Claim Missing Document
Check
Articles

Found 6 Documents
Search

RANCANG BANGUN PERAHU TANPA AWAK TENAGA SURYA (PETATES) Auto Feeder Prihantoro, Topan; Asha, Muhammad Toasin; Pratama, Wahyu Wira; Daryono, Daryono; Setiawan, Agus; Sofiana, Evi; Ali, Muhammad; Riyanti, Rika; Reski, Indah Anjar
Injection: Indonesian Journal of Vocational Mechanical Engineering Vol 4 No 1 (2024)
Publisher : Pengelola Jurnal Politeknik Negeri Ketapang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58466/injection.v4i1.1572

Abstract

Feeding fish in pond-based aquaculture involves the hand distribution of food by individuals around the pond's perimeter. Farmers utilize boats to achieve extensive food delivery. Technological advancements have facilitated the creation of self-feeder or dement-feeder statistical techniques. This device functions autonomously to provide feed at regular intervals and has a predetermined coverage area at its designated position on the periphery of ponds. Due to its peripheral location, the technology deployment system has limited capacity to distribute feed across the entire pond area, making it less effective for use in big ponds. Hence, it is imperative to develop a solar-powered unmanned boat (Petates) equipped with an Auto Feeder system to regulate the feeding process in shrimp and fish farming. This study aims to develop a solar-powered unmanned boat design for fish and shrimp farming that can efficiently distribute feed across the pond. Additionally, the research aims to assess the impact of feeding machines on the conversion of feed by fish and shrimp. The research results show that the maximum floating weight of the boat is 48.7 kg using two solar-powered electromotor-driven buoys. The boat has a maximum speed acceleration of 2.4 m/s, achieved through a well-balanced and efficient bow acceleration. Experiments were conducted using two distinct feed types: type 781-2 with a diameter ranging from 2.3 to 3 mm, and type 781-3 with a diameter ranging from 3.2 to 4 mm. The throwing distance for the feed is between 8 and 10 meters, and between 7 and 8 meters. The feed spreading rate for each minute is 950 grams and 1,080 grams, with a feed capacity of 7 kilograms and 6 kilograms respectively.
PERENCANAAN MANAJEMEN KONSTRUKSI PADA GEDUNG MANGATA 4 LANTAI DI JALAN H. RAIS A. RACHMAN KELURAHAN SUNGAI JAWI KECAMATAN PONTIANAK KOTA, KOTA PONTIANAK. F, Andra Rivandra; Silalahi, Feri; Nernawani, Nernawani; Reski, Indah Anjar
RETENSI Vol. 1 No. 1 (2020): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i1.241

Abstract

The author carried out a construction management plan for the Mangata building which had previously been carried out by structural planning and drawing plans by (Muhammad Oki Try Hatmojo and Maulidya Anau Wiyah), Final Project for students of Pontianak State Polytechnic Diploma IV Civil Engineering Department 2019. Therefore, to realize the construction of the Mangata Building, proper construction management planning is required, so that results are in accordance with the requirements. Therefore, the authors plan an excellent project construction management system in an effort to accelerate the construction of the Mangata building which is the title of this final project. The method used in the discussion of construction management is in the form of a management system for cost, quality, time, human resources and occupational health safety in structural work which includes foundations, beams, columns and floor plates. Based on the results of the analysis of the method above, it is found that the cost of the structural work required to complete the work on the Mangata Building construction project is Rp. 28,007,395,396.25. The time it took to complete the work was 30 weeks for quality planning in the form of quality control and a list of specifications tables. Furthermore, for human resource planning in the form of organizational structure and workforce requirements as a means for good work implementation, while the planned K3 management planning is in the form of identification and control of K3 potential hazards to each type of work and costs for PPE and APK needs.
PELAKSANAAN PEMBANGUNAN GEDUNG SERBAGUNA PLBN ENTIKONG YANG DILAKSANA OLEH PT NINDYA KARYA (PERSERO) PADA PROYEK PENGEMBANGAN SARANA DAN PRASARANA PENUNJANG PLBN TERPADU KALIMANTAN BARAT Mahendra, Andi; Rosanti, Indah; Reski, Indah Anjar
RETENSI Vol. 1 No. 1 (2020): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i1.252

Abstract

State Border Crossing Post of Entikong (PLBN) is one of the border points between the state owned by theIndonesian State which is directly adjacent to the State of Malaysia, the state of Sarawak. In the PLBNEntikong area there is a multipurpose building carried out by PT. Nindya Karya (Persero). In this finalproject discusses the systematics and process of implementing the multipurpose building construction inorder to know the management system of a project, volume or backup quantity (Mutual check 100%), RAB,weight, duration of time (Barchart), work methods, and workers' personal protective equipment. In theprocess of reviewing the implementation of the Multipurpose Building construction, the methods used inretrieving data were the methods of observation, interviews, and documentation. In addition, the data wereobtained from the project contracts documents for the development of facilities and infrastructure to supportthe integrated PLBN West Kalimantan. From the review process and stages, the results are obtained,namely: the management system of a project obtained from the project contract document, the volume thathas been crosschecked through the daily monitoring process, the cost budget plan that has been addendumdue to the addition and reduction of volume, the weight of the work after being added the duration of timeafter the workday addendum, making the method of each work item carried out by direct field review, as wellas personal protective equipment used while working.
MANAJEMEN KONSTRUKSI PADA PELAKSANAAN LANJUTAN GEDUNG STADION INDOOR KABUPATEN LANDAK KALIMANTAN BARAT Syahbani, Gusti; Utomo, satriyo; reski, indah anjar
RETENSI Vol. 2 No. 2 (2022): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v2i2.470

Abstract

Construction management consultant is the management of construction project management withlarge-scale projects. Analysis of the implementation of construction management can be applied to projectimplementation to manage, organize, and find solutions, including the timing of the project implementation.Good timing and management is one of the success factors of a construction construction project, managingproject management and implementing construction management in large-scale projects. Setting and managingtime with the aim of minimizing and reducing risks that may occur in an Indoor Stadium building project inLandak Regency. The time risk that may occur is the delay in project completion.Precise, fast, and safe timing are very helpful in completing the work on the Indoor Stadium buildingconstruction project in Landak Regency. Good time management is the process of planning, organizing, andcontrolling project execution. So that the timeliness at each stage of the work must be in accordance with theplanned time. Determination, management, and planning. Meanwhile, the extension of time is based on thingsthat have been coordinated with all parties and can be accounted for.The purpose of this final project is to identify the various factors involved in the presence of aconstruction management consultant at each stage of the project. This requires proper time management ateach stage of the work, so that the work is completed as expected. The implementation of this Final Projectincludes: literature review, determination of required data, secondary data, and data analysis as well asconclusions drawn from the analysis of the application of time management in construction projects and thisFinal Project is carried out at the Indoor Stadium in Landak Regency.Keywords: Cost Management, Human Resource Management, Time Management, Quality Management, WorkSafety Management
Pembuatan Fasilitas Pendukung Infrastruktur Belajar Mengajar di Pondok Pasantren Hidayatul Muslimin 1 di Jalan Parit Sembin Desa Parit Baru Kecamatan Sungai Raya Kabupaten Kubu Raya: The Production of Learning Support Infrastructure Facilities at Hidayatul Muslimin 1 Islamic Boarding School on Jalan Parit Sembin, Parit Baru Village, Sungai Raya District, Kubu Raya Regency Rizal, Rizal; Sarpawi, Sarpawi; Asmadi, Asmadi; Sasongko, Hartanto Wahyu; Helyanto, Helyanto; Purnama, Ihkwan Arief; Setiawan, Randy; Anggraini, Irene; Reski, Indah Anjar
PengabdianMu: Jurnal Ilmiah Pengabdian kepada Masyarakat Vol. 10 No. 9 (2025): PengabdianMu: Jurnal Ilmiah Pengabdian kepada Masyarakat
Publisher : Institute for Research and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33084/pengabdianmu.v10i9.9595

Abstract

Islamic Boarding School Hidayatul Muslimin 1 is situated in West Kalimantan Province. This school features 19 classrooms constructed from basic wooden structures. The educational facilities available at this school, including tables, chairs, blackboards, and shoe racks, were insufficient to facilitate effective learning; some students even had to sit on the floor due to the lack of teaching and learning facilities. In addition, the classroom walls look dull because the paint has faded, so they display the original color of the wood that is the material of the classroom walls. This Community Service initiative aims to create learning facilities that will not only foster a comfortable learning environment for students but also enhance the practical skills of Civil Engineering students in woodworking applications. The Community Service team and Civil Engineering students who practiced woodworking at the Civil Engineering Department Workshop at Pontianak State Polytechnic executed the project to create these educational facilities. The learning facilities created for Hidayatul Muslimin 1 Islamic Boarding School in West Kalimantan include 20 tables, 40 chairs, two whiteboards, and four shoe racks. Additionally, with the support of Civil Engineering students, several teachers, and students from the Islamic boarding school, the Community Service team renovated and painted two classrooms.
Pelatihan Konsep Building Information Modelling (BIM) melalui Aplikasi AutoCAD dan SketchUp bagi Siswa Kompetensi Keahlian DPIB SMKN 8 Pontianak: The Training of Building Information Modeling (BIM) Concept through AutoCAD and SketchUp Applications for DPIB Expertise Competency Students of SMKN 8 Pontianak Sasongko, Hartanto Wahyu; Purnama, Ihkwan Arief; Reski, Indah Anjar; Riyanti, Rika; Rabihati, Etty; Setiawan, Randy; Haffiyan, Qalby; Perangin Angin, Imanuel Kemenangenta
PengabdianMu: Jurnal Ilmiah Pengabdian kepada Masyarakat Vol. 10 No. 9 (2025): PengabdianMu: Jurnal Ilmiah Pengabdian kepada Masyarakat
Publisher : Institute for Research and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33084/pengabdianmu.v10i9.10071

Abstract

Rapid developments in the construction era are shown by using the latest technology to improve efficiency and effectiveness in project implementation. One of the technologies widely used by construction experts today is Building Information Modeling (BIM). Building Information Modeling (BIM) is a digital-based concept that integrates 3D modeling and stores important information in the design, construction, and maintenance processes. Given the high demand for workers who are competent in BIM, there is a necessity for coaching or training on BIM applications to ensure that the developed workforce can fulfill the job market requirements. The purpose of this Community Service was to train students of SMK N 8 Pontianak with a concentration of expertise in Building Information and Modeling Design so that these students can better understand the concept of BIM. This training used AutoCAD and SketchUp software as tools for basic levels from 2D to 3D. The training results indicated that 74.18% of students at SMKN 8 Pontianak comprehended the concept of BIM, which they were previously unaware of, compared to a 28.64% percentage prior to the training. In addition, the ability of SMKN 8 Pontianak students to apply AutoCAD and SketchUp software has increased, as evidenced by the results of the images before and after the training. These results are anticipated to empower SMKN 8 Pontianak students to utilize their skills proficiently in the job market.