cover
Contact Name
Moh Debby Rizani
Contact Email
dbyrizani@gmail.com
Phone
+628122507299
Journal Mail Official
giratory.upgris@gmail.com
Editorial Address
Jl. Sidodadi Timur No.24, Karangtempel, Kec. Semarang Tim., Kota Semarang, Jawa Tengah 50232
Location
Kota semarang,
Jawa tengah
INDONESIA
Jurnal Teknik Sipil Giratory Upgris
ISSN : 26217864     EISSN : 27164969     DOI : https://doi.org/10.26877/goratory
Core Subject : Engineering,
Jurnal ini bertujuan untuk menyediakan platform bagi para ilmuwan dan akademisi di seluruh dunia untuk mempromosikan, berbagi, dan mendiskusikan berbagai masalah dan perkembangan baru di berbagai bidang teknik sipil
Articles 162 Documents
ANALISIS KORELASI PEARSON DALAM MENENTUKAN HUBUNGAN ANTARA PDRB JAWA TENGAH DENGAN ARUS PETIKEMAS TPK SEMARANG Arif, An Zaenal; Muldiyono, Rachmat; Sulistyo, Juny Andry
Jurnal Teknik Sipil Giratory UPGRIS Vol 7, No 1: Juni 2026
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v7i1.28125

Abstract

This study aims to analyze the correlation between the Gross Regional Domestic Product (GRDP) of Central Java Province and container throughput at the Semarang Container Terminal. Using time series data from 2015 to 2024, a Pearson correlation analysis was conducted to measure the strength of the relationship between the two variables. The results indicate a very strong and positive correlation between Central Java’s GRDP and container throughput, suggesting that regional economic growth is closely linked to the expansion of logistics and port activities. These findings are significant as a basis for policy formulation in developing port infrastructure that aligns with regional economic growth.
ANALISIS FAKTOR–FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PROYEK PEMBANGUNAN GUDANG LOGISTIK POLRES LAMONGAN Mayasari, Intan; Zamaniah, Zamaniah; Masvika, Hendra; Permatasari, Citra; Ramadhon, Ardiana; Wardani, Agustina
Jurnal Teknik Sipil Giratory UPGRIS Vol 7, No 1: Juni 2026
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v7i1.28133

Abstract

The construction of the Lamongan Police Logistics Warehouse, as part of public infrastructure, requires efficient supervision to support police operational needs. However, several operational issues have arisen, hindering timely completion. One of the main problems is delays in material delivery, which significantly disrupt project progress. This study aims to analyze the factors influencing delays in the warehouse construction project, focusing on the roles of contractors, suppliers, consultants, and project owners. Using a quantitative approach, the research identifies both internal and external factors that contribute to construction delays. Multiple linear regression analysis was employed to examine the relationship between independent variables (work environment, material delays, equipment, labor, and design changes) and project implementation delays. The findings indicate that labor is the most influential factor, with a beta value of 0.455, followed by design changes, which have a positive though relatively minor effect. In contrast, work environment, material delays, and equipment factors show no significant impact. To mitigate delays, the study recommends strengthening coordination among stakeholders, improving resource management, and enhancing project planning. The research provides valuable insights for improving construction project management and preventing unforeseen delays in similar future projects.
PERBANDINGAN JENIS SEMEN PCC DAN OPC DENGAN UJI KONSISTENSI NORMAL DAN WAKTU IKAT SEMEN Adhi, Bagas Wahyu; Hariyani, Betty; Nurrohim, Rio Ridwan; Nugroho, Satrio Adi Wahyu; Safarizki, Hendramawat Aski; Qomaruddin, Mochammad
Jurnal Teknik Sipil Giratory UPGRIS Vol 7, No 1: Juni 2026
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v7i1.28126

Abstract

Cement setting time is the time required for cement to harden, calculated from when the cement begins to react with water to form a paste. Cement setting time refers to the period of time required for cement paste mixed with water to become stiff enough to form a structure and bind construction materials. The purpose of this study was to determine the normal consistency of cement and cement setting time for PCC and OPC cement. The results of this study are for the Normal Consistency test of Portland Cement PCC Ex. Tiga Roda with a penetration target of 10 mm obtained a water content of 30.8%. Normal Consistency test of Portland Cement OPC Ex. Tiga Roda with a penetration target of 10 mm obtained a water content of 26.4%. Testing the Setting Time of Portland cement PCC Ex. Tiga Roda obtained penetration at Initial Setting of 112 mm, Final Setting of 210 mm. Testing the Setting Time of Portland cement OPC Ex. Tiga Roda obtained penetration at Initial Setting of 111 mm, Final Setting of 210 mm.
ANALISIS JALUR KRITIS MENGGUNAKAN METODE CPM CRITICAL PATH METHOD UNTUK OPTIMASI WAKTU PENYELESAIAN PEMBANGUNAN GEDUNG BHAYANGKARI POLRES LAMONGAN Setiawan, Agus; Putra, Dani Pranata; Irawati, Iin; Saputra, Nor Dede Dwi Aditya; Ramadhan, Zhafif Fawwazsatya; Afifah, Risdiana Cholifatul
Jurnal Teknik Sipil Giratory UPGRIS Vol 7, No 1: Juni 2026
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v7i1.28135

Abstract

The construction of the Bhayangkari Police Headquarters in Lamongan is a large-scale project requiring efficient time management. This study aims to analyze the application of the Critical Path Method (CPM) to optimize project completion time. By applying the CPM method, the critical path is identified, which allows for prioritizing activities that significantly affect the overall project duration. The results of this study show that the project, initially planned to be completed in 150 calendar days, can be completed in 122 calendar days. The identification of the critical path reveals 31 activities that directly impact the project's overall duration. This research provides insights into time management in construction projects and recommends optimizing scheduling and resource allocation to ensure timely project completion.
ANALISIS AKSEBILITAS BAGI ANGKUTAN PENUMPANG PADA STASIUN PLABUAN BATANG Lestari, Deswita Anggraini; Saraswati, Ratri Septina
Jurnal Teknik Sipil Giratory UPGRIS Vol 7, No 1: Juni 2026
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v7i1.28127

Abstract

Accessibility in station buildings is very important because stations are public buildings used by many people. Accessibility that meets standards will make the station more orderly, efficient, and effective. Plabuan Station is experiencing problems because several supporting facilities are not provided or do not meet the applicable regulations. The existing facilities, such as waiting rooms and toilets, are inadequate, while other essential facilities like parking spaces, pedestrian pathways, health service rooms, and ramp facilities are not available. Therefore, it is recommended to expand the station to the east, improve the layout, add parking facilities on the west side, and ensure the station facilities comply with regulations and are universally accessible.
EFEKTIVITAS PENGGUNAAN JALUR LAMBAT PADA RUAS JALAN DR LUKMONOHADI DAN DR RAMELAN KUDUS DI KABUPATEN KUDUS Kholil, Munawar; Fauzan, Nur Maulana; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 1: Juni 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i1.16196

Abstract

Kudus street is a national road that connects Jakarta-Semarang-Surabaya-Banyuwangi, on this north coast road as the need for mobility of goods delivery or mobility of residents between cities. On the way Dr. Lukmonohadi - Dr. Ramelan has a slow lane on the left side of the road. The purpose of the existence of the slow lane on road DR. Lukmonohadi-Dr. Ramelan is to smooth traffic and reduce the fatality rate of accidents in the fast lane, but due to very high shopping and industrial activities that can interfere with performance on these roads. The purpose of this research study is to review the effectiveness of the slow lane on the Dr. Lukmonohadi-Dr. The Ramelan is working properly or not. From the results of the analysis of traffic performance measured using the degree of saturation (DS) for Road Dr. Lukmonohadi of 0.57, while Road Dr. Ramelan is 0.61. From the level of congestion that can be obtained from the value of the side barriers that Dr. Lukmonohadi until Dr. Ramelan is included in the medium side resistance class (M). Based on the comparison of the accident rate from 2016-2021 the number of accidents continues to increase. The recommended recommendations are that it is necessary to repair and add road facilities such as repair of separator paint, faded road markings, addition of zebra crossings in pedestrian-congested locations and asphalt repairs on slow lanes because there is a lot of asphalt that is peeling and has holes, it is very dangerous for road users crossing it. Based on the results of the analysis for the slow lane, it can be concluded that the slow lane has been effective in facilitating traffic flow to reduce the number of accidents on the fast lane.
ANALISIS KERUSAKAN JALAN AKIBAT VOLUME KENDARAAN “STUDI KASUS : JALAN RAYA SEMARANG BOJA KM 38 – 42” Wardani, Agustina; Kristiawan, Agung; Samsudin, Nur
Jurnal Teknik Sipil Giratory UPGRIS Vol 1, No 1: Juni 2020
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v1i1.7907

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.
Evaluasi Kinerja Penerapan Sistem One Way pada Ruas Jalan Jendral Sudirman Nugroho, Muhammad Adi; Rizani, Mohammad Debby; Ariawan, Donny
Jurnal Teknik Sipil Giratory UPGRIS Vol 1, No 2: Desember 2020
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v1i2.9408

Abstract

The means of transportation in the current era of globalization have a very important role in the distribution of goods, the economy and the movement of people. However, in reality, problems in transportation movement, especially during peak hours, cause transportation users to experience delays. This is no exception in the case of Kudus Regency. hence resulting in traffic congestion, precisely on Jalan Jendral Sudirman Kudus in front of Kliwon Kudus Market. The purpose of this study is to evaluate the post-implementation of the One-Way System, to analyze the causes of congestion on Jalan Jendral Sudirman in front of Kliwon Kudus Market.
ANALISIS STABILITAS TIMBUNAN DENGAN PLAXIS MEMBANDINGKAN 2 METODE AKIBAT KETERBATASAN LAHAN Adhi, Bagas Wahyu; Setiyanto, Beni; Hidayawan, Ahmad; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 1: Juni 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i1.16187

Abstract

In the Cibitung - Cilincing Ramp 3-1 Toll Road development project, where the road alignment is an embankment construction with subgrade conditions that have dominant soil layers with sand and limited land. Then the implementation of subgrade improvement is carried out by comparing 2 methods, namely the first Replace 1.5 m (50 cm Limestone + Geomembrane + 50 cm Granular backfill + Geotextile Non Woven) + Sheet Pile with a length of 15 meters + Retaining Wall and the second Replace 1.5 m (50 cm Limestone + Geomembrane + 50 cm Granular backfill + Geotextile Non Woven) + Retaining Wall with Bore Pile D60 Int. 2 meters + Retaining Wall.The analysis of the two treatments used Plaxis with the results for the 1 year and 10 year consolidation of the two treatments meeting the requirements. The safety factor for the embankment slopes also meets the requirements. The results of the Horizontal Displacement in the first treatment are still very large, namely 6.73 cm, not in accordance with the AASTHO criteria of 3.8 cm and it can be seen from the profile bending moment on the Sheet Pile that the Sheet Pile is not pinched so that for this case the handling suitable is to use the second treatment, namely Replace 1.5 m (50 cm Limestone + Geomembrane + 50 cm Granular backfill + Geotextile Non Woven) + Retaining Wall with Bore Pile D60 Int. 2 meters + Retaining Walls
ANALISA AKSES LAYANAN PENGELOLAAN AIR LIMBAH DI WILAYAH PERKOTAAN (STUDI KASUS KOTA MOJOKERTO) Nugroho, Hengky Setyo; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 2, No 1: Juni 2021
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v2i1.9460

Abstract

Waste water management problems in urban areas occur due to several factors  are a funding aspect, planning aspect, and due to lack of public awareness. Research area taken at Mojokerto City. The study aims to formulate a concept of domestic waste water management in urban areas. According to exsisting data from the Statistic Bureau of Mojokerto City shows that ownership of home septic tanks reachs 89.83 %. The Methods are combine the analysis of zone and system results and the SWOT analysis results. Analysis of the zone and the system, using the data of the population density, environmental health risk allocation areas of the CBD (Central Business District), and the soil conditions. This analysis has a scope of areas with levels of village, to all areas of the village in Mojokerto City. In SWOT analysis, researchers using data dissemination of the questionnaire to society respondents and interviews to Government and society respondents. The result of the zone and system analysis shows that there are 3 (three) systems are recommended. The results are individual on-site system in 2 (two) villages, a communal individual on-site system in 9 (nine) villages, and a centralized system of medium-term (off-site medium) in the 7 (seven) villages. The SWOT analysis shows that public access to the services of domestic wastewater management in Mojokerto City still requires an increase in the funding and the community participation aspects.