Claim Missing Document
Check
Articles

Analisis Terpadu Revitalisasi Pelabuhan Liem Hie Djung untuk Layanan Lintas Batas Indonesia-Malaysia Edy Utomo; Muhammad Djaya Bakri; Daud Nawir; Muhammad Asfihan Nur Arifin; Iif Ahmad Syarif
Teras Jurnal : Jurnal Teknik Sipil Vol. 16 No. 1 (2026): Teras Jurnal
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v16i1.1341

Abstract

Abstrak   Pelabuhan Liem Hie Djung (Nunukan, Kalimantan Utara) merupakan simpul layanan lintas batas Indonesia-Malaysia, namun kinerja sisi air dan sisi darat masih dibatasi oleh kedalaman efektif, geometri perairan, dan kapasitas terminal. Penelitian ini menyusun dasar teknis revitalisasi melalui pemodelan bathimetri berbasis SIG dari raster BATNAS resolusi 10 m, survei lapangan, serta analisis kebutuhan fasilitas sisi air-sisi darat. Parameter arus dan pasut ditetapkan dari pengukuran dan analisis pasut setempat, sedangkan tinggi gelombang rencana diperoleh melalui peramalan gelombang. Hasil menunjukkan arus maksimum 0,59 m/s saat surut, tinggi gelombang rencana 0,46 m, serta muka air HWS +4,81 m, MSL +3,29 m, dan LWS +1,81 m. Untuk kapal rencana (LOA 29,50 m; sarat 1,22 m), kebutuhan minimum meliputi kedalaman rencana 2,27 m, lebar alur satu jalur 32,64 m, diameter kolam putar 44,25 m, dan panjang dermaga 81,00 m. Pada sisi darat diperlukan optimasi ruang tunggu, fasilitas pemeriksaan, serta area parkir 2.644 m2. Secara keseluruhan, pra-desain revitalisasi diusulkan bertahap dengan zonasi layanan regional dan internasional.   Kata kunci: Bathimetri, BATNAS, Dermaga, Revitalisasi, SIG.       Abstract   Liem Hie Djung Port (Nunukan, North Kalimantan) is a key border gateway for Indonesia-Malaysia maritime services, yet its waterside and landside performance is constrained by effective depth, basin geometry, and terminal capacity. This study develops a technical basis for revitalization by integrating GIS-based bathymetry modelling from 10 m BATNAS rasters, field surveys, and facility-needs analysis. Currents and tidal levels were derived from local measurements and tidal analysis, while the design wave height was estimated through wave forecasting. Results indicate a maximum current of 0.59 m/s during ebb, a design wave height of 0.46 m, and water levels of HWS +4.81 m, MSL +3.29 m, and LWS +1.81 m. For the design vessel (LOA 29.50 m; draft 1.22 m), the minimum requirements are a 2.27 m design depth, a 32.64 m single-lane channel width, a 44.25 m turning basin diameter, and an 81.00 m berth length. Landside improvements include reorganizing passenger flow, inspection facilities, and 2,644 m2 of parking. Overall, a phased, zoned revitalization is recommended to support border connectivity.   Keywords: Bathymetry, Border, GIS, Revitalization, Terminal
Analisis Forensik Kegagalan Atap Kayu akibat Perubahan Penutup Atap pada Balai Adat Dayak Kalimantan Utara Edy Utomo; Ahmad Hernadi
Teras Jurnal : Jurnal Teknik Sipil Vol. 16 No. 1 (2026): Teras Jurnal
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v16i1.1347

Abstract

Abstrak   Keruntuhan atap kayu pada bangunan publik merupakan peristiwa kritis yang menimbulkan risiko keselamatan dan menuntut evaluasi teknis yang akuntabel. Penelitian ini bertujuan menyajikan analisis forensik kegagalan atap kayu pada Balai Adat Dayak “X” di Kalimantan Utara yang terjadi segera setelah pemasangan penutup atap dan pelepasan penyangga sementara. Perubahan penutup atap dari seng (3,26 kg/m2) menjadi sirap kayu ulin (25 kg/m2) meningkatkan beban mati penutup atap sekitar 21,74 kg/m2 (0,213 kN/m2) atau 667% (7,7 x) dibanding kondisi awal, sehingga menaikkan tuntutan layanan elemen atap. Metode penelitian meliputi investigasi lapangan, pengujian laboratorium sifat material kayu, analisis manual gording sebagai elemen balok, serta pemodelan global rangka kuda-kuda menggunakan SAP2000 mengacu SNI 7973:2013. Evaluasi juga mempertimbangkan peran sambungan, pengaku lateral, dan perubahan kondisi pelaksanaan saat penyangga sementara dilepas. Hasil menunjukkan gording eksisting melampaui kriteria kekuatan lentur dan batas lendutan, sedangkan elemen kuda-kuda secara global masih aman terhadap gaya aksial. Temuan ini menegaskan bahwa kegagalan lokal elemen sekunder dapat memicu keruntuhan sistem atap secara keseluruhan. Studi ini memberikan dasar teknis bagi pengendalian perubahan spesifikasi material, pemeriksaan lendutan, dan pengaturan tahapan pelepasan penyangga pada konstruksi atap kayu.   Kata kunci: Atap, Forensik, Gording, Kayu, Keruntuhan     Abstract Public timber-roof collapses are critical events that pose safety risks and require accountable technical evaluation. This study aims to present a forensic analysis of a timber roof failure at the Dayak Traditional Hall “X” in North Kalimantan, which occurred shortly after roof covering installation and the removal of temporary supports. Replacing a metal sheet roof (3.26 kg/m2) with ironwood shingles (ulin) (25 kg/m2) increased the roof dead load by about 21.74 kg/m2 (0.213 kN/m2), equivalent to 667% (7.7 x) relative to the original condition, thereby increasing serviceability demands on roof components. The methodology includes field investigation, laboratory testing of timber material properties, manual analysis of purlins as local elements, and global modelling of the roof truss using SAP2000 in accordance with SNI 7973:2013. The evaluation also considers the role of connections, lateral bracing, and construction-stage changes when temporary supports were removed. Results indicate that the existing purlins exceeded bending strength and deflection limits, while the truss members remained globally safe in terms of axial forces. These findings confirm that local failure of secondary elements can trigger collapse of the specification changes, checking deflections, and managing the timing of temporary support removal in timber roof construction.   Keywords: Roof, Forensic, Purlin, Timber, Collapse
STUDI BANGUNAN PELINDUNG PANTAI TIPE REVETMENT SEBAGAI ALTERNATIF PENANGANAN ABRASI DI PANTAI AMAL BARU KOTA TARAKAN Arin Isyamelya Maharani; Edy Utomo
Civil Engineering Scientific Journal Vol 3, No 3 (2024): Civil Engineering Scientific Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/cesj.v3i3.5900

Abstract

ABSTRACT: It is known that Amal Baru beach, Tarakan City has experienced 72% abrasion phenomenon and 28% accretion phenomenon with the condition of shoreline change due to abrasion reaching 2.59 meters per year, which causes heavy damage to the coastal area. One of the triggers that causes this abrasion phenomenon is changes in wave characteristics. One solution to protect the coast from abrasion and accretion is to build a revetment type of coastal protection building. This study aims to determine the value of the generated wave height and the value of the thickness of the protection layer as a reference in designing revetment type of coastal protection buildings utilizing several methods, namely, the Wilson Method used to analyze wave generation, the Admiralty Method used in tidal analysis, the Weibull Method used to analyze long-term wave predictions. The results of calculations of wave height and tides that have been carried out at Amal Baru Beach, Tarakan City for revetment type of coastal buildings, namely, for the main protection layer showed the peak width of the building reaching 1.76 meters and the thickness of the protection layer was 1.17 meters. The second protection layer used quarrystone with a grain weight of 2.435 meters and has a protection layer thickness of 0.21 meters. The core protection layer used quarrystone with a grain weight of 0.12 kg and had a protection layer thickness of 0.08 meters. Toe protection used quarrystone with a grain weight of 48.7 kg and has a toe protection width of 0.85 meters and a protection layer thickness of 0.57 meters.Keywords: Abrasion, Accretion, Coastal Building, Protection Layer, Beach, Revetment ABSTRAK: Diketahui bahwa di pantai Amal Baru, Kota Tarakan telah mengalami 72% fenomena abrasi dan 28% fenomena akresi dengan kondisi perubahan garis pantai akibat abrasi adalah 2,59 meter per tahun, yang menyebabkan kerusakan berat pada daerah pantai. Salah satu pemicu yang menyebabkan adanya fenomena abrasi ini adalah perubahan pada karakterisitik gelombang. Salah satu solusi untuk melindungi pantai dari abrasi dan akresi adalah dengan membuat bangunan pelindung pantai tipe Revetment. Penelitian ini bertujuan untuk mengetahui nilai tinggi gelombang yang dibangkitkan dan nilai ketebalan lapis lindung sebagai acuan dalam mendesain bangunan pelindung pantai tipe Revetment dengan menggunakan beberapa  metode yaitu, Metode Wilson digunakan untuk menganalisis pembangkitan gelombang, Metode Admiralty digunakan dalam analisis pasang surut, Metode Weibull digunakan untuk menganalisis prediksi gelombang jangka panjang. Hasil perhitungan dari tinggi gelombang dan pasang surut air laut yang telah dilakukan di Pantai Amal Baru Kota Tarakan untuk bangunan pantai tipe Revetment yaitu, untuk lapis lindung utama diketahui lebar puncak bangunan 1,76 meter dan tebal lapis lindung 1,17 meter. Lapis lindung kedua digunakan quarrystone dengan berat butir 2,435 meter dan memiliki tebal lapis lindung 0,21 meter. Lapis lindung inti digunakan quarrystone dengan berat butir 0,12 kg dan memiliki tebal lapis lindung 0,08 meter. Toe protection (pelindung kaki) digunakan quarrystone dengan berat butir 48,7 kg dan memiliki lebar pelindung kaki 0,85 meter serta tebal lapis lindung 0,57 meter.Kata kunci: Abrasi, Akresi, Bangunan Pantai, Lapis Lindung, Pantai, Revetment
PENANGANAN ABRASI PANTAI AMAL BARU KOTA TARAKAN DENGAN BANGUNAN PELINDUNG PANTAI TIPE DETACHED BREAKWATER Giar Tri Haryanti; Edy Utomo
Civil Engineering Scientific Journal Vol 3, No 2 (2024): Civil Engineering Scientific Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/cesj.v3i2.5897

Abstract

ABSTRACT: Amal Baru Beach has experienced damage in the form of abrasion and accretion which occurs due to the characteristics of waves that are destructive. One solution to protect Amal Baru Beach from the damage that occurs is a Detached Breakwater which is planned for the next 25 years. The result of this study indicate that the dominant wind direction comes from the East of Tarakan Island with a wave height at a 25-years return period of 2,85 meters with a period of 9,40 seconds. The planned Detached Breakwater structure is a sloping side building with a main protective layer using two recommended tetrapods, namely W = 0,5 tons and W = 0,084 tons, with a building peak width (B) of 1,76 meters, a main protective layer thickness (t) of 1,17 meters, a second protective layer thickness (t) of 0,21 meters, and a toe protection height of a 0,58 meters. The length of the building (Ls) is 250 meters, the width of the building gap (Lg) is 100 meters and the distance of the breakwater from the coastline (Y) is 100 meters. Keywords: Abrasion, Accretion, Coastal Building, Protective Layer, Beach ABSTRAK: Pantai Amal Baru telah mengalami kerusakan berupa abrasi dan akresi yang terjadi akibat dari karakteristik gelombang yang bersifat merusak atau destruktif. Salah satu solusi untuk melindungi Pantai Amal Baru dari kerusakan yang terjadi adalah bangunan pelindung pantai tipe Detached Breakwater. Data yang digunakan dalam penelitian ini merupakan data primer dan data sekunder yang akan digunakan dalam perencanaan Detached Breakwater yang direncanakan pada 25 tahun kedepan. Hasil dari penelitian ini menunjukkan bahwa dominasi arah angin bersumber dari arah Timur Pulau Tarakan dengan tinggi gelombang pada kala ulang 25 tahun sebesar 2,85 meter dengan periode 9,40 detik. Struktur Detached Breakwater yang direncanakan adalah bangunan sisi miring dengan lapis lindung utama menggunakan tetrapod yang direkomendasikan ada dua, yaitu W = 0,5 ton dan W = 0,084 ton, dengan lebar puncak bangunan (B) sebesar 1,76 meter, tebal lapis lindung utama (t) sebesar 1,17 meter, tebal lapis lindung kedua (t) sebesar 0,21 meter, dan tinggi pelindung kaki (toe protection) sebesar 0,58 meter. Panjang bangunan (Ls) sebesar 250 meter, lebar celah bangunan (Lg) sebesar 100 meter dan jarak pemecah gelombang dari garis pantai (Y) sebesar 100 meter.Kata kunci: Abrasi, Akresi, Bangunan Pantai, Lapis Lindung, Pantai