Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Journal Geuthee of Engineering and Energy

Analisis Aliran Daya Dengan Beban Tidak Seimbang Pada Penyulang Teubeng Gardu Hubung Kota Sigli Menggunakan Software ETAP 16.0. Syukri, Mahdi; Fitrah, Nur Nuzulul; Syukriyadin, Syukriyadin; Alfisyahrin, Alfisyahrin
Journal Geuthee of Engineering and Energy Vol 1, No 1 (2022): Journal Geuthee of Engineering and Energy
Publisher : Geuthèë Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (407.437 KB) | DOI: 10.52626/joge.v1i1.6

Abstract

Penelitian ini bertujuan untuk melakukan komputasi perhitungan aliran daya dengan beban tidak seimbang pada jaringan distribusi dengan sistem radial. Kondisi beban yang tidak seimbang muncul di sisi sekunder dari transformator distribusi dikarenakan permintaan daya pada masing masing phasa tidak sama besar, hal ini disebabkan karena pemakaian beban oleh tiap pelanggan berbeda. Studi aliran Beban yang tidak seimbang pada sistem tenaga listrik akan berpengaruh pada konsumen yaitu akan terjadi penurunan tegangan yang diterima oleh konsumen. Suatu studi aliran beban dengan kondisi beban tak seimbang akan memberikan gambaran tentang kondisi tegangan, sudut fasa, arus, daya dan rugirugi daya tiap-tiap bus pada masing-masing fasa A, B dan C. Perhitungan aliran beban tak seimbang dengan menggunakan software ETAP versi 16.0.0 dengan objek penelitian jaringan distribusi sistem radial penyulang Teubeng gardu hubung Sigli Kota. Dari hasil simulasi pada penyulang Teubeng diperoleh beban pada phasa A sebesar 0.473 MW dan 0.313 MVAr, beban pada phasa B sebesar 0.503 MW dan 0.320 MVAr, sedangkan beban pada phasa C sebesar 0.483 MW 0.343 MVAr. Penyulang Teubeng mengalami penurunan tegangan terbesar pada bus DLM005- 00S yaitu sebesar 6.1%, 5.8% dan 6.9% untuk masing masing phasa A, B dan C.
Electrical Energy Audit Analysis at Muara Batu Subdistrict Office, North Aceh Richardo, R; Multazam, Teuku; Syukri, Mahdi; Alfisyahrin, A; Siregar, Ramdhan Halid
Journal Geuthee of Engineering and Energy Vol 2, No 2 (2023): Journal Geuthee of Engineering and Energy
Publisher : Geuthèë Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52626/joge.v2i2.31

Abstract

The need for electricity is one of the important things in the advancement of technology and human civilization in all respects. So it is necessary to regulate the use of electrical energy properly. Thus, it is very important for us to regulate the use of electrical energy in terms of power usage by electrical loads. One way is by saving electrical energy. One way to save electrical energy is an energy audit. The audit report is the result of the audit plan which will be processed and analyzed further in energy management (electrical energy regulation). From the results of the energy audit, energy flows will be known which will provide an overview of energy use, so that a strategic plan can be prepared to control energy use better and of course be more energy and cost efficient. One aspect of an energy audit is an audit of lighting energy (lighting in an area), so it is very important for us to control the use of electrical energy loads, in this research the kit only audits electrical energy, from the lighting energy of the Muara Batu sub-district office, North Aceh, so that the use of electrical energy becomes economical. Efficient use of energy can be a solution that will be very profitable in efforts to increase comfort. When an office is able to carry out energy efficiency, it means that the office has benefited from savings in energy consumption costs in a certain period, then from these results there are funds available that can be converted for other needs such as adding facilities or replacing equipment, which will indirectly increase employee comfort or the office.
The effect of distributed generator injection in different number of units on power and voltage losses in the electricity distribution system Syukri, Mahdi; Nasution, Ardiansyah
Journal Geuthee of Engineering and Energy Vol 3, No 2 (2024): Journal Geuthee of Engineering and Energy
Publisher : Geuthèë Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52626/joge.v3i2.40

Abstract

Distributed Generator (DG) is a small-capacity power plant located within the electrical distribution system and is usually placed on buses directly connected to the load. The placement of distributed generators is a technical effort to reduce voltage drops and power losses in the system. Additionally, Power flow analysis is conducted to plan and determine the power levels within an electrical power system. The results in terms of power losses after adding a DG were achieved in the fifth experiment on bus 149, where the system's total active power loss (P) decreased from 720.822 kW to 682.939 kW, and the total reactive power loss (Q) decreased from 530.02 kVar to 405.835 kVar. These results were obtained from power flow calculations using Electrical Transient Analyzer Program (ETAP) software.Therefore, it can be concluded that the electrical network system is operating efficiently. The results show that the more wind turbine generators are added to the buses, the more the voltage drop is reduced. After simulation, the overall voltage drops still meet the standards according to the text report in ETAP.