Claim Missing Document
Check
Articles

Found 7 Documents
Search
Journal : Journal of Industrial Engineering Management

PERANCANGAN INSTRUKSI KERJA DOKUMEN DAN VISUAL PADA MESIN ELECTRICAL DISCHARGE MACHINE Ahmad Padhil; Nurhayati Rauf
Journal of Industrial Engineering Management Vol 5, No 2 (2020): Journal of Industrial Engineering Management Vol. 5 No. 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v5i2.121

Abstract

Quality is a factor that can increase product competitiveness. In improving products quality is necessary to control the quality (Quality Control) of the process activities. This study aims to determine the quality control of granulated sugar packaging process by using the seven tool method consisting of check sheet, histogram, Pareto chart, flow chart, scatter diagram, control chart and fishbone diagram. From 30 days observation concluded that the highest type of damage consist of metal detection by 145 bags and torn packaging by 50 bags. Then, from the results of control chart known that out of control process still happen. Both types of damage then revised, and process capability analysis is carried out, so can be concluded that the process is not capable in making the product according to specifications. Therefore, an analysis using fishbone diagram shows that the causes of damage are human, working methods, and machines. From these factors, Standard Operating Procedures can be done as well as designing new machines in packaging process
PERBAIKAN KUALITAS KAIN SUTERA DENGAN MENGGUNAKAN METODE KANO DAN METODE QUALITY FUNCTION DEPLOYMENT (QFD) Nur Hayati Rauf; Taufik Nur; Helmy Sulfiani Malica
Journal of Industrial Engineering Management Vol 3, No 1 (2018): Journal of Industrial Engineering Management Vol. 3 No. 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (487.903 KB) | DOI: 10.33536/jiem.v3i1.201

Abstract

KM Sutera Opo bergerak dibidang industri pertenunan sutera, kualitas kain sutera sangat mempengaruhi kepuasan pelanggan, Berbagai macam keluhan yang sering muncul baik dalam wawancara langsung dengan pelanggan maupun dari data pengamatan Dinas Perindustrian Kab.Bone. Penelitian ini bertujuan untuk mengetahui indikator-indikator kepuasaan pelanggan terutama indikator mana yang paling berpengaruh terhadap kenaikan dan penurunan tingkat kepuasan tersebut. Penelitian ini menggunakan dua metode, yang pertama metode kano untuk menganalisa dan mengkategorikan atribut-atribut dari kualitas produk, berdasarkan seberapa baik produk tersebut mampu memuaskan pelanggan, selanjutnya metode kedua yaitu metode Quality Function Deployment, untuk merencanakan dan mengembangkan secara terstruktur dan mendefinisikan secara jelas kebutuhan dan harapan pelanggan secara sistematik. Hasil penelitian tersebut adalah Dimensi yang paling diprioritaskan pada metode kano yaitu dimensi One dimensional dan Must be, Kemudian analisa QFD akan dilakukan perbaikan kualitas produk pihak IKM hendaknya melaksanakan respon teknikal dengan skala prioritas yang sesuai dengan urutan tingkat kepentingan absolut dan relatif.
DETERMINATION OF THE OPTIMAL NUMBER OF EMPLOYEES USING THE FULL TIME EQUIVALENT (FTE) METHOD AT PT. XYZ Arfandi Ahmad; Nurhayati Rauf; Yusril Mahenra; Takdir Alisyahbana; muhammad dahlan; Andi Pawennari; Dirgahayu Lantara; Rahmaniah Malik
Journal of Industrial Engineering Management Vol 6, No 3 (2021): Journal of Industrial Engineering Management Vol. 6 No. 3
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v6i3.1071

Abstract

Determining the optimal number of employees in a company is a basic condition that must be concern into account when drafting a work plan. The work design process ultimately aims for balance the physical and mental aspects of humans in completing certain tasks so that. Determination of the number of employees whit the existing workload will support employees performance in perform their duties optimally. The purpose of this research is to determine the optimal number of salesman based on the workload calculated using the Full Time Equivlent method. Based on the results of research at PT. Xyz used the method FTE is know that the workload of the 4 salesman is classified as overloaded. Where is sales I has a workload of 1.48, sales II has a workload of 1.70, sales III has a workload of 1.66, sales IV get a workload of 1.42. Based on the table of labor requirements to the FTE value, the number of initial salesman was 4 sales and the addition of the number of salesman is as many as 10 salesmen. So, the optimal number of salesmen in Makassar city is 14 salesmen.
ANALYSIS OF QUALITY CONTROL OF T-SHIRT SCREEN PRINTING PRODUCTS WITH SIX SIGMA DMAIC METHOD ON CV. MACCA CLOTHING. Nurhayati Rauf; Ahmad Padhil; Takdir Alisyahbana; Anis Saleh; Muhammad dahlan; Rahmaniah Malik; Andi Pawennari; Nurul Chairany
Journal of Industrial Engineering Management Vol 7, No 1 (2022): Journal of Industrial Engineering and Management Vol 7 No 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v7i1.1147

Abstract

CV. Macca Clothing is a company engaged in Clothing screen printing. The resulting product is a short sleeve t-shirt screen printing. In producing the production, on average per month there are defective products of 6% types of defects, namely blurred colors, wrong colors, and wrong screen printing. Therefore, this study aims to providelevels sigma and DPMOand then analyze the factors causing disability and provide suggestions for improvements to reduce defective products at CVMacca Clothing. The data collection method used is to conduct interviews with CV.Macca Clothing. Then in analyzing the data using the method DMAIC and theapproach six sigma.From the research results, thevalue DPMO is 21,000 and the conversion result is 3.53, which means that out of a million opportunities there will be 3.53 possibilities for the production process to produce defective products. in thelevel stage  sigma CV.Macca Clothing has not yet reached thelevel Six Sigma, but it is still in the average industrial condition because in the production process there are still product defects that have not reached zero defect. The factors that cause defects in the product are the operator is not careful in doing the work, the quality of raw materials is not good, the cleanliness of the equipment is not maintained, and the production room facilities are inadequate. From the results of the analysis based on the implementation tools kaizen , the control and improvement to reduce defects that must be carried out by CV.Macca Clothing is to carry out stricter supervision or control, carry out regular machine maintenance, and provide complete facilities. 
DESIGNING AN INVENTORY MODEL FOR THE BEHAVIOR OF DEPENDENCE ON LPG GAS CONSUMPTION OF 3 KG USING THE DYNAMIC SYSTEM SIMULATION METHOD IN LUWUK BANGGAI REGENCY Izzul Aziz; Abdul Mail; Muhammad Nusran; Anis Saleh; Dirgahayu Lantara; Nurhayati Rauf; Muhammad Fachry Hafid
Journal of Industrial Engineering Management Vol 7, No 2 (2022): Journal of Industrial Engineering and Management Vol 7 No 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v7i2.1262

Abstract

Liquefied Petroleum Gas (LPG) or more commonly known as LPG gas is a gas stove fuel that comes from the results of liquefied petroleum gas and is then put into a tube, one of which is a 3-kilogram tube. The behavior of dependence on the consumption of 3-kilogram gas cylinders from the people of Banggai Regency can be seen from the use of non-subsidized 3 kilogram LPG gas, namely (±) 32. 002 people/group, the second is the consumption rate from subsidies and non-subsidies, namely 38. 864 units from total users, namely (±) 45. 000 people/groups with a supply of 30. 800 units and the third about frequent scarcity in 2020 and early 2021 reported by Banggai News and Obormotindok. Simulation Method Dynamic systems are modeling and running simulations of real systems to analyze problems and present solutions from policy scenarios from the researcher's perspective. By using this method, researchers can identify the behavior of 3 kilograms of gas consumption from the rate of consumption and demand through tables and graphs using the Powersim Studio 7 software. The results of the study present 3 policy scenarios, namely the first scenario regarding an increase in the transition to 99% non-subsidized gas cylinders with simulation results, namely September 1 2021 - October 1 2022 the demand is fulfilled, the second scenario regarding the addition of a 7th agent with simulation results, namely September 1 2021 - April 1 2023 demand can still be fulfilled and the third scenario regarding an increase in the transition to 99% non-subsidized gas cylinders and the addition of a 7th agent with simulation results, namely 1 September 2021 – 1 September 2023 the demand for needs is fulfilled. The conclusion is that the third policy scenario will be taken because among the policy scenarios presented, the preparation of tube supplies is fulfilled within two years, namely September 1 2021 - September 1 2023.
QUEUE SYSTEM ANALYSIS IN SERVICE OPTIMIZATION IN PT. BANK SULSELBAR MAIN BRANCH MAKASSAR CITY Lamatinulu Ahmad; Windayani windayani; Muhammad Dahlan; Ahmad Padhil; Nurhayati Rauf
Journal of Industrial Engineering Management Vol 8, No 1 (2023): Journal of Industrial Engineering and Management Vol 8 No 1
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v8i1.1362

Abstract

PT. Bank Sulselbar is a regionally owned business entity engaged in banking services. Companies in the service sector must be able to provide the best service to meet the wishes of customers who require fast service. As the number of customers increases, there are queuing problems in serving customers, this problem results in many customers waiting for quite a long time. For this reason, this study aims to reduce the length of time waiting for customers to avoid queues that are too long . This research uses queuing theory analysis method with queuing model (M/M/S). The results of this study using queuing theory analysis, namely the model calculation (M/M/S) shows that the busy period occurs in the period 08.00-09.00, and 13.00-14.00 by adding 1 service facility from 6 to 7 customer service, there will be a decrease customer waiting time. The waiting time in the system in the time period of 08.00-09.00 from 25.15 minutes to 10.07 minutes, and the time period of 13.00-14.00 from 19.39 to 9.13 minutes
DISTRIBUTION ROUTE ANALYSIS WITH SAVING MATRIX METHOD IN DETERMINING HOT MIX ASPHALT (HMA) DISTRIBUTORS Muhammad Fachry Hafid; Muhammad Dahlan; Nurhayati Rauf; Takdir Alisyahbana; Rahmaniah Malik
Journal of Industrial Engineering Management Vol 8, No 3 (2023): Journal of Industrial Engineering and Management Vol 8 No 3
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v8i3.1370

Abstract

The Gorontalo Regency Public Works Department is responsible for a road construction program, in this case, the Public Works Department will conduct project auctions from several existing road projects and there will be one contractor company that will get an auction, where the contractor will produce asphalt in one of the Asphalt companies. Mixing Plant (AMP). The asphalt distribution process of course has routes and distribution costs where this needs to be optimized to get efficient planning in the distribution process, in the project data of the Public Works Department in 2022 there are five road projects and in the Gorontalo Regency area there are five (5) Asphalt Mixing Plants ( AMPs). Distribution is one part of the activities of Supply Chain Management which distributes goods and services from producers to consumers. The idealism of distribution is to distribute or deliver the right amount and type of product at the right time and place at the lowest possible cost to generate maximum profit. The Vehicle Routing Problem (VRP) is related to determining the route for the problem of distributing goods or products involving more than one vehicle with a certain capacity to serve some customers with their respective requests. The results of this study found that the determination of the distribution route of hot mix asphalt with the saving matrix method found that, the Otopade-Liyoto Project (F1) with 1,639 Ton Asphalt Demand, the selected asphalt distributor was (F0-E) PT.PETRA with a distance of 14.4 Kilometers with a total cost of Rp42,508,800. Project (F2) road project Construction of the Buhu - Iloponu Perintis road with an asphalt demand of 609 tons, the selected asphalt distributor is (F0A) PT. Cahaya Nusa Sulutarindo with a distance of 9.6 Kilometers with a Total Cost of Rp 11,712,000. Project (F3) Pilomonu – Pasir Putih road with 763 Ton Asphalt Demand, the selected asphalt distributor is (F0-E) PT.PETRA with a distance of 38.1 Kilometers with a total cost of Rp52,806,600. Project (F4) of Molohu – Langge road with 656 Tons of Asphalt Demand, the selected asphalt distributor is (F0-E) PT.PETRA with a distance of 42.4 kilometers with a total cost of Rp 50,371,200. For the project (F5) of the Helume Bihe - Sukamaju road with an asphalt demand of 1,564 Tons, the selected asphalt distributor is (F0-E) PT.PETRA with a distance of 32.6 Kilometers with a total cost of Rp 92,127,600. Keywords: Distribution, Supply Chain Management, Vihicle Routing Problem, Asphalt Mixing Plant, Hot Mix Asphalt, Direct Shipment, Routes, Cost