Analysis of Park and Ride Location Determination in Urban Areas Using Analytical Hierarchy Process (AHP) Casuya, Casuya; Faisal, Muhamad; Saifutdin, Muchammad Arif; Hariani, Mira Lestira; Farhan, Ohan
Journal of World Science Vol. 4 No. 9 (2025): Journal of World Science
Publisher : Riviera Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58344/jws.v4i9.1508

Abstract

The rapid growth of private vehicles in urban areas has caused various problems such as traffic congestion, increased air pollution, excessive fuel consumption, and decreased quality of life. The urgency of this research lies in the need for strategic solutions to reduce the use of private vehicles in the city center, one of which is through the construction of Park and Ride (PnR) facilities integrated with public transportation. The purpose of this research is to determine the strategic location of PnR facilities in Cirebon City to support a more sustainable urban transportation system. This research uses the Analytical Hierarchy Process (AHP) method involving ten main criteria, including parking lot capacity, supporting facilities, ease of access, transportation integration, intermodal connectivity, and development costs. Data was obtained through expert surveys and secondary data from relevant agencies. The results showed that the alun-alun kejaksan area is the most optimal location for the development of PnR facilities, followed by Kejaksan Station, Prujakan Station, and Harjamukti Terminal. This location is superior in terms of accessibility, land capacity, transportation mode integration, and proximity to community activity centers. These findings are expected to be a reference in planning and policy making for the development of urban transportation systems in Cirebon City.
Analysis of the Effectiveness of Using Autodesk Revit Applications in Increasing Work Productivity: a Case Study of the Construction of the Al-Multazam Islamic Boarding School Building, Kuningan Syarif Hidayat, Ahmad; Adi Wibowo, Faizal; Nur Fadilah, Wahyu; Farhan, Ohan
Journal of World Science Vol. 3 No. 8 (2024): Journal of World Science
Publisher : Riviera Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58344/jws.v3i8.705

Abstract

The implementation of construction work, there are still many problems, namely schedule mismatches, delays, and cost calculations that are sometimes inaccurate because they still use conventional methods. In the Al-Multazam Islamic Boarding School Building Construction project, Kuningan still uses traditional methods, where this method has the potential for human error because in making calculations it can be wrong to enter data which will ultimately change the calculation results to be greater. This research aims to show that the BIM method is very important to be applied in construction projects to streamline work productivity in building construction projects. In this case, there are differences in the results of the calculation of Quantity Take Off on the project, the difference in the results of the analysis shows that there is a difference between the existing volume and the volume of the Quantity Take Off results using the BIM concept, Foot plate foundation work has an average difference of 6.67%, Tie Beam has a difference of 7.62%, Beams have a difference of 5.30%, Columns have a difference of 8.26%, and Floor Plates have an average difference of 2.51%.  This research has implications for the application of BIM to enable a more structured, efficient, and accurate planning and implementation process, thereby reducing the potential for errors caused by human factors. In addition, the use of BIM can also increase efficiency in overall project management, including in schedule monitoring, cost estimation, and resource management, which in turn can increase work productivity on building construction projects.