Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : PROZIMA (Productivity, Optimization and Manufacturing System Engineering)

Balanced Scorecard Method: Analysis of Achievement of Manufacturing Services Companies Strategies in Pasuruan Muhamad abdul Jumali; Anita Kristina
PROZIMA (Productivity, Optimization and Manufacturing System Engineering) Vol 4 No 1 (2020): Juni
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/prozima.v4i1.1274

Abstract

Bussiness iicompetition iiin iimanufacturing iisector iihas iipotential iito iidevelop, iiespecially iiin iieastern iiarea iiof iiEast iiJavaProvince, iiso iicompetency iiin iiservice iisector iiis iineeded, iibest iilevel, iiresistant iito iicompetition, iioptimizing iiresources iiowned iioptimally iiand iiachieving ii iicompany iistrategic. iiThe iiselection iiof iimanufacturing iiservice iicompanies iias iiresearch iiobject iiis iibased iion iitrusted iitrack iirecords. iiAim iiof iithis iistudy iiis iito iiknow ii4 iiprespctive, iicustomer iiprespective, iiinternal iibusiness iiprespective iiand iigrowth iilearning iiwith iibalanced iiscorecard ii iirules. iiUsing iiresponden iiwith iiproportionate iistratified iirandom iisampling iimethod iiusing iisolving iiformula. iiResult iiof iistudy iiis iiindicate iithat iithere iiare iia iinumber iivariations iidominated iiby iitotal iiplanning iicost iimanagement iiprocess iicarried iiout iiin iiaccordance iiwith iiperformance iimeasurement iistandarts, ii4 iiprespective iiof iithis iiperformance iimeasurement iihas iibeen iiguaranteed iiin iiexternal iiaudit iisystem iiand iineeds iito iigrow iiand iidevelop iithe iicompany’s iiexistence.
Rearranging First-In First-Out (FIFO) Parts Layouts: Menata Ulang Tata Letak Bagian First-In First-Out (FIFO) Jumali, Muhamad Abdul; Rusdiyantoro; Alfi Rohmatil Maulidah; Yitno Utomo
PROZIMA (Productivity, Optimization and Manufacturing System Engineering) Vol. 6 No. 2 (2022): Desember
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/prozima.v6i2.1580

Abstract

Surabaya locomotive warehouse is one part of the company PT. Kereta Api Indonesia (Persero) as a place to store spare parts for repair and maintenance purposes, especially locomotives. The implementation of these inspections and repairs, of course, requires spare parts to facilitate the maintenance process which generally spare parts are placed in storage or warehouses. The problem in the Surabaya locomotive warehouse is that the arrangement of spare parts for bin boxes for each type of group is not always fixed so that the search becomes a bit hampered. This study aims to review the repair of bin box spare parts placement on a regular basis by using the First-In First-Out (FIFO) approach to sort bin box spare parts based on their movement flow. Based on the results of the analysis, the classification of bin boxes in each type of spare parts rack group based on the flow of movement in sequence is fast moving, medium moving, and slow moving. In the fast moving spare parts bin boxes are placed on the bottom row of shelves, bin boxes that have medium moving spare parts are placed on the second and third rows of shelves. Meanwhile, bin boxes that have slow-moving spare parts will be placed on the top shelf. After classifying the spare parts in the bin box, an addressing area is made on each row of the rack to determine the location of the spare part position.