APPLICATION OF BUILDING INFORMATION MODELING 3D, 4D, AND 5D IN THE DESIGN PLANNING OF IHM DOCK ACCESS ROAD Wardani, Muhammad; Waluyo, Rudi; Purwantoro, Almuntofa
Jurnal Disprotek Vol 16, No 1 (2025)
Publisher : Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/jdpt.v16i1.7065

Abstract

Along with the times, infrastructure development is increasingly complex, especially in terms of road planning. An innovation is needed to face these challenges. Before the introduction of the building information modeling (BIM) method, road planning still used conventional methods. Many studies have revealed that the BIM method is more accurate and superior compared to conventional methods. The PT ITCI Hutani Manunggal (IHM) jetty access road construction package still uses conventional methods in its planning. So the plan for the road construction project was updated by applying BIM technology. The objective of research are  to know implementation of 3D, 4D, and 5D BIM on integration of road redesign. This research was conducted for two months with the location in Penajam Paser Utara Regency. The data analysis technique using the BIM Method consists of 3 stages, namely modeling alignment and profile plans, integration of total costs into the BIM model, integration of work duration into the BIM model. The results of the application of 3D BIM provide a clear initial picture of the shape of the infrastructure to be built, and the application of 4D BIM provides a detailed visualization of construction progress with a 270-day scheduling plan, and the application of 5D BIM describes the cost aspects in an integrated manner with the total planning cost obtained of Rp 166,491,010,588. With the integration of these three dimensions in the BIM model, cost, schedule, and quality estimation becomes more organized and transparent.PENERAPAN BUILDING INFORMATION MODELLING 3D, 4D, DAN 5D PADA PERENCANAAN DESAIN JALAN AKSES DERMAGA IHMSeiring dengan perkembangan zaman pembangunan infrastruktur semakin kompleks, terutama dalam hal perencanaan jalan. Perlu sebuah inovasi dalam menghadapi tantangan tersebut. Sebelum dikenalnya metode building information modeling (BIM), perencanaan jalan masih banyak menggunakan metode konvensional. Banyak penelitian yang mengungkapkan bahwa metode BIM lebih akurat dan unggul dibandingkan dengan metode konvensional. Paket pembangunan jalan akses Dermaga PT. ITCI Hutani Manunggal (IHM) masih menggunakan metode konvensional dalam perencanaannya. Maka rencana untuk proyek konstruksi jalan tersebut diperbarui dengan menerapkan teknologi BIM. Penelitian ini bertujuan untuk mengetahui penerapan BIM 3D, 4D, dan 5D pada redesain jalan yang saling terintegrasi. Penelitian ini dilakukan selama dua bulan dengan lokasi di Kabupaten Penajam Paser Utara. Teknik analisis data menggunakan Metode BIM terdiri dari 3 tahapan yaitu permodelan alignment dan profile rencana, integrasi total biaya terhadap model BIM, integrasi durasi pekerjaan terhadap model BIM. Hasil penelitian menunjukkan bahwa penerapan BIM 3D memberikan gambaran awal yang jelas terhadap bentuk infrastruktur yang akan terbangun, penerapan BIM 4D memberikan visualisasi progres konstruksi secara detail dengan rencana penjadwalan selama 270 hari, serta penerapan BIM 5D menggambarkan aspek biaya secara terintegrasi dengan total biaya perencanaan diperoleh sebesar Rp 166.491.010.588. Dengan integrasi ketiga dimensi tersebut dalam model BIM, estimasi biaya, jadwal, dan mutu menjadi lebih terorganisasi dan transparan.
FEASIBILITY EVALUATION OF HEAVY EQUIPMENT RENTAL INVESTMENT IN SOUTH KALIMANTAN Purwantoro, Almuntofa; Wibowo, Guswiem; Lendra, Lendra
Jurnal Disprotek Vol 15, No 1 (2024)
Publisher : Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/jdpt.v15i1.4967

Abstract

Development in the construction sector in Indonesia is one of the reasons investment is why heavy equipment has increased, but in 2020 Indonesia's economic growth contracted by 2.07 due to Covid-19. Economic growth in Indonesia in 2020 affected heavy equipment rental companies, especially in South Kalimantan. To assess the feasibility of investments that have been carried out in this study, one of them relies on the analysis of the investment break-even point and its sensitivity. The evaluation aims to determine the feasibility of the business that has been implemented. Based on Break Even Point that occurred at 2.46 years at that time revenue amounted to Rp. 98,784,716,825. The results of the sensitivity analysis stated that the assumption of fixed income and expenditure costs increased by 50% resulting in an NPV of Rp. 67,126,506,911 declared feasible, the break-even point obtained at 4.50 years or 4 years 163 days of income of Rp. 67,126,506,911. Revenue decreased by 50% and fixed expenses resulted in an NPV of -Rp. 24,104,127,174 declared unfeasible, the break-even point did not find results because the company still suffered losses until 2026. Revenue fell by 50% and income increased by 50% resulting in NPV -Rp. 100,720,629,289 declared unfeasible, the break-even point did not find results because the company was still experiencing losses until 2026.EVALUASI KELAYAKAN INVESTASI PENYEWAAN ALAT BERAT DI KALIMANTAN SELATANPembangunan di bidang konstruksi di Indonesia menjadi salah satu alasan investasi mengapa peralatan alat berat mengalami peningkatan namun pada tahun 2020 pertumbuhan ekonomi Indonesia mengalami kontraksi sebesar 2,07 akibat covid-19. Pertumbuhan ekonomi di Indonesia pada tahun 2020 berimbas perusahaan penyewaan alat berat khususnya di Kalimantan Selatan. Untuk menilai kelayakan investasi yang telah dilaksanakan dalam penelitian ini salah satunya bergantung pada analisis break even point inventasi dan sensitivitasnya. Evaluasi tersebut dimaksud bertujuan untuk mengetahui kelayakan usaha yang telah di laksanakan. Berdasarkan Break Even Point terjadi pada 2,46 Tahun pada saat itu pendapatan sebesar Rp. 98.784.716.825. Hasil analisis sensitivitas menyatakan bahwa asumsi pemasukan tetap dan biaya pengeluaran naik 50% menghasilkan NPV yaitu Rp. 67.126.506.911 dinyatakan layak, titik impas mendapatkan pada 4,50 tahun atau 4 tahun 163 hari pendapatan sebesar Rp. 67.126.506.911. Pemasukan turun 50% dan biaya pengeluaran tetap menghasilkan NPV yaitu -Rp. 24.104.127.174 dinyatakan tidak layak, titik impas tidak menemukan hasil karena perusahaan masih mengalami kerugian sampai tahun 2026. Pemasukan turun 50% dan pemasukan naik 50% menghasilkan NPV -Rp. 100.720.629.289 dinyatakan tidak layak, titik impas tidak menemukan hasil karena perusahaan masih mengalami kerugian sampai tahun 2026.