Claim Missing Document
Check
Articles

Found 25 Documents
Search
Journal : MINERAL

Kajian Teknis Sistem Jaringan Ventilasi Tambang Ciurug Level 600 PT Aneka Tambang Tbk UBPE Pongkor Leyriesa Awdina; Irvani Irvani; Haslen Oktarianty
MINERAL Vol 5 No 2 (2020): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1968.77 KB) | DOI: 10.33019/mineral.v5i2.3073

Abstract

According to field observation result the average dry temperature and wet temperature around between 23 – 30 ºC, with relative humidity around 83 - 93 % and contain 20.9 % O2, 4 ppm CO, on the front production there are 2 cross cut XC 636 and XC 644 have high temperature that reach 31 ºC and 100 % relative humidity. The acquired field data contain dry temperature, wet temperature, wet bulb global temperature, air velocity, and tunnel dimension so then effective temperature, work efficiency and work climate threshold value can be calculated. The result calculation get effective temperature is acquired 29 – 30 ºC, work efficiency 79 - 62 %, and climate threshold value with work arrangement as much 0 - 50 %. Technical problem on the field which causes high temperature is air recirculation from dirty air exhaust from XC 636 that is opposite with clean air direction from fan 75 kW, recirculation on access 644 from booster fan 37 kW located before XC 637 which results in increasing dirty air quantity into front production plus the second front with water puddles from drilling front roof droplets. Effort made on access XC 644 that is fan 75 kW replaced with fan 90 kW, and the tip of flexible duct extends after RC 7 so that the airflow doesn’t mix with exhaust from XC 636, aside from that booster fan 37 kW after XC 637 is moved so it help sucking dirty air from front XC 644, it can resolve air recirculation
EVALUASI HASIL PENCUCIAN RAW MATERIAL KAOLIN TERHADAP KEBUTUHAN PRODUKSI UNIT PENGOLAHAN PT ANEKA KAOLINE UTAMA BELITUNG Mukram Belto Pratama; Irvani Irvani; Mardiah Mardiah
MINERAL Vol 6 No 1 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (527.46 KB) | DOI: 10.33019/mineral.v6i1.3083

Abstract

PT Aneka Kaoline Utama produces kaoline powder through two processes which are washing are washing unit and processing unit. Washing unit does the separation between tailing and kaoline with the extract as the result. The extract contains water and kaoline, then the water reduction will be processed in processing unit. Based on the information, writer evaluates the extract production in washing unit for fulfilling the needs of processing unit in PT Aneka Kaoline Utama using evaluation method and action research method. The steps are sampling raw material (feed), calculating the sediment pond’s dimention and the volume of full pond, sampling tailing in washing unit’s tools, observing the production’s process, and evaluating the needs off kaoline extract. The result of this research shows that raw material in washing unit were 3,847.4 ton in April, 3,606.2 ton in May, 2,594.9 ton June, and 3,890 in July which showed the amound of extract did not reach the target in processing unit. 69.2% of loose material and 21% loosing kaolin in average caused the recovery value in washing unit just reached 30.8%. Because of loose kaoline’s presence in washing unit, writer suggests the increasing of raw material and working hour as big as 27,056.3 ton per hour with 30.8% washing unit’s recovery so the company can produce 8.34 ton kaoline per hour and 4,000 ton kaoline per month.
Analisis Ekonomis Sewa atau Beli Alat Excavator pada Kegiatan Produksi Bijih Timah PT Prima Timah Utama, Desa Cit, Kabupaten Bangka Randa Wirana; Irvani Irvani; Mardiah Mardiah
MINERAL Vol 6 No 2 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (173.247 KB) | DOI: 10.33019/mineral.v6i2.3088

Abstract

Fulfilling the annual production target of PT Prima Timah Utama based on the 2019 Work Plan and Budget of 1,100,000 m3 requires the procurement of adequate mining equipment both in terms of quantity and production capacity, especially excavators. The equipment procurement plan is estimated by calculating the need for tools using a sample of 30 distribution time data, 9-time constraints data, and some supporting calculation data that results in tool requirements. The cost of ownership of the equipment to be compared with the rental cost is obtained from the purchase price, interest, residual value and economic life of the equipment, the cost comparison is then analyzed using the Net Present Value method. The calculation results show that PT Prima Timah Utama must add 2 units of CAT 320D2 excavator for overburden stripping and wash with an estimated equipment cost of Rp. 2,224,076,433.6 for 2 units of new equipment and Rp. 2,541,131,520 for 2 units of rental equipment where the difference between the rental and purchase equipment is Rp. 317,055,086.4 for one year of work. The result of the analysis with the evaluation of NPV investment has a value of Rp. 32,313,773,567.7 or >0 which states that the investment is declared feasible.
Potensial Mineral Kasiterit Pada Tailing Penambangan Timah Daerah Parit Tiga Kabupaten Bangka Selatan Rezky Dwi Aditya; Irvani Irvani; Janiar Pitulima
MINERAL Vol 7 No 1 (2022): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v7i1.3334

Abstract

Unconventional tin mining in Parit Tiga Village, Toboali District, South Bangka Regency is one of the mining sites that is rampantly carried out by the community. The problems that arise from the activities carried out by the community indicate that tin minerals in that location still have the potential to be mined at the conventional mining scale, this condition makes researchers want to study how much potential Sn levels are still contained even though the location is in the form of tailings. Data collection was 16 points at the first tailings location with an area of 160.000 m2 and 15 points at the second tailings location with an area of 150.000 m2. The samples were taken regularly with a distance between samples of 100 meters with a depth of 1,5 meters. Tailings samples were then tested using a microscope overview analysis method to obtain cassiterite levels. The results showed that the study area had 201.15 tons of Cassiterite potential at the first location and 300 tons at the second location to be studied further in terms of its economics.
Interpretasi Material Pada Rancang Bak Ukur Skala Laboratorium Dengan Pendekatan Konfigurasi Wenner, Wenner – Schlumberger dan Dipole-dipole Guskarnali Guskarnali; Haslen Oktarianty; Irvani Irvani; E.P.S.B. Taman Tono; Delita Ega Andini
MINERAL Vol 8 No 2 (2023): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v8i2.4958

Abstract

Geoelectric measurements have been carried out using multichannel ResistivityMeter (Geores) tools with Wenner, Wenner-Schlumberger, and Dipole-dipole Configuration approaches on the influence of materials arranged in a laboratory-scale measuring tub design with dimensions of 194x184x80 cm. The measured method is the variation in resistivity value against each trajectory of the material. The method used is the variation of resistivity values for each path of the material that has been arranged in a laboratory scale measuring design. Geoelectric measurements were carried out on 7 lines (5 line in the West-East direction and 2 line in the North-South direction). The spacing between the electrodes of each line is 10 cm with 16 electrodes in one line so that each line has a length of 160 cm or 1.6 m which corresponds to the length and width dimensions of a laboratory scale measuring design. The electrode arrangement parameters are constant with respect to changes in the configuration selected from the geores parameters during geoelectric measurements. The measurement results showed that the identified depth reached 31.2 cm. The low resistivity value category has an interval of 374-4,397 ohm.meters at a depth of 0-12.5 cm, which is the influence of building sand material containing water and soil, while the depth interval is 12.5 - 31.2 cm ohm.meters (material category that is influenced by 2 iron rods, tin tailings sand, granite, gravel) with resistivity values ranging from 12,378–67,498 ohm.meters. From experiments on the influence of the resistivity values of the three Wenner, Wenner-Schlumberger, and Dipole-dipole configurations, it was obtained that the smallest absolute error resistivity value in the Wenner configuration was 5.01% against the overall average absolute error resistivity value of 10.16%.