cover
Contact Name
Moh Debby Rizani
Contact Email
dbyrizani@gmail.com
Phone
+628122507299
Journal Mail Official
giratory.upgris@gmail.com
Editorial Address
Jl. Sidodadi Timur No.24, Karangtempel, Kec. Semarang Tim., Kota Semarang, Jawa Tengah 50232
Location
Kota semarang,
Jawa tengah
INDONESIA
Jurnal Teknik Sipil Giratory Upgris
ISSN : 26217864     EISSN : 27164969     DOI : https://doi.org/10.26877/goratory
Core Subject : Engineering,
Jurnal ini bertujuan untuk menyediakan platform bagi para ilmuwan dan akademisi di seluruh dunia untuk mempromosikan, berbagi, dan mendiskusikan berbagai masalah dan perkembangan baru di berbagai bidang teknik sipil
Articles 115 Documents
ANALISA FAKTOR PENYEBAB KERUSAKAN RUAS JALAN JAKENAN - WINONG KABUPATEN PATI Hermawan, Matholiul Fatani; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 2: Desember 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v5i2.21967

Abstract

Roads are a transportation infrastructure that plays a very important role in the economic, social, political, defense and security fields. With the increasing number of vehicles, it is possible that the road will be damaged in a relatively short time. The Jakenan-Winong route can be said to be an alternative route that connects the Rembang-Pati areas. Jalan Raya Jakenan - Winong is included in the provincial road and according to road class it is included in the primary collector road. The purpose of this study, among others, is to determine the type of damage to the road using the Bina Marga Method, to identify the factors that cause road damage, and to find solutions to minimize damage to the road segment. Methods of data collection by observation or direct observation. The results of this study are: the total area of road damage is 2041.78 m2 or 0.1982310%. Consists of several types of damage, the most dominant is collapse with a total damage area of 250 m2 or 2.4271844% and an overall crack of 50.8 m2 or 0.4932038%. Based on an analysis of the condition of the types of road damage on the Jakenan-Winong road section, among others: subsidence, longitudinal cracks, edge cracks, slip cracks, loose grain, peeling of the surface layer, holes, patches, pavement edge damage. Of the many types of damage that occurred, the most common types of damage were collapse and cracks that occurred on these roads. The road damage factors are caused by excessive vehicle weight, poor implementation, material quality, poor drainage system, rainfall, soil and natural factors which damaged the Jakenan-Winong road. Repair solutions or handling strategies are carried out with corrective and maintenance actions in accordance with the type and level of damage that occurs on the Jakenan-Winong road section, each type and level of road damage requires repair and maintenance according to the damage. Repairs are made to restore comfort and safety for road users.
ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PADA PROYEK PEMBANGUNAN EXPAND & ENHANCEMENT NEUCENTRIX PUGERAN YOGYAKARTA MENGGUNAKAN SPSS Pinuji, Putri; Permata Suwandi, Putri Anggi; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 1: Juni 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i1.24096

Abstract

The 2023 Neucentrix Expand Enhancement Development Project Pugeran Yogyakarta is planned to last 19 weeks. However, there was a delay due to the large amount of additional work and new items that were not listed in the BoQ. This research aims to identify the main factors causing project delays. The data used came from a questionnaire and then factor analysis was carried out using SPSS. A total of 11 managerial team respondents filled out the questionnaire, producing 18 valid variables that were very reliable. The results of the analysis show 5 rankings of the main factors causing delays, namely: delayed payments have an impact on project delays; changes in costs due to additional work; less than optimal labor productivity; error in basic price estimation in the Cost Budget Plan; difficulty in finding materials and/or equipment due to certain specialties; submission and request for changes to completed work from the project owner; changes in work methods by contractors; lack of adequate workforce; owner's delay in making decisions; changes to the scope of work (SOW) during implementation; and lack of workforce discipline regarding attendance and attendance, which hampers work time
ANALISA KEBUTUHAN DAN KETERSEDIAAN AIR BERSIH DI UNIT PDAM KECAMATAN WONOSALAM Mahendra, Andyka Zulfa; Kurniawan, Fernando Dwi; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 2: Desember 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i2.27920

Abstract

The need for clean water in Wonosalam District increases every year as seen from data from the Demak Regency Central Statistics Agency, where the population of Wonosalam District from 2018 to 2022 has increased, so the need for water is also increasing. Therefore, the aim of this research is to determine water needs, water availability, quantity and quality of water and determine the capacity of the reservoir to accommodate clean water. Starting with collecting secondary data, namely population data, data on the number of PDAM customers, source capacity and discharge data, water quality samples. In calculating population growth, population data for the last 5 years is used with predicted calculations until 2032. To calculate this data, the Geometry method, Arithmetic method, and Linear Regression method are used. Then from these calculations, the Arithmetic method was chosen because it has a smaller value. Based on data calculations using the arithmetic method, the value of clean water needs from the population calculation in 2031 is 149,251 liters/second. Meanwhile, the need for clean water for the number of PDAM customers in 2032 is 7,176 liters/second. For the availability of clean water from a source capacity of 10 liters/second and a production discharge of 7,176 liters/second. 
IDENTIFIKASI RISIKO DAN PERMASALAHAN PADA PEMBANGUNAN JEMBATAN KERETA API ELEVETED TRACK SIMPANG JOGLO Puspitasari, Nikmatul Rochmy; Wibowo, Kartono; Mudiyono, Rachmat
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 2: Desember 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v5i2.21969

Abstract

The construction of the Simpang Joglo Elevated Track Bridge is an iconic development in the city of Surakarta with the Elevated Railway Bridge which was built over seven very busy intersections. At this intersection, traffic jams often occur when trains pass, for this reason an elevated track railway bridge was built to reduce this congestion. The implementation of development is not free from risks that occur both internally and externally. This research aims to identify the risks and problems that occur in the construction of the Simpang Joglo Elevated Track Bridge. After identification, an assessment will be carried out on the level of risk that has been identified in the construction of the elevated track bridge at Joglo intersection. Data collection was divided into two, namely primary data collection through distributing questionnaires and interviews on the Simpang Joglo Elevated Track Bridge Construction Project which was conducted with project owners, consultants and contractors and secondary data collection through previous research and data from the Simpang Joglo Elevated Track Bridge Construction Project. Risk identification is carried out using the Risk Breakdown Structure (RBS) method and probability impact grid to determine the level of risk. After obtaining the data, a feasibility test will be carried out on respondents and then a validity and reliability test will be carried out for the three stakeholders. Risk identification is carried out by calculating the probability and impact for each variable and then clarifying the ranking using the Extremely Ineffective, Ineffective, Moderately Ineffective, Very Effective and Extremely Effective rating scale. After that, the risk level is classified using a probability-impact matrix. From the results of the risk level classification, it was found that there were 31 risk variables in the high category from the owner, 31 risk variables according to the consultant and 19 risk variables according to the contractor. Determining the high category of risk is based on combining the same variables from the three stakeholders to obtain 18 risk variables. These variables are problems that occur and influence the implementation of the Simpang Joglo Elevated Track Bridge Construction Project. These problems include increased vibration, traffic flow, road damage, K3 environmental sanitation, community attitudes and perceptions, organizational structure, payments, owner finances, overtime, time and cost estimates, changes in design, heavy equipment and materials
ANALISA KAPASITAS RUANG PARKIR STASIUN PONCOL SEMARANG (Studi Kasus Pada Lahan Parkir Stasiun Poncol Semarang) Masykuroh, Ifana; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 2: Desember 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i2.27915

Abstract

Currently, train stations are still busy for train passengers, parking capacity requirements are also being considered. This research is motivated by the problem of parking capacity, where there are several points that cause congestion and the direction of the parking lane is less than optimal at Poncol Semarang Station. In overcoming this problem, it is necessary to analyze parking capacity, evaluate problems and alternatives that can be used to solve existing problems. The method used in this research is a descriptive approach. This means that the data collected is not in the form of numerical data, but rather data originating from interview scripts, field notes, personal documents, researcher notes or memos and other official supporting documents which aim to enable researchers to describe the empirical reality behind the conditions that occur at train stations. Poncol Semarang. This research produces parking capacity at the station where the parking area can accommodate 554 SRP for cars and 241 SRP for motorbikes with the most parking accumulation getting the most results on Sunday, August 20 2023, namely in the morning at 06.00-09.00 WIB. Amounting to 157 motorbikes and 100 cars. Alternatives for handling traffic jams during peak parking hours are: moving the motorbike taxi post, improving the direction of the parking lane and moving entrance 2.
OPTIMALISASI KINERJA TEKNIS PENGELOLAAN DAERAH IRIGASI SALURAN INDUK MADIUN KABUPATEN MADIUN Dewi Nusantara, Danayanti Azmi; Damayanti, Nada Devi
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 2: Desember 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v5i2.21961

Abstract

Ulo Secondary Canal which has an irrigation area of 1,352 ha is one of the secondary canals in the Madiun Main Canal. Ulo Secondary Canal is supplied by three dams namely Semawur Dam, Jati Dam and Gondrok Dam which are located in Madiun Regency. The Madiun Main Canal Irrigation Area has been rehabilitated in 2019, and has been completed in 2022. The Madiun Main Irrigation Channel area is still in need of water. The methods used to calculate water requirements are Climatology Method, FJ. Mock Method, and Water Balance Method. From the calculation, it is known that the condition before rehabilitation, the value of water availability cannot fulfill agricultural water needs in the Ulo Secondary Canal area. In conditions before rehabilitation, the supply from Jati Dam is 18% with a value between 0.43 m3/s - 0.72 m3/s, coupled with water withdrawal at the Semawur Dam intake of 0.06 m3/s and water withdrawal at the Gondrok Dam intake of 0.07 m3/s. The existing water availability can only fulfill the needs of the cropping pattern of paddy (20%) - crops (40%) - crops (45%), with the smallest residual discharge value of 0.09 m3/s in April III. After rehabilitation, the supply value of Jati Dam is 15% with a value between 2.17 m3/s - 2.72 m3/s, with water withdrawal at the Semawur Dam intake of 0.06 m3/s and water withdrawal at the Gondrok Dam intake of 0.07 m3/s.The percentage value after rehabilitation is smaller than before rehabilitation but the value of water supply is bigger. Based on these conditions, several alternative cropping patterns are planned, such as Paddy (100%) - Crops (100%) - Crops (100%), Paddy (100%) - Paddy (100%) - Crops (100%) and Paddy (100%) - Paddy (100%) - Paddy (100%) with a profit amounting to IDR 6,415,515,780.00 in conditions before rehabilitation and after rehabilitation, on alternative III with a cropping pattern of paddy (100%) - paddy (100%) - paddy (100%) obtained the highest profit amounting to IDR 62,144,490,720.00.
KINERJA LALU LINTAS PADA RUAS JALAN SATU ARAH (STUDI KASUS JL. SUNAN KUDUS KABUPATEN KUDUS) Paripurna, Drian; Supriyanto, Joko; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 1: Juni 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i1.24097

Abstract

The high mobility of the people and traffic due to the existence of a railroad crossing on the Mranggen road section is the main factor for the high congestion that exists on this section. The government's efforts through the Central Java Office of Public Works and Human Settlements to build the Ganefo Mranggen KM 14 Fly Over is an alternative solution to tackling the high traffic jams on this section. Therefore, researchers will identify how the performance of the Mranggen road section after the construction of the Fly Over. After conducting research, it was found that the busiest traffic was on Wednesday at 16.00-16.15 with a total flow value of 883.3 pcu/hour. The degree of saturation is 0.962 0.75, which exceeds the requirements of the 1997 MKJI guidelines. If the value of the degree of saturation 0.75 requires improvement, then the degree of saturation is included in the category E service level with conditions of very high traffic density and low volume. The highest side resistance value on this section is 906.8 where the time interval is 06.00-09.00 WIB with the VH Resistance Class (906.8 900) which means commercial area, with roadside market activity. So that alternative solutions can be found using SWOT calculations where it is known that the segment is in a position between the Weakness and Opportunity axes, namely in quadrant 4. This means that the Ganefo Mranggen Fly Over segment is advised to change the strategy from internal Weaknesses So that the strategy is changed to Opportunity ( external Opportunity) in order to achieve good traffic performance on the Ganefo Mranggen Km 14 Fly Over section.
ANALISIS MANAJEMEN KONSTRUKSI DENGAN METODE POAC (PLANNING, ORGANIZING, ACTUATING, CONTROLLING) PADA PROYEK PONDOK PESANTREN AL-AMANAH 4 KOTA SEMARANG Kuncara, Dana; Hsada, Ibnu Toto; Permata Suwandi, Putri Anggi
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 2: Desember 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i2.27921

Abstract

The success or failure of a project depends on how construction management manages and utilizes available resources, as well as how it handles problems when they arise. With a company or individual that is professional in the field of construction management, project owners will find it easier to manage their projects effectively and efficiently. In this development, there needs to be adequate construction management system management. With this in mind, the researcher conducted a construction management analysis study on the Al-Amanah 4 Islamic Boarding School Development Project in Amanah City. This research aims to identify the factors that affect the performance of construction management, determine the steps that need to be taken to overcome problems that arise, so that the implementation of construction management performance in the project can run smoothly, and analyze the implementation of construction management perfo
ANALISIS KOEFISIEN KEBUTUHAN MATERIAL DAN TENAGA DENGAN METODE ANALISIS BURGERLIJKE OPENBARE WERKEN (BOW) DAN METODE ANALISIS SNI 2008 TERHADAP EFISIENSI ALUR PENGADAAN MATERIAL DI PROYEK (Studi Kasus : Bangunan Tenant-150, Project Awann Costa POJ, Semarang) Octaviana, Luthfia Dea; Permata Suwandi, Putri Anggi; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 2: Desember 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v5i2.21970

Abstract

The development of construction planning, especially in the construction of building structures, calculates unit prices using a tool called Construction Cost Analysis (ABK), where until now the method often used by contractors and consultants is the BOW (Burgerlijke Openbare Werken) guideline. However, as time went by, it was realized that the BOW guidelines were only segmentally suitable for projects in the form of labor-intensive work that utilized conventional equipment and less professional workforce, which resulted in very expensive planning costs if this approach was still used purely. The 2008 Indonesian National Standard (SNI) analysis method is an update of the 1921 BOW (Burgerlijke Openbare Werken) analysis during the Dutch government, in other words, the SNI analysis is an updated BOW analysis. This SNI analysis was issued by the Center for Settlement Research and Development. The cost preparation system using SNI analysis is almost the same as the calculation system using BOW analysis. The basic principle of the SNI method is that a list of coefficients for materials and labor costs has been determined to analyze the price or costs required to make a unit price for building work. From these two coefficients we will get a calculation of the materials needed and a calculation of the wages of those doing the work. The comparative composition and arrangement of materials and labor for one job has been determined, which is then multiplied by the price of materials and wages prevailing in the market.
PERBANDINGAN KUAT TEKAN BETON MENGGUNAKAN AGREGAT HALUS PASIR SILIKA MALIMPUNG DAN PASIR SUNGAI SADDANG KABUPATEN PINRANG Fadly, Imam; Hamka, Hamka; Jabir M., Muh.; Fatmawati, Fatmawati
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 2: Desember 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i2.27916

Abstract

Silica contains impurities that are carried during the sedimentation process. Silica is usually obtained through a mining process that starts from mining quartz sand as a raw material. This study aims to determine the effect of fine aggregate of Malimpung silica sand on the compressive strength of concrete. And to determine the effect of fine aggregate of Saddang river sand on the compressive strength of concrete. In this study, tests were conducted on two types of fine aggregates to determine their effect on the compressive strength of concrete. The research method used is a quantitative experimental method with compressive strength testing at the ages of 7, 14, and 28 days. The results of the study obtained showed that concrete using Malimpung silica sand had a higher compressive strength compared to concrete using Saddang river sand. At the age of 28 days, the compressive strength of concrete with a composition of 100% silica sand reached 28.120 MPa, while concrete with 100% river sand only reached 19.439 MPa.

Page 10 of 12 | Total Record : 115