Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Astonjadro

Development of Otam – Molibagu TL 150 kV Transmission Design which is Environmentally Friendly Musliani, Musliani; Desi, Natsar; Anugrah, Anugrah
ASTONJADRO Vol. 12 No. 3 (2023): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v12i3.13871

Abstract

Population growth is increasing every yearrequires more and more energy requirements, especially on the electrical energy side, namely the increasing demand for electric power.Although the technology for the construction of power plants and their transmission systems has been pursued with more sophisticated, effective, efficient and safe technologies, the obstacles still exist, one of which is the increasing difficulty of placing high-voltage transmission lines that are free from settlements and the influence of electric field radiation. and magnetic fields on human health has become an environmental problem for PT. PLN (Persero). This study aims to determine how much safe voltage is for people who pass through the High Voltage Air Lines and develop construction designs. The data analysis technique used by the author is descriptive qualitative analysis. The results of monitoring the magnetic field on the 150kV SUTT transmission is 0.5 mT while the electric field strength is 70 V/m. in Bolaang Mangandow Selatan is safe for human health based on standards.
Evaluation of the Existing Conditions of Tinobu Port, Lasolo District, North Konawe Regency, Southeast Sulawesi Province Usman, Rizki; Chaerul, Muhammad; Anugrah, Anugrah
ASTONJADRO Vol. 13 No. 1 (2024): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v13i1.14769

Abstract

The research location is located in Tinobu Village, Lasolo District, North Konawe Regency, which is a developing area and is known for its abundant natural wealth. Tinobu Port existed before Indonesia's independence, where Tinobu Port is tens of years old and has become an icon on the coast of North Konawe Regency, especially in Tinobu Village. Tinobu Port does not have any main facilities or supporting facilities that can facilitate activities at the port. Tinobu Port is widely used by local fishermen for loading and unloading of fish to be sold around the North Konawe Regency area and some are even sold as far as the city of Kendari. development after development has been carried out by the surrounding community as well as assistance from the local government so that at this time Tinobu Port already has a causeway with a length of approximately 400 (four hundred) meters, but due to the age factor, the condition of the causeway has also suffered a lot of damage. The purpose of this study was to evaluate the Existing Conditions of Tinobu Port, Lasolo District, North Konawe Regency in the form of several surveys conducted directly at the research location for future development purposes.
Development of Public Electric Vehicle Charging Stations (SPKLU) in Makassar as an Electric Car Supporting Means Nur, Muhammad Yusuf; Nur, Nur Khaerat; Anugrah, Anugrah
ASTONJADRO Vol. 13 No. 2 (2024): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v13i2.14893

Abstract

Electric vehicles are a potential solution for reducing greenhouse gas emissions and dependence on fossil fuels. However, a successful transition to electric vehicles depends on the availability of adequate charging infrastructure. Therefore, this journal aims to describe the development of Public Electric Vehicle Charging Stations (SPKLU) in the city of Makassar, including an analysis of the obstacles, benefits, and steps taken in the development process. This thesis discusses the latest condition of the electric vehicle battery charging infrastructure, especially the electric car General Electric Vehicle Charging Station (SPKLU) located in Makassar. This thesis also discusses the development of electric car sales in Indonesia, especially in the city of Makassar and other cities around it. How to charge electric vehicle batteries either through portable charging, wall charging or charging at SPKLU as one of the supporting infrastructure for electric vehicles. Programs carried out by both the Government and PLN in an effort to encourage people to switch to electric vehicles to reduce air pollution in big cities and also reduce the use of fossil fuels.