cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
infoijies@telkomuniversity.ac.id
Editorial Address
-
Location
Kota bandung,
Jawa barat
INDONESIA
IJIES (International Journal of Innovation in Enterprise System)
Published by Universitas Telkom
ISSN : -     EISSN : 25803050     DOI : -
Arjuna Subject : -
Articles 258 Documents
COMPLETION VEHICLE ROUTING PROBLEM (VRP) IN DETERMINING ROUTE AND DETERMINING THE NUMBER OF VEHICLES IN MINIMIZING TRANSPORTATION COSTS IN PT XYZ WITH USING GENETIC ALGORITHM Abdurrahman, Ahmad Fauzan; Ridwan, Ari Yanuar; Santosa, Budi
International Journal of Innovation in Enterprise System Vol. 2 No. 2 (2018): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In the transportation process is closely related to the route, the route is the path through which a mode / vehicle to arrive at a destination. The route is related to the number of vehicles and the location where it goes. PT XYZ is a company engaged in fast moving consumer goods (FMCG), with the field makes the flow of goods speed will be high until the goods distribution process becomes fast and often. In the process of distribution is done by using 1 fleet in each customer. Currently in the process of distributing goods, the company still ignores the utility of the vehicles used, so the availability of empty space in capacity is still occurring and this makes the cost of transportation is high. Consolidation of multiple customers becomes possible, keeping in mind the time window, capacity and multiple products. This study designs a route by considering the limits to get the route, the number of vehicles, the utility increase of each vehicle and the optimal distance so that it can minimize transportation costs. The use of a genetic algorithm preceded by the nearest neighbor algorithm is used to solve this problem. Later the route will be formed and get the number of vehicles, the increase in vehicle utility and the optimal distance. This resulted in average vehicle utility improvement of 35,317%, vehicle repairs amounted to 34.05%, and distance of 10.075% so as to reduce transportation costs by 26.56% from initial conditions. Keywords— Transportation, FMCG, Vehicle Routing Problem, Time Window, Heterogeneous Fleet, Utility, Vehicle Number Determination.
Design of Web-Based Material Management Information System in Financial Module (Case Study PT INTI) Vanesia, Selvyananda Adelita; Andreswari, Rachmadita; Al Anshary, Faishal Mufied
International Journal of Innovation in Enterprise System Vol. 2 No. 2 (2018): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT INTI engaged in telecommunication, has long become a supplier of network construction with a large scale that is national. Therefore, PT INTI has a lot of material and spread all over the city in Indonesia. Previously, PT Inti still uses semi-manual way to do their material recording. The material recording is done by using Microsoft Excel which will be sent by electronic mail (email) if needed. But it is vulnerable to errors because the data contained in is not integrated. To overcome this, PT INTI wants to have a web based application called INTI Maintenance to manage financial materials such as material input, material search, material removal, material search, material data printing, to finance such as request addition, change of request status, delivery, and residual balances of each city. INTI Maintenance web-based information system financial module is built with open source software that uses PHP as the programming language, MySQL as the database, and Windows as server computer. The final results achieved in the material management information system in this module have advantages in assisting PT INTI employees in managing financial data and validation for material delivery using receipt of delivery material. Keywords—information system, management, material, finance.
A Conceptual Model on Integrating Supply Chain Operations Reference (SCOR) into Disaster Response Service Supply Chain FMEA Syamil, Rio Avicenna; Ridwan, Ari Yanuar; Santosa, Budi; Sutrisno, Agung; Maluegha, Benny L.; Soukotta, Jan
International Journal of Innovation in Enterprise System Vol. 2 No. 2 (2018): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Becoming country prone to the occurrence of natural disasters, determination on risk variables affecting successful operation of disaster response service supply chain using supply chain FMEA (Failure Mode and Effect Analysis) is undeniably important to support successfulness of humanitarian operation. However, scientific studies concerning on integrating SCOR into Risk evaluation of disaster response supply chain is rarely found in references. To response such gap, this paper presents a conceptual model on integrating disaster response supply chain FMEA with Supply Chain Operational Reference (SCOR) to determine a conceptual risk-based performance evaluation model in disaster response supply chain. A framework on integrating Service Supply Chain FMEA with SCOR is presented coupled with a decision support model for evaluating criticality of risk-based performance index and followed with discussions and new opportunity for further investigations. Keywords—Service Supply Chain, FMEA, SCOR, Disaster Response, Risk.
Designing Risk Qualitative Assessment on Fiber Optic Instalation Project in Indonesia Purba, Feviana Betsi; Andrawina, Luciana; Astuti, Murni Dwi; Pratami, Devi; Fadlillah, Fachri; Haryono, Imam; Bermano, Ageak Raporte
International Journal of Innovation in Enterprise System Vol. 2 No. 2 (2018): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

A project always has risks that can lead to project failure. In the project, a risk analysis is required to provide an evaluation for the project to proceed as planned. In the event of inadequate planning and ineffective control, it will result in irregularities identified as a risk to the project. This study aims to analyze the qualitative risk on Fiber Optic Installaion project in Sukabumi, West Java, Indonesia. In addition, risk assessment is undertaken on project implementation. Assessment of risk using the impact and probability to measure the impact of risk occurrence. The impacts are more detailed by classified by time impact, cost impact, quality impact, safety and security impact, proximity. The result is there are 36 risk that may occur and mostly risks are associaated by quality and safety&security impact. Keywords— risk assessment, qualitative analysis, Project, fiber optic.
Maintenance System of Universal Goss Printing Machine based on failure data using RCM and RCS method Sarashvati, Made Shanti; Nopendri, Nopendri; Alhilman, Judi; Atmaji, Fransiskus Tatas Dwi; Aulia, Valinouski
International Journal of Innovation in Enterprise System Vol. 2 No. 2 (2018): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Over time a machine will get experience a decrease in reliability, causing the engine to be damaged at the time of operation, thus disrupting the production line. To maintain a machine remains reliable then a good maintenance system is required. In this research, we will use Reliability Centered Maintenance (RCM) and Reliability Centered Spare (RCS) analysis on the critical system of Goss Universal printing machine based on engine failure data. The result of RCM analysis obtained the optimal preventive maintenance schedule and the type of treatment, while based on the RCS analysis obtained spare part needs following the maintenance schedule. With the result of this analysis, is expected where the machine will keep good and will continue to operate without a sudden breakdown under the production schedule's need. Based on RCM analysis for each critical subsystem obtained interval preventive maintenance for transfer roller 127.60 hours, Ink fountain roller 24.45 hours, ink form roller 29.23 hours respectively, and the wash-up device is no scheduled maintenance. For spare parts inventory strategies the result using RCS method are: transfer roller104 units, ink fountain roller requires 32 units, ink form roller 36 units and are holding spare policy required, and a wash-up device no holding spare parts. Keywords— Failure data, Maintenance System, RCM, RCS
QUALITY METRIC DESIGN USING INTERNAL CONTROL METHOD TO CONTROL THE QUALITY OF FIBER OPTIC INSTALLATION PROJECT Abdurrahman, Ahmad Fauzan; Delvika, Rizka Hasna; Haryono, Imam; Pratami, Devi; Bermano, Ageak Raporte
International Journal of Innovation in Enterprise System Vol. 3 No. 1 (2019): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

To provide internet network, one of public Telecommunication provider in Indonesia conduct several project related to fiber optic cable installation such as the STO Modernization Feeder project. In every project implementation, the company is concerned with quality in order to remain competitive with competitors. Deliverable which meets the project quality will produce the product in accordance with the requirements. STO Garut Feeder Modernization Project was experiencing delays which is caused by the non-conformity project deliverable to project specification during monitoring & controlling phase. At project planning, the quality metric was not designed, which can be used as a guideline for vendor in carrying out the project task and to assist the process of quality control. Quality metric design is carried out using internal control methods that can identify possible errors in each project activity and critical success criteria that define a successful activity that will be performed. Result shows that only 67.1% statement (critical success criteria) form critical activity is implemented. This result can answer why the project delay because the activity on critical path is mostly re-worked due to non-conformity issues. Keywords—Quality, quality metric, internal control, control quality, telecommunication project
DESIGNING ROUTE DISTRIBUTION USING TWO PHASE TABU SEARCH ON HETEROGENOUS FLEET VEHICLE ROUTING PROBLEM WITH TIME WINDOW IN PT. XYZ TO MINIMIZE TRAVEL DISTANCE Pratami, Devi; Puspitasari, Nurfitri Ayu; Haryono, Imam; Brilliane, Citra Septi; Ridwan, Ari Yanuar; Aurachman, Rio
International Journal of Innovation in Enterprise System Vol. 3 No. 1 (2019): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

XYZ is a pasteurization milk processing company that produce milk drink from pure cow milk. PT. XYZ don’t sell their product directly to end user, instead they distribute their product to many companies which serve milk for their employees or operators in lunch time. So, their customer is mostly a manufacture company from various kinds of industry. They have about 40 customers and most of them are outside Bandung. However, the delivery may not be done as planned. The average on time delivery is around 96%. it is below PT. XYZ target which is 98%. The impact of the delay itself is vary between customers. Because when delay occur, each customer has their own regulation that has been settled in agreement contract. Based on the delay recapitulation above, there are several factors that caused this problem. Delay in departure is the most influential factors. It is because PT. XYZ don’t have fixed schedule of delivery and they miscalculate the departure time because of improper route determination that also leads to longer travel time. This case is categorized as Vehicle Routing Problem with Heterogeneous Fleet and Time Window (VRPHFTW) that will be solved using one of meta-heuristics algorithm which is Two Phase Tabu Search Algorithm to minimize travel distance. In the end, the travel distance can be minimized 19.48%. Keywords—Vehicle Routing Problem with Heterogenous Fleet and Time Window (VRPHFTW), Meta-Heuristics, Two Phase Tabu Search Algorithm.
IT Services Quality Measurement Using IT SERVQUAL at University X Putri, Tantri Febiara; Nugraha, Fida Nirmala; Pratami, Devi; Suwarsono, Litasari
International Journal of Innovation in Enterprise System Vol. 3 No. 1 (2019): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Information technology plays a major role to enhance service activities in organizations as well as in higher educational institutions / universities. A special unit (Sisfo) at University X is dedicated to handles daily technology-based services. Every year the performance of the unit is evaluated to increase customer satisfaction and yet the result is contradictory. Using balanced scorecard, the result showed that the unit's performance is in a good category, but when it comes to the satisfaction questionnaire the result said otherwise. This puzzling result due to not so appropriate tools of measurement for the unit’ services. This study conducted performance measurement using IT SERVQUAL to tap the perceived service and expected service of the Sisfo Unit’, form the eyes of the students as the largest customers, on the 6 dimensions: tangibles, responsiveness, reliability, assurance, emphaty and usability. Service dimensions that require immediate action are physical facilities such as hardware and software that are up to date, and processes related to academic activities such as failure to enter into a system, card recording errors, and students’ presence list errors. Keywords— IT SERVQUAL, performance measurement, satisfaction, services
FLOWSHOP SCHEDULING WITH SEQUENCE DEPENDENT SET-UP TIME USING IMMUNE ALGORITHM TO REDUCE MAKESPAN IN PT. XYZ BANDUNG AS A TEXTILE INDUSTRY Jonathan, Fernaldi; Mulyana, Rahmat; Prasetyo, Yuli Adam; Nasution, Shafira T.; Damayanti, Dida D.; Juliani, Widia
International Journal of Innovation in Enterprise System Vol. 3 No. 1 (2019): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In manufacturing operations, production system is certainly an important aspect. Thus, company should do the planning and production control well in order to have satisfactory system. One of the production planning process is scheduling. This process is one of the main process in production planning. The urge of doing the scheduling process is due to scheduling is the details of the planning process. The production scheduling in textile industry is considered as the industry with the hybrid flow shop scheduling type. Moreover, in this company there are several machine have the characteristic of sequence dependent setup time. Thus, in order to get the optimal solution this research used Immune Algorithm. This algorithm combines an efficient mutation to cooperate the pursuit for a near-optimal solution. Keywords—Hybrid flow shops, Sequence Dependent Setup Times, Makespan, Immune Algorithm
Proposal of Product-Replenishment Policy Determination on Multi-Source Problems to Minimize Over Stock in DC PT. XYZ Area Bandung Using Mixed-Integer Programming Method Tungadi, Adri Riawan; Dyah, Saskia; Aurachman, Rio; Santosa, Budi
International Journal of Innovation in Enterprise System Vol. 3 No. 1 (2019): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

XYZ is one of the companies engaging in fast moving consumer goods (FMCG) sector and produce soft drinks as its main product. In supporting the product distribution to its customers, PT XYZ has several administrative offices and distribution centers (DC) which spread across each region. The DC has main function as the warehouse which has storage activity before the products are distributed. One of the DC is located in Bandung, West Java. DC Bandung itself received product shipments from three factories, such as Cibitung, Cakung and Tambun. Related to the product shipment, DC Bandung has not determined the replenishment policy, and this condition results over stock at some periods, due to the unscheduled delivery time and undetermined product quantity. This condition gives a big impact to the total inventory cost that has to be borne by DC Bandung. This research was conducted to give the proposal of product replenishment policy using mathematical model with mixed-integer programming method as one of the linear programming types, which aimed to minimize over stock and total holding cost in DC Bandung with several constraints. Mathematical modeling is involved in this research as an approximation to the real replenishment system in the DC. The results of application of the proposed method are in the form of analytical solution, such as order quantity, and reorder point of each product that will give an impact to the total unit inventory and the total holding cost in the DC. The results calculation of replenishment policy provide savings on total inventory costs as much as IDR 23,800,981.20 Keywords—Mixed-Integer Programming, Order Quantity, Over Stock, Replenishment Policy.

Filter by Year

2017 2025


Filter By Issues
All Issue Vol. 9 No. 1 (2025): International Journal of Innovation in Enterprise System Vol. 8 No. 2 (2024): International Journal of Innovation in Enterprise System Vol. 8 No. 1 (2024): International Journal of Innovation in Enterprise System Vol 7 No 02 (2023): International Journal of Innovation in Enterprise System Vol 7 No 01 (2023): International Journal of Innovation in Enterprise System Vol. 7 No. 2 (2023): International Journal of Innovation in Enterprise System Vol. 7 No. 1 (2023): International Journal of Innovation in Enterprise System Vol 6 No 02 (2022): International Journal of Innovation in Enterprise System Vol 6 No 01 (2022): International Journal of Innovation in Enterprise System Vol. 6 No. 2 (2022): International Journal of Innovation in Enterprise System Vol. 6 No. 1 (2022): International Journal of Innovation in Enterprise System Vol 5 No 02 (2021): International Journal of Innovation in Enterprise System Vol 5 No 01 (2021): International Journal of Innovation in Enterprise System Vol. 5 No. 2 (2021): International Journal of Innovation in Enterprise System Vol. 5 No. 1 (2021): International Journal of Innovation in Enterprise System Vol 4 No 02 (2020): International Journal of Innovation in Enterprise System Vol 4 No 01 (2020): International Journal of Innovation in Enterprise System Vol. 4 No. 2 (2020): International Journal of Innovation in Enterprise System Vol. 4 No. 1 (2020): International Journal of Innovation in Enterprise System Vol 3 No 02 (2019): International Journal of Innovation in Enterprise System Vol 3 No 02 (2019): International Journal of Innovation in Enterprise System (In Press) Vol 3 No 01 (2019): International Journal of Innovation in Enterprise System (In Press) Vol 3 No 01 (2019): International Journal of Innovation in Enterprise System Vol. 3 No. 2 (2019): International Journal of Innovation in Enterprise System Vol. 3 No. 1 (2019): International Journal of Innovation in Enterprise System Vol 2 No 02 (2018): International Journal of Innovation in Enterprise System Vol 2 No 02 (2018): International Journal of Innovation in Enterprise System (In Press) Vol 2 No 01 (2018): International Journal of Innovation in Enterprise System Vol 2 No 01 (2018): International Journal of Innovation in Enterprise System Vol. 2 No. 2 (2018): International Journal of Innovation in Enterprise System Vol. 2 No. 1 (2018): International Journal of Innovation in Enterprise System Vol 1 No 02 (2017): International Journal of Innovation in Enterprise System Vol 1 No 01 (2017): International Journal of Innovation in Enterprise System Vol 1 No 01 (2017): International Journal of Innovation in Enterprise System Vol. 1 No. 1 (2017): International Journal of Innovation in Enterprise System More Issue