cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota malang,
Jawa timur
INDONESIA
Bangunan
ISSN : 08522480     EISSN : 26210959     DOI : -
Core Subject : Engineering,
Jurnal Bangunan terbit minimal 1 (satu) kali setahun berisi gagasan konseptual, kajian teori, praktik, penelitian, dan pengajaran dalam bidang Teknik Bangunan.
Arjuna Subject : -
Articles 129 Documents
PENYUNTING penyunting penyunting
BANGUNAN Vol 26, No 2 (2021): BANGUNAN EDISI OKTOBER
Publisher : Universitas Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17977/um071v26i22021p%p

Abstract

INOVASI METODE LIFTING BENTANG UTAMA JEMBATAN SEI WAMPU DI SUMATERA UTARA Andrew Nugraha Standyarto
BANGUNAN Vol 26, No 2 (2021): BANGUNAN EDISI OKTOBER
Publisher : Universitas Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17977/um071v26i22021p33-46

Abstract

Abstrak:Jembatan merupakan bagian integral dari Infrastruktur jalan yang dibangun untuk menunjang konektivitas dan mobilitas masyarakat Indonesia dalam kegiatan ekonomi. Untuk menjamin konstruksi jembatan terbangun dengan aman dan sesuai desain, diperlukan pemilihan metode konstruksi yang tepat, terutama untuk pelengkung baja sepanjang 140 m yang merupakan bentang utama Jembatan Sei Wampu. Jembatan Sei Wampu merupakan jembatan yang terletak pada ruas jalan nasional dan menghubungkan daerah Stabat dengan Tanjung Pura di Provinsi Sumatera Utara. Paket pembangunan Jembatan Sei Wampu mengalami putus kontrak pada tahun 2019 dimana sistem lantai bentang utama jembatan berupa stringer dan cross girder telah terpasang di tengah sungai menggunakan sistem shoring. Maka dari itu, menindaklanjuti rencana tender lanjutan, dibutuhkan inovasi metode lifting elemen pelengkung dan hanger untuk menyelesaikan pekerjaan pemasangan bentang utama. Dengan menggunakan pendekatan studi literatur dan tinjauan lapangan, metode lifting ditentukan menggunakan tower backstay dan lifting segmen menggunakan heavy crane pada platform beton sementara di kedua sisi abutmen. Dari hasil analisis pengecekan radius dan load chart crane untuk segmen terberat Top Chord (TC), heavy crane 450 ton dipilih untuk melakukan lifting 6 segmen di arah Stabat dan heavy crane 450 ton + superlift 180 ton untuk lifting 9 segmen arah Tj. Pura dengan pondasi platform tiang pancang baja ø 60 cm berjumlah 9. Dengan telah ditentukannya metode lifting, tender paket pembangunan Jembatan Sei Wampu pun dapat dilakukan.Kata-kata kunci: jembatan pelengkung, lifting, heavy crane, pancang baja.Abstract: The bridge is an integral part of the road infrastructure that is built to support the connectivity and mobility of the Indonesian people in economic activities. To ensure that the bridge construction is built safely and according to the design, it is necessary to choose the right construction method, especially for the 140 m long steel arch which is the main span of the Sei Wampu Bridge. The Sei Wampu Bridge is a bridge located on the national road and connects the Stabat area with Tanjung Pura in North Sumatra Province. The Sei Wampu Bridge construction package ended the contract in 2019 where the main span floor system of the bridge in the form of stringers and cross girders was installed in the middle of the river using a shoring system. Therefore, following up on the follow-up tender plan, innovation in the lifting method of arch elements and hangers is needed to complete the main span installation work. Using a literature study and field review approach, the lifting method was determined using a tower backstay and segment lifting using a heavy crane on a temporary concrete platform on both sides of the abutment. From the results of the analysis of checking the radius and load chart of the crane for the heaviest segment of the Top Chord (TC), a heavy crane of 450 tons was chosen to carry out lifting 6 segments in the Stabat direction and a heavy crane 450 tons + 180 tons superlift for lifting 9 segments in the Tj direction. There are 9 temples with steel pile platform foundations of 60 cm. With the lifting method determined, a tender for the construction package of the Sei Wampu Bridge can also be carried out.Keywords: arch bridge, lifting, heavy crane, steel pile.
BESARI ( BETON SISA INDUSTRI ) FOR SUSTAINABLE DEVELOPMENT Arruna Rodhi Prasetya; Fadhilah Arifatunnisa; Riztira Yeca Tiya Milleda
BANGUNAN Vol 26, No 2 (2021): BANGUNAN EDISI OKTOBER
Publisher : Universitas Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17977/um071v26i22021p47-62

Abstract

Abstrak:High density concrete atau beton berat merupakan beton yang dihasilkan dari agregat yang mempunyai berat isi lebih besar dari berat beton normal. Beton yang mempunyai berat yang tinggi ini biasanya digunakan untuk kepentingan tertentu seperti menahan radiasi, menahan benturan dan lainnya. Untuk membuat beton tersebut diperlukan inovasi material yang berasal dari limbah, selain menghasilkan berat isi yang tinggi juga terciptanya beton ramah lingkungan. Tujuan penelitian ini, pembuatan beton ramah lingkungan kami beri nama BESARI (Beton Sisa Industri) dengan pembuatan beton SCC (Self Compacting Concrete) yang memanfaatkan limbah industri yaitu limbah steel slag dan granit sebagai pengganti agregat kasar, serbuk besi sebagai pengganti agregat halus, serta serbuk marmer sebagai filler dalam substitusi semen. Limbah yang kami gunakan didapatkan dari daerah sekitar Klaten dan Surakarta. Dengan menggunakan metode perencanaan American Concrete Instituted (ACI) dan standar EFNARC, pembuatan beton berjumlah 3 silinder ukuran 15 cm x 30 cm dan 1 kubus ukuran 15 cm x 15 cm dengan rancangan penambahan serbuk besi (10%) dari total agregat halus, steel slag (50%) dan granit (50%) dari total agregat kasar, serbuk marmer (10%) dari total semen, serta penambahan Sika Viscocrete 1003 sebesar 1,5% digunakan di Laboratorium Teknik Sipil Universitas Muhammadiyah Surakarta, dengan f’cr 45 MPa. Penelitian ini diharapkan dapat menjadi inovasi beton sustainable, ramah lingkungan, efisien, serta ekonomis dari pada beton konvensional.Kata-kata kunci: High Density Concrete, Beton SCC, Limbah Industri, Ramah LingkunganAbstract: High density concrete or heavy concrete is concrete produced from aggregates that have a density greater than the weight of normal concrete. Concrete that has a high weight is usually used for certain purposes such as resisting radiation, resisting impact and others. To make the concrete, it is necessary to innovate materials derived from waste, in addition to producing a high density, the creation of environmentally friendly concrete. The purpose of this research is to produce environmentally friendly concrete named BESARI (Industrial Residual Concrete) with the manufacture of SCC (Self Compacting Concrete) concrete that utilizes industrial waste, namely steel slag and granite as a substitute for coarse aggregate, iron powder as a substitute for fine aggregate, and powder marble as filler in cement substitution. The waste we use is obtained from the area around Klaten and Surakarta. By using the American Concrete Instituted (ACI) planning method and the EFNARC standard, the production of concrete consists of 3 cylinders measuring 15 cm x 30 cm and 1 cube measuring 15 cm x 15 cm with the design of adding iron powder (10%) of the total fine aggregate, steel slag (50%) and granite (50%) of the total coarse aggregate, marble powder (10%) of the total cement, as well as the addition of Sika Viscocrete 1003 of 1.5% were used in the Civil Engineering Laboratory, University of Muhammadiyah Surakarta, with f’cr 45 MPa . This research is expected to be a sustainable, environmentally friendly, efficient, and economical concrete innovation compared to conventional concrete.Keywords: High Density Concrete, SCC Concrete, Industrial Waste, Environmentally Friendly
PEMANFAATAN LIMBAH BATA RINGAN SEBAGAI BAHAN PENYUSUN PENGGANTI PADA BETON As’at Pujianto; Restu Faizah; Acep Widiyanto; Tri Ananda Putri; Hakas Prayuda; Fadhila Firdausa
BANGUNAN Vol 26, No 2 (2021): BANGUNAN EDISI OKTOBER
Publisher : Universitas Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17977/um071v26i22021p1-8

Abstract

Abstrak: Beton merupakan salah satu material konstruksi yang paling banyak digunakan baik di dunia maupun di Indonesia. Bahan penyusun beton yang terdiri dari semen, air, agregat halus dan agregat kasar sangat mudah diperoleh. Pada penelitian ini memanfaatkan limbah bangunan sebagai material recycle yang dapat dimanfaatkan sebagai material penyusun beton. Bata ringan merupakan salah satu material yang digunakan untuk emngisi dinding sebagai komponen non-struktural. Limbah bata ringan yang sudah tidak digunakan dimanfaatkan kembali sebagai bahan tambah penyusun beton. Pada penelitian ini terdiri dari dua pemeriksaan utama yaitu limbah bata ringan sebagai agregat kasar dengan variasi ukuran maksimal agregat yaitu 16 mm, 22,4 mm dan 25 mm. sedangkan pemeriksaan kedua yaitu limbah bata ringan sebagai pengganti semen dengan variasi campuran sebesar 5%, 10% dan 15% dan berat binder. Pengujian sifat beton yang dilakukan terdiri dari slump test dan kuat tekan. Slump test digunakan untuk memeriksa workability beton segar sedangkan kuat tekan digunakan untuk memeriksa kapasitas tekan nya. Melalui penelitian ini diharapkan dapat memanfaatkan limbah konstruksi secara optimal dan dapat digunakan kembali sebagai material penyusun beton. Hasil penelitian menunjukkan bahwa agregat kasar limbah bata ringan dengan variasi ukuran maksimal 16 mm memperoleh kuat tekan tertinggi. Sedangkan pada pemanfaatan limbah bata ringan sebagai material pengganti semen menghasilkan kuat tekan tertinggi dengan variasi 5%.Kata-kata kunci: limbah bata ringan, agregat kasar, kuat tekan, recycle materialsAbstract: Concrete is one of the most widely used construction materials both in the world and in Indonesia. Concrete constituent materials consisting of cement, water, fine aggregate and coarse aggregate are very easy to obtain. In this study, using building waste as a recycle material that can be used as a concrete constituent material. Lightweight brick is one of the materials used to fill walls as a non-structural component. Light brick waste that is no longer used is reused as an added material for making concrete. This study consisted of two main examinations, namely lightweight brick waste as coarse aggregate with a maximum size variation of 16 mm, 22.4 mm and 25 mm. while the second examination was light brick waste as a substitute for cement with a mixture variation of 5%, 10% and 15% and the weight of the binder. The test of concrete properties consisted of slump test and compressive strength. Slump test is used to check the workability of fresh concrete while the compressive strength is used to check its compressive capacity. Through this research, it is hoped that construction waste can be utilized optimally and can be reused as a concrete constituent material. The results showed that the coarse aggregate of lightweight brick waste with a maximum size variation of 16 mm obtained the highest compressive strength. While the use of lightweight brick waste as a cement substitute material produces the highest compressive strength with a variation of 5%.Keywords: lightweight brick waste, coarse aggregate, compressive strength, recycle materials
COMPARING VOCATIONAL EDUCATION CURRICULA IN CHINA AND INDONESIA FOR ECONOMIC GROWTH Muhammad Aris Ichwanto; Mohammad Mustofa Al Ansyorie; Zhao Ping
BANGUNAN Vol 26, No 2 (2021): BANGUNAN EDISI OKTOBER
Publisher : Universitas Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17977/um071v26i22021p9-20

Abstract

Abstrak: Asia dicirikan oleh keragaman iklim, geografi, sumber daya alam, struktur populasi, tingkat melek huruf, struktur ekonomi, dan bentuk pemerintahan. Penelitian ini dilakukan di dua negara yaitu China dan Indonesia. Karena perekonomian China dan Indonesia tetap stabil dan meningkat di tengah krisis ekonomi global, apalagi negara-negara tersebut menduduki peringkat pertama dan kedua pertumbuhan ekonomi dunia. Tujuan dari studi di bidang pendidikan ini adalah untuk menginformasikan tentang kurikulum pendidikan kejuruan yang menciptakan lapangan kerja yang terampil, kreatif, berdaya saing tinggi, mudah diserap, yang pada gilirannya mendukung pertumbuhan ekonomi di kedua negara. Kajian melalui kubus Bray dan Thomas ini memberikan kerangka analisis pendidikan komparatif yang melibatkan tiga kategori yang disusun dalam kubus. Perbandingan kurikulum sains kedua negara menunjukkan bahwa mereka sebenarnya secara umum serupa. Relatif sedikit perbedaan yang ditemukan sehubungan dengan pengetahuan yang dimaksudkan dan konten kompetensi dalam hal perbedaan diamati kuantitas keseluruhan tersirat oleh dokumen kurikulum tampaknya seimbang.Kata-kata kunci: Pendidikan Kejuruan, Kurikulum, Indonesia, CinaAbstract: Asia is characterized by its variety of climate, geography, natural resources, population structure, literacy rate, economic structures, and forms of government. This study was done in two countries they are China and Indonesia. Because the economy in China and Indonesia remained stable and increased amid the global economic crisis, moreover those countries were ranked first and second world economic growth. The purpose of this study in education should be to inform about vocational education curriculum that creates skilled, creative, highly competitive, easily absorbed employment, which in turn support the economic growth in both countries. This study through the Bray and Thomas cube provides a framework for comparative education analysis involving three categories arranged in a cube. A comparison of the science curricula of the two countries indicates they are in fact broadly similar. Relatively few differences were uncovered with respect to intended knowledge and competence content in the event where differences were observed the overall quantity implied by the curriculum document appeared to be evenly matched.Keywords: Vocational Education, Curriculm, Indonesia, China
PENYIAPAN TENAGA KERJA PROFESIONAL DIBIDANG JASA KONSTRUKSI DAN PROPERTI PADA MASA MASYARAKAT EKONOMI ASEAN (MEA) Muhammad Aris Ichwanto; Isnandar Isnandar; Mohammad Musthofa Al Ansyorie
BANGUNAN Vol 27, No 1 (2022): BANGUNAN EDISI MARET
Publisher : Universitas Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17977/um071v27i12022p31-38

Abstract

Abstrak:Masyarakat Ekonomi ASEAN (MEA) telah resmi mulai diterapkan sejak tahun 2015. Hal ini membuat perpindahan atau pergerakan informasi, barang, pelajar, dan tenaga kerja profesional di wilayah negara-negara ASEAN semakin lebih luas. Pada hakekatnya Indonesia telah menyiapkan sistem pendidikan untuk siap dan berkompetisi dalam MEA dengan mempersiapkan SDM yang professional. Namun masih terdapat kendala yang ditemui dalam membangun SDM berbasis kompetensi untuk borkompetisi dalam MEA. Untuk mencapai Mutual Recognition Arrangement (MRA) dibidang jasa konstruksi diperlukan sinergi stakeholder baik dari pemerintah, industri, dunia pendidikan, dan asosiasi untuk melatih dan mempersiapkan setiap individu menjadi tenaga profesional yang dapat bersaing di era MEA.Kata-kata kunci: MEA, Mutual Recognition Arrangement, Sinergi KelembagaanAbstract: The ASEAN Economic Community (AEC) has been officially implemented since 2015. This has made the movement of information, goods, students, and professional workers in the ASEAN countries increasingly wider. In essence, Indonesia has prepared an education system to be ready and compete in the MEA by preparing professional human resources. However, there are still obstacles encountered in building competency-based human resources for competition in the MEA. To achieve a Mutual Recognition Arrangement (MRA) in the field of construction services, a synergy of stakeholders from the government, industry, education, and associations is needed to train and prepare each individual to become a professional who can compete in the MEA era.Keywords: MEA, Mutual Recognition Arrangement, Institutional Synergy
SIMULASI DESAIN FASAD DALAM MENINGKATKAN KINERJA PENCAHAYAAN ALAMI PADA BANGUNAN RUMAH TINGGAL DI DAERAH TROPIS Cynthia Permata Dewi
BANGUNAN Vol 27, No 1 (2022): BANGUNAN EDISI MARET
Publisher : Universitas Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17977/um071v27i12022p1-10

Abstract

Abstrak:Desain pencahayaan alami pada bangunan rumah tinggal seringkali tidak dipertimbangkan sesuai dengan kebutuhan maupun kondisi geografis dan lingkungan setempat. pemanfaatan pencahayaan alami pada daerah tropis seperti Indonesia dengan penyinaran yang cukup kuat sepanjang tahun merupakan salah satu faktor yang harus dipertimbangkan. Pada penelitian ini, desain fasad yang meliputi lebar dan posisi bukaan dari lantai serta kombinasi dengan tipe shading device bertujuan untuk memperoleh tingkat pencahayaan alami yang sesuai dengan standar kebutuhan pencahayaan pada bangunan rumah tinggal. Hasil penelitian menunjukkan, desain jendela selebar 0.6m dengan posisi bukaan 0.5m di R1 dan 1.5m di R2 serta penggunaan shading device berupa overhang beton 0.5m mampu menghasilkan tingkat pencahayaan dalam ruang sebesar 300 lux sebesar 50 persen dari luas ruang R2. Desain ini paling efektif dalam mencapai standar kebutuhan pencahayaan dibandingkan alternatif lainnya.Kata-kata kunci: pencahayaan alami, tingkat pencahayaan, fasad, desain bukaan shading deviceAbstract: The design of natural lighting in residential buildings is often not considered according to the needs and geographical conditions and the local environment. the use of natural lighting in tropical areas such as Indonesia with strong enough radiation throughout the year is one of the factors that must be considered. In this study, the facade design which includes the width and position of the opening from the floor as well as the combination with the type of shading device aims to obtain a level of natural lighting that is in accordance with the standard lighting needs of residential buildings. The results showed that the design of a 0.6m wide window with an opening position of 0.5m in R1 and 1.5m in R2 and the use of a shading device in the form of a 0.5m concrete overhang was able to produce an indoor lighting level of 300 lux by 50 percent of the area of R2. This design is most effective in achieving the standard of lighting requirements compared to other alternatives.Keywords: natural lighting, lighting level, facade, design of shading device openings
PENGARUH METODE PEMBELAJARAN PRAKTIK LABORATORY TRAINING BERBASIS WEB VIRTUAL TERHADAP HASIL BELAJAR MAHASISWA PADA MATAKULIAH TEORI DAN PRAKTIK KONSTRUKSI KAYU Priyono Priyono; Tri Kuncoro; Imam Alfianto; Isnandar Isnandar
BANGUNAN Vol 27, No 1 (2022): BANGUNAN EDISI MARET
Publisher : Universitas Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17977/um071v27i12022p11-18

Abstract

Abstrak:tujuan peneltiian ini adalah mengetahui ada tidaknya perbedaan hasil belajar antara mahasiswa yang belajar dengan model pembelajaran praktik menggunakan model Laboratory Training Berbasis Web Virtual Laboratory dibandingkan mahasiswa yang belajar dengan metode konvensional pada matakuliah Teori Dan Praktik Konstruksi Kayu. Penelitian ini menggunakan rancangan penelitian ekperimen. Subyek penelitian adalah mahasiswa semester IV Prodi PTB TS FT UM, yang memprogram matakuliah Teori dan Praktik Konstruksi Kayu. Untuk uji eksperimen digunakan dua offering/ kelas, satu kelas sebagai kelompok eksperimen dan satu kelas yang lain sebagai kelompok kontrol. Ke dua kelompok ini diasumsikan sama dalam semua segi yang relevan dan hanya berbeda dalam pemberian perlakuan. Jenis data yang diperlukan adalah data tentang hasil belajar, yang diambil dengan teknik test perbuatan. Pengembangan tes berpedoman pada kisi-kisi pokok bahasan matakuliah praktik. Untuk menguji hipotesis yang diajukan digunakan teknik uji t test. Berdasarkan hasil analisis data dapat disimpulkan bahwa terdapat perbedaan hasil belajar antara kelompok mahasiswa yang diajar yang diajar dengan metode pembelajaran praktik laboratory training berbasis web virtual dan kelompok mahasiswa yang diajar yang diajar dengan metode pembelajaran praktik laboratory training tanpa berbasis web virtual. Hal ini berarti metode pembelajaran praktik laboratory training berbasis web virtual lebih unggul dari pada metode pembelajaran praktik laboratory training tanpa tanpa web virtualKata-kata kunci: Laboratory Training, Web Virtual, Hasil Belajar, Konstruksi KayuAbstract: The purpose of this research is to find out whether there are differences in learning outcomes between students who study with a practical learning model using a Web Virtual Laboratory-Based Laboratory Training model compared to students who study using conventional methods in the Theory and Practice of Wood Construction courses. This study uses an experimental research design. The research subjects were fourth semester students of PTB TS FT UM Study Program, who programmed the Theory and Practice of Wood Construction courses. For the experimental test, two offerings/classes were used, one class as the experimental group and the other as the control group. These two groups are assumed to be the same in all relevant aspects and differ only in the treatment given. The type of data needed is data about learning outcomes, which are taken with an action test technique. The development of the test is guided by the grid of practical subjects. To test the proposed hypothesis, the t test technique was used. Based on the results of data analysis, it can be concluded that there are differences in learning outcomes between groups of students who are taught by using virtual web-based practical laboratory training learning methods and groups of students who are taught by using virtual web-based practical laboratory training learning methods. This means that the virtual web-based practical laboratory training learning method is superior to the laboratory training practice learning method without a virtual web.Keywords: Laboratory Training, Virtual Web, Learning Outcomes, Wood Construction
IMPLEMENTASI METODE PELAKSANAAN KONSTRUKSI PILE CAP PROYEK PEMBANGUNAN GEDUNG PENUNJANG PEMBELAJARAN UNIVERSITAS NEGERI MALANG DI ERA PEMBERLAKUAN PEMBATASAN KEGIATAN MASYARAKAT (PPKM) Christian Hadhinata; M. Mirza Abdillah Pratama
BANGUNAN Vol 27, No 1 (2022): BANGUNAN EDISI MARET
Publisher : Universitas Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17977/um071v27i12022p19-30

Abstract

Abstrak:Kebijakan Pemberlakuan Pembatasan Kegiatan Masyarakat (PPKM) dalam mengatasi pandemi COVID-19 telah melumpuhkan banyak sektor kehidupan, terutama sektor konstruksi. Banyak proyek yang mengalami keterlambatan, penghentian pelaksanaan, dan pembengkakan anggaran. Universitas Negeri Malang (UM) merupakan salah satu perguruan tinggi negeri yang tengah melaksanakan Proyek Pembangunan Gedung Penunjang Pembelajaran Universitas Negeri Malang (UM) di era PPKM. Hal ini tentunya membutuhkan suatu metode pelaksanaan dan kebijakan yang dapat menjamin keselamatan dan kesehatan para pekerjanya. Pile cap merupakan sebuah konstruksi beton bertulang yang berfungsi untuk menyatukan sekelompok tiang pancang yang telah terpasang dan menyebarkan beban dari struktur di atasnya. Pile cap memiliki peranan yang sangat penting dalam suatu konstruksi yang mengharuskan pelaksanan konstruksi pile cap harus menggunakan metode pelaksanaan yang sesuai. Pelaksanaan penelitian ini bertujuan untuk menganalisis metode pelaksanaan konstruksi pile cap Proyek Pembangunan Gedung Penunjang Pembelajaran UM di era PPKM. Pelaksanaan konstruksi pile cap berpedoman pada metode yang telah ditentukan oleh proyek. Metode pelaksanaan pile cap memiliki beberapa tahapan, yaitu: 1) pekerjaan persiapan; 2) pekerjaan galian, 3) pekerjaan pembobokan; 4) pekerjaan urugan dan lantai kerja; 5) pekerjaan pembesian; 6) pekerjaan bekisting; 7) pekerjaan pengecoran; dan 8) pekerjaan perawatan beton. Pelaksanaan konstruksi tersebut tentunya juga memiliki beberapa kendala yang menghambat waktu penyelesaiannya, yaitu cuaca dan keamanan pekerja. Kebijakan yang diambil oleh pelaksana proyek saat era PPKM yaitu dengan menerapkan instruksi Menteri PUPR dengan membentuk satuan tugas (satgas) pencegahan COVID-19, menyediakan fasilitas kesehatan, mengedukasi semua pekerja, hingga melakukan tindakan isolasi dan penyemprotan sarana dan prasarana kantor dan lapangan.Kata-kata kunci: pile cap, Universitas Negeri Malang, Gedung Penunjang Pembelajaran, PPKMAbstract: The Policy for the Implementation of public activity restriction (PPKM) in overcoming the COVID-19 pandemic has disabled many sectors of life, especially the construction sector. Many projects were delayed, execution halts, and budget overruns. Universitas Negeri Malang (UM) is one of the state universities currently implementing the Learning Support Building Development Project of the Universitas Negeri Malang (UM) in the PPKM era. This project requires an implementation of the method and policy that can guarantee the safety and health of its workers. Pile cap is a reinforced concrete construction that serves to unite a group of piles that have been installed and spread the load from the structure above it. It has very essential role in the construction requiring the use of the appropriate implementation method. The implementation of this study aims to analyze the method of implementing the pile cap construction of the UM Learning Support Building Development Project in the PPKM era. The implementation of pile cap construction is guided by the method determined by the project. The pile cap implementation method has several steps, such as: 1) preparation; 2) excavating soil; 3) trimming the pile; 4) backfill and lean concrete work; 5) reinforcing-bars work; 6) formwork work; 7) concrete casting; and 8) concrete maintenance. The construction implementation also has several obstacles hindering the completion time, such as weather and worker safety. The policies taken by project implementers during the PPKM era were by implementing the instructions of the Minister of PUPR by forming a COVID-19 prevention task force, providing health facilities, educating all workers, carrying out isolation measures and spraying office and field facilities and infrastructure.Keywords: pile cap, Universitas Negeri Malang, Learning Support Building, PPKM
PENYUNTING penyunting penyunting
BANGUNAN Vol 27, No 1 (2022): BANGUNAN EDISI MARET
Publisher : Universitas Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17977/um071v27i12022p%p

Abstract

Page 7 of 13 | Total Record : 129