Tejo Sukmadi
Departemen Teknik Elektro, Universitas Diponegoro, Semarang Jl. Prof. Sudharto, SH, Kampus UNDIP Tembalang, Semarang 50275, Indonesia

Published : 56 Documents Claim Missing Document
Claim Missing Document
Check
Articles

PERANCANGAN DIMER LAMPU SECARA OTOMATIS BERBASIS MIKROKONTROLER PADA PENERANGAN DALAM RUANGAN Pratama, Guntur Pradnya; Yuningtyastuti, Yuningtyastuti; Sukmadi, Tejo
Transmisi Vol 15, No 4 (2013): TRANSMISI
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (190.704 KB) | DOI: 10.12777/transmisi.15.4.186-190

Abstract

Abstrak   Penerangan merupakan suatu faktor untuk mendapatkan keadaan lingkungan yang aman dan nyaman. Penerangan yang baik memungkinkan seseorang melihat obyek-obyek yang dikerjakan secara jelas, dan dapat memberikan kesan pemandangan yang menyegarkan. Sebaliknya jika ruangan memiliki penerangan yang buruk dapat mengakibatkan kelelahan mata, oleh karena itu diperlukan dimmer untuk mengatur penerangan  suatu ruangan secara otomatis. Dalam penelitian ini dibuat perancangan model penerangan dengan menggunakan dimmer otomatis berbasis mikrokontroler ATMega8, sebuah sensor PIR (Passive Infrared Receiver), dan sebuah sensor LDR (Light Dependent Resistor). Prinsip kerja sesnsor PIR mendeteksi adanya gerak dari seseorang yang menghasilkan perubahan suhu tubuh, sedangkan sensor LDR berfungsi untuk mengatur perubahan intensitas cahaya. Berdasarkan perancangan alat ini didapatkan hasil dalam suatu ruang kamar dengan ukuran (2,5x2,5)m sebelum menggunakan dimmer besarnya intensitas penerangan 0 - 350 lux. Untuk memenuhi standar nasional penerangan sebuah ruang kamar yang berukuran (2,5x2,5)m sebesar 100 - 250 lux, sedangkan menggunakan dimmer yang dibuat dalam penelitian ini telah mampu menghasilkan intensitas penerangan 135 - 180 lux.   Kata kunci : Dimmer, Sensor LDR, sensor PIR.     Abstract   Lighting is one of the factor which establish in an environment to get a safe and comfort condition. A good lighting enable people to see the objects clearly, and can giving the impression of a refreshing. On the contrary  if an area have a bad lighting  it could be a factor which cause of eyestrain, therefore a dimmer is needed in a room to control a lighting automatically. In this research, a design of lighting has been made by using a dimmer microcontroller ATMega8 – based, a PIR (Passive Infrared Receiver) sensor and a LDR (Light Dependent Resistor). The working principal of PIR is detecting of someone movement which make the changed of body temperature, while LDR sensor to control the changed of lighting intensity. Based on this tool designed in a room with the (2,5x2,5)m of measure, the amount of lighting intensity is 0 – 350 lux. To accomplish the national standard, a lighting for a room with dimmer using of (2.5x2.5)m is 100 – 250 lux, and by using the dimmer designed in this final aassigment has been  able to produce 135 – 180 lux of lighting intensity. Keywords: Dimmer, LDR Sensor, PIR Sensor
Perancangan Pengasutan Bintang – Segitiga dan Pengereman Dinamik pada Motor Induksi 3 Fasa dengan Menggunakan Programmable Logic Controller (PLC) Prakoso, Isna Joko; Warsito, Agung; Sukmadi, Tejo
Transmisi Vol 14, No 1 (2012): TRANSMISI
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (428.694 KB) | DOI: 10.12777/transmisi.14.1.13-19

Abstract

Three-phase induction motor is the motor of alternating current (AC) is the most widely used and much used by the industry because it has several advantages, among others, this motor is simple, in expensive and easy to maintain and can be directly connected to an AC power source. Besides the advantages of this motor, also has disadvantages. The disadvantage of this induction motor which has a large starting currents and the use of induction motors are often needed to stop the motor rotation quickly, especially for conveyor applications. At this final project, created a system starting star (Y)-triangle (Δ) and the dynamic braking of three phase induction motor using a Programmable Logic Controller (PLC). Where the system is very simple, does not require a lot of support tools and can be applied to any type of three-phase induction motors. Starting of the test results to show that the method starting with Y-Δ has a starting current of 3.59 A. This current is smaller than the nominal starting current induction motor 1 HP is 6.3 A relationship Δ and 3.62 A relationships Y. Starting time is good for the displacement of the star (Y) - triangle (Δ) is 6 seconds, so the starting of induction motors using the star (Y) - triangle (Δ) can reduce the high current flow starting of induction motor starts to operate. For braking, DC injection current is supplied by 1.908 A and the stop time for load 100 W is 1,57 seconds, for load 200 W is 1,38 seconds, and for load 300 W is 0,95 seconds. Time stopped by dynamic braking faster than without dynamic braking. Keywords : Starting star (Y)-triangle (Δ), dynamic braking, three-phase induction motor, Programmable Logic Control (PLC)
ANALISIS KERUSAKAN BATANG ROTOR PADA MOTOR INDUKSI TIGA FASA MENGGUNAKAN METODE MOTOR CURRENT SIGNATURE ANALYSIS Firdhana, Niko Riza; Sukmadi, Tejo; Karnoto, Karnoto
Transmisi Vol 19, No 4 Oktober (2017): TRANSMISI
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (707.078 KB) | DOI: 10.14710/transmisi.19.4.168-176

Abstract

Motor induksi digunakan di berbagai bidang karena harganya murah, handal, dan memiliki efisiensi yang tinggi.Salah astu penggunaan motor induksi adalah pada unti pembangkit listrik. Motor induksi dapat mengalami kegagalan karena proses penuaan dan bebagai faktor lain yang berkaitan dengan pola operasi. Salah satu kegagalan motor induksi disebabkan oleh rusaknya batang rotor.Untuk mengurangi kegagalan motor induksi diperlukan adanya condition monitoring untuk melihat kondis dan performai motor induksi. Salah satu metode yang digunakan dalam condition monitoringadalah Motor Current Signature Analysis (MCSA). Metode ini melakukan pendekatan sinyal arus stator untuk mendeteksi side band frequency di sekitar terminal sumber. Penelitian  ini merancang desain GUI yang berisi analsis kondisi batang rotor menggunakan metode MCSA, persentase keseimbangan arus dan tegangan untuk menganalisis kondisi motor induksi yang ada di PT. PJB UBJOM PLTU Rembang yaitu Medium Speed Mill 20 A dan Medium Speed Mill 20D. Kondisi batang rotor pada kedua motor semakin memburuk seiring bertambahnya beban. Meskipun semakin memburuk, tetapi kondisi keseimbangan arus dan tegagan kedua motor normal karena bearda di bawah 5% dan 10%.
Karakteristik Transformator terhadap Arus Harmonik Sukmadi, Tejo
Transmisi Vol 13, No 4 (2011): TRANSMISI
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (334.087 KB) | DOI: 10.12777/transmisi.13.4.141-145

Abstract

Electric power have become one of the primary need of modern society. Most of electrical equipments in this time represents as non linear loads. In the electric power system, a non linear load represents as harmonic source. The generated harmonic load currents will flow back into electric power source passing through the transformers. These harmonic currents will become smaller in their amplitude when passing the transformer even some higher order harmonics components will be suppresed. This research is conducted as a mean to know how far transformers could reduced harmonic currents amplitude and to investigate what higher order harmonic current compenents would be suppresed after passing the transformers. Keywords : Transformator, harmonic current, amplitude.
Pengembangan Trafo Distribusi Berdasarkan Pertumbuhan Beban Tahun 2012 – 2016 di UPJ Batang Mahardhika, Dhimas; Nugroho, Agung; Sukmadi, Tejo
Transmisi Vol 12, No 3 (2010): TRANSMISI
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (504.338 KB) | DOI: 10.12777/transmisi.12.3.87-93

Abstract

Electric energy infrastructure as one of the livelihood of the people concerning the distribution of electrical energy must be able to guarantee in an amount sufficient, reasonable price and good quality. Electrical energy demand will increase in line with regional economic development and population growth and the growth of electric power loads. And It need forecasting electrical energy within a period of 5 years and doing physical development. One of them, ​​the development of distribution transformers to help electrical service to the new customers. In meeting the increasing electricity, then implemented the development of distribution networks. In the development of distribution networks, it would require the development of distribution transformers. In the development of distribution transformers, electricity demand forecasting needs to be done to get the load growth. Forecasting model used is using the DKL 3.2 model. After getting the results of load growth (KVA) with DKL 3,2 model, then divided according to the needs of growth so that the load can be simulated to ETAP 7.0.0 software simulates previously existing in 2011 as the basis of the development of distribution transformers in 2012 to 2016 from result study in PT PLN Persero UPJ Batang. From the calculation of the development of distribution transformers based on load growth forecasting results DKL model 3.2, it was found that the number of placements the development of distribution transformers based on land-use map of the area which is then divided in accordance with the development of the existing load growth. Showed that the number and type distribution transformers capacity development each year is different. From 2012 to 2016, there were variations in the number and type of capacity transformer including transformer 1 phase 50 KVA, 3 phase 50 and 100 KVA, and also the replacement transformer or upgrading of transformer 1 phase 25 to 50 KVA. After simulated using ETAP 7.0.0, the losses of energy development in 2012 to 2016 has increased gradually due to the load growth. But there are some feeders whose load to be cut, so that the losses value of energy to be down. Keyword :   Diistribution of electric energy, Load forecasting, DKL 3.2, ETAP 7.0.0, Development of distribution transformers
Optimasi Load Tap Changing Transformer Menggunakan Algoritma Genetik Guna Meminimalisasi Rugi Daya Transmisi Lawang, Oktavianus; Darmanto, Nugroho Agus; Sukmadi, Tejo
Transmisi Vol 6, No 2 (2003): TRANSMISI
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1768.813 KB) | DOI: 10.12777/transmisi.6.2.35-41

Abstract

Transformator memberikan suatu sarana tambahan untuk mengatur daya reaktif dengan menggunakan on load tap changing transformer. Walau posisi tap transformator bukan merupakan sumber daya reaktif, tetapi posisi tap transformator mengubah impedansi jalur yang dilalui daya reaktif sehingga akan mempengaruhi aliran daya reaktif. Jika keadaan beban di setiap simpul tidak berubah, maka perubahan tap dari sebuah transformator akan secara langsung mengubah tegangan dari simpul yang berhubungan dengan tap transformator. Perubahan tegangan ini juga akan mengubah besarnya arus yang mengalir antara simpul tersebut dan selanjutnya juga akan mempengaruhi simpul-simpul yang lain serta mempengaruhi rugi-rugi dalam sistem, yaitu PL. Tugas Akhir ini menggunakan Algoritma Genetik (ALGEN) untuk menentukan nilai tap changing transformator yang optimal ditinjau dari rugi-rugi transmisi yang minimum. ALGEN adalah metode yang memberikan sekumpulan solusi yang bersifat global (global solutions) karena karakteristik pencarian solusi ALGEN adalah multi point searching sehingga seorang decision maker dapat menentukan solusi optimal dari permasalahan yang dihadapi. ALGEN memiliki operator-operator genetik yang identik dengan kejadian-kejadian pada evolusi alam seperti seleksi alam dan reproduksi, rekombinasi dan mutasi. Tugas Akhir ini menggunakan operator-operator genetik standar yaitu seleksi menggunakan metode roulette wheel selection, rekombinasi menggunakan metode single point crossover dan mutasi menggunakan metode flip-bit. Keywords: transformator, algoritma, genetic
PERHITUNGAN DAN ANALISIS KESEIMBANGAN BEBAN PADA SISTEM DISTRIBUSI 20 KV TERHADAP RUGI-RUGI DAYA (STUDI KASUS PADA PT. PLN UPJ SLAWI) Sukmadi, Tejo; Winardi, Bambang
Transmisi Vol 11, No 1 (2009): TRANSMISI
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (85.924 KB) | DOI: 10.12777/transmisi.11.1.47-52

Abstract

Power distribution network is the part of electrical power system close to the customer or load side than the transmission network. To be better the electrical power system giving the electrical power supply to the customer, load balance must be achieved in each load points. Keseimbangan beban dapat tercapai jika tegangan yang dihasilkan dapat mensuplai beban secara penuh dari masing-masing titik beban maka sistem juga menjadi lebih baik dalam pemenuhan kebutuhan listrik. The load balance is important issue to decrease the voltage drop or power losses that can be occured in distribution line, so the information about load characteristics in each phases (R, S, and T) in some network area must be observed certain time. Keywords: distribution system, load balance, drop voltage, power loss.
PERHITUNGAN KORONA, AUDIBLE NOISE DAN RADIO INTERFERENCE PADA SALURAN UDARA TEGANGAN EKSTRA TINGGI 500 KV DENGAN VARIASI JARAK ANTAR KAWAT DAN JARAK ANTAR SIRKIT Saraswati, Amalia; Sukmadi, Tejo; Handoko, Susatyo
Transmisi Vol 14, No 4 (2012): TRANSMISI
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (721.738 KB) | DOI: 10.12777/transmisi.14.4.141-149

Abstract

Abstract Electric power delivering from power plant to load needs power transmission system with low energy loss and low voltage regulation. Extra high voltage can reduce the energy loss but it results corona. Corona produces corona loss and gives negative impact to the environment such as audible noise (AN) and radio interference (RI). Space conductor is one factor that affects the corona loss. In this final project will calculate corona loss, audible noise and radio interference under extra high voltage overhead lines 500 kV. The calculation will be held in the variation of cross arm and the variation of space conductor. Then, corona loss, AN and RI value will be compare to the permission value. Analysis result shows that corona loss value in single line configuration is smaller than corona loss value in double line configuration. Conductor space change has dominant influence to modify corona loss value, AN and RI value. It is more dominant than cross arm space change. Calculation with the configuration that suitable with SNI 04-6918-2002 shows that AN and RI value is lower than Perry Criteria and SPLN 46-1-1981 about AN maximum limitation guide and IEEE Radio Noise Design Guide about RI maximum limitation. Keyword : conductor space, cross arm space, corona, audible noise, radio interference
PERANCANGAN TRANSFORMATOR DAYA SATU FASA CORE TYPE DENGAN BANTUAN PC Widiatmoko, Catur; Sukmadi, Tejo; Winardi, Bambang
Transmisi Vol 8, No 2 (2004): TRANSMISI
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (204.466 KB) | DOI: 10.12777/transmisi.8.2.15-20

Abstract

Transformator digunakan secara luas, baik dalam bidang tenaga listrik maupun elektronika. Pengguaan dalam sistem tenaga memungkinkan dipilihnya tegangan yang sesuai dan ekonomis untuk tiap-tiap keperluan. Dalam bidang elektronika, transformator digunakan antara lain sebagai gandengan impedansi antara sumber dan beban, untuk memisahkan satu rangkaian dengan rangkaian yang lain. Agar memperoleh hasil perancangan yang baik dan memuaskan diperlukan perancangan dengan menggunakan program Bantu komputer. Perancangan dengan menggunakan program bantu komputer ditujukan untuk mengganti perancangan yang dilakukan secara manual sehingga dapat meningkatkan efisiensi waktu dan tenaga. Program Bantu yang digunakan adalah borland delphi 6 Keywords: Transformator, Satu Fasa, Core type, PC
KOORDINASI OVER CURRENT RELAY (OCR) SISI INCOMING 1 DENGAN OCR SISI OUTGOING KLS 03 PADA GI KALISARI Nugoho, Agung; Sukmadi, Tejo
Transmisi Vol 19, No 3 Juli (2017): TRANSMISI
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (701.235 KB) | DOI: 10.14710/transmisi.19.3.114-119

Abstract

Peralatan  proteksi  yang  biasa  digunakan  pada  sistem  tegangan  menengah  adalah  pemutus  tenaga  yang kerjanya diperintah oleh rele arus lebih Incoming 20 kV menyalurkan tenaga listrik ke beberapa outgoing feeder. Antara PMT Incoming 20 kV dan PMT Outgoing 20 kV harus ada koordinasi yang baik. Namun pada kenyataanya, dari beberapa gangguan disebabkan karena kesalahan koordinasi proteksi. Koordinasi proteksi yang tidak baik  bisa menyebabkan overlap antara pengaman di incoming20 kV dengan pengaman di outgoing 20 kV dan menyebabkan blackout di semua penyulang. Pada penelitian ini membahas tentang evaluasi koordinasi peralatan pengaman antara PMT Incoming 20 kV dengan PMT outgoing 20 kV penyulang utama KLS 03 pada Gardu Induk Kalisari yang memasok objek vital seperti Rumah sakit Dr. Kariadi, dengan memabandingkan data yang ada di lapangan dengan data hasil perhitungan, Dari hasil perhitungan TMS OCR di sisi incoming 20 kV adalah 0,225 dan TMS di sisi outgoing 20 kV adalah 0,263 dengan arus gangguan 3 fasa sebesar 10878,01 Ampere, arus gangguan 2 fasa terbesar sebesar 9420,63 Ampere,  dan  arus  ganggguan  1  fasa  sebesar  11586,78  Ampere .  Dari setting rele di Incoming dengan Outgoing 20 kV yang ada di lapangan masih berkoordinasi dengan baik hanya  saja  untuk  lebih mengoptimalkan kerja rele tersebut perlu dilakukan resetting rele.