PENERAPAN SISTEM MANAJEMEN MUTU PELAKSANAAN PEKERJAAN LAPIS PONDASI AGREGAT PADA JALAN PROVINSI DI PROVINSI JAWA TENGAH Muballigh .; Agus Taufik Mulyono
Jurnal Transportasi Vol. 18 No. 2 (2018)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (586.709 KB) | DOI: 10.26593/jtrans.v18i2.3037.77-86

Abstract

Abstract Road pavement is often damaged before the design life caused by the quality of the base layer material and the foundation layer density is not achieved. Work Instruction which refers to the general specifications of the Directorate General of Highways, which is prepared as a guide in monitoring the implementation of road construction work, is very necessary so that the construction work of provincial road aggregate base can be carried out according to the correct working method. The purpose of this study was to determine the implementation of the quality management system of aggregate base work and the achievement of the quality performance of its implementation. The data were analyzed on the level of importance of the implementation of aggregate base work based on the respondents' answers, which consisted of parties directly involved in the implementation of provincial road construction work in Central Java Province. Analysis is performed using Structural Equation Modeling. The results obtained show that the contribution of weighting influence to the subcomponents of preparation, implementation, compaction, and compaction improvement was 70.5%, 50.6%, 76.0%, and 94.7% respectively. The assessment of the achievement of the quality performance of the implementation of aggregate base work is 82.49% and is included in the medium category. Keywords: base layer, quality management system, road construction, provincial roads  Abstrak Perkerasan jalan sering mengalami kerusakan sebelum umur rencana yang disebabkan oleh mutu material lapis pondasi rendah dan kepadatan lapis pondasi tidak tercapai. Instruksi Kerja yang mengacu pada spesifikasi umum Direktorat Jenderal Bina Marga, yang disusun sebagai panduan dalam pengawasan pelaksanaan pekerjaan konstruksi jalan, sangat diperlukan agar pekerjaan konstruksi lapis pondasi agregat jalan provinsi dapat dilaksanakan sesuai metode kerja yang benar. Tujuan penelitian ini adalah untuk mengetahui pelaksanaan sistem manajemen mutu pekerjaan lapis pondasi agregat dan capaian kinerja mutu pelaksanaannya. Data dianalisis terhadap tingkat kepentingan pelaksanaan pekerjaan lapis pondasi agregat berdasarkan jawaban responden, yang terdiri atas pihak-pihak yang terlibat langsung dalam pelaksanaan pekerjaan konstruksi jalan provinsi di Provinsi Jawa Tengah. Analisis dilakukan dengan menggunakan Structural Equation Modeling. Hasil yang diperoleh menunjukkan bahwa kontribusi bobot pengaruh untuk subkomponen persiapan, pelaksanaan, pemadatan, dan perbaikan pemadatan adalah 70,5%, 50,6%, 76,0%, dan 94,7% berturut-turut. Penilaian capaian kinerja mutu pelaksanaan pekerjaan lapis pondasi agregat adalah sebesar 82,49% dan termasuk dalam kategori medium. Kata-kata kunci: lapis pondasi, sistem manajemen mutu, konstruksi jalan, jalan provinsi
TINGKAT KEPENTINGAN DAN PENERAPAN SISTEM MANAJEMEN MUTU PELAKSANAAN PEKERJAAN TIMBUNAN PILIHAN PADA JALAN PROVINSI DI PROVINSI JAMBI Dori Novi Posilama; Agus Taufik Mulyono
Jurnal Transportasi Vol. 18 No. 2 (2018)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (489.718 KB) | DOI: 10.26593/jtrans.v18i2.3040.107-116

Abstract

Abstract The implementation of the Quality Management System in the implementation of road projects is intended so that the results of activities can achieve the planned quality objectives. For this reason, work instructions are systematically arranged as a guidance for monitoring road projects. This study aims to determine the contribution of components and subcomponents of a selected land work on a road project to the achievement of the quality of the selected land work on provincial roads in Jambi Province. The results showed that the contribution of material compaction subcomponents is 86%, folowed by material overlaying subcomponents 82%, and preparation subcomponents 71%, on the achievement of the quality of the selected land work. The implementation of the quality performance assessment in the road construction project in Jambi Province produces a value of 82.30%, which is in the medium category. Keywords: quality management system, road projects, land work, provincial roads  Abstrak Penerapan Sistem Manajemen Mutu pada pelaksanaan proyek jalan dimaksudkan agar hasil kegiatan dapat mencapai sasaran mutu yang direncanakan. Untuk itu, diperlukan instruksi kerja yang disusun secara sistematis sebagai panduan pengawasan proyek jalan. Penelitian ini bertujuan untuk mengetahui kontribusi komponen dan subkomponen suatu pekerjaan timbunan pilihan pada suatu proyek jalan terhadap capaian mutu pekerjaan timbunan pilihan tersebut pada jalan provinsi di Provinsi Jambi. Hasil penelitian menunjukkan bahwa kontribusi pengaruh Subkomponen Pemadatan material 86%, Subkomponen Penghamparan material 82%, dan Subkomponen Persiapan 71% terhadap capaian mutu pekerjaan timbunan pilihan tersebut. Imple-mentasi penilaian kinerja mutu pada proyek konstruksi jalan di Provinsi Jambi ini menghasilkan nilai sebesar 82,30%, yang termasuk dalam kategori medium. Kata-kata kunci: sistem manajemen mutu, proyek jalan, land work, jalan provinsi
KONTRIBUSI PENGARUH FAKTOR DAN VARIABEL YANG MEMENGARUHI CAPAIAN MUTU PELAKSANAAN PRESERVASI JEMBATAN Novi Ari Nugroho; Iman Setyarno; Agus Taufik Mulyono; Latif Budi Suparma
Jurnal Transportasi Vol. 20 No. 2 (2020)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/jtrans.v20i2.4107.151-160

Abstract

Abstract Bridges are an important part of a road network system, so they need to be kept functioning properly. Bridge preservation is one of the important and fundamental types of handling to maintain the condition of the bridge in good condition and restore the condition of the bridge to its original capacity so that it can serve effectively. The purpose of this study is to identify the contribution of the influence of factors and variables that affect the quality of the implementation of bridge preservation. Data analysis was based on the results of a survey of respondents who came from service users, service providers and the public who had been involved in implementing bridge preservation. The analysis was conducted using the Structural Equation Modeling method. The results showed that the implementation of bridge preservation factors and variables that influence the implementation of bridge preservation influence on the achievement of the quality of the bridge preserva-tion of 60.6%. The contribution of the influence of the factors that affect the quality of the implementation of the bridge preservation is the human resource factor contributing to the effect of 89.4%, a material factor of 81.8%, a method factor of 80.7%, a tool factor of 68.7%, a factor financial contribution of 54.0%, and environmental factors contributed an influence of 53.1%. To realize good quality achievements, the parties involved in implementing bridge preservation must pay attention to 6 factors and 33 important variables to be able to support these quality achievements. Keywords: bridge preservation; Structural Equation Modelling; influence contribution; quality achievement.  Abstrak Jembatan merupakan bagian yang penting dalam suatu sistem jaringan jalan, sehingga perlu dijaga agar tetap berfungsi dengan baik. Preservasi jembatan merupakan salah satu jenis penanganan yang penting dan mendasar untuk mempertahankan kondisi jembatan dalam kondisi baik dan mengembalikan kondisi jembatan sesuai kapasitas semula sehingga dapat melayani dengan efektif. Tujuan penelitian ini adalah mengidentifikasi kontri-busi pengaruh dari faktor dan variabel yang memengaruhi capaian mutu pelaksanaan preservasi jembatan. Data analisis berdasarkan hasil survei terhadap responden yang berasal dari pengguna jasa, penyedia jasa dan publik yang pernah terlibat dalam pelaksanaan preservasi jembatan. Analisis dilakukan dengan metode Structural Equation Modelling. Hasil penelitian menunjukkan bahwa pada pelaksanaan preservasi jembatan faktor dan variabel yang memengaruhi pelaksanaan preservasi jembatan memberikan pengaruh terhadap capaian mutu pelaksanaan preservasi jembatan sebesar 60,6%. Kontribusi pengaruh dari faktor-faktor yang memengaruhi capaian mutu pelaksanaan preservasi jembatan adalah faktor sumber daya manusia memberikan kontribusi pe-ngaruh sebesar 89,4%, faktor material sebesar 81,8%, faktor metode sebesar 80,7%, faktor alat sebesar 68,7%, faktor keuangan sebesar 54,0%, dan faktor lingkungan memberikan konstribusi pengaruh sebesar 53,1%. Untuk mewujudkan capaian mutu yang baik, pihak-pihak yang terlibat dalam pelaksanaan preservasi jembatan harus memerhatikan 6 faktor dan 33 variabel penting untuk dapat mendukung capaian mutu tersebut. Kata-kata kunci: preservasi jembatan; Structural Equation Modelling; kontribusi pengaruh; capaian mutu.
QUALITY ASSURANCE DAN QUALITY CONTROL PEMERIKSAAN JEMBATAN DENGAN APLIKASI INVI-J Agung Wahyudi; Iman Satyarno; Latif Budi Suparma; Agus Taufik Mulyono
Jurnal Transportasi Vol. 21 No. 2 (2021)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/jtrans.v21i2.5156.81-92

Abstract

Abstract Bridge inspection aims to determine the condition of the bridge, so that the bridge manager can determine the appropriate action. Bridge inspection using the INVI-J application makes it easy to implement and store data, but requires a quality assurance and quality control. In this study, data from questionnaires and interviews were used to complete the quality assurance and quality control of bridge inspections with the INVI-J application in the regions of Central Java and the Special Region of Yogyakarta. The results of the evaluation of the audit report data showed 95% for completeness of the data, 33% for the suitability of the documentation, and 78% for the suitability of the examination results. Evaluation of the field inspection gives a conformity value of 47% at level 1 and 40% at level 2. Evaluation of the inspection report data provides a higher level of conformity than the evaluation of independent inspection data. Keywords: bridge inspection; INVI-J application; quality assurance; quality control. Abstrak Pemeriksaan jembatan bertujuan untuk mengetahui kondisi jembatan, sehingga pengelola jembatan dapat menentukan tindakan yang tepat. Pemeriksaan jembatan menggunakan aplikasi INVI-J memudahkan pelaksanaan dan penyimpanan data, tetapi memerlukan suatu Quality assurance dan quality control. Pada studi ini, data hasil kuesioner dan wawancara digunakan untuk melengkapi quality assurance dan quality control pemeriksaan jembatan dengan aplikasi INVI-J di wilayah-wilayah Jawa Tengah dan Daerah Istimewa Yogyakarta. Hasil evaluasi terhadap data laporan pemeriksaan menunjukkan capaian 95% untuk kelengkapan data, 33% untuk kesesuaian dokumentasi, dan 78% untuk kesesuaian hasil pemeriksaan. Evaluasi terhadap pemeriksaan lapangan memberikan nilai kesesuaian 47 % pada level 1 dan 40% pada level 2. Evaluasi terhadap data inspection report memberikan tingkat kesesuaian yang lebih tinggi dibandingkan dengan evaluasi terhadap data independent inspection. Kata-kata kunci: pemeriksaan jembatan; aplikasi INVI-J; quality assurance; quality control.
PENINGKATAN KESELAMATAN JALAN PADA BLACK SPOT JALAN PROVINSI DI KABUPATEN SLEMAN One Sigit Hermanto; Agus Taufik Mulyono; Latif Budi Suparma
Jurnal Transportasi Vol. 21 No. 2 (2021)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/jtrans.v21i2.5159.109-122

Abstract

Abstract The fatality rate of traffic accidents in Sleman Regency is increasing every year. This study aims to identify black spots and set priorities for repairing road infrastructure components needed to improve road safety on 3 provincial roads in Sleman Regency. The black spot is determined using the Accident Equivalence Number Method and the Upper Control Limit. The evaluation carried out resulted in the 3 worst segments on each observed road segment. The results of the road safety evaluation show that the technical implementation of traffic management and engineering, the technical use of road components, and the technicality of road equipment are the 3 technical requirements of the road with the lowest level of application. To improve road safety, this study recommends adding rumble strips, adding signs, relocating roadside hazards, and adding sidewalks and crossing zones. Keywords: fatality; black spots; traffic accident; road; road safety. Abstrak Tingkat fatalitas kecelakaan lalu lintas di Kabupaten Sleman meningkat setiap tahun. Penelitian ini bertujuan untuk mengidentifikasi black spot dan menetapkan prioritas perbaikan komponen infrastruktur jalan yang diperlukan untuk meningkatkan keselamatan jalan di 3 ruas jalan provinsi di Kabupaten Sleman. Black spot ditentukan dengan menggunakan Metode Angka Ekivalensi Kecelakaan dan Batas Kontrol Atas. Evaluasi yang dilakukan menghasilkan 3 segmen terburuk pada setiap ruas jalan yang diamati. Hasil evaluasi keselamatan jalan menunjukkan bahwa teknis penyelenggaraan manajemen dan rekayasa lalu lintas, teknis pemanfaatan bagian-bagian jalan, dan teknis perlengkapan jalan merupakan 3 persyaratan teknis jalan dengan tingkat penerapan terendah. Untuk meningkatkan keselamatan jalan, studi ini merekomendasikan penambahan rumble strip, penambahan rambu, merelokasi hazard yang terdapat di tepi jalan, serta penambahan trotoar dan zona penyeberangan. Kata-kata kunci: fatalitas; black spot; kecelakaan lalu lintas; jalan; keselamatan jalan.
PREDIKSI SISA UMUR PERKERASAN LENTUR DENGAN METODE MEKANISTIK-EMPIRIK RUAS JALAN PROF. DR. WIRJONO PRODJODIKORO, YOGYAKARTA Adrian Yonanda Dwiputra; Suryo Hapsoro Tri Utomo; Agus Taufik Mulyono
Jurnal Transportasi Vol. 21 No. 3 (2021)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/jtrans.v21i3.5447.173–186

Abstract

Abstract Jalan Prof. Dr. Wirjono Prodjodikoro is part of the south arterial road of Yogyakarta, which connects collector roads in the vicinity. In fact, the planned age of the pavement is often not in accordance with what is happening in the field and suffers early damage. This study aims to determine the value of load repetitions and predict the remaining life of flexible pavement so that it can be a guide in handling road damage. The method used is a mechanistic-empirical method, using the KENPAVE program. This study shows that the pavement at Jalan Prof. Dr. Wirjono Prodjodikoro was able to accommodate the repetition load of 13,444,693 ESAL until perma-nent deformation occurred in the 8th year, 38,286,385 ESAL until rutting damage occurred in the 17th year, and 147,165,814 ESAL until fatigue cracking damage occurred in 36th year. Before the 8th year, the pavement must be repaired so as not to experience more severe damage. Keywords: road; road pavement; flexible pavement; road damage; pavement age Abstrak Ruas Jalan Prof. Dr. Wirjono Prodjodikoro merupakan bagian jalan arteri selatan Yogyakarta, yang menghu-bungkan jalan-jalan kolektor di sekitarnya. Pada kenyataannya, umur perkerasan jalan yang direncanakan seringkali tidak sesuai dengan yang terjadi di lapangan dan mengalami kerusakan dini. Penelitian ini bertujuan untuk mengetahui nilai repetisi beban dan memprediksi sisa umur perkerasan lentur agar dapat menjadi pedoman dalam melakukan penanganan kerusakan jalan. Metode yang digunakan adalah metode mekanistik-empirik, menggunakan program KENPAVE. Studi ini menunjukkan bahwa perkerasan jalan di Ruas Jalan Prof. Dr. Wiryono Prodjodikoro mampu mengakomodasi beban repetisi sebesar 13.444.693 ESAL sampai terjadi kerusakan permanent deformation pada tahun ke-8, sebesar 38.286.385 ESAL sampai terjadi kerusakan rutting pada tahun ke-17, dan sebesar 147.165.814 ESAL sampai terjadi kerusakan fatigue cracking pada tahun ke-36. Sebelum tahun ke-8, perkerasan harus diperbaiki agar tidak mengalami kerusakan yang lebih parah. Kata-kata kunci: jalan; perkerasan jalan; perkerasan lentur; kerusakan jalan; umur perkerasan jalan
PENENTUAN TRASE JALAN LINTAS PENGHUBUNG ANTARA JALAN LINTAS TENGAH DAN JALAN LINTAS SELATAN PULAU JAWA PADA KORIDOR TRASE KEPANJEN–BALEKAMBANG JAWA TIMUR DENGAN PENDEKATAN LEAST COST PATH Satrio Tunggul Satoto Jagad; Agus Taufik Mulyono; Suryo Hapsoro Tri Utomo; Wimpy Santosa
Jurnal Transportasi Vol. 22 No. 1 (2022)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/jtrans.v22i1.5767

Abstract

Abstract Malang Regency has spatial inequality in the northern and southern regions. The southern region has a landscape that has the potential to become a tourism and agricultural area, but does not yet have access to the National Road, which is needed to accelerate the growth of the southern region of Malang Regency. Road development with the Kepanjen-Balekambang route can help the development gap in Malang Regency. In this study, road alignment planning is carried out, which considers aspects relevant to the selection of a road route, namely: (1) road geometry, (2) traffic volume, (3) regional topography, (4) land cover, (5) forest area, (6) lithology, (7) geological structure, (8) geological bearing capacity, (9) soil types, (10) slopes, (11) water boundaries, and (12) river orders. These twelve aspects are processed to select the best route, by overlaying raster maps and displaying a cost map to produce the route with the lowest cost. This study shows that the cheapest alternative chosen route is the Kepanjen-Gondanglegi-Wonokerto-Bantur-Balekambang route. Keywords: spatial inequality; road alignment; road route selection; least cost path. Abstrak Kabupaten Malang memiliki ketimpangan spasial di kawasan utara dan kawasan selatan. Kawasan selatan memiliki bentang alam yang berpotensi menjadi kawasan pariwisata dan pertanian, namun belum memiliki akses Jalan Nasional, yang diperlukan untuk mempercepat pertumbuhan kawasan selatan Kabupaten Malang tersebut. Pengembangan jalan dengan trase Kepanjen-Balekambang dapat membantu kesenjangan pembangunan di Kabupaten Malang. Pada studi ini dilakukan perencanaan trase jalan, yang mempertimbangkan aspek-aspek yang relevan terhadap pemilihan trase jalan, yaitu: (1) geometrik jalan, (2) volume lalu lintas, (3) topografi wilayah, (4) penutup lahan, (5) kawasan hutan, (6) litologi, (7) struktur geologi, (8) daya dukung geologi, (9) jenis tanah, (10) kemiringan lereng, (11) sempadan air, dan (12) orde sungai. Keduabelas aspek ini diolah untuk memilih trase jalan terbaik, dengan cara overlay peta-peta raster dan menampilkan peta biaya untuk mengha-silkan rute dengan biaya termurah. Studi ini menunjukkan bahwa alternatif trase terpilih yang paling murah adalah trase Kepanjen-Gondanglegi-Wonokerto-Bantur-Balekambang. Kata-kata kunci: ketimpangan spasial; trase jalan; pemilihan trase jalan; least cost path.
PENGARUH KOMPONEN MANAJEMEN KONTRAKTOR TERHADAP CAPAIAN MUTU REKONSTRUKSI PERKERASAN LENTUR DI PROVINSI DAERAH ISTIMEWA YOGYAKARTA Francisca Dyah Anggraini Permana; Agus Taufik Mulyono
Jurnal HPJI (Himpunan Pengembangan Jalan Indonesia) Vol. 2 No. 1 (2016)
Publisher : Himpunan Pengembangan Jalan Indonesia (HPJI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/jh.v2i1.2121.%p

Abstract

Abstract Contractor management component affects the quality of chievements of road works. The data used in this study were collected parties directly involved in the implementation of road projects under the Road Authority of, the Province of Yogyakarta Special Region. Factors affecting the achievement of reconstruction quality of provincial road reconstruction in the Province of Yogyakarta Special Region, are labor, equipment, materials, work methods, project administration, and environment. The contractor management contributes with the amount of 46.6% to the quality of the reconstruction. Whereas, the relationship of contractor management components to the quality of the reconstruction is that labor factor accounts for 77% of the contractor management, equipment factor contributes by the amount of 90.7% to contractor management, materials factor accounts for 93% of the contractor management, work methods factor accounts for 89% of the contractor management, project administration contributes 74.9% to the contractor management, environmental accounts for 67.1% of the contractor management. Keywords: road reconstruction, provincial roads, management, contractors  Abstrak Komponen manajemen kontraktor mempengaruhi kualitas prestasi pekerjaan jalan. Data yang digunakan pada penelitian ini diperoleh dari survei kepada pihak yang terlibat langsung dalam pelaksanaan proyek pekerjaan jalan di lingkungan Dinas Bina Marga, Provinsi Daerah Istimewa Yogyakarya. Faktor-faktor yang mempengaruhi pencapaian mutu rekonstruksi jalan provinsi di Provinsi DIY adalah tenaga kerja, peralatan, material, metode kerja, administrasi proyek, dan lingkungan. Hasil studi ini menunjukkan bahwa manajemen kontraktor memberi kontribusi sebesar 46,6% terhadap capaian mutu rekonstruksi. Sedangkan hubungan komponen manajemen kontraktor terhadap capaian mutu rekonstruksi adalah tenaga kerja memberikan kontribusi sebesar 77%, peralatan sebesar 90,7%, material sebesar 93%, metode kerja sebesar 89%, administrasi proyek sebesar 74,9%, dan lingkungan sebesar 67,1% masing-masing terhadap manajemen kontraktor. Kata-kata kunci: rekonstruksi jalan, jalan provinsi, manajemen, kontraktor
PROGRAM PEMELIHARAAN JALAN NASIONAL BERDASARKAN NILAI KERATAAN PERMUKAAN, NILAI LENDUTAN, DAN NILAI MODULUS ELASTISITAS PERKERASAN David Rachmat Prabowo; Agus Taufik Mulyono
Jurnal HPJI (Himpunan Pengembangan Jalan Indonesia) Vol. 2 No. 1 (2016)
Publisher : Himpunan Pengembangan Jalan Indonesia (HPJI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/jh.v2i1.2127.%p

Abstract

Abstract Road can serve its users in accordance with the intended design life if a right road maintenance program is implemented. Preparation of road maintenance activities are necessary to asses the condition of the road pavement, which will be used as the basis for determining the type of maintenance needed. This study aimed to determine the road maintenance program based on the value of pavement roughness, the value of deflection, and the modulus of elasticity. The results showed that the determination of road conditions by combining the functional evaluation method, based on the value of International Roughness Index, and structural evaluation method, based on the value of deflection, is more appropriate and representing the actual conditions in the field. Keywords: pavement condition, road roughness, deflection, road maintenance  Abstrak Jalan dapat melayani penggunanya sesuai dengan umur desain yang diharapkan jika program pemeliharaan jalan diterapkan dengan benar. Persiapan kegiatan pemeliharaan jalan diperlukan untuk mengetahui kondisi perkerasan, yang akan digunakan sebagai dasar untuk menentukan jenis perawatan yang dibutuhkan. Penelitian ini bertujuan untuk menentukan program dan pemeliharaan jalan, berdasarkan nilai kekesaran perkerasan, nilai lendutan, dan modulus elastisitas. Hasil penelitian ini menunjukkan bahwa penentuan kondisi jalan berdasarkan kombinasi metode evaluasi fungsional, berdasarkan International Roughness Index, dan evaluasi struktural, berdasarkan nilai lendutan, lebih sesuai dan lebih mencerminkan kondisi di lapangan. Kata-kata kunci: kondisi perkerasan, kekasaran jalan, lendutan, pemeliharaan jalan
KETIMPANGAN PRODUKSI ANGKUTAN BARANG DAN PENUMPANG TIAP MODA TRANSPORTASI JALUR UTAMA PANTURA JAWA Agus Taufik Mulyono
Jurnal HPJI (Himpunan Pengembangan Jalan Indonesia) Vol. 2 No. 2 (2016)
Publisher : Himpunan Pengembangan Jalan Indonesia (HPJI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/jh.v2i2.2311.%p

Abstract

Abstract Java Island plays an important role in maintaining the smooth and accelerated distribution of freight and passengers to support the improvement of the national economy. An important issue on transportation across the island of Java in three decades is a very significant disparities heaping load of freight and passengers between the traffic lanes the north coast of Java and central and southern lanes. The government needs to implement the share mode target in order to achieve reduction in the logistics travel time from 2.75 hours/100 km (2015) to 1.0 hours/100 km (2019) for balancing the northern and southern regions. There are some actions needed including: (1) the acceleration of the construction of the Trans Java toll road, (2) the widening and improvement of the national road geometric in central and southern regions, (3) the widening and improvement of road geometric and the addition of cross-connecting lines, (4) the revitalization of rail track width of 1,067 mm to 1,450 mm along with rail facilities capable of carrying larger and more secure loads, (5) the development of infrastructure networks and integrated services; and (6) increasing awareness of local government together with the police in controlling the right of way of national roads from local socio-economic activities. Keywords: transport production, mode share, travel time, intermodal  Abstrak Pulau Jawa memegang peranan penting dalam mempertahankan kelancaran dan percepatan distribusi angkutan barang dan penumpang untuk mendukung peningkatan ekonomi nasional. Persoalan penting pada lintas transportasi Pulau Jawa dalam 3 dasawarsa adalah terjadinya kesenjangan yang amat signifikan penumpukan beban angkutan barang dan penumpang antara jalur lintas Pantai Utara Jawa dan lintas tengah maupun lintas selatan. Pemerintah perlu merealisasikan target mode share agar tercapai penurunan waktu tempuh angkutan barang dari 2,75 jam/100 km (2015) menjadi 1,0 jam/100 km (2019) untuk mewujudkan keseimbangan wilayah utara dan selatan. Oleh karenanya perlu dilakukan: (1) percepatan pembangunan jalan tol Trans Jawa; (2) pelebaran dan perbaikan geometrik jalan nasional lintas tengah dan lintas selatan; (3) pelebaran dan perbaikan geometrik jalan serta penambahan jalur penghubung lintas; (4) revitalisasi jalan rel dari lebar 1.067 mm menjadi 1.450 mm beserta sarana kereta api yang mampu mengangkut beban barang yang lebih besar dan aman; (5) pembangunan jaringan prasarana dan pelayanan terpadu; dan (6) peningkatan kepedulian Pemerintah Daerah beserta polisi dalam mengendalikan gangguan fungsi jalan nasional dari kegiatan sosial ekonomi lokal pada ruang manfaat jalan nasional. Kata-kata kunci: produksi angkutan, mode share, waktu tempuh, antarmoda