IDENTIFYING THE CARBON FOOTPRINT OF FORMWORK MATERIAL DELIVERY IN BUILDING CONSTRUCTION PROJECTS Tubagus Arsalan Raihan Alauddin; Ryan Faza Prasetyo
International Journal on Livable Space Vol. 8 No. 1 (2023): IMAGE OF THE CITY, BUILDING CONSTRUCTION AND MATERIAL
Publisher : Jurusan Arsitektur - FTSP - Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/livas.v8i1.19472

Abstract

Sustainable construction is a way of implementing sustainable development of the construction industry and infrastructure through building a better quality of life, and minimizing the use of resources and energy in order to actualize The 2030 Agenda for Sustainable Development. The use of construction materials is one source of carbon dioxide emissions and material delivery is one of the stages in the construction material supply chain that has the potential to cause CO2 emissions, one of which is the use of formwork. Global warming is closely related to carbon footprint. The research was done by surveying the building construction project followed by data processing which aims to find out how much carbon emissions are generated by construction projects in the contracting process, delivery, formwork fabrication process, and the use of tower cranes and find out what factors contribute to the carbon footprint and what processes are most significant in producing carbon footprints. The results show that carbon emissions for 28 floors amounted to 84,815.1037 kg.CO2 and by doing 2 scenarios in which scenario 1 maximizes the carrying capacity of each delivery truck during the delivery process and delivery for all the needs of 1 tower is carried out during the GF floor and first floor work, the resulting carbon emission efficiency is 2289.0626 kg. CO2 and in scenario 2 where the delivery of multiplexes for the needs of only 1 floor, which makes delivery carried out for each floor and makes the delivery distance half the actual distance, the resulting carbon emission efficiency is 4628.7909 kg.CO2.
RISK LIST IDENTIFICATION ENCOMPASSING TACIT KNOWLEDGE FOR VIRTUAL REALITY IN BUILDING PROJECTS IN JAKARTA Aditya Pratama; Ryan Faza Prasetyo
International Journal on Livable Space Vol. 8 No. 2 (2023): IDENTIFICATION OF RISK AND PERFORMANCE
Publisher : Jurusan Arsitektur - FTSP - Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/livas.v8i2.19477

Abstract

A high-rise building project can be considered as a high-risk project because the work items are quite a lot and high in the structure being built, the occupational health and safety (OHS) of construction plays an important role in the smooth implementation of a construction project. Construction OHS conducts safety briefing to all construction workers when they enter the construction project environment and every morning before the construction begins. Two information systems are used to inform the workers about the conditions and hazards in the construction projects, namely tacit knowledge and explicit knowledge. Therefore, safety induction is less effective and hinders the implementation of construction project work, where construction workers do not know situations that occur when carrying out a job socialized by OHS officers. In this problem, a simulation must be carried out before workers do their work, to carry out this simulation can be done with virtual reality technology. The research was conducted by distributing questionnaires to the OHS staff of construction projects in Jakarta while the data from the questionnaires were calculated. This study aims to find out a list of risks that are still relevant including tacit knowledge and obtained 11 work risks including tacit knowledge from 38 work risks for building construction projects in Jakarta. Keywords: Construction, OHS, Risk, Knowledge management, Virtual reality.
WASTE MATERIAL RATIO ANALYSIS OF REBAR USING THE BIM METHOD IN CONSTRUCTION DESIGN AND BUILD Fachreza Alyazid Athar Nugraha; Ryan Faza Prasetyo
International Journal on Livable Space Vol. 9 No. 1 (2024): URBAN DEVELOPMENT, HOUSING AFFORDABILITY, AND UTILITIES
Publisher : Jurusan Arsitektur - FTSP - Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/livas.v9i1.19920

Abstract

Construction of the Taman Mini Indonesia Indah Parking Building project is conducted by using a design-build procurement system. During its implementation, 36 changes were made to the working drawings for the ground structure. This was due to the existing ground conditions and changes in space allocation at the client’s request. Objectives: This research aims to compare the waste of reinforcement materials that can occur between conventional methods and BIM methods, particularly in the design work. Methodology and results: In order to be able to calculate the volume of iron material using BIM, working drawing data was collected. In addition, an interview was conducted with the contractor to obtain detailed information on the revised working drawings. The BIM method of calculating the volume of material is carried out using the supporting software Autodesk Revit. Conclusion, Significance, and implications: The results showed that the waste material ratio value of the BIM method was higher than the conventional method with the results in the conventional method is 4.83% and in the BIM method is 6.58%. These results contribute to the development of material waste evaluation, especially in the type of design project. However, previous research that has been conducted focuses more on the type of construction project only.
Counseling and assistance in verification and validation of housing data for surveyors Wahyu Sejati; Lili Kusumawati; Giraldi Fardiaz Kuswanda; Ryan Faza Prasetyo; Avelina Nathania Bennediktus Suhardjo Pusoko
Community Empowerment Vol 9 No 6 (2024)
Publisher : Universitas Muhammadiyah Magelang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31603/ce.11323

Abstract

The data collection of housing database in Jembatan Besi Village conducted by surveyors from the Faculty of Civil Engineering and Planning, Trisakti University often encounters data errors and obstacles during its implementation. These errors can be in the form of incorrect writing of addresses, family card numbers, head of family NIKs, or geotagging (location points) of buildings. Therefore, in the middle of the data collection, a workshop was held to analyze and evaluate the data that had been entered and to correct data errors. The method used is through data checking by field coordinators and repairs are carried out simultaneously. Workshop activities include presentation of the progress of the 50% survey results, data validation and verification, and data correction. During the workshop, the survey results were obtained as much as 60.55% with a total of 2,704 buildings and data correction facilities including geotagging, RT and RW data, Family Card Numbers, NIK, address writing, and deleting duplicate data.
Towards data-driven urban planning: Developing a real-time data update framework for unfit-for-habitation houses in Jakarta Prasetyo, Ryan Faza; Sari, Feby Kartika; Rezandi, Fajar; Putra, Adhitya Utama
Community Empowerment Vol 10 No 6 (2025)
Publisher : Universitas Muhammadiyah Magelang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31603/ce.13451

Abstract

Rapid population growth in DKI Jakarta has led to increased territorial density, resulting in a growing number of slums and a housing gap in the availability of decent housing. One of the main challenges in urban planning is the unavailability of accurate and up-to-date data on Unfit-for-Habitation Houses (RTLH), which is still based on sampling methods. Therefore, the primary objective of this community service activity is to develop an efficient data update framework, enabling the Department of Public Housing and Settlement Areas (DPRKP) to update data in real-time without the need for extensive re-surveys. The implementation method involved outreach to the Sub-Department of Public Housing and Settlement Areas (PRKP) across various administrative regions of Jakarta, followed by question-and-answer sessions and discussions. The results indicate that the developed data update framework can enhance the accuracy and efficiency of RTLH information management, thereby supporting more effective data-driven decision-making for the local government.
PENGAMBILAN KEPUTUSAN DALAM PENYEDIAAN HUNIAN LAYAK HUNI BAGI MASYARAKAT BERPENGHASILAN RENDAH DI JAKARTA SELATAN Purnomo , Arya Wirawan; Raflis, Raflis; Prasetyo, Ryan Faza
INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD) Vol 5 No 1 (2022): INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)
Publisher : Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/cesd.v5i1.13933

Abstract

Abstract The problem that comes from year to year in Jakarta is the high demand for housing, especially for Low-Income Communities. The DKI Jakarta Government has implemented a program that is expected to be able to answer these problems by carrying out a lot of simple flats for rent or simple flats for sale construction and providing subsidies to LowIncome Communities. There are 6 Criteria and 31 Sub-Criteria that underlie the selection of a residence. Analysis of the importance level of criteria segmented according to Low-Income Communities in South Jakarta, obtained by distributing questionnaires to 100 respondents, where the 3 criteria with the highest order are safe residence, flood-free living area, availability of clean water for daily needs. The data on the importance of criteria based on Low-Income Communities are then analyzed using the Analytical Hierarchy Process by asking 5 experts for the views of what is the best alternative for providing livable housing for Low-Income Communities in South Jakarta. The selection of the location for the construction is based on 5 experts, according to expert judgment Jl. Joe belongs to a relatively quiet area that meets the criteria for a safe place to live, in the Jl. Joe also has a water channel for flood prevention in accordance with the criteria for a flood-free area, while for the availability of clean water for daily needs, the three areas in the proposed alternative have relatively the same availability of clean water.
KEANDALAN SISTEM TANGGAP DARURAT KEBAKARAN PADA GEDUNG X Sabililah, Maftukhah; Ryan Faza Prasetyo
Jurnal Rekayasa Lingkungan Terbangun Berkelanjutan Vol. 1 No. 2 (2023): Juli - Desember
Publisher : Jurusan Arsitektur Fakultas Teknik Sipil dan Perencanaan Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/jrltb.v1i2.16304

Abstract

Bencana alam di indonesia memiliki beberapa faktor yang mengakibatkan luka sehingga kerugian harta benda. Bencana yang sering di alami masyarakat disekitar merupakan bencana kebakaran dari beberapa sektor seperti gedung bertingkat karena gedung semakin berkembang pesat dapat menimbulkan ancaman kebakaran. Gedung yang dapat di manfaatkan adalah gedung yang andal memiliki beberapa aspek yaitu kesehatan, keselamatan, kenyamanan dan kemudahan. Untuk mengamankan suatu bangunan gedung dari kebakaran perlu dilakukan persyaratan teknis, pengendalian gedung, pemeriksaan fungsi gedung dan keandalan bangunan terhadap bahaya kebakaran. Maka perlu adanya prosedur penyelamatan sistem tanggap darurat yang tepat dan sesuai. Peneliti ini berujuan untuk mengetahui kondisi eksisting di gedung terhadap kajian kebakaran berdasarkan panduan Permen PU No.26 Tahun 2008. Metode pada penelitian yang digunakan yaitu teknik skoring untuk mengetahui kesesuaian sistem tanggap darurat mengacu pada Permen PU No.26 Tahun 2008. Berdasarkan hasil analisis kesesuaian sistem tanggap darurat mengacu pada Permen PU No.26 Tahun 2008 menghasilkan rata rata nilai skor 76,5% dengan kategori Cukup (C). Berdasarkan hasil penelitian melakukan rekomendasi penerapan pada sistem proteksi detektor, alaram, simulasi pemadam kebakaran Kata kunci : Gedung, Kebakaran, Sistem Tanggap Darurat.
RELEVANSI PENDEKATAN AGILE DALAM MENGATASI PENYEBAB PEKERJAAN ULANG PADA PROYEK KONSTRUKSI Wijaya, Aloysius Bramantyo; Ryan Faza Prasetyo
Jurnal Rekayasa Lingkungan Terbangun Berkelanjutan Vol. 1 No. 2 (2023): Juli - Desember
Publisher : Jurusan Arsitektur Fakultas Teknik Sipil dan Perencanaan Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/v1i2.17706

Abstract

Proyek konstruksi merupakan suatu bidang proyek yang termasuk sangat kompleks bila dibandingkan dengan proyek dalam bidang lainnya karena dalam bidang ini melibatkan banyak stakeholders, sarat modal dan teknologi, dan bekerja dalam time schedule yang ketat. Oleh karena itu, proyek konstruksi perlu dilaksanakan dengan perencanaan yang matang, kemudian pengerjaan konstruksi dilakukan dengan mengikuti shopdrawing dan RAB yang telah ditentukan di awal. Meskipun demikian, proyek seperti ini masih sangat rentan terhadap kesalahan dan perubahan, sehingga mengharuskan kontraktor melakukan pekerjaan ulang. Pendekatan Agile mungkin bisa diterapkan; suatu pendekatan yang bersifat fleksibel dan adaptif terhadap perubahan, yang sudah terbukti efektif dan selalu diterapkan dalam proyek di bidang software development. Beberapa proyek konstruksi sektor swasta juga menggunakan pendekatan ini yang ditandai dengan penerimaan terhadap tuntutan perubahan demi terpenuhinya stakeholders’ satisfaction. Melalui Risk Assessment menggunakan Probability-Impact Matrix (PIM), sebanyak 21 faktor risiko telah teridentifikasi sebagai penyebab pekerjaan ulang dengan tingkat frekuensi dan dampak yang signifikan.Untuk menghadapi risiko ini, ternyata ada 8 prinsip pendekatan agile yang menurut para pelaku konstruksi mungkin dan cocok untuk diterapkan untuk menghindari kesalahan dan kelalaian dalam implementasi proyek ke dalam pengerjaannya di lapangan. Kata kunci : faktor risiko pekerjaan ulang, pendekatan Agile, proyek konstruksi Probability-Impact Matrix
ANALISIS WASTE MATERIAL RATIO TULANGAN MENGGUNAKAN METODE BIM PADA KONSTRUKSI DESIGN AND BUILD Fachreza Alyazid Athar Nugraha, Fachreza Alyazid Athar Nugraha; Ryan Faza Prasetyo
Jurnal Rekayasa Lingkungan Terbangun Berkelanjutan Vol. 2 No. 1 (2024): Januari-Juni
Publisher : Jurusan Arsitektur Fakultas Teknik Sipil dan Perencanaan Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/v2i1.19423

Abstract

Pekerjaan konstruksi pada Proyek Gedung Parkir TMII dilaksanakan dengan sistem pengadaan design and build. Pada pelaksanaannya mengalami perubahan gambar kerja struktur bawah sebanyak 36 kali. Adapun hal tersebut dikarenakan kondisi tanah existing serta berubahnya peruntukan ruangan atas permintaan pihak owner. Penelitian ini bertujuan untuk membandingkan pemborosan material tulangan yang dapat terjadi antara metode konvensional dengan metode BIM. Untuk dapat melakukan perhitungan volume material besi menggunakan BIM, dilakukan pengumpulan data gambar kerja. Selain itu dilakukan sesi interview terhadap pihak kontraktor untuk mendapatkan detail informasi mengenai revisi gambar kerja. Pada metode perhitungan volume material metode BIM dilakukan dengan menggunakan software penunjang Autodesk Revit. Hasil penelitian menunjukan bahwa nilai Waste Material Ratio metode BIM lebih besar dibandingkan metode konvensional. Dengan hasil yang diperoleh pada metode konvensional sebesar 4,83% dan pada metode BIM sebesar 6,58%. Keywords : Quantity Take-Off, BIM, Design and Build, Waste Material Ratio
PERSPEKTIF JUNIOR ENGINEER TERHADAP PENILAIAN RESIKO (STUDI KASUS PADA PROYEK PEMBANGUNAN MRT JAKARTA FASE 2A CP 202) Allysa Putri Nazhirah, Allysa Putri Nazhirah; Ryan Faza Prasetyo
Jurnal Rekayasa Lingkungan Terbangun Berkelanjutan Vol. 2 No. 1 (2024): Januari-Juni
Publisher : Jurusan Arsitektur Fakultas Teknik Sipil dan Perencanaan Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/v2i1.19495

Abstract

Hadirnya MRT terbukti mendukung pembangunan kota yang berkelanjutan, meningkatkan kualitas hidup, dan merangsang pertumbuhan ekonomi. Karena itu, pembangunan MRT akan terus berjalan dengan cakupan wilayah yang akan terus meluas dan tentu tidak lepas dari risiko yang mungkin terjadi terutama saat proses pembangunannya. Penelitian ini bertujuan untuk mengetahui penilaian risiko menurut perspektif junior engineer pada proyek pembangunan MRT Jakarta Fase 2A CP 202 karena pada proyek MRT kedepannya, junior engineer kemungkinan akan memiliki peran yang lebih besar. Penelitian ini menggunakan pendekatan kuesioner dan wawancara untuk pengumpulan data serta untuk menganalisis hasil kuesioner, digunakan metode delphi. Hasil yang diperoleh terdapat 21 variabel risiko yang mungkin terjadi; terdiri dari 16 variabel medium risk dan 5 variabel low risk yang berdampak terhadap biaya dan juga 17 variabel medium risk dan 4 variabel low risk yang berdampak terhadap waktu pada proyek pembangunan MRT Jakarta Fase 2A CP 202. Dari total 21 variabel risiko, terdapat 3 variabel risiko yang memiliki perbedaan pendapat antara junior engineer dan senior engineer yang cukup signifikan. Keyword : Risk Assessment, Junior Engineer, Delphi Method, MRT Jakarta