cover
Contact Name
DWI PRASETIYAWATI DIYAH HARIYANTI
Contact Email
duik_pdh@yahoo.com
Phone
-
Journal Mail Official
paudiapgpaud@gmail.com
Editorial Address
-
Location
Kota semarang,
Jawa tengah
INDONESIA
PAUDIA: JURNAL PENELITIAN DALAM BIDANG PENDIDIKAN ANAK USIA DINI
ISSN : 20891431     EISSN : 25984047     DOI : -
Core Subject : Education, Social,
PAUDIA is scientific journal about early childhood education; it hereby states that the publication of the articles is true research outcomes and it is scientifically. PAUDIA is a scientific journal about early childhood education. It belongs to PG PAUD Program of Science Education Faculty in Semarang PGRI University. It publishes twice a year; it is on July and October. This journal is research outcomes which are talking about early childhood educatio
Arjuna Subject : -
Articles 389 Documents
Pengaruh Metode Bercerita Menggunakan Boneka Tangan terhadap Perkembangan Emosi Usia 5-6 Tahun Insani, Aulia
PAUDIA: Jurnal Penelitian dalam Bidang Pendidikan Anak Usia Dini Vol 10, No 1 (2021): Juli 2021 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini)
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/paudia.v10i1.8537

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.
UPAYA MENINGKATKAN PENGETAHUAN MAKANAN SEHAT MELALUI PENERAPAN SENTRA COOKING PADA KELOMPOK BERMAIN B DI PAUD BAITUS SHIBYAAN KECAMATAN BERGAS KABUPATEN SEMARANG TAHUN AJARAN 2014/2015 Nurchayati, Dewi; Pusari, Ratna Wahyu
PAUDIA: Jurnal Penelitian dalam Bidang Pendidikan Anak Usia Dini Vol 3, No 2 Oktober (2014)
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/paudia.v3i2 Oktober.510

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.
Upaya Meningkatkan Daya Kreativitas Menggunakan Media Loose Part Pada Kelompok B Di RA As-Syuhada Tlogosari Kulon Semarang Mutahijhah, Lailatul; Munawar, Muniroh; Sagala, Anita Chandra Dewi
PAUDIA: Jurnal Penelitian dalam Bidang Pendidikan Anak Usia Dini Vol 10, No 2 (2021): Desember 2021: PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/paudia.v10i2.9620

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.
MODEL PENINGKATAN KEMAMPUAN MENGAJAR GURU RA MELALUI PENDEKATAN PEMBELAJARAN BCCT Munawar, Muniroh; Handayani, Arri; Suharno, Agus; Fitriana, Siti
PAUDIA: Jurnal Penelitian dalam Bidang Pendidikan Anak Usia Dini Vol 1, No 1 (2011)
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/paudia.v1i1.258

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.
Status Gizi Anak Terhadap Perkembangan Motorik Kasar Pada Anak Usia 1-2 Tahun Damayanti, Aprilia; Pusari, Ratna Wahyu; Kusumaningtyas, Nila
PAUDIA: Jurnal Penelitian dalam Bidang Pendidikan Anak Usia Dini Vol 10, No 1 (2021): Juli 2021 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini)
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/paudia.v10i1.8252

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.
Pola Komunikasi Guru Dalam Menstimulasi Kemampuan Hots Pada Anak Usia 5 - 6 Tahun Di Paud Taman Belia Candi Semarang Sumbawa, Rieyani Okta; Munawar, Muniroh; Sagala, Anita Chandra Dewi
PAUDIA: Jurnal Penelitian dalam Bidang Pendidikan Anak Usia Dini Vol 11, No 2 (2022): Desember 2022 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Din
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/paudia.v11i2.13245

Abstract

AbstractEarly childhood learning activities have not provided the process of children's opportunities to explore, children have not been given the opportunity to express their ideas and ideas so that children do not have direct experience in solving their own problems, children must complete an activity according to the teacher's orders, this can limit the child's learning experience . The purpose of this study was to find out how teacher communication patterns can stimulate children's HOTS abilities in PAUD Taman Belia Candi Semarang. Communication in early childhood is certainly different from communication in adults. In early childhood, in communicating children begin to be sensitive to receive various stimuli, the sensitive period for each child is also different. In order for communication to be effective, accompanying children through stimulation so that they are able to think at higher levels which are not just memorizing but also the ability to think logically, analytically, systematically, critically, and creatively, as well as the ability to work together. The levels of thinking skills are divided into low and high levels, namely remembering, understanding, applying, analyzing, evaluating, and creating. This study uses a qualitative method with the approach taken to describe the facts and data obtained from data sources taken through interviews, observation, and documentation. The results of this study are the teacher's communication patterns at PAUD Taman Belia Candi Semarang in stimulating children's HOTS abilities through STEAM-based learning, seen when teachers stimulate students in learning activities and play through effective communication patterns. Using two-way communication patterns and higher-order thinking skills in PAUD Taman Belia Candi Semarang in children aged 5-6 years, children are able to solve their own problems from very diverse problems. Keywords: HOT’s, communication, STEAMAbstrakKegiatan pembelajaran anak usia dini belum memberikan proses kesempatan anak untuk bereksplorasi, anak belum diberikan kesempatan untuk mengungkapkan ide dan gagasannya sehingga anak tidak memiliki pengalaman langsung dalam memecahkan masalahnya sendiri, anak harus menyelesaikan suatu kegiatan sesuai dengan perintah guru, hal ini dapat membatasi pengalaman belajar anak. Tujuan penelitian ini adalah untuk mengetahui bagaimana pola komunikasi guru yang dapat menstimulasi kemampuan HOTS anak di PAUD Taman Belia Candi Semarang. Komunikasai pada anak usia dini tentu berbeda dengan komunikasi pada orang dewasa. Pada anak usia dini, dalam berkomunikasi anak mulai peka untuk menerima berbagai rangsangan, masa peka pada masing-masing anak juga berbeda. Agar komunikasi menjadi efektif, mendampingi anak melalui stimulasi agar mampu berpikir tingkat tinggi yang bukan hanya sekedar menghafal tetapi lebih pada kemampuan berpikir logis, analitis, sistematis, kritis, dan kreatif, serta kemampuan bekerja sama. Tingkatan kemampuan berpikir yang dibagi menjadi tingkat rendah dan tinggi yaitu mengingat, memahami, mengaplikasikan, menganalisis, mengevaluasi, dan mencipta. Penelitian ini menggunakan metode kualitatif dengan pendekatan  fakta dan data-data yang diperoleh dari sumber data yang di ambil melalui wawancara, observasi, dan dokumentasi. Hasil dari penelitian ini adalah pola komunikasi guru di PAUD Taman Belia Candi Semarang dalam menstimulasi kemampuan HOTS anak melalui pembelajaran pembelajaran berbasis STEAM, terlihat saat guru-guru menstimulasi siswa dalam kegiatan pembelajaran dan bermain melalui pola komunikasi yang efektif. Menggunakan pola komunikasi dua arah dan kemampuan berpikir tingkat tinggi di PAUD Taman Belia Candi Semarang  pada anak usia 5-6 tahun anak mampu menyelesaikan masalahnya sendiri dari masalahnya yang sangat beragam.Kata kunci: Hot’s, komunikasi, STEAM
Validitas Konstruk (CFA) Dan Model Rasch Alat Ukur Regulasi Diri Untuk Anak Usia 3-7 Tahun Fitrizqi, Salsabila; Susanto, Hery
PAUDIA: Jurnal Penelitian dalam Bidang Pendidikan Anak Usia Dini Vol 10, No 1 (2021): Juli 2021 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini)
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/paudia.v10i1.8058

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.
Pengembangan Bahan Ajar Tematik Berbasis Flipbook Marker untuk Meningkatkan Kemampuan Berfikir Kreatif Anak TK Darul Iman Wahyuni, Wahyuni
PAUDIA: Jurnal Penelitian dalam Bidang Pendidikan Anak Usia Dini Vol 11, No 1 (2022): Juli 2022 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini)
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/paudia.v11i1.11752

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.
IMPLEMANTASI PENDIDIKAN KEWIRAUSAHAAN SEBAGAI MEDIA PEMBELAJARAN MELALUI PEMANFAATAN LIMBAH KDP (KERTAS, DAUN DAN PLASTIK) PAUD DI KOTA SEMARANG Kristanto, M.; Prasetiyawati D.H., Dwi; Purwadi, Purwadi
PAUDIA: Jurnal Penelitian dalam Bidang Pendidikan Anak Usia Dini Vol 2, No 1 mei (2013): PAUDIA
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/paudia.v2i1 mei.370

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.
Karakter Peduli Sosial Anak Usia Dini Dalam Film Animasi Diva The Series Nurbaiti, Amalia; Supriyono, Supriyono; Kurniawan, Heru
PAUDIA: Jurnal Penelitian dalam Bidang Pendidikan Anak Usia Dini Vol 11, No 1 (2022): Juli 2022 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini)
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/paudia.v11i1.9318

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.

Filter by Year

2011 2024


Filter By Issues
All Issue Vol 13, No 1 (2024): Juli 2024 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini) Vol 12, No 2 (2023): Desember 2023 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Din Vol 12, No 1 (2023): Juli 2023 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini) Vol 11, No 2 (2022): Desember 2022 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Din Vol 11, No 1 (2022): Juli 2022 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini) Vol 10, No 2 (2021): Desember 2021: PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini Vol 10, No 1 (2021): Juli 2021 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini) Vol 9, No 2 (2020): Desember 2020 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini Vol 9, No 1 (2020): Juli 2020 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini) Vol 8, No 2 (2019): Desember 2019 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini Vol 8, No 1 (2019): Juli 2019 : PAUDIA (Jurnal Penelitian Dalam Bidang Pendidikan Anak Usia Dini) Vol 7, No 2 (2018) Vol 7, No 1 (2018) Vol 7, No 1 (2018) Vol 6, No 2 (2017) Vol 6, No 1 (2017) Vol 5, No 2 (2016) Vol 5, No 1 (2016) Vol 4, No 1 (2015): volume.4 No. 1 Juli (2015) Vol 4, No 2 Oktober (2015): PAUDIA Vol 4, No 1 Oktober (2015): PAUDIA Vol 3, No 2 Oktober (2014) Vol 3, No 1 (2014) Vol 3, No 1 Oktober (2014) Vol 2, No 2 (2013): PAUDIA Vol 2 No 2 Oktober 2013 Vol 2, No 1 mei (2013): PAUDIA Vol 2, No 1 mei (2013): PAUDIA Vol 1, No 1 (2011) Vol 1, No 1 (2011) More Issue