cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota bandar lampung,
Lampung
INDONESIA
Jurnal Rekayasa Sipil dan Desain
Published by Universitas Lampung
ISSN : 23030011     EISSN : 27150690     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 840 Documents
Perencanaan 4D Scheduling Simulation Dengan Menggunakan Building Information Modeling (BIM) Pada Gedung 6 (Enam) Rumah Sakit Pendidikan Perguruan Tinggi Negeri Universitas Lampung Dzakiroh, Alda Alfiah; Bayzoni, Bayzoni; Siregar, Amril Ma'ruf; Husni, Hasti Riakara
Jurnal Rekayasa Sipil dan Desain Vol 11, No 1 (2023): Edisi Maret 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstractThe use of Building Information Modeling (BIM) is an alternative solution to optimize the time for each step of work in a project. This study aims to determine the duration of scheduling with the normal and overtime method accompanied by the addition of heavy equipment and to determine the stages of planning with the application of 4-Dimensional BIM. The analytical method used is the implementation of a 4D Scheduling Simulation in Building 6th of the State University Education Hospital (RSPTN), University of Lampung. The calculation result by using the scenario of labor use with a normal duration of 8 hours/day showed that the completion of the work takes 272 days. After crashing with the addition of working hours (overtime) for 3 hours and the addition of heavy equipment, the duration was reduced to 200 days with a difference of 72 days. Based on this research, it can be concluded that the use of crashing method increases time efficiency by 36% higher than duration planning using the normal method and the application of BIM 4D can provide solutions that can be used as a reference in understanding engineering and construction plans.Keywords: Building Information Modeling (BIM), 4D Scheduling Simulation, Building 6th RSPTNAbstrakPenggunaan Building Information Modeling (BIM) merupakan solusi alternatif untuk pengoptimalan penggunaan waktu tiap tahap pekerjaan dalam suatu proyek. Penelitian ini bertujuan untuk memodelkan dan mengetahui durasi penjadwalan dengan metode normal dan lembur yang disertai penambahan alat berat serta mengetahui tahapan perencanaan dengan penerapan BIM 4 Dimensi. Metode analisis yang digunakan yaitu dengan penerapan 4D Scheduling Simulation pada Gedung 6 Rumah Sakit Pendidikan Perguruan Tinggi Negeri (RSPTN) Universitas Lampung. Hasil perhitungan dengan menggunakan skenario penggunaan tenaga kerja dengan durasi normal selama 8 jam/hari menunjukkan bahwa penyelesaian pekerjaan membutuhkan waktu selama 272 hari. Setelah dilakukan crashing dengan penambahan jam kerja (lembur) selama 3 jam serta penambahan alat berat didapat pengurangan durasi menjadi 200 hari dengan perbedaan selisih waktu 72 hari. Berdasarkan penelitian ini diperoleh kesimpulan bahwasannya penggunaan metode crashing meningkatkan efisiensi waktu 36% lebih tinggi dibandingkan dengan perencanaan durasi menggunakan metode normal serta penerapan BIM 4D dapat memberikan solusi yang dapat dijadikan acuan dalam pemahaman teknik dan rencana konstruksi.Kata kunci: Building Information Modeling (BIM), 4D Scheduling Simulation, Gedung 6 RSPTN
Manajemen Penjadwalan Menggunakan Microsoft Project dan Analisis Risiko pada Proyek Pembangunan RSPTN Universitas Lampung Alviani, Enggar; Putra, Andius Dasa; Siregar, Amril Maruf; Usman, Kristianto
Jurnal Rekayasa Sipil dan Desain Vol 11, No 2 (2023): Edisi Juni 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pelaksanaan proyek konstruksi melibatkan serangkaian kegiatan atau pekerjaan yang kompleks dan saling berketerkaitan satu sama lain. Proyek RSPTN Universitas Lampung memiliki potensi risiko yang cukup tinggi dan akan memakan waktu pelaksanaan yang cukup lama mengingat besarnya bobot pekerjaan sehingga dapat menyebabkan keterlambatan, pembengkakkan biaya dan berbagai macam risiko.. Untuk mengantasi hal tersebut diperlukan analisis mengenai penjadwalan guna mencapai efektivitas dan efisiensi yang cukup tinggi serta analisis mengenai faktor risiko terhadap biaya dan waktu agar dapat diidentifikasi dan dikelola dengan baik pada kemungkinan risiko yang akan terjadi. Analisis penjadwalan dilakukan dengan menggunakan Precedence Diagram Method (PDM) dan bantuan perangkat lunak Microsoft Project, sedangkan untuk metode analisis risiko yang digunakan adalah analisis semi kuantitatif, dimana skala-skala deskriptif yang digunakan dalam analisa kuantitatif diberi nilai. Berdasarkan hasil pengolahan data didapatkan bahwa durasi kegiatan normal proyek, yaitu 176 hari, dan pekerjaan yang berada pada lintasan kritis sebanyak 60 pekerjaan dimana sebagian besar berada pada pekerjaan struktur kolom dan dari analisis faktor risiko didapatkan beberapa faktor risiko dominan yakni cuaca tidak menentu, kerusakan atau kehilangan material, kecelakaan tenaga kerja, kesalahan estimasi biaya dan waktu, serta timbulnya kemacetan di sekitar proyek. Kemudian setelah dianalisis kembali penjadwalan setelah terpengaruh oleh faktor risiko didapatkan durasi proyek menjadi 240 hari dengan 50 pekerjaan kritis. Kata kunci : Precedence Diagram Method, Microsoft Project, Risiko, Jadwal.
Analisis Stabilitas Bangunan Pengaman Pantai (Revetment) di Pantai Muli Lampung Selatan Tomi, Muhammad; Zakaria, Ahmad; Tugiono, Subuh; Kusumastuti, Dyah Indriana
Jurnal Rekayasa Sipil dan Desain Vol 11, No 2 (2023): Edisi Juni 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study analyzes the revetment structure located at Muli Beach, South Lampung, through wave analysis occurring at the beach. The stability of the coastal protection structure, revetment, at Muli Beach is of utmost importance due to safety and security concerns for beach users. If the revetment is unstable, it can cause damage to the structure and potentially pose hazards to the users. The aim of this research is to assess the stability of the revetment structure against high waves occurring at the beach. The analysis method employed in this study utilizes wave forecasting with a return period of 10 years. The analysis also encompasses the examination of the components constituting the revetment structure at Muli Beach. The research findings indicate that the composition of the revetment structure is unstable against high waves. The wave forecasting analysis at Muli Beach resulted in a significant wave height, Hs = 1,02 m and a wave height at breaking point Hb = 1,82 m. Regarding the structure's components, there are several shattered stones > 2, indicating inconsistency with the existing literature. In the analysis of the revetment toe protection, a stability coefficient value of Ns^3 = 290 was obtained, which can be considered safe. Based on these analysis results, it is recommended to implement necessary measures to prevent the collapse of the revetment structure during high wave events. Keywords: revetment, waves, stability, beach.
Evaluasi Kinerja Struktur Gedung Bertingkat dengan Metode Analisis Respon Spektrum (Studi Kasus: Gedung 5 Rumah Sakit Pendidikan Perguruan Tinggi Negeri (RSPTN) Universitas Lampung) Sabila, Widya Lulu Amalia; Husni, Hasti Riakara; Bayzoni, Bayzoni; Isneini, Mohd
Jurnal Rekayasa Sipil dan Desain Vol 11, No 3 (2023): Edisi September 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstractThe high occurrence rate of damage to buildings and infrastructure due to earthquakes necessitates a review or analysis of earthquake-resistant structural planning. Considering the importance of hospital functions, it is necessary to conduct an evaluation of the performance of the building structure under seismic loads using the latest standards to determine the structural suitability of the building. The level of safety in high-rise buildings is considered crucial to be known, so in this study, a case study was conducted on Building 5 of RSPTN UNILA using the method of response spectrum dynamic analysis. The structural analysis was calculated using a commercial structural analysis program in a three-dimensional model to determine whether the structure is safe or not according to the inter-storey drift limits specified in SNI 1726:2019. The results of the analysis show that as the earthquake acceleration increases, the drift value in the building structure also increases. The drift values obtained for the evaluated building are 15.5850% in the X direction and 19.3563% in the Y direction compared to the allowable drift. The drift (Δ) occurring in the building structure satisfies the allowable story drift (Δa) requirements according to SNI 1726:2019.Key words : structural performance, earthquake, dynamic analysis, spectrum response.  AbstrakTingginya tingkat terjadinya kerusakan pada bangunan dan infrastruktur akibat terjadinya gempa membuat perlu adanya peninjauan atau analisis terhadap perencanaan struktur tahan gempa. Mengingat pentingnya fungsi rumah sakit maka perlu diadakannya evaluasi kinerja struktur gedung terhadap beban gempa dengan standar terbaru untuk menentukan kelayakan struktur gedung. Tingkat keamanan gedung bertingkat tinggi dinilai sangat penting untuk diketahui sehingga dalam penelitian kali ini dilakukan studi kasus pada Gedung 5 RSPTN UNILA dengan menggunakan metode penelitian analisis dinamik respon spektrum. Analisis struktur dihitung menggunakan program analisis struktur komersial dalam model tiga dimensi bertujuan mengetahui apakah struktur aman atau tidak sesuai batas simpang antar tingkat dalam SNI 1726:2019. Hasil dari analisis yang dilakukan diketahui bahwa semakin besar percepatan gempa, maka nilai drift atau simpangan akan semakin besar juga pada struktur gedung. Nilai drift atau simpangan ini dipengaruhi juga oleh ketidakberaturan vertikal, sistem struktur, geometri gedung, dan fungsi gedung. Simpangan yang terjadi pada struktur gedung memenuhi syarat simpangan antar tingkat izin sesuai dengan SNI 1726:2019.Kata kunci : kinerja struktur, gempa, analisis dinamik, respon spetrum
Evaluasi Jumlah Armada Angkutan Kota Bandar Lampung Trayek Rajabasa-Tanjung Karang Berdasarkan Load Factor Angkutan Jannah, Faizatul; Ofrial, Siti Anugrah Mulya Putri; Karami, Muhammad; Herianto, Dwi
Jurnal Rekayasa Sipil dan Desain Vol 11, No 4 (2023): Edisi Desember 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Salah satu sarana transportasi yang memiliki peranan penting untuk memenuhi kebutuhan transportasi masyarakat perkotaan adalah angkutan kota. Ketersediaan angkutan harus seimbang juga dengan jumlah permintaan agar kinerja angkutan dapat berjalan dengan baik. Tujuan dari penelitian ini adalah untuk mengetahui jumlah armada yang beroperasi saat ini apakah sudah sesuai dengan faktor muatannya.Data yang dibutuhkan dalam penelitian ini antara lain : jumlah angkutan kota yang beroperasi saat ini dan jumlah penumpang yang naik/turun angkutan. Diketahui bahwa berdasarkan Keputusan Jendral Direktorat Perhubungan Darat Nomor 687 Tahun 2002 nilai ideal load factor angkutan umum adalah sebesar 70%. Penelitian dilakukan selama satu minggu pada periode sibuk pagi, siang dan sore. Penelitian dilakukan di sepanjang rute angkutan yaitu dari Terminal Rajabasa menuju Tanjung Karang. Dari penelitian diperoleh jumlah armada angkutan kota yang beroperasi saat ini ialah sebanyak 25 armada dan nilai load factor angkutan ialah sebesar 46%. Itu artinya perlu dilakukan pengurangan jumlah armada agar kinerja angkutan dapat berjalan dengan baik.Kata kunci : angkutan kota, kinerja, transportasi.
Karakteristik Arus Lalu Lintas Pada Jalan 2/2 Tidak Terbagi Sari, Yulianti Dewi Manda; Putra, Sasana; Sulistyorini, Rahayu; Herianto, Dwi
Jurnal Rekayasa Sipil dan Desain Vol 11, No 1 (2023): Edisi Maret 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The conditions of volume, speed, and density are influenced by the interaction of the driver and the vehicle with the road and the environment. One of the way to understand traffic behavior is by describing it in mathematical and graphical form.Through analysis of the relationship between volume, speed, and density can be known information about the current traffic flow conditions. The Greenshield model is used to represent the mathematical relationship between volume, speed, and density. The purpose of the study to analyze the characteristic relationship on 2/2 roads with an undivided type. Based on the results of calculating the mean speed, the service level of this road is type E. The mean speed in the morning is 28.78 km/hour towards Teluk and 25.44 km/hour towards Tanjung Karang. It concluded that the mean speeds of vehicles at this research location are not according to the Regulation of the Minister of the Republic of Indonesia Number 96 of 2015, where for secondary arterial roads with a service level of at least C, namely 60 km/hour.Based on the analysis of the relationship between traffic characteristics using the Greenshield model obtained (r2) = 0,276.
Pemanfaatan Material Pasir Sebagai Bahan Pengganti Fraksi Agregat Halus Untuk Lapis Pondasi Agregat Kelas A Santoso, Muhammad Bagus; Putra, Sasana; Sulistyorini, Rahayu; Herianto, Dwi
Jurnal Rekayasa Sipil dan Desain Vol 11, No 1 (2023): Edisi Maret 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The base course material uses mountain stone which is broken up with a stone crusher so that it has a high quality which makes it expensive. In this research we need an alternative material to replace fine aggregate that meets the specification requirements. One of the more affordable resources is sand aggregate. The purpose of this study was to determine the density and comparison of the California Bearing Ratio (CBR) value of the base course using sand as a substitute for fine aggregate. The method used in this research is laboratory scale testing to obtain data on aggregate characteristics, optimum moisture content, and CBR values. The base course aggregate mixture used was 55% coarse aggregate and 45% fine aggregate consisting of a mixture of fine crushed stone and 0%, 10%, and 20% sand substitution. The results showed that the KAO value decreased with the addition of sand aggregate. Laboratory CBR values increased with 0% sand substitution having a CBR value of 99.2%, 10% sand substitution having a CBR value of 90.6%, and 20% sand substitution having a CBR value of 84.1%. Only the laboratory CBR value with sand substitution of 20% does not meet the specifications for base A aggregate, namely a minimum value of 90%.
Pengaruh Penambah Ekstraksi Bubuk Lindi Hitam Terhadap Limbah Aspal Bekas Pakai Talitha, Yolanda Septiani; Putra, Sasana; Herianto, Dwi; Sulistyorini, Rahayu
Jurnal Rekayasa Sipil dan Desain Vol 12, No 1 (2024): Edisi Maret 2024
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jalan yang sering dilalui kendaraan berat, mengakibatkan penuaan aspal yang dapat menurunkan kualitas aspal tersebut. Inovasi yang dilakukan, yaitu memanfaatkan limbah aspal yang termodifikasi dengan ekstraksi bubuk lindi hitam atau lignin. Penelitian ini untuk mengetahui karakteristik pengikat aspal bekas pakai dengan tambahan lignin dengan kadar 0%, 3%, dan 6%. Pengujian reologi aspal meliputi berat jenis, penetrasi, daktilitas, titik lembek, viskositas.Penelitian ini menunjukkan bahwa aspal bersifat sangat kaku dan membutuhkan suhu yang sangat tinggi untuk mencair. Hasilnya terbukti dari titik lembek tertinggi (78,5°C pada kadar lignin 6%), penetrasi terdalam (9,33 mm pada kadar lignin 0%), daktilitas terpendek (4,15 cm pada kadar lignin 6%), nilai viskositas yang mendekati spesifikasi bina marga (3592,205 cSt pada lignin 3%), Kesimpulannya, bahan zat aditif lignin mampu membuat aspal semakin kaku dan keras dan tidak baik untuk bahan peremajaan aspal.
Pengaruh Penggunaan Ordinary Portland Cement (OPC), Semen Modifikasi Jenis III dan Jenis IV, dan Portland Composite Cement (PCC) Terhadap Kuat Tekan Beton Prameswari Tw, Aqilla Regita; Irianti, Laksmi; Sebayang, Surya; Isneini, Mohd.
Jurnal Rekayasa Sipil dan Desain Vol 11, No 4 (2023): Edisi Desember 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract Cement is one of the main materials used in making concrete. Cement is useful as a hydraulic binder when mixed with water. Based on the differences in usage characteristics and properties of cement, this research will discuss the effect of using OPC cement (type I), modified cement (type III and type IV), and PCC cement to see how the compressive strength of concrete develops over time with testing periods of 3 days, 7 days, 14 days, and 28 days. The research method used is an experimental study aimed at obtaining a comparison of compressive strength of concrete using OPC and PCC cement. The test specimens used are cylindrical in shape (diameter 150 mm and height 300 mm) with a total of 48 samples with 4 variations, each consisting of 3 samples. The planned concrete quality is 25 MPa. The highest compressive strength of concrete at 3 days, 7 days, 14 days, and 28 days is obtained by OPC cement, modified cement type III, PCC cement, and modified cement type III, while the lowest compressive strength of concrete at 3 days, 7 days, 14 days, and 28 days is obtained by modified cement type IV. Key words : cement, OPC cement, PCC cement, modified cement, compressive strength. AbstrakSemen merupakan salah satu bahan utama dalam pembuatan beton. Semen berguna sebagai perekat hidrolis ketika dicampur dengan air. Berdasarkan perbedaan karakteristik penggunaan dan sifat pada semen, maka penelitian ini akan membahas mengenai pengaruh penggunaan semen OPC (jenis I), semen modifikasi (jenis III dan jenis IV), dan semen PCCuntuk melihat bagaimana kuat tekan beton terhadap perkembangan umur beton dengan waktu pengujian beton berumur 3 hari, 7 hari, 14 hari, dan28 hari. Metode penelitian yang akan dilakukan adalah studi eksperimental yang bertujuan untuk mendapatkan hasil perbandingan kuat tekan beton pada semen OPC dan semen PCC. Benda uji yang digunakan berbentuk silinder (diameter 150 mm dan tinggi 300 mm) dengan sampel sebanyak 48 buah dengan 4 variasi yang masing-masing terdiri dari 3 sampel. Mutu beton yang direncanakan, yaitu 25 MPa. Kuat tekan beton terbesar pada umur 3 hari, 7 hari, 14 hari, dan 28 hari secara berturut diperoleh oleh semen OPC, semen modifikasi jenis III, semen PCC, dan semen modifikasi jenis III, sedangkan kuat tekan beton terkecil pada umur 3 hari, 7 hari, 14 hari, dan 28 hari diperoleh oleh semen modifikasi IV. Kata kunci : semen, semen OPC, semen PCC, semen modifikasi, kuat tekan.
Implementasi Building Information Modeling (BIM) Dalam Analisis Waste Material Tulangan Balok Pada Gedung Kuliah Umum 2 Institut Teknologi Sumatera Nurvireza, Daffa; Bayzoni, Bayzoni; Husni, Hasti Riakara; Ashruri, Ashruri
Jurnal Rekayasa Sipil dan Desain Vol 11, No 4 (2023): Edisi Desember 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Perkembangan teknologi tak terhindarkan, termasuk dalam industri konstruksi. Inovasi bertujuan untuk mempercepat penjadwalan, menghemat biaya, dan mengurangi pemborosan material. Melaksanakan konstruksi bangunan tanpa menghasilkan waste material merupakan suatu tantangan yang sulit. Oleh karena itu, konsep Building Information Modeling (BIM) diterapkan dalam perencanaan untuk meningkatkan efektivitas dan efisiensi dalam penggunaan material, dengan tujuan meminimalisir waste material. Penelitian ini dilakukan untuk mengevaluasi penerapan Building Information Modeling (BIM) dalam optimalisasi waste material pada penulangan balok. Penerapan Building Information Modeling (BIM) dalam penelitian ini menggunakan software Autodesk Revit. Tahapan penelitian mencakup pengumpulan data, pemodelan struktural 3D, pemodelan tulangan, input schedule mark tulangan, clash detection, output Bar Bending Schedule (BBS), cutting list menggunakan software 1D Cutting Optimization Pro, dan analisis waste material. Hasil penelitian menunjukkan berat total sebesar 188.655,89 kg. Persentase waste material pada D10 adalah 0,5%, D13 adalah 6,46%, D16 adalah 6,07%, dan D19 adalah 15,09%

Filter by Year

2013 2024


Filter By Issues
All Issue Vol 12, No 1 (2024): Edisi Maret 2024 Vol. 12 No. 1 (2024): Edisi Maret 2024 Vol. 11 No. 4 (2023): Edisi Desember 2023 Vol 11, No 4 (2023): Edisi Desember 2023 Vol. 11 No. 3 (2023): Edisi September 2023 Vol 11, No 3 (2023): Edisi September 2023 Vol. 11 No. 2 (2023): Edisi Juni 2023 Vol 11, No 2 (2023): Edisi Juni 2023 Vol 11, No 1 (2023): Edisi Maret 2023 Vol. 11 No. 1 (2023): Edisi Maret 2023 Vol. 10 No. 4 (2022): Edisi Desember 2022 Vol. 10 No. 3 (2022): Edisi September 2022 Vol 10, No 2 (2022): Edisi Juni 2022 Vol. 10 No. 2 (2022): Edisi Juni 2022 Vol 10, No 1 (2022): Edisi Maret 2022 Vol. 10 No. 1 (2022): Edisi Maret 2022 Vol 9, No 4 (2021): Edisi Desember 2021 Vol. 9 No. 4 (2021): Edisi Desember 2021 Vol. 9 No. 3 (2021): Edisi September 2021 Vol 9, No 3 (2021): Edisi September 2021 Vol. 9 No. 2 (2021): Edisi Juni 2021 Vol 9, No 2 (2021): Edisi Juni 2021 Vol 9, No 1 (2021): Edisi Maret 2021 Vol. 9 No. 1 (2021): Edisi Maret 2021 Vol. 8 No. 4 (2020): Edisi Desember 2020 Vol 8, No 4 (2020): Edisi Desember 2020 Vol. 8 No. 3 (2020): Edisi September 2020 Vol 8, No 3 (2020): Edisi September 2020 Vol 8, No 2 (2020): Edisi Juni 2020 Vol. 8 No. 2 (2020): Edisi Juni 2020 Vol. 8 No. 1 (2020): Edisi Maret 2020 Vol 8, No 1 (2020): Edisi Maret 2020 Vol 7, No 4 (2019): Edisi Desember 2019 Vol. 7 No. 4 (2019): Edisi Desember 2019 Vol 7, No 3 (2019): Edisi September 2019 Vol 7, No 2 (2019): Edisi Juni 2019 Vol 7, No 1 (2019): Edisi Maret 2019 Vol 6, No 4 (2018): Edisi Desember 2018 Vol 6, No 3 (2018): Edisi September 2018 Vol 6, No 2 (2018): Edisi Juni 2018 Vol 6, No 2 (2018): Edisi Juni 2018 Vol 6, No 1 (2018): Edisi Maret 2018 Vol 6, No 1 (2018): Edisi Maret 2018 Vol 5, No 4 (2017): Edisi Desember 2017 Vol 5, No 3 (2017): Edisi September 2017 Vol 5, No 3 (2017): Edisi September 2017 Vol 5, No 2 (2017): Edisi Juni 2017 Vol 5, No 1 (2017): Edisi Maret 2017 Vol 5, No 1 (2017): Edisi Maret 2017 Vol 4, No 4 (2016): Edisi Desember 2016 Vol 4, No 3 (2016): Edisi September 2016 Vol 4, No 2 (2016): Edisi Juni 2016 Vol 4, No 2 (2016): Edisi Juni 2016 Vol 4, No 1 (2016): Edisi Maret 2016 Vol 3, No 3 (2015): Edisi September 2015 Vol 3, No 2 (2015): Edisi Juni 2015 Vol 3, No 1 (2015): Edisi Maret 2015 Vol 3, No 1 (2015): Edisi Maret 2015 Vol 1, No 1 (2013): Edisi Maret 2013 More Issue