cover
Contact Name
Husnah
Contact Email
husnah@univrab.ac.id
Phone
-
Journal Mail Official
jurnal.ts@univrab.ac.id
Editorial Address
Redaktur Jurnal RACIC Universitas Abdurrab: Gedung Universitas Abdurrab Pekanbaru Jl. Riau Ujung No. 73 Pekanbaru Riau - Indonesia
Location
Kota pekanbaru,
Riau
INDONESIA
RACIC : Rab Construction Research
Published by Universitas Abdurrab
ISSN : 25277073     EISSN : 26203170     DOI : https://doi.org/10.36341/racic
Core Subject : Engineering,
RACIC "Rab Construction Research" (ISSN 2527-7073) adalah Jurnal yang dikelola oleh Program Studi Teknik Sipil, Fakultas Teknik Universitas Abdurrab, yang terbit secara berkala dalam dua edisi per tahun.
Arjuna Subject : -
Articles 314 Documents
ANALISIS KETERSEDIAAN AIR BERDASARKAN DATA HUJAN SATELIT GPM DI DAS MESJID KOTA DUMAI Manyuk Fauzi; Muhammad Wildan Pahlevi; Rinaldi Rinaldi; Yohanna Lilis Handayani; Ermiyati Ermiyati; Husnah Husnah
Racic : Rab Construction Research Vol. 9 No. 1 (2024): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i1.4423

Abstract

The use of clean water is a basic necessity for the population in Indonesia, where it serves various purposes such as drinking, hydrology, and irrigation. Therefore, it is crucial in the infrastructure for providing clean water. Rainfall is one of the sources of water, and in the development planning of existing water resources, field discharge data is essential. Field data includes rainfall, climatology, and water level. Due to data limitations, accuracy becomes a challenge in hydrological modeling. Thus, the use of satellite rainfall data is deemed necessary as an alternative for hydrological modeling. In this case, Global Precipitation Measurement (GPM) satellite data is utilized. The modeling employs Mock and Rainrun models, and the results show that the Coefficient of Correlation (R) is significantly low for both Mock and Rainrun models. For Nash-Sutcliffe Coefficient (NSE), the Mock model yields scheme 1 = 0.506, scheme 2 = 0.555, scheme 3 = 0.578, and scheme 4 = 0.431, meeting the average criteria. The Rainrun model's NSE values are scheme 1 = 0.505, scheme 2 = 0.582, scheme 3 = 0.506, and scheme 4 = 0.501, also meeting the average criteria.
PERENCANAAN MANAJEMEN PEMELIHARAAN BANGUNAN HOTEL X DI PADANG UNTUK MENCAPAI EFISIENSI BIAYA DAN WAKTU Muhammad Ilham Maulana; Hanif Sufran; Merley Misriani; Rahmi Hidayati; Jumyetti Jumyetti
Racic : Rab Construction Research Vol. 9 No. 1 (2024): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i1.4532

Abstract

Every building needs maintenance on every component of the building. Before carrying out maintenance activities, planning is required for every aspect of maintenance in the building. Good planning can ensure achieving goals in carrying out maintenance that utilizes costs and time efficiently. This study aims to plan the implementation of hotel building maintenance to achieve cost efficiency and maintenance time. The implementation methods include making SOPs, checklist forms, cost planning and maintenance schedules. Planning for SOP is made by adding existing SOP from the hotel to several SOPs from ministerial regulations that the hotel has not implemented. Planning checklist forms, costs and maintenance schedules made for architectural, mechanical and electrical work are limited to a period of 1 year and use ministerial regulation no. 24/PRT/M/2008 to check its suitability with implementation in the field. This research shows that hotel building maintenance management planning is better than before. The maintenance management plan created is expected to help the hotel carry out maintenance activities efficiently and utilize costs and time.
PENGARUH RASIO ALKALI AKTIVATOR DALAM CAMPURAN TANAH-POFA BERDASARKAN UJI TEKAN BEBAS Muhammad Toyeb; Puspa Ningrum
Racic : Rab Construction Research Vol. 9 No. 1 (2024): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i1.4579

Abstract

Modern soil stabilization has included environmentally friendly materials in the mixture design. Adding an alkali activator provides an alternative to the innovation of the binder agent for soil stabilization. This study aims to know the effect of adding the alkali activator soluble for soil-POFA mixture on changes in the soil strength characteristic through an unconfined compression test (UCT). The alkali activators are sodium silica (Na2SiO3) and Sodium Hydroxide (NaOH). They prepare with a ratio Si/Al: 1.0, 1.5, 2.0, 2.5, and NaOH concentrated at 10M. Compressive strength to the soil-POFA mixture obtained slightly increased strength, and the soil is clayey sand poorly graded. However, adding the alkali activator increases the soil strength significantly. Thus, the soil-POFA with the alkali activators gained the maximum compressive strength on a ratio of 2.5, and it all has the characteristic of rapid hardening in the initial period as a binder agent.
IDENTIFIKASI PERILAKU DEFORMASI VERTIKAL BERDASARKAN HASIL PEMANTAUAN MULTILAYER SETTLEMENT SAAT PELAKSANAAN TIMBUNAN BENDUNGAN AMERORO Alfian Arbie Simbolon; Sri Prabandiyani Retno Wardani; Suharyanto Suharyanto
Racic : Rab Construction Research Vol. 9 No. 1 (2024): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i1.4615

Abstract

The Ameroro Dam, located in Southeast Sulawesi, was built by the Ministry of Public Works and Public Housing and is currently still in the process of filling. Dam deformation actually started to occur during the dam construction process and then continued during the dam's operational period after construction was completed. Therefore, it is very important to observe and analyze the deformation of the dam body since the construction period to avoid dam failure in the future. This research aims to identify the vertical internal deformation behavior of the Ameroro Dam based on data from Multilayer Settlement monitoring results. The identification is intended to assess the normal or abnormal behavior of the core zone of the dam embankment using reading data from the Multilayer Settlement instrument installed at the Ameroro Dam to determine its deformation behavior based on empirical references. The reading graph of the Multilayer Settlement monitoring results shows that the bottom magnetic plate of IMS 1-8 has experienced a stagnant decline at the embankment elevation of +88.50 m so that it is predicted that at the next embankment increase the deformation will be stable. The normal limit referred to is when the height of the embankment is less than 50 m, the total settlement is generally in the order of less than 1% to 2.5%. From the results of the analysis, the settlement value at the core of the Ameroro Dam that occurred was still within normal limits.
ANALISIS TAHANAN HORIZONTAL TIANG PANCANG BARU YANG DIBEBANI LATERAL AKIBAT EFEK ADANYA TIANG PANCANG EKSISTING PADA TANAH CLAY Fardan Fikriansyah; Budi Susilo Soepandji
Racic : Rab Construction Research Vol. 9 No. 1 (2024): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i1.4902

Abstract

The method of driving new piles in existing buildings using existing piles is often used to speed up the construction period. The load distribution and displacement of the new pile need to be investigated further because of the influence of the existing pile. The lateral load displacement method (p-y curve) is used to analyze the load and displacement of the pile using threedimensional finite element analysis. The new and existing piles used are piles with a diameter of 0.6 meters, a thickness of 0.1 meters, a pile depth of 17 meters, and the distance between the new piles and the existing piles is 1 meter. The horizontal load applied is 150 kN on the pile head which is 1 meter from the ground surface. This research was carried out on clay with the Modified Cam Clay constitutive model. The results of three-dimensional finite element analysis show that the horizontal resistance of the new pile increases at the pile head due to the presence of the existing pile.
UPAYA PENINGKATAN KESELAMATAN LALU LINTAS PADA PERSIMPANGAN TAK BESINYAL RAWAN KECELAKAAN DI JALAN NASIONAL KABUPATEN KAMPAR Benny Hamdi Rhoma Putra; Elianora Elianora; Sri Djuniati; Rizqy Ridho Prakasa; Novreta Ersy Darfia
Racic : Rab Construction Research Vol. 10 No. 1 (2025): JUNI 2025
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v10i1.3829

Abstract

The high rate of accidents at unsignalized intersections in Kampar Regency is one of the reasons for conducting this research. Data from the State Police of the Republic of Indonesia in the Kampar Sector recorded 1,013 accident cases between 2017 and 2020. The purpose of this study was to select accident-prone locations based on the results of ranking the highest accident rates, analyze safety issues, and provide recommendations for handling these locations. The ranking analysis was carried out using accident data for 4 years using the ACF and EPDO methods. Based on the ranking results, two locations are accident-prone areas, namely Jl Pekanbaru-Bangkinang KM 40 and Jl Pasir Putih KM 07. The problem of traffic safety on the Pekanbaru-Bangkinang KM 40 road is the time of accidents that occur during the day and night with the type of rear accident. end, single, head on. Traffic conflicts that occur are slowing down in the same direction, changing lanes, turning right in the same direction and turning left in the same direction. Some of the obstacles that occur include, there are no warning signs, road markings are unclear, visibility is disturbed by bushes, no PJU, roads that have not been paved, no road nails, and damaged pavement. Recommendations that can be suggested include repairing road pavements, clearing bushes at intersections, making PJUs, warning signs for accident-prone areas, caution signs, making road spikes. At the location of Jalan Pasir Putih KM 07 the problem of traffic safety is when the accident occurred during the day, with the type of head on accident. Traffic conflicts slow down in one direction, change lanes, turn right in the same direction and turn left in the same direction. Traffic management has no warning signs, plants that interfere with the driver's line of sight, vehicles parked haphazardly, unclear road markings, no road spikes, no PJU, damage to road pavement. The recommendations for handling are repairing road damage, repairing road markings, clearing land from plants that interfere with driver's visibility, signs prohibiting parking, making road spikes, warning signs for accident-prone areas, caution signs.
ANALISIS WILLINGNESS TO PAY KERETA API KOMUTER SIDOARJO - INDRO Hafizhudin Alfin Putra Yuwanto; Nugroho Utomo; Fithri Estikhamah
Racic : Rab Construction Research Vol. 9 No. 2 (2024): DESEMBER
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i2.4212

Abstract

The high level of economic activity and population density has resulted in Surabaya City, Gresik Regency, and Sidoarjo Regency experiencing a high level of community mobility, necessitating good public transportation services. Therefore, on February 10, 2021, PT. Kereta Api Indonesia (Persero) Regional Operation 8 Surabaya initiated passenger train services in Gresik Regency by operating the Commuter Train with the route from Indro Station (Gresik) to Sidoarjo Station. This study aims to determine a fare that is suitable for the Commuter Train service from Sidoarjo to Indro using the willingness to pay (WTP) method. Based on the research findings, the willingness to pay value for the Sidoarjo-Indro Commuter Train journey with the existing fare of Rp 5,000 is Rp 7,700. Therefore, the current fare is deemed appropriate, and it can still be increased with improvements in facilities and services.
ANALISIS DAN PEMETAAN KERUSAKAN JALAN DENGAN METODE SURFACE DISTRESS INDEX PADA RUAS JALAN RAYA KEBONAGUNG - JALAN RAYA PEPEN KABUPATEN MALANG Achmad Chullbuddin Badghey; Hendrata Wibisana
Racic : Rab Construction Research Vol. 9 No. 2 (2024): DESEMBER
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i2.4224

Abstract

The increasing population and resulting increase in traffic volume can affect the condition of road surface construction, in this case causing a decline in the quality of the city's roads. The Kebonagung Highway - Pepen, is the main road that has experienced a decline in road quality. Based on observations, the SDI (surface distress index) method is good for determining road surface conditions on the Kebonagung - Pepen highway and mapping using SIG. The types of damage found at the research location include checkerboard cracks, longitudinal cracks, crocodile skin cracks, edge cracks, holes, wheel marks (grooves), patch damage, fall damage, and subsidence damage. The percentage results of road damage values based on the SDI method for the area of damage were 1.66% square cracks, 2.81% longitudinal cracks, 3.14% crocodile skin cracks, 2.27% edge cracks, 0.23% holes, 2 .87% wheel marks (grooves), 2.03% patch damage, 3.65% fall damage, and 0.22% sink damage. The condition value using the method on the Jalan Raya Kebonagung - Jalan Raya Pepen section shows good condition at STA 0+000 - 8+100 because it produces an SDI value (<50). From the results obtained all damage values ​​were based on the SDI method. Geographic Information System was implemented, namely creating a thematic map of road damage values on the Kebonagung Highway - Jalan Raya Pepen section.
ANALISIS KERUSAKAN PERMUKAAN JALAN DENGAN METODE PAVEMENT CONDITION INDEX DAN PEMETAAN BERDASARKAN SISTEM INFORMASI GEOGRAFI (STUDI KASUS: JALAN RAYA KEBONAGUNG - JALAN RAYA GENENGAN) Randhita Bintang Wijaya; Hendrata Wibisana
Racic : Rab Construction Research Vol. 9 No. 2 (2024): DESEMBER
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i2.4225

Abstract

Damaged roads, if follow-up repairs are not carried out immediately, cause greater damage and require greater costs to repair, so efforts need to be made to maintain the condition of the road to avoid this. So this research aims to find an index of the level of damage to the road pavement on the Malang - Kepanjen arterial road section with the help of civil engineering using the Pavement Condition Index (PCI) method and mapping of the condition of road damage in the research area using the help of the Geographic Information System (GIS) will be carried out. Based on the results of the analysis and calculations, the condition of road surface damage was obtained, namely, shoving, rutting, depression, patches, holes, alligator cracks, longitudinal cracks, edge cracks, and block cracks. Meanwhile, the Pavement Condition Index (PCI) value for each road, namely the Kebonagung highway has a PCI value of 76.8 (Very Good) and the Genengan highway has a PCI value of 80.75 (Very Good). After obtaining all the damage values based on the Pavement Condition Index (PCI) method, the Geographic Information System was implemented, namely creating a thematic map of the road damage values on each road in the research location so that the mapping of the road damage values could be used as a reference to see the condition of the roads in the Pakisaji and Kepanjen sub-district.
PEMETAAN KARAKTERISTIK ARUS LALU LINTAS DENGAN METODE GREENBERG PADA RUAS JALAN KOTA MALANG Fauzi Aldiansyah Aldiansyah; Hendrata Wibisana
Racic : Rab Construction Research Vol. 9 No. 2 (2024): DESEMBER
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v9i2.4226

Abstract

The volume of traffic on Jaksa Agung Suprapto Road is quite high and is expected to continue increasing with the growing population. Therefore, an analysis of traffic flow characteristics is necessary. In this study, a mathematical model approach using the Greenberg method was employed. The research and analysis on Jaksa Agung Suprapto Road yielded results using the Greenberg method, with the highest R2 value occurring on Fridays, specifically in segment 7, at 0.89. The variable values obtained for this segment include the Maximum Volume (Vm) at 5523.05 pcu/hour, Free Flow Speed (Uf) at 73.01 km/h, Maximum Speed (Um) at 9.98 km/h, and Saturation Density (Dj) at 1504.53 pcu/km. The application of Geographic Information System (GIS) in this research involved using the research results as attribute data in thematic maps depicting traffic characteristics.