Coordination Analysis of Over Current Protection Using ETAP Software: A Case Study in PT Indocement Tunggal Prakarsa Tarjun, Kotabaru, South Kalimantan Setiawan, Aditiya; Syahputra, Ramadoni; Chamim, Anna Nur Nazilah; Jeckson, Jeckson
Journal of Electrical Technology UMY Vol 3, No 1 (2019): March
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/jet.3151

Abstract

PT Indocement Tunggal Prakarsa Tarjun, Tbk Plant 12, is the largest cement company in Kalimantan. The growing industrial world in the field of cement that is very rapidly will significantly affect the speed of the economy. Thus the increase in the field of electricity will be more felt. PT Indocement Tunggal Prakarsa Plant 12, located in South Kalimantan, requires a reliable electrical system, both in terms of its power supply, in terms of backup of installed electrical systems, as well as safeguards that meet the electricity standards. In the short-circuit settlement is not desired, then the protection of the current relays more with proper coordination protection and reliable required. The coordination of the protection of the current relay is more necessary than the others in order to occur short circuit occurs in the field. No widespread damage occurred in its electricity and existing industrial equipment. To maintain the condition of the electric power system in optimum absence, a re-study of the coordination of current relational protection in PT Indocement Tunggal Prakarsa, Tbk Plant 12. This final project will discuss coordination analysis of overcurrent relay protection at PT. Indocement Tunggal Prakarsa, Tbk. In analyzing the coordination of overcurrent protection, then using several methods in a more coordinated way with coordination protection resetting using ETAP software. They are also resetting coordination protection overcurrent relays using manual calculations. After making the comparison, it can be seen as more current relay protection installed in the field. Some do not work well. It is pronounced in the work of existence, which does not match the standard ie, 0.2 - 0.35 seconds from the IEEE.
Analysis of Power Transformer Insulation: A Case Study in 150 kV Bantul Substation Hidayat, Arief Rahman; Jamal, Agus; Chamim, Anna Nur Nazilah; Syahputra, Ramadoni; Jeckson, Jeckson
Journal of Electrical Technology UMY Vol 3, No 2 (2019): June
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/jet.3254

Abstract

Insulation of the transformer is one of the essential components. So that the quality of the resistance in the isolation of the transformer is essential to note the condition, in order to find out the condition of the transformer isolation, several tests must be performed, namely the polarization index, delta tangent, and break down voltage. In this study, all three tests were carried out on Transformer 1 in the 150 kV Bantul substation. Polarization index testing itself is testing the leakage current on the transformer isolation by comparing the test results for 1 minute with the results of the 10-minute drive test. While delta tangent is testing capacitive leakage current in the isolation transformer, and break down voltage is a test of the ability of the breakdown voltage in transformer insulation oil. Based on the results of the analysis, it can be seen that the value of the transformer polarization index in 2016 and 2018, the average value between the windings has been in the rating of 1.25-2.0. As for the delta tangent test results in 2016 and 2018, the value between the capacitive parts is already in the rating of 0.18% -0.36%. For the breakdown voltage test results in 2016 and 2018, the average breakdown voltage value is 43.9 kV/mm - 65.5 kV/mm. From these data, it can be concluded that the transformer isolation conditions in 2016 and 2018 are in good condition, although there was a decline in the transformer isolation conditions in 2016. However, the National Electric Company has made repairs and maintenance of the isolation transformer. This is seen due to an increase in the quality of transformer insulation in 2018. Repair and maintenance of transformer insulation are done to maximize the work system and the life of the transformer.
PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA ON GRID Yenni Afrida; Jeckson; Dwi Feriyanto
Aisyah Journal Of Informatics and Electrical Engineering Vol 4 No 1 (2022): Aisyah Journal Of Informatics and Electrical Engineering
Publisher : Aisyah Journal Of Informatics and Electrical Engineering (A.J.I.E.E)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30604/jti.v4i1.107

Abstract

Makalah ini membahas tentang sistem PLTS yang terhubung dengan jaringan listrik PLN. Energi surya merupakan sumber energi besar dan tidak akan habis, tidak menimbulkan polusi, aman bagi lingkungan. Pemilihan sistem PLTS yang terhubung dengan jaringan listrik PLN dianggap cocok untuk penggunaan pada daerah yang sudah tersedia jaringan listrik (On Grid). Pada makalah ini perencanaan beban mengambil simulasi beban pada rumah tangga daya 900 VA non subsidi. Berdasarkan hasil perhitungan maka didapatkan nilai efisiensi sebesar 20% menggunakan sistem PLTS.
Analysis of Potential Alternative Energy Sources for Electricity Conservation in Yogyakarta State Finance Building Anna Nur Nazilah Chamim; Rahmat Adiprasetya Al Hasibi; Agus Jamal; Siva Aprilia; Yessi Jusman; Jeckson Jeckson
Journal of Electrical Technology UMY Vol 3, No 3 (2019): September
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/jet.3360

Abstract

State Finance Building of Yogyakarta is a community service that is included in the types of buildings that consume electric energy that is large, so that often led to the power outage unexpectedly due to excessive use of electricity. This excessive use of electricity has also contributed to bill accounts for electricity from PLN which each month up to hundreds of millions of dollars. To that end, this research was undertaken that aim to be able to device that most optimal configuration in the use of solar panels and could compare the PLTS system between On-Grid and PLN in the aspect of cost and CO2 emissions.In knowing the potential of alternative energy sources, namely solar power connected to the PLN as the optimal power plant is carried out by means of conducting research in the form of knowing the intensity of the solar radiation data, data in the form  of electric power load is active for 24 hours, and data rates time of outside peak load and time of peak load from PLN for State Finance Building Of Yogyakarta. Later, she did the simulation using software to help homer modeling from use of the most optimal solar panel. In the research results obtained that the potential PLTS system that are connected with the grid PLN unfit to be carried out because the cost of the initial investment to expenses during the period of operation of the system including the high value of the NPC of $970,742. However, the potential of the power plant that are appropriate for the conditions on site research solar power plant was connected to the grid PLN power plant configuration that is optimized for without using batteries, use only PV with a capacity of 91,35 kW, the converter with a capacity of 400 kW, and power grid network of PLN the system transmitted to PLTS On-Grid of 552 kW.
Simulasi Perbaikan Tegangan menggunakan Aplikasi ETAP pada Mobile Substation 150/20 KV Sistem Kelistrikan PLN (Persero) Rayon Menggala Jeckson Son; Yenni Afrida; Ubaidah U; Ali Ahmad A
Electrician : Jurnal Rekayasa dan Teknologi Elektro Vol. 17 No. 1 (2023)
Publisher : Department of Electrical Engineering, Faculty of Engineering, Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/elc.v17n1.2411

Abstract

Drop tegangan di wilayah Tulang Bawang dan Mesuji sudah mencapai level – 50 percents dari tegangan nominal. Sedangkan berdasarkan SPLN T6.001 tahun 2013 tentang Tegangan Tegangan Standar disebutkan bahwa tegangan tertinggi dan tegangan terendah perbedaannya tidak boleh lebih besar kurang lebih 10 percents dari tegangan nominal sistem. Drop tegangan terjadi karena panjang penghantar jaringan terlalu panjang dan beban feeder besar di ujung jaringan serta terlambatnya pembangunan gardu induk Mesuji. Perbaikan tegangan pada sistem kelistrikan di wilayah Tulang Bawang dan Mesuji disimulasikan menggunakan Aplikasi ETAP dengan memanfaatkan fungsi Load Flow Analisis sehingga diperoleh hasil aliran daya pada sistem kelistrikan tersebut. Simulasi dilakukan pada dua kondisi yaitu kondisi sebelum dan kondisi setelah Mobile Substation 150/20 kV beroperasi pada sistem kelistrikan Tulang Bawang dan Mesuji. Dari hasil simulasi dengan Aplikasi ETAP dapat diketahui perbaikan tegangan pada sistem kelistrikan Tulang Bawang dan Mesuji. Sehingga apabila hasil simulasi dianggap layak, maka pengoperasian Mobile Substation 150/20 kV dapat dilaksanakan
Studi Penentuan State Of Charge (SOC) pada Baterai Valve Regulated Lead Acid NP7-12 Menggunakan MATLAB Yenni Afrida; Jeckson J; Ubaidah U
Electrician : Jurnal Rekayasa dan Teknologi Elektro Vol. 17 No. 2 (2023)
Publisher : Department of Electrical Engineering, Faculty of Engineering, Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/elc.v17n2.2481

Abstract

Abstract — To maintain battery performance, it is necessary to have a battery monitoring system that functions to determine several parameters in the battery, such as voltage, current, capacitance and battery capacity. The technology for knowing battery capacity is often known as state of charge (SOC). State of charge (SOC) is the ratio of the remaining energy to the maximum energy capacity of the battery. State of charge values ​​are often expressed in percentage form, 0 percent -100 percent. Estimating the value of the state of charge is quite important in battery monitoring technology. The lead acid battery testing process is carried out for 10 hours or 36000 seconds, both in the condition of discharging and charging the battery. In this study, the initial State of Charge (SOC) value for the battery is given, namely the upper limit and lower limit. The upper limit value for the initial State of Charge (SOC) is 100 percent, while the lower limit value is 20 percent. In the process of discharging the lead acid battery, it can be seen that the current value when discharging is stable at 1.2 Amperes. The charging current value is very constant, namely at 0.425 A. Meanwhile, the charging voltage value is also constant at 12.215 V. Keywords — State of Charge, Lead Acid, Coulomb Counting, Matlab.
Study On Implementation Of Watergate Control System From Manual To Automatic Based Arduino Nano ATmega328 Syafrudin, Ahmad; Jeckson, Jeckson; Afrida, Yenni
Emerging Information Science and Technology Vol 5, No 1 (2024): May
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/eist.v5i1.22424

Abstract

The system for processing river water into clean water by operating sluice gates which are controlled manually by operators often causes problems (human error), so a system must be created that is capable of controlling sluice gates automatically. The turbidity sensor detects water turbidity which is then accepted by the Arduino nano as the basis for controlling the water gate. In this research, data collection techniques were carried out using interviews with resource persons (operators), observation and literature study. After the automatic sluice control system based on the Arduino nano ATmega328 was implemented, the results obtained were: When the water conditions are muddy and murky, relay one is "on", relay two is "off" (the sluice gate is closed), while when the water conditions are normal and clear then the relay two "on" relays and one "off" relay (open floodgate). In this way, we no longer just have to rely on the operator to control the sluice gate, so that the water treatment process can be more optimal and efficient
Analysis and Visualization of High School Student Achievement Data Using Decision Tree and Cross-Validation in Rapidminer Hartanta, Radhitya Yunandri; Asroni, Asroni; Riyadi, Slamet; Jeckson, Jeckson
Emerging Information Science and Technology Vol 4, No 2 (2023): November
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/eist.v4i2.20731

Abstract

The vision, mission, and work indicators of high school education are all geared toward producing graduates of excellent quality. Students’ academic performance in the first and second grades indicates their eventual excellence as graduates. However, it is not feasible to ensure that students in the third year have good results only by comparing their academic achievements during the first and second grades. School leaders and policymakers can benefit from data analysis and visualization by gaining insight into recurring patterns and emerging trends in their stored data. Leaders and management at schools can benefit significantly from Rapidminer’s decision tree and cross-validation data analysis methods when trying to figure out what to do about students performing well or poorly academically.
Analisa Data Hasil Pengukuran Beban Motor Listrik 1 Fasa pada kWh Analog dan kWh Digital SON, JECKSON
Electrician : Jurnal Rekayasa dan Teknologi Elektro Vol. 15 No. 3 (2021)
Publisher : Department of Electrical Engineering, Faculty of Engineering, Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/elc.v15n3.2219

Abstract

Penggunaan Energi Listrik telah menjadi kebutuhan masyarakat sehari-hari. Untuk mengetahui besaran energi listrik yang digunakan, PLN membutuhkan sebuah alat yang disebut kWh Meter. Terdapat dua macam kWh Meter yang digunakan, yaitu kWh meter Analog (paskabayar) dan kWh Meter Digital (prabayar). Setelah beralih ke kWh meter Digital, hampir di semua rumah sudah menggunakannya, akan tetapi ternyata masih banyak juga keluhan dari masyarakat dan kurang setuju dengan kWh meter Digital. Hal ini disebabkan karena adanya anggapan, pemikiran dan informasi dari masyarakat bahwa kWh meter Digital tersebut membuat perhitungan yang salah sehingga banyak merasa perhitungan energi listrik yang dipakai lebih besar dari pada kWh meter Analog. Penelitian ini bertujuan untuk mengetahui nilai data hasil pengukuran beban motor listrik 1 fasa pada kWh meter Digital dan Analog. Metode yang digunakan yaitu dengan cara membandingkan hasil pembacaan oleh kWh meter analog dan kWh meter digital yang dipasangkan pada motor listrik 1 fasa. Proses penelitian ini dilakukan dengan cara mengukur langsung beban motor listrik 1 fasa pada kWh Analog dan kWh Digital sebanyak sepuluh kali dengan jangka waktu berbeda. Hasil penelitian ini adalah kWh Digital menunjukkan pengukuran yang lebih teliti dan akurat karena digit angka yang ditampilkan dua desimal (0,00). Dari hasil pembulatan satu desimal (0.0), maka hasil pengukuran adalah sama.
Analisis Gangguan Earth Fault pada Penyulang Hujan Gardu Induk Teluk Betung Afrida, Yenni; Jeckson, Jeckson; A, Ancolo; Fajar Rhomadon
Electrician : Jurnal Rekayasa dan Teknologi Elektro Vol. 15 No. 3 (2021)
Publisher : Department of Electrical Engineering, Faculty of Engineering, Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/elc.v15n3.2239

Abstract

Intisari Hubung singkat merupakan salah satu jenis gangguan yang sering terjadi pada suatu sistem tenaga listrik, baik itu hubung singkat antara kawat fasa ketanah maupun hubung singkat antara kawat yang berbeda fasanya. Gangguan hubung singkat dapat berakibat fatal pada sistem tenaga listrik, jika tidak memperhatikan sistem pengaman. Gangguan tanah terjadi karena adanya tegangan induksi kumparan-kumparan transformator terhadap struktur logam disekitarnya. Bila didiamkan tanpa pengaman listrik, akan menimbulkan kebakaran. Untuk itu diperlukan pengaman listrik yang tepat sesuai dengan beban atau jaringan listrik yang diamankan. Penelitian ini membahas tentang arus hubung singkat satu fasa ketanah pada titik gangguan 10 persen sampai dengan 100 persen panjang saluran. Metode yang digunakan adalah dengan menghitung inpedansi sumber, impedansi tranformator 150 kV, Impedansi ekivalen, dan gangguan hubung singkat 1 fasa ke tanah. Hasil perhitungan arus gangguan menjadi salah satu faktor pertimbangan dalam menentukan nilai proteksi. Berdasarkan hasil penelitian didapatkan bahwa semakin jauh atau panjang kawat penampang pada panjang penyulang maka arusnya semakin berkurang/kecil atau semakin dekat maka arus gangguan semakin besar. Kata kunci Hubung singkat 1 fasa ketanah, Penyulang, Gardu Induk, Impedansi, Transformator. Abstract — Short circuit is one type of disturbance that often occurs in an electrical power system, whether it is a short circuit between a ground wire or a short circuit between wires of different phases. Short circuit failure can have fatal consequences to the electric power system, if not paying attention to the safety system. Ground disturbance occurs due to the voltage induced by the transformers on the surrounding metal structures. If left without electric safety, it will cause a electrical fire. For this reason, it requires proper electrical safety according to the load or electrical network being secured. This research discusses the single phase ground short circuit current at the fault point of 10 persen to 100 persen of the channel length. The method is used to calculate the source inpedance, 150 kV transformer impedance, equivalent impedance, and 1 phase short circuit to ground. The result of the calculation of the noise current is one of the factors of consideration in determining the value of protection. Based on the research results, it was found that the farther or longer the cross-sectional wire at the length of the feeder, the lesses current then you have or the closer the current, the greater the fault current. Keywords Short circuit, feeder, substation, impedance, transformer.