Comparative Analysis of Conventional and Plates Floor plate Floor Area Bondek PIM 3 Basement Project and Cost Performance Against Time Hamonangan, Girsang; Khalid, Ihsan
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 3 No 1 (2020): March 2020
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v3i1.1076

Abstract

Work on the project floor Pondok Indah Mall 3 using plates bondek on basementnya area. Here I want to compare the effectiveness of the cost and time, why the owner and the contractor chose to use a plate bondek the basement area. This study aims to determine the differences of the two methods in terms of cost and time of work on the basement floor plates only at Pondok Indah Mall 3 project. Techniques of data collection using interviews and direct observations and combined with literature studies. Processing data using analytical methods of unit price (AHSP). The results of this research review time and cost. Observed work item is a work in basement slab. From this research work price obtained slab bondek system more expensive Rp 1,179,138,501 compared with the conventional method, in which the total price of the floor slab work bondek system is Rp 61,546,996,028, while the conventional method seberar Rp 60,367,857,526 As for the floor turnaround times bondek system requires 378 days, while the floor of conventional systems require 504 days.
Analysis of The Acceleration of Time and Cost of Construction Projects by Adding Labor and Working Hours (Overtime) using The Time Cost Trade Off Method (Case study: Construction of The Conexio Apartment Project) Hamonangan Girsang; M. Andi Wahyud
Journal of World Conference (JWC) Vol. 3 No. 2 (2021): March 2021
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Systematic project management is needed to ensure the project implementation time is in accordance with the contract or even faster, so the cost incurred can provide benefits and also avoid the existence of fines due to delays in project completion. This study discusses the acceleration of time and cost project in the implementation of high rise building construction projects using the Time Cost Trade Off method. The author will analyze the scenario of accelerating the completion of the project by comparing the addition of working hours by 4 hours (scenario 1) and additional labor (scenario 2). The results of the analysis found the estimated time to accelerate the implementation of the project is from the normal duration of 600 calendar days, after a crash duration there is an acceleration of time to 582 calendar days. With a time efficiency of 18 days / 3.00%. The total cost due to acceleration of time (including indirect cost) for the addition of overtime hours for 4 hours (scenario 1) obtained a normal cost of IDR 66,637,746,719 (excl. VAT), then after the crash cost there is an increase in the cost to IDR 70,224,661,008 (excl. VAT) with an over cost of IDR 3,586,914,289 / 5.38%. Whereas with the addition of labor (scenario 2) a normal cost of IDR 66,637,746,719 (excl. VAT), then after the crash cost there is an increase in the cost to IDR 71,454,128,134 (excl. VAT) with an over cost of IDR 4,816,381,415 / 7.23%.
Analisis Earned Value Pekerjaan Struktur Proyek Pembangunan Gedung XYZ Hamonangan Girsang; Wasi Dwi Prastomo; Rangga Nelson Kurniawan
Rekayasa Sipil Vol 11, No 1 (2022)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/jrs.2022.v11.i1.02

Abstract

 AbstractProject implementation is sometimes dificult with various complex problems such as not being able to be completed as planned. not on time, quality, and costs which sometimes happen to be over budget. To overcome this, it is necessary to implement good cost, quality and time management. This study aims to determine the estimated costs and time required to complete a project as well as positive and negative performance factors.The research method in this paper is quantitative research with literature study. The data were collected through observation and discussion activities in the construction project of the XYZ Apartment Building in Bandung specifically on the structure section and the data were analyzed descriptively.From the Earned Value analysis, the research results show that the estimated cost required for the XYZ Bandung apartment development project until completion of all work is Rp. 169,118,439,088, - from the original planned budget of Rp. 164,552,000,000, - and the estimated total time required is 443 days from the originally planned schedule of 336 days. And as much as 29.1% (twenty nine point one percent) of the total work time of this project took place with a negative performance where the value of the resulting work package was lower than the costs that had been incurred and the packages that were carried out were less than the scheduled schedule. It is planned that due to several things such as the slow process of approval for image changes, the arrival of material that is not on time and decreased worker productivity due to the Covid pandemic and 70.9% of the total time for the project that has been underway is performing positively or well. Keywords: Analysis, Earned, Building, Project, Value.Abstrak Pelaksanaan proyek terkadang dihadapkan dengan berbagai masalah yang kompleks seperti tidak bisa diselesaikan sesuai dengan yang direncanakan. tidak tepat waktu, mutu, dan biayanya yang terkadang terjadi over budget  Untuk mengatasi hal ini perlu adanya penerapan manajemen biaya, kualitas, dan waktu yang baik. Penelitian ini bertujuan mengetahui prakiraan biaya dan waktu yang diperlukan menyelesaikan sebuah proyek serta faktor-faktor kinerja positif dan negatif.Metoda penelitian dalam karya tulis ini yaitu penelitian kuantitatif dengan studi kepustakaan. Data dikumpulkan melalui kegiatan pengamatan dan diskusi di proyek pembangunan Gedung Apartemen XYZ di bandung secara khusus pada bagian struktur serta data tersebut dianalisis secara deskriptif.Dari analisa Earned Value hasil penelitian menunjukkan prakiraan biaya yang diperlukan pada proyek pembangunan apartemen XYZ Bandung sampai selesai semua pekerjaan adalah Rp. 169.118.439.088,-  dari rencana anggaran semula  sebesar Rp. 164.552.000.000,- dan  prakiraan total waktu yang dibutuhkan adalah 443 hari dari jadwal yang direncakan semula 336 hari. Dan sebanyak 29,1% (dua puluh Sembilan koma satu persen) dari total waktu pengerjaan proyek ini berlangsung dengan kinerja negatif yang mana nilai paket pekerjaan yang dihasilkan dari lebih rendah dibandingkan dengan biaya yang sudah dikeluarkan dan paket paket yang terlaksana lebih sedikit dari jadwal yang direncanakan yang disebabkan beberapa hal seperti lambatnya proses approval perubahan gambar, kedatangan material yang tidak ontime dan produktifitas pekerja yang menurun akibat pandemic Covid dan sebesar 70,9% dari total waktu pelakasanaan proyek yang sudah berlangsung adalah  berkinerja positif atau baik.
Comparative Analysis of Conventional Mortars and Instant Mortars (RAPI) Against Stone and Plastering Wall Pairs Judging from Quality, Cost, and Time Girsang Hamonangan; Habibi T.B. Muhammad Nazmi
IJEEIT : International Journal of Electrical Engineering and Information Technology Vol 3 No 1 (2020): March 2020
Publisher : NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijeeit.v3i1.1075

Abstract

The development of technology in construction has resulted in ready-made Mortar products is one product that is increasingly needed in the construction industry for several reasons such as material source, project location, quality accuracy, material efficiency, management and price factors. The larger the scale of the city and the more difficult to get quality materials at low prices and increasingly complex handling, it is enough to make an excuse in developing a more practical product with better quality assurance. The aim is to lead to ease in the process of work in the field while continuing to prioritize quality, but its utilization is still not maximized. This study tries to determine the neat instant mortar comparison with conventional mortar against the cost, quality, and time of the red brick and plastering wall pairs. The results showed that the compressive strength in 28 days the compressive strength of Mortar RM-115 with a compressive strength of 215.88 kg / cm2 which is larger and more measurable than Conventional Mortar with a value of 151.76 kg / cm2 whose implementation is sometimes incorrect. The time needed to complete the red brick wall pair work using Mortar RM-115 material is 14 days, while the time needed on the work of the red brick wall pair Conventional Mortar material is 15 days. So that the work of the red brick wall pair using the Mortar RM-115 material is more efficient 1 day and cleaner storage compared to using conventional Mortar material. The price of installing red brick walls with Mortar RM-115 materials in Bintaro Sector 7 housing is Rp. 36,858,425.99. While the price of installing red brick walls and plastering using conventional Mortar materials in Bintaro Sector 7 housing is Rp. 47,188,780.22. Work Installation of red brick walls and plaster using Mortar materials RM-115 is more expensive with a difference of Rp. 10,330,354.23.
STEEL DOME PROJECT DESIGN BOGOR CONVENTION CENTER OPTIMIZATION FOR BUDGET AND AESTHETIC ARCHITECTURE Hamonangan Girsang; Cecep Indra Lesmana
Neutron Vol 20 No 01 (2020): JULY 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

A building needs to be considered various aspects to meet the values - both economic value, cost, durability, impact on the environment to aesthetics or beauty. This research was conducted to make a comparison of the Bogor Convention Center project which was built using the Dome structure with the WF Steel Profile which will be replaced by using steel pipe material. The software used in designing steel is SAP2000 Analysis. SAP2000 is a 3D modeling application that is able to design steel structures that produce analysis and calculation results include static analysis, finite element dynamics analysis, as well as images, reports or other outputs from one structural model. As for the depiction using Autocad where Autocad functions to detail the connections that are in the dome frame of the study. Analysis and Design of a spherical dome structure with building functions as a convention center. The structure of the shell is used as the roof of the building so that the aesthetic elements and values of the architecture of the shell structure can be seen its beauty from the inside of the building. The analysis conducted is an analysis of the internal forces and design of reinforcement in the structure.
COMPARATIVE ANALYSIS OF CONVENTIONAL AND PLATES FLOOR PLATE FLOOR AREA BONDEK PIM 3 BASEMENT PROJECT AND COST PERFORMANCE AGAINST TIME Hamonangan Girsang; Ihsan Khalid
Neutron Vol 20 No 01 (2020): JULY 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Work on the project floor Pondok Indah Mall 3 using plates bondek on basement area. Here I want to compare the effectiveness of the cost and time, why the owner and the contractor chose to use a plate bondek the basement area. This study aims to determine the differences between the two methods in terms of cost and time of work on the basement floor plates only at Pondok Indah Mall 3 project. Techniques of data collection using interviews and direct observations and combined with literature studies. Processing data using analytical methods of unit price (AHSP). The results of this research review time and cost. An observed work item is a work in the basement slab. From this research work price obtained slab bondek system more expensive, Rp 1,179,138,501 compared with the conventional method, in which the total price of the floor slab work bondek system is Rp 61,546,996,028, while the conventional method equal to Rp 60,367,857,526 As for the floor turnaround times bondek system requires 378 days, while the floor of conventional systems require 504 days.
Analysis of The Causes of Delay Completion of Development Projects Workshop Facility - Bekb, Melak, East Kalimantan Hamonangan Girsang; Refianda Eki Putra; Irriene Indah Susanti; Yopi Lutfiansyah
Journal of World Conference (JWC) Vol. 4 No. 3 (2022): May 2022
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Construction projects often suffer from poor performance in terms of execution time management. This is a problem that must be taken seriously. When a delay occurs in a project, there will be additional costs that must be incurred outside the contract and can cause losses for the parties involved, especially the construction contractor. Therefore, it is necessary to pay more attention to the delay in implementation time. The research method used in this research is descriptive quantitative by determining the research variables based on previous journals. Supported by the distribution of phase 1 questionnaires and phase 2 questionnaires which were distributed to 40 respondents related to the Facility Workshop development project located in Melak, East Kalimantan. The questionnaire analysis was assisted by the SPSS version 25 program. The analyzes used were Validity Test, Reality Test, Descriptive Statistical Analysis, Normality Test, Multiple Regression Test, T Test and F Test. From this study, the factors causing delays based on descriptive statistical analysis that meet the requirements of the T-test are material factors (X1), with the indicator "Incorrect material delivery schedule (X1.2)" then supported by the results of multiple linear regression analysis with coefficient positive regression, meaning that there is a significant effect between variables and project delays.
Analisis Penggunaan Bekisting Konvensional, Baja dan Sistim Peri dari Segi Biaya pada Struktur Pier Konstruksi Ramp On/Off Jalan Tol Hamonangan Girsang
Rekayasa Sipil Vol 12, No 1 (2023)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/jrs.2023.v12.i1.05

Abstract

 Formwork is a concrete mold reference or temporary structural element in the work of construction that also contributes to the cost of project implementation, several types of formworks are using in the construction works are conventional, steel, aluminum, peri-system, fiberglass, that’s will make their contribution in the implementation of concrete construction structures. the selection for use of the formwork method are important role in achieving the success of the structural work, especially in the terms of costing because it is necessary to do a thorough analysis related to the formwork material used and the method of implementation. This study aims to compare the costs of using polymer system peri formwork, conventional formwork, and steel plate formwork in pier structure construction work.This research was conducted using descriptive analysis method, the data obtained from various sources were then analyzed and used for the research process in comparing costs. The construction structure reviewed in this study is specifically the pier structure construction consisting of pilecap, column and pierhead.After analyzing the use of bakesting by reviewing of cost performance, the use of polymer system peri formwork materials required costs IDR 773,879,700,- and with conventional formwork materials required costs IDR 1,391,152,241,- and using steel formwork requires IDR 1,091,953,197,- thus the comparative price index the three formwork materials are 1: 1.8: 1.4.
Pendampingan Pembuatan Lubang Resapan Biopori di Meruya Selatan Zel Citra; Reni Karno Kinasih; Mukhlisya Dewi Ratna Putri; Hamonangan Girsang
Jurnal Inovasi Masyarakat Vol. 4 No. 2 (2024): Jurnal Inovasi Masyarakat
Publisher : LP2M Universitas Widyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33197/jim.v4i2.1964

Abstract

Minimnya ruang untuk resapan air di kota-kota besar seperti Jakarta, menimbulkan genangan-genangan, oleh sebab itu perlu antisipasi genangan air hujan, salah satunya adalah pembuatan Lubang Resapan Biopori (LRB). Metode alternatif Lubang Resapan Biopori (LRB) dipilih dikarenakan memiliki beberapa keunggulan diantaranya teknik pembuatannya mudah, operasinya sederhana, biaya yang dibutuhkan murah dan dapat dilakukan secara gotong royong.  Selain berfungsi untuk meningkatkan luasan resapan air, keunggulan dari penerapan metode ini adalah pemanfaatan limbah organik yang dapat dikonversi menjadi pupuk kompos yang dapat dimanfaatkan oleh masyarakat. Kegiatan PkM ini dilaksanakan pada Rabu, 24 April 2024 di RPTRA Meruya Selatan yang dihadiri oleh 55 peserta termasuk Lurah Meruya Selatan. Berdasarkan hasil perhitungan skor kepentingan dan kinerja, peserta merasa sangat puas dengan materi yang disampaikan, karena sesuai dengan kebutuhan.
Assessment of Energy Efficiency and Conservation Aspects Based on Building Information Modeling at Park Residence Building Faridah, Yunita Hasna; Girsang, Hamonangan
Rekayasa Sipil Vol. 18 No. 3 (2024): Rekayasa Sipil Vol. 18 No. 3
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2024.018.03.15

Abstract

To save energy, according to two aspects of the Sustainable Development Goals (SDGs), namely Sustainable Urban Development (SDG 11) and Climate Change (SDG 13), concrete efforts that can be made are increasing energy efficiency and conservation, reducing greenhouse gas emissions, and strengthening resource sustainability. One of the initial efforts that can be made to increase energy efficiency and conservation is by applying Building Information Modeling (BIM) for energy simulation in building structures. One of the BIM-supporting software that can be used in energy simulations is Autodesk Revit, which functions for architectural, structural, mechanical, electrical, and plumbing (MEP) modeling, and Autodesk Green Building Studio, which is a cloud-based media for conducting simple simulations of building performance so that various aspects of its energy can be analyzed for assessment. The Green Building aspect assessment of GBCI used is the GREENSHIP Existing Building Ver1.1 parameter, taken from the Energy Efficiency and Conservation (EEC) aspect, which is a quantitative assessment and can be modeled. The results of the EEC aspect assessment using a quantitative assessment tool obtained a value of 5 points from a total maximum value of 28 points. This value indicates that the 1 Park Residence Building is a building that has not implemented Green Building and requires actions that support the sustainability aspect of the building.