cover
Contact Name
Aris Fiatno
Contact Email
abi.fiat@gmail.com
Phone
+6282113270340
Journal Mail Official
teknikindustri@universitaspahlawan.ac.id
Editorial Address
Jl. Tuanku Tambusai No. 23 Bangkinang Kampar, Riau » Tel / fax : (0762) 216 77 / (0762) 216 77
Location
Kab. kampar,
Riau
INDONESIA
Jurnal Teknik Industri Terintegrasi (JUTIN)
ISSN : 26208962     EISSN : 26208962     DOI : 10.31004jutin
Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses manufaktur, kegagalan dan rekayasa material, perawatan berbasis keandalan, keselamatan kerja, perancangan sistem kerja dan ergonomi, pengendalian dan penjaminan mutu, tata letak fasilitas, penelitian operasional, kewirausahaan dan pengembangan bisnis
Arjuna Subject : -
Articles 1,566 Documents
Evaluasi Kesesuaian Ergonomi Mesin Gas Deep Fryer GETRA GF-75 Berdasarkan Data Antropometri Zein Natasya Cabrine; Wahyu Kristian Sugandi; Boy Macklin Pareira Prawiranegara
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.62862

Abstract

The GETRA GF-75 gas deep fryer machine is used in the par frying process at the French Fries Factory of the Potato Farmer Group in Pasirwangi District, Garut Regency. Therefore, the suitability of the machine dimensions to users’ anthropometric characteristics needs to be evaluated. This study aimed to assess machine dimension suitability based on Indonesian anthropometric characteristics. The study involved machine dimension identification and measurement, followed by comparison with secondary data from the Indonesian Anthropometric Database using the 5th (P5), 50th (P50), and 95th (P95) percentiles. The evaluated dimensions included the front height of 85 cm compared with standing elbow height (D4) and the upper width of 40 cm compared with forward arm reach (D24). The results showed that the front height was between P5 and P50 of D4, while the upper width was below P5 of D24. Based on their functional and anthropometric relationships, both dimensions were considered suitable. Further evaluation is recommended to include working posture and workload.
Analisis Perhitungan Biaya dan Waktu Pemindahan Tanah Mekanis pada Proyek X Salma Nabilah; Katarina Rini Ratnayanti; Ratih Dewi Shima
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.63088

Abstract

This study addresses the low productivity of mechanical earthmoving operations caused by improper selection and coordination of heavy equipment (excavators, bulldozers, and dump trucks) which can result in excessive idle time, reduced productivity, and increased operating costs. The objective of this study is to evaluate equipment productivity, operating costs, and cycle time in mechanical earthmoving activities using the Method Productivity Delay Model (MPDM). Topographic data and cut-and-fill volumes were processed using Civil 3D. The equipment analyzed consisted of a Zoomlion ZE215E excavator, a Komatsu D65EX-17 bulldozer, and a Hino Ranger FG235 JJ dump truck. The results show productivity rates of 70.473 m³/h for the excavator, 28.248 m³/h for the bulldozer, and 6.724 m³/h for the dump truck, with a total operating cost of IDR 625,546,369.42. MPDM analysis identified the dump truck as the governing equipment, with a cycle time of 62.80 minutes. These findings indicate that proper equipment coordination can improve productivity, operational efficiency, and cost performance in mechanical earthmoving works.
Peramalan Permintaan Lem Waterproof dengan Metode Holt-Winters dan Single Exponential Smoothing Serta Integrasi Min-Max pada PT. XYZ Fadillah Danardi Putra; Iip Muhlisin; Junaedi Junaedi
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.63110

Abstract

Uncertainty in demand for waterproof glue at PT. XYZ has the potential to trigger overstock and stockout risks. This study aims to determine the best forecasting method between Holt-Winters Exponential Smoothing and Single Exponential Smoothing (SES), and integrate it into Min-Max inventory control. This quantitative study used secondary data of monthly sales for the period April 2023 to March 2026 (36 sample periods). Accuracy test results show that the Holt-Winters method is significantly superior with a MAD value of , MSE of , and MAPE of  (Good category), compared to SES which yields a MAPE of . Integrating the Holt-Winters forecast results into the Min-Max method results in a safety stock of , minimum inventory of , maximum inventory of , and a reorder quantity of . The company is recommended to implement this Min-Max limit scheme to optimize inventory efficiency. 
Hubungan Kondisi Ergonomi Kerja dengan Keluhan Musculoskeletal Disorders pada Operator Produksi PT Surabaya Wire Muhammad Syahrul; Ida Kusnawati Tjahjani
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.63142

Abstract

Musculoskeletal Disorders (MSDs) are occupational health problems that can be caused by poor ergonomic working conditions. This study aimed to determine the relationship between working ergonomic conditions and MSDs complaints among production operators at PT Surabaya Wire. This quantitative study used a correlational and cross-sectional design. The population and sample consisted of 50 production operators selected using total sampling. Data were collected using a work ergonomics questionnaire and Nordic Body Map (NBM), then analyzed using descriptive statistics and Pearson correlation. The results showed that ergonomic working conditions had a mean score of 77.48 and were categorized as good, while MSDs complaints had a mean score of 55.22 and were categorized as moderate. Pearson correlation analysis showed r = -0.682 with a significance value of 0.000 (p < 0.05). Therefore, there was a significant and strong relationship between ergonomic working conditions and MSDs complaints. The negative relationship indicates that better ergonomic conditions are associated with lower MSDs complaints.
Model Konseptual Pengolahan Sampah Organik di Pasar Induk Gedebage: Pengomposan Windrow dan Pengolahan Anaerobik Menggunakan Biodigester Alya Qothrunada; Devi Maulida Rahmah; Januardi Januardi
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.63157

Abstract

Organic waste management requires an approach that supports resource recovery while considering economic potential and greenhouse gas (GHG) emissions. This study aimed to develop a conceptual system dynamics model for organic waste processing at Gedebage Wholesale Market, using windrow composting as the baseline and anaerobic digestion in a biodigester as an alternative scenario. A qualitative system dynamics approach was applied through literature review, preliminary study, system boundary definition, conceptual model development, variable identification, and Causal Loop Diagram (CLD) construction. The results show that each CLD forms one balancing loop representing the interaction between organic waste accumulation and the rate at which material completes processing. The two pathways differ in treatment process, recovered product, and causal relationships associated with economic potential and GHG emissions. Future studies should extend the model to a Stock and Flow Diagram and quantitative simulation to enable dynamic comparison of the two pathways.
Pembuatan dan Pengujian Mesin Pemotong Kentang Luxman Duwi Pamukas; Sigit Iswahyudi; Sigit Joko Purnomo
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.63251

Abstract

This study aims to manufacture and evaluate a potato cutting machine designed to improve the convenience and efficiency of the potato cutting process. The machine was manufactured at the Production Process Workshop of the Department of Mechanical and Industrial Engineering, Faculty of Engineering, Universitas Tidar. The machine was designed using an electric motor as the driving system, with rotational power transmitted through a pulley and V-belt to the cutting-blade shaft. The machine was equipped with three knife variations, namely flat, stick, and soft knives, allowing different potato cutting forms to be produced according to food-processing requirements. The cutting tests used 1 kg of potatoes, with three trials conducted for each knife variation. The observed parameters included cutting time and the weight of the resulting cut potatoes. The results showed that the machine was successfully manufactured according to the planned design, with dimensions of 300 mm in width, 421 mm in length, and 544 mm in height. The test results indicated that the flat knife required an average cutting time of approximately 3 minutes to process 1 kg of potatoes, while the stick knife required approximately 2 minutes and the soft knife approximately 3 minutes.
Penentuan Rute Distribusi untuk Meminimalkan Karbon Emisi Menggunakan Clarke And Wright Saving Method di CV. ABC Bekasi Nurike Oktavia; Wahyuni Amalia; Mutiara Yetrina
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.63535

Abstract

CV ABC supplies fresh and frozen meat. Based on observations and interviews, the company often experiences delays in delivering products because delivery routes are still determined by the type of customer company. This study was conducted to determine delivery routes using the Clarke and Wright Saving Method. This research focuses on improving the distribution process to compare the carbon emissions of the existing routes with selected routes. Based on the calculations, the new routes reduced the distance and carbon emissions by 23.6%. The delivery distance decreased from 6,109.2 km/year to 4,670.4 km/year, leading to a decreased carbon emissions from 1,446.10 kgCO2e to 1,105.52 kgCO2e. Although the research results indicate an improvement, this study is limited by the assumption that customer demand does not fluctuate; therefore, the results should not be generally applied. Integrating methods for determining fluctuating demand with route-planning methods could be a direction for future research. 
Analisis Kelayakan Ekonomi Teknik pada Usaha Produksi Jam Digital Berbasis LED Panel P10 dan Mikrokontroler ESP32 Rizqi Maulana Abdul Azi; Dzikri Maulana; Rafik Rafik Srimurni
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.63550

Abstract

This study analyzes the economic feasibility of a digital clock production business based on the LED P10 panel and ESP32 microcontroller using an engineering economics approach. A quantitative descriptive method was employed through cost classification, break-even point (BEP) calculation, income statement, cash flow report, and investment feasibility analysis (NPV, IRR, PBP, BCR, and AE) based on 10-year annual cash flow projections. The business operates on a custom-order scale with a capacity of 120 units per year, a raw material cost of Rp 800,000 per unit, and a selling price of Rp 2,000,000 per unit. Results show BEP is achieved at 21 units per year (83% margin of safety), with net income after tax of Rp 94,920,000 per year (39.55% margin), NPV of Rp 385,255,491, BCR of 17.06, IRR of about 405.61% per year, PBP of 0.25 years, and AE of Rp 90,528,617 per year, indicating the business is economically feasible.
Analisis Kelayakan Ekonomi Teknik UMKM Banana Lumer dengan Metode Investasi Multikriteria Dede Rohimin; Damar Arif Satrio; Rafika Ratik Srimurni
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.63559

Abstract

This study aims to analyze the financial feasibility of establishing a micro-manufacturing business “Banana Lumer Uninus”, specializing in premium chocolate banana chips. Engineering economic analysis methods applied include Net Present Value (NPV), Annual Worth (AW), Internal Rate of Return (IRR), Payback Period (PP), Benefit-Cost Ratio (B/C Ratio), Straight-Line depreciation, and sensitivity analysis. The modeling inputs consist of an initial capital investment of IDR 10,000,000, monthly operational expenses of IDR 5,500,000, and a production capacity of 500 units/month priced at IDR 15,000/unit (generating IDR 7,500,000/month gross revenue). The 5-year investment horizon uses a Minimum Attractive Rate of Return (MARR) of 12% per annum. The results indicate highly prospective economics: the calculated NPV is IDR 77,082,029, AW reaches IDR 21,383,325/year, and the B/C Ratio stands at 1.31. The Payback Period is swift at 5 months, while the IRR (239.8%) significantly exceeds the MARR. Annual straight-line depreciation accounts for IDR 1,800,000/year with a salvage value of IDR 1,000,000. Sensitivity analysis proves the project remains robustly feasible (NPV > 0 and B/C > 1) even under a 20% increase in production costs or a 20% reduction in sales. In conclusion, the Banana Lumer Uninus business project is highly feasible for implementation.
Pengaruh Lingkungan Kerja, Fleksibilitas Waktu Kerja dan Motivasi Kerja Terhadap Retensi Karyawan Grand Impression Hotel Erni Erni; Lenny Menara Sari Saragih
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.63583

Abstract

This study aims to analyze the influence of work environment, work time flexibility, and work motivation on employee retention at Grand Impression Hotel Medan. A quantitative method with a descriptive approach was employed. The population consisted of 60 employees, all of whom were selected using a saturated sampling technique. Data were collected through a Likert-scale questionnaire and analyzed using validity and reliability tests, classical assumption tests, multiple linear regression, t-test, F-test, and the coefficient of determination using SPSS. The results show that work environment has a positive and significant effect on employee retention, while work time flexibility has a positive but insignificant effect. Work motivation has a positive and significant effect on employee retention. Simultaneously, work environment, work time flexibility, and work motivation significantly affect employee retention. The R Square value of 0.815 indicates that the model explains 81.5% of the variation in employee retention, while the remaining 18.5% is explained by factors outside the model. Based on the Standardized Coefficients Beta, work environment is the most dominant variable.