Claim Missing Document
Check
Articles

Found 16 Documents
Search

Workload and Compensation Impact on Lecturer Performance Samsudin, Harun; Rijal, Syamsu; Pranoto, Wati Asriningsih; Rahayu, Puspita Puji; Zarkasi, Zarkasi
Jurnal Ilmiah Ilmu Manajemen Vol 5 No 2 (2023): Juli : Jurnal Ilmiah Ilmu Manajemen
Publisher : Universitas Gajah Putih

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55542/juiim.v5i2.754

Abstract

The goal of Winaya Mukti University, a formal educational institution, is to create excellent human beings. The performance of lecturers, however, is a problem that higher education institutions routinely deal with because it is one of the factors that influences academic progress. Two factors that can affect performance are workload and compensation. The goal of this study is to ascertain, partially or simultaneously, the impact of workload and compensation on the output of professors at Winaya Mukti University. Data were acquired from all of the current topic lecturers. The research included both the descriptive and verification methodologies. In this work, the analysis was performed using multiple linear regression. The results of hypothesis testing show that the workload and pay of course professors at Winaya Mukti University have a positive and significant impact on their performance. Both workload and compensation have a positive and significant effect.
DESAIN ALGORITMA DAN IMPLEMENTASI ROBOT TRADING FOREX HEDGING DAN AVERAGING Fat, Joni; Utama, Hadian Satria; Candra, Henry; Pranoto, Wati Asriningsih; Yoshua, Axel Irving; Gilbert, Tyven Christopher
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan Vol. 7 No. 2 (2023): Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmstkik.v7i2.29089

Abstract

This study aims to design and evaluate the performance of a forex trading robot that implements hedging and averaging methods in the forex market. With the combination of these methods, the robot is expected to generate significant profits while managing risks effectively. Triangular hedging method is utilized to protect capital and reduce risk against market fluctuations, while averaging method is employed to enhance profit potential. This research is expected to provide a better understanding of how the strategies employed can effectively manage risk and increase profitability. The test results show that the forex trading robot implementing hedging and averaging methods managed to achieve a significant increase in profit accumulation, with a growth rate of 175.58% during the testing period, from June 9 to September 20, 2023. Although there was a daily fluctuation of 0.50%, the robot successfully achieved a monthly growth rate of 42.42%. This is also reflected in the increase in account balance from 100 USD to 275.58 USD and a total of 865 pips gained. Despite a drawdown of 61.42%, this did not hinder the robot's performance in consistently generating profits. The application of hedging and averaging methods in forex trading robots can be an effective strategy in optimizing transaction performance in the complex and dynamic forex market. By utilizing this combination of strategies, trading robots have the potential to be utilized by forex market participants in achieving their financial transaction goals. Nevertheless, this research also highlights the importance of continuous monitoring and evaluation of trading robot performance to identify and mitigate potential risks and improve long-term performance consistency. Keywords: averaging; forex; trading robot; triangular hedging Abstrak Penelitian ini bertujuan untuk merancang dan mengevaluasi kinerja robot trading forex yang menerapkan metode hedging dan averaging di pasar forex. Dengan kombinasi metode tersebut, robot diharapkan dapat menghasilkan keuntungan signifikan dengan pengelolaan risiko yang baik. Metode triangular hedging digunakan untuk melindungi modal dan mengurangi risiko terhadap fluktuasi pasar, sedangkan metode averaging dimanfaatkan untuk meningkatkan potensi profitabilitas. Penelitian ini diharapkan dapat memberikan pemahaman yang lebih baik tentang bagaimana strategi yang digunakan dapat secara efektif melakukan pengelolaan risiko dan meningkatkan profitabilitas. Hasil pengujian menunjukkan bahwa robot trading forex yang menerapkan metode hedging dan averaging mampu mencapai peningkatan signifikan dalam akumulasi keuntungan, dengan pertumbuhan sebesar 175.58% selama periode pengujian, yaitu dari 9 Juni-20 September 2023. Meski pun terdapat fluktuasi harian sebesar 0.50%, namun secara bulanan robot trading berhasil mencapai pertumbuhan sebesar 42.42%. Hal ini juga tercermin dari peningkatan saldo akun dari 100 USD menjadi 275.58 USD serta total pips yang diperoleh adalah sebesar 865 pips. Meski pun drawdown mencapai 61.42%, namun hal ini tidak menghambat kinerja robot trading dalam menghasilkan keuntungan secara konsisten. Aplikasi metode hedging dan averaging pada robot trading forex dapat menjadi strategi yang efektif dalam mengoptimalkan kinerja transaksi di pasar forex yang kompleks dan dinamis. Dengan memanfaatkan kombinasi strategi ini, robot trading memiliki potensi untuk dimanfaatkan oleh para pelaku pasar forex dalam mencapai tujuan transaksi keuangannya. Meski pun demikian, penelitian ini juga menyoroti pentingnya pemantauan dan evaluasi terus-menerus terhadap kinerja robot trading untuk mengidentifikasi dan mengatasi potensi risiko serta meningkatkan konsistensi kinerja dalam jangka panjang.
ANALISIS KAPASITAS SALURAN DRAINASE PADA PERUMAHAN X DI JAKARTA Palembangan, Timothy; Pranoto, Wati Asriningsih
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 4, November 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i3.24952

Abstract

Disaster is an event that threatens and disrupts human life, both from natural factors and non-natural factors. Floods are the biggest natural disasters in 2022. Floods are the overflow of water into rivers or canals due to the inability of existing rivers or canals to drain water. One of the causes of flooding is rain. The payback period used is the payback period of 2.5 and 10 years. Analyzed using the Manning method to determine the current runoff, then compared with the existing flood flow due to rainfall with repeated cycles of 2, 5 and 10 years. When compared, there are 6 channels that cannot accommodate inflow in the 2 year period and there are 11 existing channels that cannot accommodate inflow in the 5 and 10 year periods. There are also other factors that cause flooding in Dwelling X Cakung - East Jakarta, namely litter in the canal and sediment at the bottom of the canal causing frequent flooding in Dwelling X Cakung - Jakarta Keywords: Flood, Drainage, Rainfall Bencana adalah peristiwa yang mengancam dan mengganggu kehidupan manusia, baik dari faktor alam maupun faktor non alam. Banjir merupakan bencana alam terbesar di tahun 2022. Banjir adalah meluapnya air ke sungai atau kanal karena ketidakmampuan sungai atau kanal yang ada untuk mengalirkan air. Salah satu penyebab banjir adalah hujan. Payback period yang digunakan adalah payback period 2,5 dan 10 tahun. Dianalisis dengan metode Manning untuk menentukan aliran permukaan saat ini, kemudian dibandingkan dengan aliran banjir eksisting akibat curah hujan dengan siklus berulang 2, 5 dan 10 tahun. Setelah dibandingkan, terdapat 6 saluran yang tidak dapat menampung inflow pada periode 2 tahun dan terdapat 11 saluran eksisting yang tidak dapat menampung inflow pada periode 5 dan 10 tahun. Ada juga faktor lain penyebab banjir di Dwelling X Cakung - Jakarta Timur yaitu serasah di saluran dan sedimen di dasar saluran menyebabkan seringnya banjir di Dwelling X Cakung - Jakarta Kata kunci: Banjir, Drainase, Curah Hujan
ANALISIS KAPASITAS SALURAN DRAINASE PERUMAHAN Y DI CIPINANG MUARA - JAKARTA TIMUR Saragih, Matthew Firmata Brevando; Pranoto, Wati Asriningsih
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 4, November 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i3.24971

Abstract

Floods are the overflow of water into rivers or canals due to the inability of existing rivers or canals to drain water. One of the causes of flooding is rain. The payback period used is the payback period of 2.5 and 10 years. The capacity of the existing drainage channel was analyzed using the Manning method to determine the current runoff, then compared with the existing flood flow due to rainfall with repeated cycles of 2, 5 and 10 years. When compared, there are 9 channels that cannot accommodate inflow in the 2 year period and there are 15 existing channels that cannot accommodate inflow in the 5 and 10 year periods. There are also other factors that cause flooding in Dwelling X Cakung - East Jakarta, namely litter in the canal and sediment at the bottom of the canal causing frequent flooding in Dwelling X Cakung - Jakarta Keywords: Flood, Drainage, Rainfall Banjir adalah meluapnya air ke sungai atau kanal akibat ketidakmampuan sungai atau kanal yang ada untuk mengalirkan air. Salah satu penyebab banjir adalah hujan. Payback period yang digunakan adalah payback period 2,5 dan 10 tahun. Kapasitas saluran drainase eksisting dianalisis menggunakan metode Manning untuk mengetahui debit aliran saat ini, kemudian dibandingkan dengan debit banjir eksisting akibat curah hujan dengan siklus berulang 2, 5 dan 10 tahun. Jika dibandingkan, terdapat 9 saluran yang tidak dapat menampung inflow pada periode 2 tahun dan terdapat 15 saluran eksisting yang tidak dapat menampung inflow pada periode 5 dan 10 tahun. Ada juga faktor lain penyebab banjir di Dwelling X Cakung - Jakarta Timur yaitu serasah di saluran dan sedimen di dasar saluran menyebabkan seringnya terjadi banjir di Dwelling X Cakung - Jakarta. Kata kunci: Banjir, Drainase, Curah Hujan
ANALISIS KAPASITAS DRAINASE TERHADAP BANJIR DI DAERAH TELUK GONG Vanesa, Gina; Pranoto, Wati Asriningsih
JMTS: Jurnal Mitra Teknik Sipil Volume 7, Nomor 3, Agustus 2024
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v7i3.30724

Abstract

Banjir merupakan masalah yang sering terjadi di Jakarta saat curah hujan tinggi. Banjir merugikan warga sekitar baik kerugian secara materil, kesehatan, maupun kerugian lainnya. Salah satu upaya yang dilakukan dalam pencegahan banjir adalah menggunakan waduk yang berfungsi sebagai kolam detensi untuk menampung air sementara agar tidak terjadi banjir di suatu daerah sebelum air dipindahkan ke tempat lain. Oleh karena itu, dibutuhkan saluran drainase dengan kapasitas yang memandai untuk mengalirkan air ke waduk tanpa terjadi luapan. Studi ini berfokus pada analisis hidrologi dan analisis hidraulika pada drainase di daerah Teluk Gong, Kelurahan Pejagalan, Kecamatan Penjaringan, Jakarta Utara. Ada 93 saluran mikro dan 4 saluran makro yang mengalirkan air menuju Waduk Teluk Gong. Perhitungan debit banjir rencana menggunakan metode Soil Conservation Service dengan periode ulang 2, 5, dan 10 tahun. Hasil analisis menunjukan bahwa saluran PHB A Raya Teluk Gong membutuhkan pelebaran atau pembangunan tanggul di sekitar saluran untuk menahan debit banjir rencana periode ulang 5 dan 10 tahun.
Microscopic Sand Image Classification Using Convolutional Neural Networks Redja, Christie; Pranoto, Wati Asriningsih; Wulandari, Meirista
Ultima Computing : Jurnal Sistem Komputer Vol 16 No 2 (2024): Ultima Computing : Jurnal Sistem Komputer
Publisher : Faculty of Engineering and Informatics, Universitas Multimedia Nusantara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31937/sk.v16i2.3907

Abstract

Abstract— This research paper reviews the use of Convolutional Neural Networks (CNNs) to categorize diverse sand type using microscopic images, with an objective of improving quality control in construction materials. The paper compares three CNN architectures—LeNet-5, Inception v3, and ResNet50—for discriminating between specific sand categories, such as two river sands (Cipongkor and Citarum) and three types of silica sand (brown, cream, and white). Each model was trained and tested on different dataset splits, with images pre-processed to highlight specific microscopic properties. To achieve a thorough comparison, each model's performance was measured using a variety of measures such as F1-score, accuracy, recall, and precision. These measurements enabled a comprehensive evaluation of how accurately and reliably each CNN model categorized the various sand types. ResNet50 consistently delivered the highest accuracy, achieving perfect classification in some instances, showcasing its effectiveness in capturing fine details in sand textures. These results highlight the potential of CNN-based approaches for precise and automated sand classification, which supports increased quality assurance in construction and related areas. Index Terms— Convolutional Neural Network (CNN); sand classification; LeNet-5; Inception v3; ResNet50
ANALISIS SAMBUNGAN MORTISE-TENON KOLOM BETON PRACETAK DENGAN PIPA BAJA DIISI BETON Jusuf, Andrew Hartanto; Christianto, Daniel; Pranoto, Wati Asriningsih; Leman, Sunarjo; Tavio
Jurnal Teknik Sipil Vol. 17 No. 4 (2024)
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Atma Jaya Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24002/jts.v17i4.10119

Abstract

Kinerja struktur beton pracetak sangat bergantung pada sambungannya, terutama untuk komponen struktur beton pracetak dengan sambungan kering. Prosedur desain rasional diperlukan untuk memproporsikan spesimen yang akan digunakan dalam studi eksperimental. Dalam penelitian ini, prosedur desain sambungan mortise-tenon kolom-ke-kolom beton pracetak yang didasarkan pada spesimen uji meja getar berupa miniatur gedung rangka momen beton pracetak dengan sambungan dowel baja akan dikembangkan. Rangka momen khusus beton pracetak tiga tingkat digunakan untuk studi kasus penerapan prosedur desain yang telah dikembangkan. Dalam penelitian ini, pipa baja diisi beton dengan tegangan leleh 550 MPa digunakan untuk menggantikan dowel baja. Pipa berukuran Ø130 mm × 20 mm tersebut ditanam sedalam 600 mm ke dalam mortise pada ujung kolom atas dan ke dalam kolom bawah berukuran 450 mm × 450 mm agar bertindak sebagai tenon. Lubang silinder sedalam 600 mm dibuat di ujung kolom atas dengan menggunakan pipa berukuran Ø150 mm × 10 mm agar bertindak sebagai mortise. Beton dengan kuat tekan 35 MPa dan tulangan BJTS-420B digunakan pada semua komponen beton. Distribusi gaya sambungan serupa model Osanai untuk socket foundation digunakan untuk desain sambungan. Tiga kasus beban ditinjau dalam desain sambungan, yang meliputi faktor kuat lebih dan asumsi pembentukan sendi plastis balok. Studi kasus yang telah dilakukan menunjukkan bahwa tegangan tumpu, luas sengkang perlu, dan ukuran pipa lebih dipengaruhi oleh momen lentur dibandingkan gaya geser. Pipa baja bermutu tinggi dengan tebal relatif besar diperlukan untuk membatasi ukuran kolom.
Analisis Kelayakan Investasi Antara Bangun Baru dan Bangunan Existing Ombudsman RI di Kawasan Kuningan Jakarta Sunaryo, Sunaryo; Pranoto, Wati Asriningsih; Setiadi, Mark
Teras Jurnal : Jurnal Teknik Sipil Vol. 15 No. 1 (2025): Volume 15 Nomor 1, Maret 2025
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v15i1.1204

Abstract

Abstrak Studi kelayakan investasi dilakukan dengan metode discounted cash flow (DCF). Hasil perhitungan dengan metode DCF disimulasikan dengan metode monte carlo. Indikator-indikator yang digunakan adalah tingkat okupansi, kenaikan biaya konstruksi, kenaikan biaya sewa dan service charge. Arus kas bangunan existing dan bangunan baru dibuat untuk menghitung nilai NPV dan IRRnya. Perhitungan metode DCF pada bangunan existing dengan nilai MARR sebesar 7,47%, didapatkan nilai NPV positif sebesar Rp.155.274.649.791 dan nilai IRR sebesar 31,5%, waktu pengembalian selama 6 tahun 4 bulan. Perhitungan bangunan baru didapatkan nilai NPV positif sebesar Rp.184.233.384.822 dan nilai IRR sebesar 17,5%, waktu pengembalian selama 8 tahun 8 bulan. Perbandingan perhitungan antara bangunan existing dan bangunan baru didapatkan nilai NPV positif sebesar Rp.28.958.735.031 dan nilai IRR sebesar 18,88%, waktu pengembalian 9 tahun 1 bulan. Hasil perhitungan dengan metode DCF dilakukan simulasi monte carlo, sehingga didapatkan nilai NPV rata-rata positif sebesar Rp.21.854.144.293 dan nilai IRR rata-rata sebesar sebesar 11,4% dengan waktu pengembalian rata-rata 8 tahun 11 bulan. Nilai standar deviasi untuk NPV sebesar Rp.6.457.269.316 dan nilai standar deviasi untuk IRR sebesar 1,34%. Perbandingan NPV positif dan nilai IRR lebih besar dari MARR, sehingga alternatif bangun baru layak dilaksanakan. Mempertahankan bangunan existing perlu dilakukan analisis teknik terkait keandalan bangunan existing. Kata kunci: studi kelayakan, metode DCF, metode monte carlo Abstract An investment feasibility study was conducted using the discounted cash flow (DCF) method. The results of the DCF method were simulated using the Monte Carlo method. The indicators used were occupancy rate, construction cost increases, rental cost increases, and service charge increases. Cash flows for existing and new buildings were created to calculate their NPV and IRR. The DCF method calculation for the existing building, with a MARR of 7.47%, resulted in a positive NPV of Rp.155,274,649,791 and an IRR of 31.5%, with a payback period of 6 years and 4 months. The calculation for the new building resulted in a positive NPV of Rp.184,233,384,822 and an IRR of 17.5%, with a payback period of 8 years and 8 months. The comparison between the existing and new buildings resulted in a positive NPV of Rp.28,958,735,031 and an IRR of 18.88%, with a payback period of 9 years and 1 month. The DCF method results were simulated using the Monte Carlo method, resulting in an average positive NPV of Rp.21,854,144,293 and an average IRR of 11.4% with an average payback period of 8 years and 11 months. The standard deviation for NPV is Rp.6,457,269,316 and for IRR is 1.34%. The positive NPV comparison and IRR value greater than the MARR indicate that the new building alternative is feasible. Maintaining the existing building requires a technical analysis related to its reliability. Keywords: feasibility study, DCF method, monte carlo method
ANALISIS PERBANDINGAN KELAYAKAN INVESTASI PEMBANGUNAN APARTEMEN X DI TANGERANG, BANTEN Yudistira, Randy; Pranoto, Wati Asriningsih; Setiadi, Mark
JMTS: Jurnal Mitra Teknik Sipil Volume 8, Nomor 3, Agustus 2025
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v8i3.32701

Abstract

This study analyses the investment feasibility of building Apartment X in Alam Sutera, Tangerang, by comparing two scenarios, namely direct apartment construction and gradual apartment construction, in the context of the impact of the Covid-19 pandemic. The methods used are Net Present Value (NPV) and Internal Rate of Return (IRR) to evaluate the potential benefits of both approaches. The data analysed includes development costs, sales of residential units, building operating costs, as well as revenue from environmental management fees (IPL) for residential areas and commercial shops, commercial shop rents and so on. The results show that the direct development scenario produces an NPV value of IDR 87,860,840,681 with an IRR value of 13.08%, while the phased development scenario produces a higher NPV value of IDR 112,893,521,357 with an IRR of 14.51%. Both scenarios fulfil the investment feasibility criteria because the resulting NPV value is greater than Rp 0, and the IRR value is also higher than the MARR set at 10%. Furthermore, investment in apartment X project is feasible to be implemented both directly and in stages, but gradual development provides more optimal and more profitable results compared to direct development. This study provides important insights for property developers in determining the right investment strategy in the post-pandemic economic conditions. Abstrak Penelitian ini menganalisis kelayakan investasi pembangunan Apartemen X di Alam Sutera, Tangerang, dengan membandingkan dua skenario yaitu pembangunan apartemen secara langsung dan pembangunan apartemen secara bertahap, dalam konteks dampak pandemi Covid-19. Metode yang digunakan adalah Net Present Value (NPV) dan Internal Rate of Return (IRR) untuk mengevaluasi potensi keuntungan dari kedua pendekatan. Data yang dianalisis mencakup biaya pembangunan, penjualan unit residensial, biaya operasional gedung, serta penerimaan dari iuran pengelolaan lingkungan (IPL) area residensial dan toko komersial, sewa toko komersial dan lain sebagainya. Hasil menunjukkan bahwa skenario pembangunan secara langsung menghasilkan nilai NPV sebesar Rp 87.860.840.681 dengan nilai IRR 13,08%, sedangkan skenario pembangunan secara bertahap menghasilkan nilai NPV yang lebih tinggi, yaitu Rp 112.893.521.357 dengan IRR 14,51%. Kedua skenario memenuhi kriteria kelayakan investasi karena nilai NPV yang dihasilkan lebih besar dari Rp 0, dan nilai IRR juga lebih tinggi daripada MARR yang ditetapkan sebesar 10%. Selanjutnya investasi pada proyek apartemen X layak untuk dilaksanakan baik secara langsung maupun bertahap, tetapi pembangunan bertahap memberikan hasil yang lebih optimal dan lebih menguntungkan dibandingkan dengan pembangunan secara langsung. Studi ini memberikan wawasan penting bagi pengembang properti dalam menentukan strategi investasi yang tepat dalam kondisi ekonomi pasca-pandemi.
Comparative Analysis of Specifications for the Construction of Robotic and Non-Robotic Operating Rooms in Hospitals in Jakarta Harsvardan, Verell Rengga; Pranoto, Wati Asriningsih; Setiadi, Mark
Eduvest - Journal of Universal Studies Vol. 5 No. 9 (2025): Eduvest - Journal of Universal Studies
Publisher : Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/eduvest.v5i9.52116

Abstract

Technological developments in the health sector, especially in surgery, have encouraged hospitals to adopt robotic-based operating systems. The use of robotic surgery provides clinical benefits such as increased precision, 3D visualization, and faster patient recovery. However, the adoption of this technology requires the support of significantly different operating room infrastructure compared to conventional operating rooms. This study aims to conduct a systematic review of the literature that compares the specifications of robotic and non-robotic operating room construction, focusing on design aspects, mechanical-electrical systems, and construction costs. The method used is Systematic Literature Review (SLR) based on the PRISMA protocol, with data sources from Scopus, ScienceDirect, PubMed, and Google Scholar databases. A total of 25 scientific articles that met the inclusion criteria were analyzed qualitatively. The results of the study showed that robotic operating rooms require a larger area (≥60 m²), Laminar Air Flow (LAF) ventilation systems, additional radiation protection, as well as more complex electrical systems such as HMI and UPS. In addition, the cost of building a robotic operating room is reportedly much higher compared to a non-robotic room. The study also identifies the limitations of the literature in Indonesia that discusses the technical planning of robotic operating rooms, thus providing opportunities for further research in the field of health facility design. The results of this study are expected to be a reference for hospitals, construction planners, and policymakers in developing advanced technology-based operating room infrastructure.