Production Stage and Risk Identification on Asphalt Mixing Plant in Bali A.A.A Made Cahaya Wardani; I Nyoman Arya Thanaya; Nyoman Yudha Astana; A.A. Gde Agung Yana
International Journal of Applied Business and International Management Vol 4, No 3 (2019): December 2019
Publisher : AIBPM Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32535/ijabim.v4i3.678

Abstract

Cost, quality and time are an important performance indicators in the project success. To achieve these objectives various risks are faced in each project life cycle. One of these risks is supply chain risk, which must be managed properly, doe to the uncertainty in this activity. There are still many companies that do not understand the importance of supply chains, so they often become obstacles in achieving project goals This study aims to identify risk factors in each stage of supply chain activities, in road infrastructure in Bali Province. Data were collected from questionnaire survey, interviews and focus group discussion from 15 units asphalt mixing plant supplier in Bali, who understand supply chain issues, especially in road infrastructure work in the province of Bali. The results of research on risk is firstly AMP production processes identified as a field of manufacturing industry that produces hot asphalt used in infrastructure projects in Bali. This research was conducted at the AMP unit found in Bali. From research, the production process and AMP business are based on Supply, Input, Process, Output and Customer activities. (SIPOC). After the activities contained in the Asphalt production process, it is known that further risks can be identified. Second identity the risk on SIPOC process.
PRAKTIK KONSTRUKSI BERKELANJUTAN DALAM REKONSTRUKSI PERUMAHAN PASCABENCANA: PELAJARAN DARI GEMPA LOMBOK UTARA 2018 Indramanik, Ida Bagus Gede; Sudarsana, Dewa Ketut; Astana, I Nyoman Yudha; Agung Yana, Anak Agung Gde; Parthami Lestari, Ayu Putu Utari
Jurnal Rekayasa Sipil (JRS-Unand) Vol. 21 No. 1 (2025)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jrs.21.1.1-15.2025

Abstract

Penelitian ini meneliti praktik konstruksi berkelanjutan dalam rekonstruksi perumahan pascabencana di Lombok Utara pasca gempa bumi 2018. Perencanaan/desain, bahan, prosedur, dan dampak lingkungan adalah empat aspek utama yang dinilai. Adanya peningkatkan keberlanjutan dan ketangguhan dalam upaya rekonstruksi, akan memberikan wawasan bagi pembuat kebijakan dan praktisi dalam strategi pemulihan pasca bencana. Penelitian ini menggunakan metodologi tiga fase: meninjau literatur tentang rekonstruksi perumahan berkelanjutan pasca bencana, melakukan survei lapangan dengan kuesioner terstruktur, dan melakukan analisis statistik deskriptif menggunakan SPSS. Penduduk daerah terdampak di Lombok Utara yang berpartisipasi sebagai responden adalah 125 orang, yang menggunakan skala Likert lima poin untuk mengukur pendapat mereka tentang praktek konstruksi berkelanjutan. Hasil penelitian meninjukkan bahwa meskipun pembangunan kembali perumahan pascabencana di Lombok Utara telah membuat langkah signifikan menuju keberlanjutan, masih banyak pekerjaan yang harus dilakukan. Keterlibatan masyarakat, pemanfaatan bahan daur ulang, pengolahan limbah, pengelolaan lokasi lingkungan, pengelolaan limbah konstruksi, dan adopsi energi terbarukan adalah area penting untuk ditingkatkan. Keberlanjutan dan ketangguhan jangka panjang akan dipastikan dengan memperkuat elemen-elemen tersebut.