation . The main cause of the high rate of sedimentation is the destruction of water catchment areas and land management less attention to the principles of conservation land . Therefore it is very necessary management effective river drainage area with emphasis on the conservation and protection of the land (in particular critical area) and water, especially in the upstream of the river. One of the countermeasures for erosion and sedimentation problems in this river is by building sediment control structure or so-called check dam . From the calculations have been done, check dam was designed to have the following features: spillway crest of the main dam at El. +431.500 m, 4 m dam height and 3.2 m foundation depth, bottom width obtained by 20 m, flood design discharge with 50 years return period was 502.368 m3/sec, height of wing crests was 6.469 m at El.+437.969 m with 1.0 m freeboard, construction of the main dam was stone masonry; spillway crest of the sub dam at El.+429.000 m with 1.5 m height and 2.5 m foundation depth, height of wing crests was 6.567 m at El.+435.567 m with 1.0 m freeboard, construction of the sub dam was stone masonry. The apron elevation was El.+427.500 m with 1.8 m thickness. The apron protection was concrete in quality K 175 with 1.5 m thickness (bottom layer) and quality K 225 with 0.3 m thickness (upper layer/blanket).
STUDI PERENCANAAN SUBMERGED DAN NON SUBMERGED BREAKWATER UNTUK PENANGANAN ABRASI DI PANTAI MOROSARI DEMAK Zhafarina Hafizha Kautsar; Tubagus Nauval Dzaki; Sriyana Sriyana; Slamet Hargono
Jurnal Karya Teknik Sipil Volume 7, Nomor 4, Tahun 2018
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAK Pantai Morosari, Kevamatan Sayung, Kabupaten Demak adalah salah satu pantai yang mengalami abrasi disetiap tahunnya ditambah dengan penurunan tanah menyebabkan banjir rob, sehingga menenggelamkan pemukiman warga serta ekosistem mangrove. Tujuan studi yaitu mengembalikan daratan pantai yang tenggelam akibat abrasi dengan merencanakan bangunan pelindung pantai. Perencanaan bangunan pelindung pantai berupa bangunan submerged dan non submerged breakwater yang ditempatkan rangkap sejajar pada dua lokasi, yaitu dari arah barat laut garis pantai sebagai lokasi 1 dan dari arah barat daya garis pantai sebagai lokasi 2. Simulasi terhadap tinggi gelombang dan periode gelombang maksimum menggunakan program MIKE21, menunjukkan bahwa reduksi gelombang oleh submerged breakwater sebesar 80% sedangkan submerged breakwater sebesar 66,67%. Simulasi perubahan garis pantai menunjukkan kemajuan garis pantai sejauh +100m. Simulasi terhadap deformasi tanah pada dasar bangunan menunjukkan deformasi tanah terbesar setelah pembangunan adalah 31,41 mm. Penentuan kedalaman cerucuk bambu pada bangunan pelindung pantai menggunakan program FoundationProV1 menghasilkan kedalaman cerucuk 20m untuk non submerged breakwater dan 12m untuk submerged breakwater. Hasil perhitungan dimensi menunjukkan konstruksi pada Lokasi 1 akan mempunyai cost yang relatif jauh lebih besar dibandingkan Lokasi 2, namun efektivitas dalam melindungi wilayah pantai pada Lokasi1 lebih baik dibandingkan Lokasi2
PERENCANAAN PENGGANTIAN JEMBATAN TINJOMOYO KOTA SEMARANG Indra Hadi Mulyaning Wahyu; Kurmein Al Musadad; Moga Narayudha; Rudi Yuniarto Adi
Jurnal Karya Teknik Sipil Volume 2, Nomor 2, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (396.602 KB)

Abstract

The purpose of planning the replacement of  the bridge is the first Tinjomoyo to the facilitate public access Tinjomoyo an increasingly crowded, and then to replace the steel bridge that was damaged because there is no control of the government for the cost of care is expensive and prone to corrosions and there fore the government has an alternative to replace the bridge permanently by using concrete bridge or concrete because of soil condition in the area tinjomoyo including hard ground and there fore the selection of the palm of shallow foundation and wells as a load – bearing, but it is not concrete in terms of treatment need special care such as steel concrete bridge corrosions. Event not experience in bridge construction is needed time of 32 weeks.
ANALISIS KELAYAKAN FINANSIAL OPERASIONAL PARKIR METER DI KOTA SEMARANG Bimo Fajar Muhammad; Robertus Widhi Septiawan; Bambang Riyanto; Kami Hari Basuki
Jurnal Karya Teknik Sipil Volume 6, Nomor 3, Tahun 2017
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Meningkatnya kebutuhan parkir di daerah perkotaan akan meningkatkan jumlah titik parkir untuk memenuhinya. Semakin banyaknya titik parkir tidak berbanding lurus dengan jumlah titik parkir yang teridentifikasi, maka dibutuhkan Parkir Meter agar titik-titik parkir dapat dikontrol yang nantinya akan meningkatkan pendapatan asli daerah dari retribusi parkir. Oleh Karena itu perlu adanya analisis untuk mengetahui kelayakan operasional Parkir Meter khususnya di Kota Semarang. Penentuan lokasi didasarkan pada tipe jaringan jalan, seperti di Jalan Agus Salim yang mewakili jalan kolektor dan Jalan Pekodjan yang mewakili jalan lokal, Dua ruas jalan tersebut yang digunakan sebagai acuan dalam analisis kelayakan finansial operasional pakir meter. Survei lapangan dilakukan untuk inventarisasi kebutuhan parkir. Analisis dilakukan dalam empat skenario yang memiliki indikator berbeda-beda seperti lamanya investasi dan tarif parkir, dengan membandingkan retribusi parkir yang diterima pemerintah terhadap pendapatan parkir (existing), diolah menggunakan NPV (Net Present Value), BCR (Benefit Cost Ratio), dan rencana untuk suatu investasi Parkir Meter yang layak atau tidak menggunakan IRR (Internal Rate of Return). Nilai turn over pada tiap jalan yaitu pada Jalan Agus Salim sebesar 1,266 Kendaraan/SRP/Jam dan untuk Jalan Pekodjan sebesar 1,047 Kendaraan/SRP/Jam. Skenario IV menunjukkan kelayakan yang paling baik dibandingkan dengan skenario yang lain meskipun dengan catatan adanya tarif parkir yang baru, karena dengan skenario IV paling cepat mendapatkan modal kembali. Lebih baik lagi apabila ada penelitian atau kajian lanjutan untuk mendetailkan kedalaman teknis serta perijinan dan manajemen pengolahannya yang terintegrasi dengan beberapa aktivitas penggunaan lahan disekitar lokasi.
PERENCANAAN BENDUNG DAMAR KABUPATEN KENDAL, JAWA TENGAH Suhardi Suhardi; Yandi Purbangsa; Sri Eko Wahyuni; Sugiyanto Sugiyanto
Jurnal Karya Teknik Sipil Volume 3, Nomor 4, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (432.471 KB)

Abstract

Damar weir is a hydraulic structure which will construct in Pageruyung village, Kendal district. The objective of Damar weir construction is designed to fulfill the needs of irrigation water for the rice fields around the area. According to the analysis the flood discharge plan of Damar weir is 111 m3/sec with 50 years return period. The weir is using a rounded crest weir with effective width 23,7 m and height of the crest is 2,5 m. The length of the upstream apron floor is 3,0 m and uses the USBR Type IV stilling basin. The length of the sand trap is 40 m with the width of channel base 1,5 m. The time schedule of this project is 28 weeks and the budget plan is Rp 10.185.086.00,00 (Ten Billion, One Hundred And Eighty Five Million, Eighty Six Thousand Rupiah).
PERBANDINGAN BIAYA DAN WAKTU PADA PELAKSANAAN PEKERJAAN KONSTRUKSI DENGAN BETON KONVENSIONAL DAN FLY SLAB (Studi Kasus Proyek Pembangunan Gedung Politeknik Madiun) Indah Purwaningsih; Kunil Murtachiyatin; Pranoto Samto Admojo; M Agung Wibowo
Jurnal Karya Teknik Sipil Volume 3, Nomor 4, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (363.104 KB)

Abstract

The method of construction determines the cost and the time required to complete a construction, as well as quality, safety and health (K3) and the environment produced at the end of the project. This study aims to analyze the cost and time required to complete a storey building, specially a floor plate using a fly slab concrete and compared with the conventional reinforced concrete. Analyz quality, K3 and environment produced from the use of fly slab concrete and compared with the conventional reinforced concrete. The method of this tudy is by re-calculate of the cost and time in construction of Polytechnic Building Madiun which was changed from using the conventional reinforced concrete into the concrete fly slab. The cost recalculation is done by recalculate both the unit volume and price. While the time will be recalculated using Microsoft Project. Quality analysis is done by reviewing the existing concrete quality in the Work Plan and requirement, then compared with the quality of the fly slab concrete. K3 and environmental analysis done by reviewing the application of the K3 and the environment at the project location then compared between the conventional reinforced concrete slab with fly slab concrete. Based on the analysis of the magnitude of the reduction of the cost of implementing development work Polytechnic Building Madiun using fly slab concrete is Rp. 16.740.000,00 or 3 % of the floor plate work using the conventional reinforced concrete. Execution time savings by using fly slab concrete is 12 days or 29 % of the total concrete work timefor second and third floor using the conventional reinforced concrete.The using of fly slab concrete does not reduce the quality of the concrete slab due to the quality of the fly slab concrete that used is higher than the conventional reinforced concrete quality. The using of fly slab concrete can to minimize the work accidents, beside that, the using of fly slab concrete can reduce the wood as formwork and casting the rest of the waste reduction project.