cover
Contact Name
Husnah
Contact Email
husnah@univrab.ac.id
Phone
-
Journal Mail Official
jurnal.ts@univrab.ac.id
Editorial Address
Redaktur Jurnal RACIC Universitas Abdurrab: Gedung Universitas Abdurrab Pekanbaru Jl. Riau Ujung No. 73 Pekanbaru Riau - Indonesia
Location
Kota pekanbaru,
Riau
INDONESIA
RACIC : Rab Construction Research
Published by Universitas Abdurrab
ISSN : 25277073     EISSN : 26203170     DOI : https://doi.org/10.36341/racic
Core Subject : Engineering,
RACIC "Rab Construction Research" (ISSN 2527-7073) adalah Jurnal yang dikelola oleh Program Studi Teknik Sipil, Fakultas Teknik Universitas Abdurrab, yang terbit secara berkala dalam dua edisi per tahun.
Arjuna Subject : -
Articles 165 Documents
ANALISIS KETERSEDIAAN AIR BERDASARKAN DATA HUJAN SATELIT GPM DI DAS MESJID KOTA DUMAI Manyuk Fauzi; Muhammad Wildan Pahlevi; Rinaldi Rinaldi; Yohanna Lilis Handayani; Ermiyati Ermiyati; Husnah Husnah
Racic : Rab Construction Research Vol 9 No 1 (2024): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i1.4423

Abstract

Penggunaan air bersih merupakan kebutuhan pokok bagi penduduk di Indonesia, dimana air bersih digunakan sebagai air minum, hidrologi, irigasi dan lain sebagainya. Sehingga hal tersebut menjadi penting dalam infrastruktur penyediaan air bersih. Salah satu sumber air berasal dari hujan. Dalam perencanaan pengembangan sumber daya air yang ada, diperlukan data debit lapangan. Data yang tersedia di lapangan antara lain data curah hujan, klimatologi, dan tinggi muka air. Namun karena adanya keterbatasan data, keakuratan data menjadi penyebab kesulitan untuk melakukan analisis model hidrologi. Oleh karena itu dirasa perlu menggunakan data hujan satelit yang dapat menggantikan data hujan permukaan sebagai alternatif untuk pemodelan hidrologi. Dalam kasus ini digunakan data curah hujan yang berasal dari satelit Global Precipitation Measurement (GPM). Dalam pemodelan ini menggunakan model mock dan rainrun. Dari hasil pengujian, diperoleh Koefisien Korelasi (R) memiliki kriteria sangat rendah pada model Mock dan Rainrun. Untuk Koefisien Nash-Sutcliffe (NSE) pada model Mock diperoleh nilai skema 1 = 0,506; skema 2 = 0,555; skema 3 = 0,578; skema 4 = 0,431 sehingga rata-rata merupakan kriteria memenuhi. Untuk Koefisien Nash-Sutcliffe (NSE) pada model Rainrun diperoleh nilai skema 1 = 0,505; skema 2 = 0,582; skema 3 = 0,506; skema 4 = 0,501 sehingga rata-rata merupakan kriteria memenuhi.
PERENCANAAN MANAJEMEN PEMELIHARAAN BANGUNAN HOTEL X DI PADANG UNTUK MENCAPAI EFISIENSI BIAYA DAN WAKTU Muhammad Ilham Maulana; Hanif Sufran; Merley Misriani; Rahmi Hidayati; Jumyetti Jumyetti
Racic : Rab Construction Research Vol 9 No 1 (2024): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i1.4532

Abstract

Every building needs maintenance on every component of the building. Before carrying out maintenance activities, planning is required for every aspect of maintenance in the building. Good planning can ensure achieving goals in carrying out maintenance that utilizes costs and time efficiently. This study aims to plan the implementation of hotel building maintenance to achieve cost efficiency and maintenance time. The implementation methods include making SOPs, checklist forms, cost planning and maintenance schedules. Planning for SOP is made by adding existing SOP from the hotel to several SOPs from ministerial regulations that the hotel has not implemented. Planning checklist forms, costs and maintenance schedules made for architectural, mechanical and electrical work are limited to a period of 1 year and use ministerial regulation no. 24/PRT/M/2008 to check its suitability with implementation in the field. This research shows that hotel building maintenance management planning is better than before. The maintenance management plan created is expected to help the hotel carry out maintenance activities efficiently and utilize costs and time.
PENGARUH RASIO ALKALI AKTIVATOR DALAM CAMPURAN TANAH-POFA BERDASARKAN UJI TEKAN BEBAS Muhammad Toyeb; Puspa Ningrum
Racic : Rab Construction Research Vol 9 No 1 (2024): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i1.4579

Abstract

Modern soil stabilization has included environmentally friendly materials in the mixture design. Adding an alkali activator provides an alternative to the innovation of the binder agent for soil stabilization. This study aims to know the effect of adding the alkali activator soluble for soil-POFA mixture on changes in the soil strength characteristic through an unconfined compression test (UCT). The alkali activators are sodium silica (Na2SiO3) and Sodium Hydroxide (NaOH). They prepare with a ratio Si/Al: 1.0, 1.5, 2.0, 2.5, and NaOH concentrated at 10M. Compressive strength to the soil-POFA mixture obtained slightly increased strength, and the soil is clayey sand poorly graded. However, adding the alkali activator increases the soil strength significantly. Thus, the soil-POFA with the alkali activators gained the maximum compressive strength on a ratio of 2.5, and it all has the characteristic of rapid hardening in the initial period as a binder agent.
IDENTIFIKASI PERILAKU DEFORMASI VERTIKAL BERDASARKAN HASIL PEMANTAUAN MULTILAYER SETTLEMENT SAAT PELAKSANAAN TIMBUNAN BENDUNGAN AMERORO Alfian Arbie Simbolon; Sri Prabandiyani Retno Wardani; Suharyanto Suharyanto
Racic : Rab Construction Research Vol 9 No 1 (2024): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i1.4615

Abstract

Bendungan Ameroro berlokasi di Sulawesi Tenggara dibangun oleh Kementerian Pekerjaan Umum dan Perumahan Rakyat yang hingga saat masih dalam proses penimbunan. Deformasi bendungan sebenarnya sudah mulai terjadi sejak proses konstruksi bendungan dan kemudian berlanjut pada masa operasional bendungan setelah konstruksi selesai. Oleh karena itu, pengamatan dan analisis deformasi tubuh bendungan sangat penting dilakukan sejak masa konstruksi untuk menghindari terjadinya kegagalan bendungan di kemudian hari. Penelitian ini bertujuan untuk mengidentifikasi perilaku deformasi internal vertikal Bendungan Ameroro berdasarkan data hasil monitoring Multilayer Settlement . Identifikasi dimaksudkan untuk menilai perilaku normal atau abnormal zona inti timbunan bendungan dengan data pembacaan instrumen Multilayer Settlement yang dipasang pada Bendungan Ameroro untuk mengetahui perilaku deformasinya berdasarkan rujukan empiris. Grafik pembacaan hasil monitoring Multilayer Settlement menunjukan bahwa pada plat magnet paling bawah IMS 1-8 sudah mengalami penurunan yang stagnan pada elevasi timbunan +88,50 m sehingga diprediksi pada kenaikan timbunan berikutnya deformasinya akan stabil. Batas normal yang dirujuk adalah ketika ketinggian timbunan kurang dari 50 m total penurunan umumnya berada pada urutan kurang dari 1% sampai dengan 2,5%. Dari hasil analisis, nilai settlement pada inti Bendungan Ameroro yang terjadi masih dalam ambang batas normal.
ANALISIS TAHANAN HORIZONTAL TIANG PANCANG BARU YANG DIBEBANI LATERAL AKIBAT EFEK ADANYA TIANG PANCANG EKSISTING PADA TANAH CLAY Fardan Fikriansyah; Budi Susilo Soepandji
Racic : Rab Construction Research Vol 9 No 1 (2024): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i1.4902

Abstract

The method of driving new piles in existing buildings using existing piles is often used to speed up the construction period. The load distribution and displacement of the new pile need to be investigated further because of the influence of the existing pile. The lateral load displacement method (p-y curve) is used to analyze the load and displacement of the pile using threedimensional finite element analysis. The new and existing piles used are piles with a diameter of 0.6 meters, a thickness of 0.1 meters, a pile depth of 17 meters, and the distance between the new piles and the existing piles is 1 meter. The horizontal load applied is 150 kN on the pile head which is 1 meter from the ground surface. This research was carried out on clay with the Modified Cam Clay constitutive model. The results of three-dimensional finite element analysis show that the horizontal resistance of the new pile increases at the pile head due to the presence of the existing pile.