Claim Missing Document
Check
Articles

Found 38 Documents
Search

Edukasi Mitigasi Bencana Banjir Masyarakat Di Desa Semenpinggir Kecamatan Kapas Kabupaten Bojonegoro Rodhi, Nova Nevila; Saputra, Ichwan Hadi
Journal Of Human And Education (JAHE) Vol. 4 No. 6 (2024): Journal of Human And Education (JAHE)
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jh.v4i6.1582

Abstract

Penyebab banjir di desa Semenpinggir yang terjadi biasanya berasal dari pertemuaan antara Bengawan Solo dan Kali Pacal yang aliran air dari Waduk Pacal, Karena tingginya curah hujan dengan durasi yang cukup lama. Sehingga air meluap ke permukiman dan lahan pertanian. Dengan kondisi geografis wilayah Desa Semenpinggir yang berada pada hilir Kali Pacal, maka fokus dari pengabdian masyarakat ini adalah memberikan pandangan, edukasi dan literasi terhadap masyarakat di setiap elemen mulai remaja hingga lansia terkait mitigasi bencana banjir yang terjadi pada wilayah Desa Semenpinggir Kecamatan Kapas Kabupaten Bojonegoro sehingga masyarakat lebih tanggap. Manfaat yang dimaksud, antara lain, adalah sebagai berikut. (1) Meningkatkan pengetahuan dan kemampuan warga sekolah terkait kesiapsiagaan dalam menghadapi bencana. (2) Memberikan edukasi terkait mitigasi bencana banjir kepada masyarakat Desa Semenpinggir Kecamatan Kapas Kabupaten Bojonegoro. (3) Meningkatkan tingkat partisipasi masyarakat tentang pentingnya upaya menangani bencana banjir di daerah setempat. Dengan memberikan edukasi ini peserta berkesempatan menanyakan beberapa hal yang belum dipahami atau dimengerti, yang dilakukan setelah materi selesai. Hasil penadmpingan antara lain (1). Pengetahuan mitra tentang mitigasi bencana banjir di Desa Semenpinggir Kecamatan Kapas kabupaten Bojonegoro telah bertambah. (2). Setelah dilakukan pendampingan edukasi, Pemerintah Desa Semenpinggir akan melaksanakan kegiatan mitigasi sesuai dengan hasil musyawarah bersama. (3). Penerima manfaat program merasa puas dengan kegiatan yang telah dilaksanakan
Faktor Yang Mempengaruhi Kinerja Sumber Daya Manusia Pada Pekerjaan Proyek Konstruksi Gedung Bertingkat Di Bojonegoro Rodhi, Nova Nevila
Innovative: Journal Of Social Science Research Vol. 4 No. 6 (2024): Innovative: Journal Of Social Science Research
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/innovative.v4i6.17115

Abstract

Penggunaan teknologi modern yang terus berkembang, demi meningkatkan kualitas yang lebih baik. Perkembangan proyek yang sejalan dengan berkembangnya teknologi harus dilakukan. Perusahaan yang berkembang di bidang jasa teknologi seperti konsultan dan penyedia jasa serta diikuti dengan sumber daya manusia yang memadai. Sehingga dalam merencanakan proyek perlu disesuaikan dengan perkembangan teknologi yang ada dan pemilihan SDM yang digunakan.Dalam penelitian ini metode yang akan digunakan adalah menggunakan metode pendekatan secara deskriptif. Secara umum, metodologi yang digunakan adalah menggabungkan antara penelitian kualitatif dengan penelitian kuantitatif yang menggunakan pendekatan studi kasus dan survei. Proses identifikasi faktor - faktor yang mempengaruhi kinerja sumber daya manusia pada pekerjaan proyek konstruksi gedung bertingkat di Bojonegoro pada penelitian ini dilakukan dengan 2 tahap, pertama berdasakan literatur review, kedua dilakukan berdsarkan validasi responden.Faktor yang mempengaruhi kinerja sumber daya manusia pada pekerjaan proyek konstruksi gedung bertingkat di Bojonegoro dapat di ambil kesimpulan sebagai berikut : 1. Hasil dari proses identifikasi berdasarkan literatur review diperoleh beberapa faktor yang dikelompokkan dalam 4 kriteria yaitu kompetensi, motivasi, aspek loyalitas dan disiplin kerja. 2. faktor yang harus paling dipertimbangkan dalam meningkatkan kinerja SDM pada proyek pembangunan gedung bertingkat di Bojonegoro adalah faktor kompetensi
Analisis Pengendalian Waktu dan Biaya Proyek Konstruksi Dengan Metode CPM (Critical Path Method) Saputra, Ichwan Hadi; Erina, Yeni; Rodhi, Nova Nevila
Innovative: Journal Of Social Science Research Vol. 4 No. 6 (2024): Innovative: Journal Of Social Science Research
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/innovative.v4i6.17179

Abstract

Proyek rehabilitasi jalan Senganten - Klino dipilih sebagai studi kasus karena mengalami keterlambatan pada pelaksanaan proyek konstruksinya. Data studi ini menggunakan data sekunder pada proyek, yaitu penjadwalan proyek (time schedule) dan rencana anggaran biaya. Dari data tersebut, kemudian metode percepatan diterapkan agar dapat mereduksi waktu dan biaya pelaksanaan proyek sehingga dapat mempercepat pelaksanaan proyek. Tujuan penelitian ini adalah untuk mengetahui jalur lintasan kritis, untuk mengetahui durasi proyek setelah dilakukan percepatan dengan menggunakan metode Critical Path Method (CPM) dan untuk mengetahui besarnya efisiensi biaya pada proyek rehabilitasi Jalan Senganten - Klino Kecamatan Sekar Kabupaten Bojonegoro dengan menggunakan metode Critical Path Method (CPM). Langkah-langkah yang dilakukan antara lain menyusun jaringan kerja dengan metode Critical Path Method (CPM), mengidentifikasi jalur kritis dan jalur non kritis dan melakukan analisa perhitungan percepatan waktu dan biaya proyek. Dari hasil perhitungan menggunakan program bantu Microsoft Office Project pada penjadwalan normal atau tanpa percepatan, waktu pelaksanaan proyek selama 105 hari. Setelah mengalami percepatan dengan tambahan 1 jam kerja proyek dapat selesai selama 72 hari sehingga jika menggunakan penjadwalan percepatan waktu yang di reduksi sebesar 33 hari waktu normal. Rincian biaya upah tenaga percepatan Rp. 5.776.793,28, selama waktu lembur dalam 33 hari. Dan besar biaya total seluruh pekerja selama pekerjaan berlangsung adalah Rp. 477.921.231,20.
Faktor Utama Penyebab Keterlambatan Proyek Konstruksi Gedung di Bojonegoro Wafa, Ahmad Waldan Ali; Rodhi, Nova Nevila; Sari, Ayu Kurnia Ratna
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 7 No. 1 (2024): JUNE
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v7i1.5659

Abstract

Economic development in Bojonegoro is growing rapidly due to massive building construction. However, delays in building construction projects in Bojonegoro are a significant issue because they have a negative impact on costs, efficiency, and local economic stability. Identifying building project delay factors, especially in Bojonegoro, is important because project delay factors may differ from other areas. This research aims to identify and analyze factors influencing building project delays in Bojonegoro. The factors observed include materials, labor, equipment, finance, environment, and design changes. The research uses a quantitative approach and a questionnaire survey method, which has undergone instrument testing on 35 respondents involved in building construction projects in Bojonegoro. The data was tested on classical assumptions and analyzed using hypothesis testing (F and T tests) to determine the effect of each variable on project delays and ranking based on the coefficient values. The research results show that all variables studied significantly influence project delays, with labor as the most dominant factor, followed by environment and finance. Changes in design, equipment, and materials also contribute, although with a smaller impact. This research provides a strong empirical basis for project managers and related parties to develop more effective strategies for managing construction projects, reducing delays, and increasing project efficiency in Bojonegoro.
Strategy to improve human resource performance in construction services companies Rodhi, Nova Nevila
Annals of Human Resource Management Research Vol. 5 No. 1 (2025): March
Publisher : Goodwood Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35912/ahrmr.v5i1.2924

Abstract

Purpose: This study aims to identify factors that influence human resource performance, analyze factors that should be considered most in improving human resource performance, and analyze strategies that can be implemented to improve human resource performance in construction service companies. Methodology/approach: This study uses a descriptive approach. In general, the methodology used is to combine qualitative research with quantitative research using a case study and a survey approach. The fixed respondent design chosen in this study was the cluster sampling method. The analysis method used in this study is the Analytical Hierarchy Process (AHP) Results/findings: This study produced three conclusions: 1. The results of the identification process based on the literature review obtained several factors that were grouped into four criteria: competence, motivation, loyalty aspects, and work discipline, 2. The competency factor must be considered most in improving the performance of human resources in the construction project of high-rise buildings in Bojonegoro is the competency factor, 3. Strategies that can be carried out to improve performance based on competency include adding staff/workers, providing compensation, providing facilities, providing training, and carrying out control. Limitations: This research was conducted at a construction services company that handles the construction of high-rise buildings in Bojonegoro District, East Java, Indonesia; therefore, the research results need to be developed for larger projects. Contribution: Academically, the benefit of this research is that it can serve as a reference for managing human resources effectively. Novelty: This research can provide new insights into strategies to improve human resource performance so that activities can run more smoothly and provide maximum results.
Analisis Faktor Keterlambatan Pekerjaan Konstruksi Drainase dengan Menggunakan Metode Kaiser Mayer Oklin (KMO) Nugraha, Trinata Budi; Rodhi, Nova Nevila; Sari, Ayu Kurnia Ratna
Jurnal Ilmiah Universitas Batanghari Jambi Vol 24, No 2 (2024): Juli
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jiubj.v24i2.5296

Abstract

This research aims to identify factors that cause delays in implementing the Urban Drainage project in Kepatihan Village, Bojonegoro Regency, using Regional Revenue and Expenditure Budget (APBD) funds. The research method used a population involved in drainage construction, using a saturated sampling technique with 39 respondents. Data collection used questionnaires for primary data and secondary data obtained from project schedules, cost budget plans and workforce data. Data analysis uses factor analysis, descriptive analysis, and cross tabulation analysis. Factor analysis uses the Kaiser Mayer Olkin Measure of Sampling Adequacy (KMO-MSA) method. The KMO test was carried out with a significance value from the Bartlett Sphericity Test of less than 0.05 to determine the suitability of the variables. The KMO-MSA process is carried out by calculating the Kaiser Mayer Olkin (KMO) value. The KMO value ranges between 0 and 1, where a higher value indicates a better match. Apart from that, Bartlett's Test of Sphericity was also carried out to test the significance of the relationship between variables. If the test results are significant (p < 0.05), then these variables are suitable for proceeding to further factor analysis. The results of the cross-tabulation analysis show that the labor variable (X2) is the main factor influencing delays in drainage construction projects, with a significance value (sig) < 0.05. Based on the results of the descriptive analysis, the labor factor indicator (X2) which is the factor that has the most significant influence on construction project delays, is the variable X2.1 in the form of labor availability with a mean of 5.67 and a percentage value of 5.12%. This suggests that a lack of labor can cause delays in project implementation, potentially affecting overall project progress and quality.
PERANCANGAN SHOPPING MALL BOJONEGORO TEMA ARSITEKTUR METAFORA KOMBINASI (COMBINED METHAPHORS) Moch Miftachuddin; Muhammad Koderi; Sukma Betariah; Nova Nevila Rodhi
DEARSIP : Journal of Architecture and Civil Vol 2 No 1 (2022): Mei 2022
Publisher : Faculty of Engineering, Universitas Islam Darul Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/dearsip.v2i1.3354

Abstract

Perancangan shopping mall di Bojonegoro bertujuan untuk meningkatkan perekonomian masyarakat. Pembangnunan shopping mall di Bojonegoro menggunakan tema Metafora Kombinasi yaitu mengkombinasikan bentuk alat musik harmonika dengan karakteristiknya sehingga didapatkan bentuk bangunan yang unik dan ramah lingkungan. Lokasi perancangan shopping mall Bojonegoro berada di Jl.Lisman, Ds. Campurrejo, Kec. Bojonegoro, Kab. Bojonegoro, Provinsi Jawa Timur. Memiliki luas wilayah ± 10.800 M2. Alasan didirikannya shopping mall Bojonergoro ini adalah belum adanya pusat perbelanjaan yang memiliki fasilitas yang lengkap serta memenuhi kebutuhan belanja masyarakat. Metode perancangan meliputi 1) Ide perancangan, yaitu mencari sebuah ide atau gagasan yang kaitannya dengan pusat perbelanjaan yang berkembang di kota Bojonegoro dan sekitarnya, dan mencari tahu bagaimana minat masyarakat Bojonegoro. Kemudian pengembangan ide tersebut di dokumentasikan dan ditulis sebagai karya ilmiah. 2) Identifikasi masalah. 3) Pengumpulan data. 3) Analisa. 4) Sintesa.
Optimasi Kinerja Excavator Menggunakan Metode Overall Equipment Effectiveness (OEE) Abryandoko, Eko Wahyu; Wijiatin, Alfi; Rodhi, Nova Nevila
Journal of Industrial Engineering and Technology Vol. 6 No. 1 (2025): Desember 2025
Publisher : Universitas Muria Kudus

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Excavator is the main tool in the mining process. If the excavator is damaged, it will affect the mining process, reduce production targets, the cost of repairing damage will be high, and in the end the company will suffer losses. At PT. United Tractors Semen Gresik, based on the company's historical data from January to December 2022, the effectiveness of the Excavator unit in Mine Operation Area 1 (Tuban site) averaged 57%, of the minimum OEE standard set by the company of 75%. So it is necessary to improve to meet company standards. The purpose of this research is to optimize the performance of excavators for limestone and clay mining at PT. United Tractors Semen Gresik. The method approach in this study is carried out by calculating availability, utilization and productivity idex, then the value of overall equipment effectiveness (OEE) can be identified. After obtaining the factors that affect excavator performance, optimization is carried out using fishbone diagram analysis. The results of the research conducted show that the average total value of Overall Equipment Effectiveness (OEE) is 70%, which is still below the OEE standard set by the company, which is 75%. The factors that have the most influence on the low effectiveness of the Excavator unit using the Overall Equipment Effectiveness (OEE) method analysis are the loss time, downtime, and actual productivity factors.