cover
Contact Name
Augusta Adha
Contact Email
augusta.adha@eng.uir.ac.id
Phone
-
Journal Mail Official
saintis@journal.uir.ac.id
Editorial Address
-
Location
Kota pekanbaru,
Riau
INDONESIA
JURNAL SAINTIS
Published by Universitas Islam Riau
ISSN : 14107783     EISSN : 25807110     DOI : -
Core Subject : Social, Engineering,
Saintis is devoted to research on civil engineering related fields including geotechnics, transports, structures, water resources and others related with civil engineering topics.
Arjuna Subject : -
Articles 224 Documents
Efektivitas Implementasi Program Perumahan Bersubsidi Bagi Masyarakat Berpenghasilan Rendah Kota Pekanbaru (Studi Kasus : Kecamatan Tenayan Raya) : Effectiveness of Subsidied Housing Programs Implementation for Low-Income Communities In Pekanbaru City (Case of Study: Tenayan Raya District) Firdaus Agus; Septia Fanny; Rona Muliana
JURNAL SAINTIS Vol. 20 No. 02 (2020)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2020.vol20(02).5710

Abstract

[ID] Untuk mengetahui tercapai atau tidaknya suatu tujuan program perlu dilakukan evaluasi terhadap implementasi program tersebut, baik pelaksanaan program maupun hasilnya. Evaluasi diperlukan untuk mengukur tingkat efektivitas mekanisme program dari pembiyaan dan apakah efektivitas bila dilihat dari hasil pembangunannya, disamping itu akan diketahui sejauhmana peran pemerintah melalui Kepnmen PUPR No.348/KPTS/M/2015, sebab untuk beberapa tahun kedepan kebijakan pembangunan perumahan MBR ini masih relavan dilaksanakan. Penelitian ini bertujuan untuk mengetahui tingkat efektivitas program. Pendekatan yang digunakan dalam peneltian ini adalah pendekatan deskriptif kualitatif yang didukung oleh data dari hasil kuesioner, wawancara, dan observasi lapangan, serta data dari kajian dokumen dan telaah pustaka. Perhitungan efektivitas dilakukan dengan melakukan pembobotan menggunakan skala Likert yang didasarkan pada kriteria efektivitas. Hasil penelitian menunjukkan secara umum efektifitas Implementasi Program Perumahan Bersubsidi bagi MBR mendapat nilai 80% yang berarti Efektif. [EN] To find out whether or not a program goal has been achieved, it is necessary to evaluate the implementation of the program, both the program's implementation and its results. Evaluation is needed to measure the effectiveness of the program mechanism of financing and whether the effectiveness when viewed from the results of its development, besides that it will be known to what extent the role of government through the Ministry of PUPR No. 348 / KPTS / M / 2015, because for the next few years the MBR housing development policy is still relavan implemented. This study aims to determine the level of effectiveness of the program. The approach used in this research is a quantitative and qualitative approach which is supported by data from the results of questionnaires, interviews and field observations, as well as data from document review and literature review. The effectiveness calculation is done by measuring the Likert scale based on the effectiveness criteria. The results shows that Effectiveness of Subsidied Housing Programs Implementation at a rate of 80% which mean generally Effective.
Analisis Kelayakan Finansial Pembangunan Gedung Parkir Sukaramai Trade Center II: Financial Feasibility Analysis of Sukaramai Trade Center II Parking Building Nelson Yuli Chandra; Hendra Taufik; Mardani Sebayang
JURNAL SAINTIS Vol. 21 No. 01 (2021)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2021.vol21(01).5718

Abstract

[ID] Pembangunan gedung parkir Sukaramai Trade Center II ini direncanakan pada tahun 2016 dan di kelola oleh pihak PT. Makmur Papan Permata sebagai penunjang bangunan Sukaramai Trade Center I untuk memenuhi lahan parkir kedepannya, dikarenakan adanya pembangunan tambahan Sukaramai Trade Center III sehingga pembangunan gedung parkir Sukaramai Trade Center II harus dilaksanakan, sesuai dengan bertambahnya permintaan konsumen serta lahan yang tidak memenuhi. Tujuan dari penelitian ini adalah untuk mengetahui apakah pembangunan dari gedung parkir Sukaramai Trade Center II layak untuk dilaksanakan berdasarkan aspek analisis kelayakan finansial dan untuk mengetahui faktor-faktor yang perlu diperhatikan seperti metode tarif parkir yang digunakan. Metode penelitian ini menggunakan observasi dan wawancara. Berdasarkan data dan hasil penelitian di ketahui luas bangunan 3.466 m2 , kapasitas parkir sepeda motor 1103 kendaraan, parkir mobil 325 kendaraan, rata-rata 5 tahun belakang tingkat pertumbuhan kendaraan 10,48%, inflasi 4,87%, menggunakan suku bunga tertinggi pada bank BUMN yaitu bank BTN sebesar 10,50%, sehingga memerlukan total biaya Rp 42.472.500.000,- umur ekonomis bangunan 50 tahun. Dengan tarif parkir/jam Rp 2000,- untuk kendaraan sepeda motor, Rp 5000,- untuk kendaraan mobil, ditinjau dari aspek analisis kelayakan finansial dengan umur bangunan 50 tahun : Net Present Value(NPV)= Rp. (–12.333.948.000,) Benefit Cost Ratio(BCR)= 0,504, Internal Rate of Return(IRR)= 6,69%, dinyatakan tidak layak untuk dilaksanakan. Pembangunan gedung parkir tersebut perlu memperhatikan tingkat pertumbuhan kendaraan, kapasitas parkir, tingkat inflasi dan tingkat suku bunga, serta tarif parkir yang ditetapkan oleh Pemerintah. [EN] The construction of the Sukaramai Trade Center II parking building was planned in 2016 and managed by PT. Makmur Papan Permata is supporting the Sukaramai Trade Center I building to fill the parking lot in the future, due to the additional construction of the Sukaramai Trade Center III so that the construction of the Sukaramai Trade Center II parking building must be carried out, by increasing consumer demand and land that does not meet. The purpose of this study is to determine whether the construction of the Sukaramai Trade Center II parking building is feasible to carry out based on the aspect of financial feasibility analysis and to determine the factors that need to be considered such as the parking fee method used. This research method uses observation and interviews. Based on data and research results, it is known that the building area is 3,465.98 m2, the parking capacity for motorbikes is 1103 vehicles, 325 car parks, the average 5 years behind the vehicle growth rate is 10.48%, inflation is 4.87%, using the highest interest rate in state-owned banks, namely BTN banks at 10.50% so that it requires a total cost of IDR 42,472,500,000, - the economic age of the building is 50 years. With parking rates/hour Rp. 2000, - for motorbikes, Rp. 5000, - for cars, in terms of financial feasibility analysis aspects with a building age of 50 years: Net Present Value (NPV) = Rp. (-12,333,948,000,) Benefit-Cost Ratio (BCR) = 0.504, Internal Rate of Return (IRR) = 6.69%, declared unfit to be implemented. The construction of the parking building need to pay attention to the growth rate of vehicles, parking capacity, inflation rates, and interest rates, as well as parking rates set by the Government.
Studi Optimasi Operasional Waduk Koto Panjang Untuk Pembangkit Listrik Tenaga Air : Study of Koto Panjang Reservoir Operasional Optimization for Hydroelectric Power Plant Diana Hanafi; Harmiyati
JURNAL SAINTIS Vol. 21 No. 01 (2021)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2021.vol21(01).6249

Abstract

[ID] Pada musim kemarau PLTA Koto Panjang pernah mengoperasikan satu unit turbin dan generator sehingga daya yang dihasilkan tidak maksimal. Pada musim yang sama PLTA ini juga pernah mengoperasikan tiga unit turbin dan generator namun hanya menghasilkan daya listrik 35 MW dengan prosentase 50 % yaitu 30,702 % dari daya maksimal pengoperasian tiga unit turbin dan generator. Tujuan dari penelitian ini adalah untuk mengetahui debit andalan PLTA Koto Panjang, optimalisasi yang dilakukan dalam mengoptimasi PLTA Koto Panjang, daya listrik yang dihasilkan dari hasil optimalisasi tersebut dan perbandingannya. Metode empiris Penman digunakan untuk menghitung nilai evaporasi. Debit andalan untuk debit outflow PLTA saat ini dan setelah dioptimalisasi dihitung menggunakan rumus daya listrik dan metode mass curve. Selanjutnya debit outflow PLTA yang telah didapatkan dianalisis di dalam tabel water balance menggunakan metode sequent peak analysis. Hasil yang didapatkan adalah debit andalan PLTA saat ini dan setelah dioptimalisasi yaitu 305,319 m3/det dan 384,465 m3/det dengan prosentase 51,995 % dan 39,235 %. Optimalisasi dilakukan dengan menyesuaikan debit outflow dengan volume air yang ada pada storage saat itu. Daya listrik setelah dioptimalisasi adalah sebesar 13.302,315 kWatt pada musim kering dan 143.551,645 kWatt pada musim hujan. Daya listrik yang dihasilkan PLTA saat ini adalah sebesar 13.302,315 kWatt pada musim kering dan 114.000 kWatt pada musim hujan. Sehingga daya listrik yang dihasilkan PLTA setelah dioptimalisasi mengalami kenaikan dari daya listrik sebelum dioptimalisasi sebesar 29.551,645 kWatt. Karena kenaikan daya melebihi kapasitas generator PLTA saat ini, maka terjadi penambahan 1 generator 30.000 kWatt atau 30 MW. [EN] In the dry season, Koto Panjang Hydroelectric Power Plant has operated one turbine and generator unit so the power produced is not optimal. In the same season, this hydropower plant has also operated three turbines and generators but only produces 35 MW of electricity by percentage 50% which is 30,702 % of the maximum power from operating three turbine and generator units. The purpose of this research is to determine the mainstay discharge of Koto Panjang Hydroelectric Power Plant, optimization will be used for Koto Panjang hydroelectric power plant, power can produce from its optimization and its comparison. The Penman empirical method was used to calculate the evaporation value. The mainstay discharge for hydropower plant outflow discharge at this time and after being optimized is calculated using the electrical power formula and the mass curve method. Furthermore, the hydroelectric power plant outflow discharge has obtained is analyzed in the water balance table using the sequent peak analysis method. The results obtained are the current mainstay discharge of hydroelectric power plant and after optimization, which are 305,319 m3/s and 384,465 m3/s with a percentage of 51,995% and 39,235%. Optimization is done by adjusting the outflow discharge to the volume of water in the storage at that time. The electric power after optimization is 13.302,315 kWatt in the dry season and 143.551,645 kWatt in the rainy season. The current electricity generated by hydroelectric power plant is 13.302,315 kWatt in the dry season and 114.000 kWatt in the rainy season. Therefore the electric power generated by hydroelectric power plant after optimization has increased from the electric power before it is optimized which is 29.551,645 kWatt. Because the increasing of the electric power exceeds the capacity of the current hydroelectric power plant generator, there is an addition 1 generator which is 30.000 kWatt or 30 MW.
Analisis Kinerja Simpang Tak Bersinyal Persimpangan Pasar Sibuhuan, Kabupaten Padang Lawas, Sumatera Utara: Performance Analysis of Non Signal Intersection at Sibuhuan Market Intersection, Padang Lawas Regency, North Sumatra Desi Yanti Futri Citra Hasibuan; Muchammad Zaenal Muttaqin
JURNAL SAINTIS Vol. 21 No. 01 (2021)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2021.vol21(01).6507

Abstract

[ID] Persimpangan tak bersinyal Pasar Sibuhuan berlokasi di Desa Sibuhuan, Kabupaten Padang Lawas, Sumatera Utara. Persimpangan ini merupakan simpang tak bersinyal yang memiliki 4 (empat) lengan, dengan 2 (dua) jalur 2 (dua) lajur tanpa median. Tingginya derajat kejenuhan (DS) yang disebabkan oleh volume arus arus lalu lintas yang mengalami peningkatan serta hambatan samping yang tinggi. Dan hal tersebut sulit diimbangi dengan ketersediaan sarana dan prasarana jalan yang ada. Sehingga keadaan ini mengakibatkan munculnya permasalahan di persimpangan tak bersinyal Pasar Sibuhuan tersebut, terutama kemacetan atau penumpukan kendaraan di persimpangan. Tujuan dari penelitian ini adalah untuk mengetahui nilai derajat kejenuhan (DS) pada kondisi eksisting, alternatif apa yang dilakukan dalam mengoptimalisasi persimpangan tak bersinyal Pasar Sibuhuan, berapa derajat kejenuhan (DS) yang dihasilkan dari hasil optimalisasi, dan bagaimana perbandingan nilai derajat kejenuhan (DS) sebelum dan sesudah dilakukan optimalisasi. Teknik penelitian yang dilakukan yaitu dengan melakukan survei langsung dilapangan pada saat jam puncak selama 3 (tiga) hari, 2 (dua) hari sibuk dan 1 (satu) hari tak sibuk untuk mendapatkan data data-data yang diperlukan seperti volume lalu lintas, geomterik simpang dan data lainnya. Kemudian data-data yang telah didapat tersebut diolah dan di analisis menggunakan acuan Manual Kapasitas Jalan Indonesia (MKJI) 1997. Jenis penelitian ini adalah deskriptif kuantitatif dalam penilaian terhadap kinerja lalu lintas pada persimpangan. Hasil yang didapatkan dari analisa kondisi eksisting pada persimpangan tak bersinyal Pasar Sibuhuan diperoleh nilai Derajat Kejenuhan (DS) = 0,86, nilai Derajat Kejenuhan (DS) pada simpang empat Pasar Sibuhuan telah melewati nilai yang disarankan oleh MKJI 1997, yaitu DS ≤ 0,75. Langkah alternatif yang dilakukan untuk mengoptimalkan kinerja persimpangan ada 4 (empat) alternatif, yaitu dengan meminimalisirkan hambatan samping nilai DS = 0,78, pelebaran jalan minor menjadi 5,10 m nilai DS = 0,78, meminimalisirkan hambatan samping dan pelebaran jalan minor menjadi 5,10 m nilai DS = 0,77, dan merubah simpang tak bersinyal menjadi simpang bersinyal nilai DS = 0,58. Hasil alternatif didapat dari analisa yang dilakukan dapat mengurangi Derajat Kejenuhan (DS) yang diinginkan sesuai dengan yang disarankan oleh MKJI 1997. [EN] An intersection is a part of a road a where currents from different directions of direction meet. That is why at the instersection there is conflict between current from opposite directions and and intersecting each other, resulting in congestion along the arms of the intersection. Likewise, at the intersection of four arms without a signal at Sibuhuan Market, Padang Lawas Regency, North Sumatra, there was a congestion caused by the reduction in the effective width of the road due to parking on the road. At the intersection of four arms without a signal at Sibuhuan Market, Padang Lawas Regency, North Sumatra, there is a congestion caused by side obstacles, a high vehicle population that is not matched by the availability of adequate infrastructure (infrastructure) so that this study aims to analyze the performance of the four-arm intersection. based on the Indonesian Road Capacity Manual (MKJI) 1997 and analyzes intersections to improve the performance of these unmarked intersections. The analysis of the results showed that the intersection performance for the unsigned intersection conditions in the existing condition with the parking on the side of the road which reduced the effective width, the maximum total flow was 2341 pcu / hour, capacity (C) = 2707.06 pcu / hour, and the degree of saturation ( DS) = 0.86, intersection delay (D) = 14.62 seconds / pcu and queuing opportunity (QP) 30.03 - 59.32%. Therefore it is necessary to recalculate with various alternatives so that the DS value meets the requirements of the Indonesian Road Capacity Manual, which is <0.75.
Analisis Sektor Basis dan Sektor Non Basis dalam Upaya Peningkatan Sarana dan Prasarana Perkotaan di Kota Padang: Analysis of Basic and Non-Basic Sectors as Efforts to Improve the Urban Facilities and Infrastructure in Padang Aditia Nugraha Rusli; Angelalia Roza; Andi Mulya Rusli
JURNAL SAINTIS Vol. 21 No. 01 (2021)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2021.vol21(01).6537

Abstract

[ID] Pembangunan berkelanjutan merupakan bagian dari fokus pembangunan daerah Kota Padang dengan tujuan menyediakan infrastruktur kota dan peningkatan perekonomian kota tahun 2019-2024. Pemerintah terus mengupayakan peningkatan Produk Domestik Regional Bruto (PDRB) Kota Padang dengan mengembangkan sektor kegiatan kota yang diimbangi dengan peningkatan sarana dan prasarana perkotaan. Penelitian ini bertujuan menganalisis sektor usaha yang belum mencapai kategori basis dan maju di Kota Padang. Metode yang digunakan dalam mengetahui sektor basis maupun non basis adalah metode location quotient (LQ). Sedangkan untuk mengetahui sektor maju atau mundur, digunakan analisis shift share. Dilakukan pula Analisis kependudukan melalui metode proyeksi trendline untuk memproyeksi peramalan penduduk pada tahun mendatang. Hasil analysis location quatien (LQ) menunjukkan terdapat dua sektor non basis di Kota Padang yaitu (1) sektor pertanian, kehutanan dan perikanan, (2) pertambangan dan penggalian. Selanjutnya, analisis shift-share menunjukkan terdapat empat sektor yang berada pada kategori mundur/ lamban yaitu sektor: (1) pertanian, (2) kehutanan dan perikanan, (3) industri pengolahan, pengadaan air, pengelolaan sampah, limbah dan daur ulang, (4) jasa keuangan dan asuransi. Berdasarkan trendlinepolynominal didapatkan model proyeksi perkiraan penduduk menurut persamaan y = -194.03x2 + 15535x + 815333 dengan R2 = 0.9964. Kebutuhan sarana prasarana untuk meningkatan kualitas hidup yang layak bagi warga Kota Padang diperkirakan meningkat secara dominan pada kelompok usia 20-24 tahun sebagai proyeksi angkatan kerja. Jumlahnya diprediksi sekitar 77.761 jiwa. Penelitian ini diharapkan bermanfaat dalam menentukan fokus penyediaan infrastruktur kota, agar sektor non basis dan sektor pada kategori mundur atau lambat dapat ditingkatkan menjadi kategori sektor basis dan maju. [EN] Sustainable development is part of the regional development focus of Padang City to provide urban infrastructure and improve the city's economy in 2019-2024. The government continues to strive to increase the Gross Regional Domestic Product (PDRB) of the City of Padang by developing a sector of city activities towards improving urban facilities and infrastructure.This research supports the government's efforts in directing the development of the city of Padang. This study aims to analyze the business sector that has not reached the basic and advanced category in Padang City. The method used to determine the basis and non-base sectors is the location quotient (LQ) method. Meanwhile, to determine the forward or backward sector, shift-share analysis is used. Population analysis is also carried out through the trendline projection method to project population forecasts in the coming year. The results of the location quotient (LQ) analysis show that there are two non-basic sectors in the city of Padang, namely (1) agriculture, forestry, and fisheries, (2) mining and quarrying. Furthermore, the shift-share analysis shows that four sectors are in a slow category, namely the sectors: (1) agriculture, (2) forestry and fisheries, (3) processing industry, water supply, waste management, waste, and recycling, (4) financial and insurance services. Based on the polynomial trendline, the population forecast projection model is obtained according to the equation y = -194.03x2 + 15535x + 815333 with R2 = 0.9964. The need for infrastructure and facilities to improve the quality of life that is feasible for the residents of Padang City is predicted to increase dominantly in the 20-24 year age group. The number is predicted to be around 77,761. It is hoped that this research will be useful in determining the focus of urban infrastructure provision, so that non-base sectors and sectors in the backward or later categories can be upgraded to the basic and advanced category.
Pengujian Daya Dukung Tanah Pasir Dengan Perkuatan Geogrid: Bearing Capacity Testing of Sandy Soil Using Geogrid Reinforcement Sarah alwiyah
JURNAL SAINTIS Vol. 21 No. 01 (2021)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2021.vol21(01).6566

Abstract

[ID] Memperbaiki kondisi tanah merupakan salah satu penyelesaian masalah untuk meningkatkan daya dukung tanah dan memperkecil penurunan. Dengan berkembangnya teknologi dalam bidang geoteknik maka perkuatan tanah dapat dilakukan dengan memasang bahan sintetis seperti pemakaian geogrid. Geogrid mengandalkan kekuatan tarik yang tinggi dan kemuluran creep yang rendah, untuk kasus longsoran geogrid ditempatkan pada lapisan tanah, ditimbun, dan dipadatkan lapis demi lapis sehingga dapat menjaga menstabilkan tanah dengan mendistribusikannya menjadi kuat tarik. Tujuan penelitian ini untuk mengetahui pengaruh panjang geogrid terhadap penambahan daya dukung tanah pasir dan jumlah lapisan geogrid yang paling efisien untuk meningkatkan daya dukung tanah pasir terhadap beban pondasi dangkal menerus dengan perkuatan geogrid produk Tencate Geosynthetis asia Sdn Bhd (Malaysia) tipe GX 40/40 serta memiliki short term tensile strength 40 Kn/m. Penilitian ini dilakukan dengan menggunakan model pondasi menerus yang diletakkan diatas kotak transparan yang diisi pasir dengan kondisi kepadatan relatif (Dr) 20%-40% dan diberi beban tegak lurus menggunakan dongkrak hidrolik. Dari hasil penelitian diketahui model keruntuhan yang terjadi adalah jenis Local shear dimana geogrid mengalami tarikan pada lokasi sekitar dibawah pondasi dengan lapisan teratas dan lapisan kedua mengalami tarikan yang lebih besar. Pada pengujian penempatan geogrid lapisan teratas terhadap pondasi menunjukkan bahwa penambahan kuat dukung terbesar diperoleh pada LG/B = 3. Pada pengujian penggunaan geogrid 2 lapis diperoleh jarak antara lembaran geogrid (s) menunjukkan bahwa penambahan kuat dukung terbesar diperoleh dengan jarak s = 0,4B. Pada pengujian jumlah pemasangan lapisan geogrid menunjukkan bahwa kuat dukung meningkat dari pemasangan 1 lapisan menjadi 2 lapisan dan penambahan jumlah selanjutnya tidak menunjukkan penambahan kuat dukung yang cukup segnifikan. [EN] Improving soil conditions is a solution to the problem to increase the bearing capacity of the soil and minimize subsidence. With the development of technology in the geotechnical field, soil strengthening can be done by installing synthetic materials such as the use of geogrids. Geogrids rely on high tensile strength and low creep elongation, in the case of landslides the geogrids are placed in the soil layer, stockpiled and compacted layer by layer so as to keep the soil stable by distributing it into tensile strength. This experimen was conducted to determine the effect of long a geogrid sand soil beraring capacity and the number of layers of geogrid, the most efficient way to increase soil bearing capacity of shallow foundation of sand on the continuous load with a geogrid reinforcement the product of Tencate Geosynthetis asia Sdn Bhd (Malaysia) type GX 40/40 and The mean ultimate tensile strength 40 Kn/m. The experiment was performed using continuous foundation model placed on a transparent box filled with sand with the relative density (Dr) 20%-40% and given a perpendicular load using hydrolic jack. From the results of research known mode of failure that occurs is a kind of Local shear where the geogrid experienced the pull on the location around under the foundation with the top layer and the second layer having the pull is greater. On testing the placement of the geogrid layer the top to the foundation showed that the addition of strong carrying capacity of the largest obtained in LG/B = 3. On testing the use of geogrid 2 layers obtained by the distance between the sheets geogrid (s) show that the addition of strong carrying capacity of the largest obtained by a distance s = 0,4 B. On testing the installation of a layer of geogrid showed that strong support increased from mounting 1 layer into 2 layers and the addition of a number of further does not show the addition of support strong enough segn.
Evaluasi Kinerja Tampungan Waduk Selorejo Menggunakan Perangkat Lunak HEC-HMS: Performance Evaluation of Selorejo Reservoir Using HEC-HMS Software Christian Cahyono; Dhanny Susetyo; Henny Herawati; Juliastuti
JURNAL SAINTIS Vol. 21 No. 01 (2021)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2021.vol21(01).6695

Abstract

[ID] Permasalahan banjir merupakan permasalahan pengelolaan air yang sering terjadi di Indonesia. Untuk mengatasi permasalahan tersebut dibuat sebuah struktur yaitu waduk yang berfungsi sebagai pengendali banjir. Namun seiring waktu tampungan waduk akan semakin menurun akibat adanya akumulasi sedimen yang terbawa oleh air sungai yang masuk ke dalam waduk dan mengendap. Sehingga diperlukan evaluasi kinerja tampungan waduk tersebut, Permasalahan ini juga dialami oleh Waduk Selorejo yang terletak di Kabupaten Malang. Untuk melakukan evaluasi kinerja tampungan waduk digunakan bantuan perangkat lunak HEC-HMS yang dapat mensimulasikan debit banjir yang masuk beserta elevasi tampungan waduk. Berdasarkan hasil analisis tampungan Waduk Selorejo mampu untuk mengendalikan banjir periode ulang desain awal nya yaitu periode ulang 1000 tahun. Selain itu Waduk Selorejo juga mampu menampung debit banjir Probable Maximum Flood (PMF) apabila muka air awal waduk diturunkan sampai elevasi +605 m. [EN] Flood problem is a water management problem that often occurs in Indonesia. To overcome this problem, a structure is created, namely DAM that functions as a flood controller. However, over time the reservoir storage will decrease due to the accumulation of sediment carried by river water that enters the reservoir. So it is necessary to evaluate the performance of the Rervoir storage. This problem is also experienced by the Selorejo DAM which is located in Malang Regency. To evaluate the performance of the reservoir storage, the help of HEC-HMS software is used which can simulate the incoming flood discharge along with the elevation of the reservoir. Based on the analysis, the Selorejo DAM is able to control the flood of its initial design period which is the 1000-year return period. In addition, the Selorejo Reservoir is also able to accommodate the Probable Maximum Flood (PMF) flood discharge if the initial water level of the reservoir is lowered to an elevation of +605 m.
Rasionalisasi Kerapatan Stasiun Hujan Wilayah Sungai Rokan Berdasarkan Data Hujan Harian dan Variasi Tingkat Kesalahan: Rationalization of Rain Station Density in the Rokan River Basin Territory Based on Daily Rain Data and Variation of Error Levels Dehas Abdaa; Manyuk Fauzi; Ari Sandhyavitri
JURNAL SAINTIS Vol. 21 No. 02 (2021)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2021.vol21(02).6839

Abstract

[ID] Sebaran lokasi dan jumlah stasiun hujan ideal akan merepresentasikan kejadian hujan untuk menunjang akurasi informasi analisis di suatu wilayah. Kerapatan stasiun hujan eksisting dikaji berdasarkan metode standar World Meteorogical Organization sedangkan analisis rasionalisasi jumlah dan sebaran stasiun hujan berdasarkan data hujan harian dan variasi tingkat kesalahan menggunakan Metode Kagan-Rodda. Metode Kagan-Rodda telah digunakan di beberapa wilayah penelitian dengan beragam kategori fisiografi dan lingkup terbatas pada daerah aliran sungai. Sehingga dirasa perlu melakukan pengembangan cakupan penelitian untuk wilayah yang lebih luas yaitu Wilayah Sungai. Lokasi penelitian adalah Wilayah Sungai Rokan dengan fisiografi dataran tropis mediteran dan sedang seluas 22.455,28 km². Stasiun hujan eksisting berjumlah 13 stasiun hujan dan 1 stasiun tidak lolos Uji F, koefisien luasan Thiessen eksisting tidak merata sebesar 165,03 km2-3.758,12 km2 (0,007-0,17), dan korelasi hujan harian sebesar 0,03-0,37. Evaluasi analisis WMO menghasilkan 7 stasiun hujan yang memenuhi standar untuk luas daerah pengaruh sebesar 1.000–2.500 km2/stasiun. Perhitungan metode Kagan-Rodda dilakukan 2 skenario kesalahan perataan, skenario I dengan kesalahan perataan (Z1) sebesar 4,93% menghasilkan 37 stasiun hujan, luasan pengaruh Thiessen 273,89 km2–1197,80 km2 (0,01-0,05), nilai r(0) sebesar 0,20, jarak antar stasiun hujan sejauh 26,36 km, dan 2 stasiun memenuhi standar WMO. Sedangkan skenario II dengan Z1 sebesar 9,72% menghasilkan 10 stasiun hujan, dimana mempertahankan 2 stasiun, memindahkan 8 stasiun dan menutup 3 stasiun diperoleh luasan pengaruh Thiessen 1.691,71 km2–2.488,21 km2 (0,08-0,11), jarak antar stasiun hujan sejauh 50,70 km, dan seluruh stasiun memenuhi standar WMO. Rasionalisasi metode Kagan-Rodda skenario II relatif mewakili luas pengaruh wilayah dibandingkan skenario I. [EN] The distribution of locations and the number of ideal rain stations will represent rain events to support the accuracy of analytical information in an area. The density of existing rain stations was assessed based on the standard method of the World Meteorological Organization, while the rationalization analysis of the number and distribution of rain stations based on daily rainfall data and variations in error rates used the Kagan-Rodda method. The Kagan-Rodda method has been used in several research areas with various physiographic categories and limited scope in watersheds. So it is necessary to develop the scope of research for a wider area, namely the River Basin. The research location is the Rokan River Basin with physiography of the Mediterranean and medium tropical plains covering an area of ​​22,455.28 km². The existing rain stations are 13 rain stations and 1 station does not pass the F test, the coefficient of the existing Thiessen area is uneven at 165.03 km2-3,758.12 km2 (0.007-0.17), and the daily rainfall correlation is 0.03-0, 37. WMO analysis evaluation resulted in 7 rain stations that met the standard for the area of ​​influence of 1,000–2,500 km2/station. The calculation of the Kagan-Rodda method is carried out in 2 scenarios of smoothing error, scenario I with an alignment error (Z1) of 4.93% resulting in 37 rain stations, the area of ​​influence of Thiessen is 273.89 km2–1197.80 km2 (0.01-0.05) , the value of r(0) is 0.20, the distance between rain stations is 26.36 km, and 2 stations meet the WMO standard. While scenario II with Z1 of 9.72% produces 10 rain stations, which maintains 2 stations, moves 8 stations and closes 3 stations, the Thiessen influence area is 1,691.71 km2–2,488.21 km2 (0.08-0.11), the distance between rain stations is 50.70 km, and all stations meet WMO standards. The rationalization of the Kagan-Rodda method in scenario II is relatively representative of the area of ​​influence compared to scenario I.
Pengaruh Tiang Terhadap Kapasitas Dukung Pelat dan Modulus Reaksi Tanah-Dasar pada Tanah Gambut: The Effect of Pile on the Bearing Capacity of the Plate and the Modulus of Subgrade Reaction on Peat Soil Aazokhi Waruwu; Santo Yanri Pardosi
JURNAL SAINTIS Vol. 21 No. 02 (2021)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2021.vol21(02).7546

Abstract

[ID] Lahan gambut yang tersebar luas dapat menghambat pengembangan infrastruktur, karena tanah ini termasuk jenis tanah bermasalah sebagai tanah dasar. Tanah gambut memiliki penurunan yang tinggi dan kapasitas dukung rendah. Tiang perkuatan memiliki potensi dalam mengurangi penurunan, meningkatkan kapasitas dukung dan modulus reaksi tanah-dasar. Penelitian ini bertujuan untuk mengetahui kapasitas dukung dan modulus reaksi tanah-dasar pada pelat yang diperkuat tiang tunggal. Penelitian dilakukan pada bak uji yang diisi dengan tanah gambut sedalam 50 cm. Tiang dari bahan bambu, kayu, dan beton dipancang dalam tanah gambut. Panjang tiang yang digunakan adalah 10-40 cm dan diameter pelat beton sebesar 10 cm. Uji beban pelat dilakukan pada pelat tanpa dan dengan perkuatan tiang untuk mendapatkan nilai kapasitas dukung dan modulus reaksi tanah-dasar. Hasil penelitian didapatkan bahwa jenis dan panjang tiang berpengaruh pada nilai kapasitas dukung, deleksi, dan modulus reaksi tanah-dasar. Tiang yang lebih panjang menghasilkan kapasitas dukung dan modulus reaksi tanah-dasar yang tinggi dan defleksi yang semakin rendah. Kapasitas dukung meningkat 20% untuk tiang bambu, 22% untuk tiang kayu, dan 25% untuk tiang beton. Peningkatan modulus reaksi tanah-dasar didapatkan pada defleksi pelat maksimum 20% dari diameter pelat. Peningkatan tertinggi untuk tiang bambu sebesar 103%, tiang kayu 128%, dan tiang beton sebesar 160%. Panjang tiang yang memberikan hasil maksimal dalam mereduksi penurunan, meningkatkan kapasitas dukung, dan meningkatkan modulus reaksi tanah-dasar adalah 80% dari tebal lapisan tanah gambut. Nilai modulus reaksi tanah-dasar semakin tinggi seiring dengan peningkatan kapasitas dukung dan pengurangan defleksi. [EN] Widespread peatlands can prevent infrastructure development, because this soil is classified as problematic soil types as subgrade. Peat soil has high settlement and low bearing capacity. Reinforcement pile has the potential to reduce settlement, increase bearing capacity and modulus of subgrade reaction. This study aims to determine the bearing capacity and modulus of subgrade reaction on a single pile reinforced slab. The study was conducted in a test box filled with peat soil as deep as 50 cm. Pile made of bamboo, wood, and concrete are driven in peat soil. The length of the pile used is 10-40 cm and the diameter of the concrete slab is 10 cm. The plate load test was conducted on slabs without and with reinforced piles to obtain the value of the bearing capacity and modulus of subgrade reaction. The results showed that the type and length of the pile affect the value of the bearing capacity, deflection, and modulus of subgrade reaction. Longer piles result in higher bearing capacity and modulus of subgrade reaction and lower deflection. The bearing capacity increased by 20% for bamboo pile, 22% for wooden pile, and 25% for concrete pile. An increase in the modulus of subgrade reaction is obtained at a maximum slab deflection of 20% of the slab diameter. The highest increase for bamboo pile is 103%, wooden pile is 128%, and concrete pile is 160%. The length of the pile that gives maximum results in reducing settlement, increasing bearing capacity, and increasing the modulus of subgrade reaction is 80% of the thickness of the peat soil layer. The value of the modulus of subgrade reaction is higher as the bearing capacity increases and the deflection decreases.
Analisis Kelayakan Finansial Pembangunan Koneksi Pelabuhan Kapal Ro-Ro Dumai – Malaka Metode Deterministik: Financial Feasibility Analysis Development of Ro-Ro Ship Port Connections Dumai – Malacca Deterministic Method Yoga Budi
JURNAL SAINTIS Vol. 21 No. 02 (2021)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2021.vol21(02).7584

Abstract

[ID] Dalam rangka mendorong pengembangan kawasan implementasi Masyarakat Ekonomi ASEAN (MEA) Pelabuhan Penyeberangan Ro-Ro Dumai – Melaka menjadi salah satu dari tiga Pelabuhan Penyeberangan Ro-Ro yang akan diprioritaskan pengembangannya. Dalam rangka merealisasikan program tersebut, perlu dilakukan persiapan berupa penyediaan fasilitas pokok dan fasilitas yang akan menggunakan pendanaan/investasi yang besar. Dengan nilai investasi yang besar, maka diperlukan analisa kelayakan finansial pada rencana pembangunan koneksi kapal Ro-Ro Dumai – Malaka. Besar total investasi adalah Rp. 56.702.000.000,00 dengan umur rencana proyek selama 30 tahun. Metode analisa kelayakan finansial yang dipakai melalui pendakatan deterministik. Berdasarkan hasil Net Present Value/NPV bernilai negatif dengan nilai NPV adalah Rp.-11.520.600.000 pada akhir umur rencana. Selanjutnya berdasarkan dari perhitungan Internal rate of return (IRR) didapatkan nilai IRR 3,75% dimana nilai ini lebih kecil dari nilai discount rate yaitu 4,92%. Dan berdasarkan hasil Benefit Cost Ratio (BCR) didapat nilai BCR 0,832 (BCR < 1). Berdasarkan hasil analisa sensitivitas diketahui variabel yang paling sensitif (berpengaruh) adalah biaya konstruksi dermaga dan fasilitas pelabuhan. Dari hasil tersebut dapat dinyatakan bahwa rencana pembangunan rute koneksi kapal Ro-Ro Dumai – Malaka tidak layak secara finansial. [EN] In order To encourage the development of the ASEAN Economic Community (MEA) implementation area, the Dumai–Melaka Ro-Ro Ferry Port is one of the three Ro-Ro Ferry Ports that will be prioritized in the development. In order to be able to realize the program it is necessary to make preparations in the form of basic facilities and facilities that require a lot of money/investments. The aim of this research is to analyze the financial feasibility with a deterministic approach (one-point estimate) and to identify the most sensitive (influential) variable on the financial plan for the construction of the Dumai-Malacca Ro-Ro ship connection route and how much influence it so that it can be a reference for solution-making scenarios decisions that can be made by the government, companies and investors to invest comprehensively in the planned construction of the Dumai-Malacca Ro-Ro ship connection route. The total investment is Rp. 56,702,000,000.00 with a project duration of 30 years. The method used for financial feasibility analysis is through a deterministic approach. Based on the results the net present value/NPV is negative with an NPV value of Rp 11,520.6 million at the end of the term. In addition, based on the internal rate of return (IRR) calculation, an IRR value of 3.75% was obtained where this value is less than the discount rate value of 4.92%. And based on the results of the Benefit Cost Ratio (BKR), a BKR value of 0.832 (BKR<1) was obtained. Based on the results of the sensitivity analysis, it is known that the most sensitive (influential) variable is the cost of constructing docks and port facilities. Hence it is summary that was the planned construction of the Ro-Ro ship connection route Dumai–Malacca is not financially feasible to performed.