cover
Contact Name
Achmad Riyanto
Contact Email
ariyanto@ub.ac.id
Phone
+62341-562454
Journal Mail Official
jtresda@ub.ac.id
Editorial Address
Jl. MT. Haryono No.167, Ketawanggede, Kec. Lowokwaru, Kota Malang, Jawa Timur 65145
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Teknologi dan Rekayasa Sumber Daya Air
Published by Universitas Brawijaya
ISSN : 27982386     EISSN : 27983420     DOI : https://doi.org/10.21776/ub.jtresda
Jurnal Teknologi dan Rekayasa Sumber Daya Air is a scientific journal published regularly twice per year by Water Resources Engineering Department, Universitas Brawijaya. The paper submitted in this journal covers the fields of Water Resources Information System, Water Resources Conservation, Water Resources Utilization and Efficiency, Water Structure Engineering Planning and Water Resources Engineering Basic Knowledge. The submitted paper can be a summary of research reports or scientific literature review. The language used in this journal is either English or Indonesian.
Articles 612 Documents
Studi Peningkatan Usia Guna Waduk Songputri Akibat Dampak Sedimentasi Sris Novita Emiliawati; Moh Sholichin; Riyanto Haribowo
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 2 No. 2 (2022): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2022.002.02.21

Abstract

Songputri Reservoir located in Wonogiri Regency which was built in 1977-1984 needs to be handled such as vegetation, checkdam construction, and dredging to find out how much additional the reservoir's useful life, besides that it is also necessary to calculate the erosion and sedimentation in the Songputri watershed. The data needed is monthly rainfall data, number of rainy days, and maximum daily data used to calculate the value of erosivity (R), a soil type map to determine the erodibility value (K), a slope map to determine the LS factor, and a land use map to determine the CP value. The calculations will using USLE method assisted by the ArcMap 10.4 application. From the results, it is known that the erosion is 23,157.57 tons/year, the sedimentation is 1,976.71 tons/year, and the reservoir useful life is 22 years. After that, reforestation is carried out on an area of 14.28 ha, construction of 6 checkdams, and dredging in the Songputri Reservoir. After that, the erosion and sedimentation were calculated using the same formula, it is known that the erosion is 7,735.39 tons/year, the sedimentation is 660.29 tons/year, and the useful life of the reservoir is increased to 67 years
Studi Manajemen Proyek Rehabilitasi Daerah Irigasi Domas Kabupaten Pasuruan Menggunakan Metode Crashing dan Fasttrack Arya Pradamansyah Putra; Evi Nur Cahya; Jadfan Sidqi Fidari
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 2 No. 2 (2022): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2022.002.02.19

Abstract

Penerapan manajemen konstruksi diperlukan untuk menindaklanjuti penyimpangan yang terjadi pada proyek. Penelitian dilakukan pada proyek pemerintah Rehabilitasi Daerah Irigasi Domas, Kabupaten Pasuruan yang terindikasi mengalami adanya deviasi keterlambatan proyek. Tujuan dalam penelitian ini akan dibahas penggunaan metode Earned Value Analysis sebagai estimasi durasi akhir proyek serta analisa perecepatan proyek menggunakan metode Crashing dan Fasttrack agar dapat kembali on-track. Alternatif yang digunakan pada percepatan Crashing menggunakan penambahan jam lembur, sedangkan Fasttrack dengan memparalelkan hubungan pekerjaan. Pada perhitungan metode Earned Value Analysis, dilakukan titik pemantauan pada minggu ke-7 dan ke-11. Didapatkan hasil Schedule Performance Index (SPI) masing-masing sebesar 0,507 dan 0,751. Hal ini menandakan bahwa proyek mengalami schedule overrun atau ketidakefektifan karena hasil SPI kurang dari satu. Kemudian, dari hasil tersebut, dilakukan perhitungan Estimation Completion Date (ECD) pada titik pemantauan dengan masing-masing hasil -70,66% dan -18,95% terhadap durasi normal jika performa proyek tetap. Maka dari itu, dilakukan perhitungan percepatan dengan metode Crashing yang dimulai pada minggu ke-11 dengan hasil efektivitas durasi sebesar 23,33% dan efisiensi biaya sebesar 14,24%. Berbeda dengan percepatan metode Fasttrack yang dimulai pada minggu ke-7 didapatkan efektivitas durasi sebesar 16,03% dan efisiensi biaya sebesar 14,43%. Implementation of construction management is needed to follow up on deviations that occur in the project. The research was conducted on the government project for the Rehabilitation of the Domas Irrigation Area, Pasuruan Regency which indicated that there was a deviation from project delays. The purpose of this study will be to discuss the use of the Earned Value Analysis method as an estimate of the final project duration and analysis of project acceleration using the Crashing and Fasttrack methods so can be back on track. The alternative used in the acceleration of Crashing is to add overtime hours, whereas Fasttrack is to parallelize the task dependencies. Monitoring points are performed in the Earned Value Analysis method calculation at the 7th and 11th weeks. The Schedule Performance Index (SPI) results are 0.507 and 0.751, respectively. Because the SPI result is less than one, this indicates that the project is experiencing a schedule overrun or ineffectiveness. Hence, based on these results, an Estimation Completion Date (ECD) is calculated at the monitoring point, with results of -70,66% and -18.95%, respectively, of the normal duration if project performance remains. Accordingly, the Crashing method was calculated at week 11 with the results of duration effectiveness is 23,33% and cost-efficiency is 14,24%. In contrast to the Fasttrack method in the 7th week, the duration effectiveness is 16,03% and the cost-efficiency is 14,43%.
Rationalization Study of Rainfall Network Density Using The Kagan-Rodda Method in Sub Watershed of Bango Zeinnia Alya Azhari; Lily Montarcih Limantara; Jadfan Sidqi Fidari
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 2 No. 2 (2022): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2022.002.02.20

Abstract

Management of water resources in watershed determined by avaibility of accurate rainfall data. The study of rationalization rainfall recorded density result the suggestion of amount and placement of rainfall recorded in watershed. The study was manage in Watershed of Bango with total area 246,4 km2 using Kagan-Rodda method and WMO Standard. The analysis of rainfall recorded using WMO Standard, 100-250 km2/rainfall recorded shown that none of the existing rainfall recorded in Bango Sub-Watershed are qualified. The result of Kagan-Rodda analysis giving recommendation the precise amount of rainfall recorded in Bango Sub-Watershed is Blimbing as point of reference station and form another rainfall recorded, C station. The coverage area of Blimbing is 133,74  km2 and C Station is 112,61 km2.
Analisis Debit Banjir Rancangan dengan Metode HSS Nakayasu, HSS ITB-1, dan HSS Limantara pada DAS Manikin di Kabupaten Kupang Alvine Cinta Damayanti; Lily Montarcih Limantara; Riyanto Haribowo
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 2 No. 2 (2022): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2022.002.02.25

Abstract

East Nusa Tenggara Province is a dry area where the rain season is relatively short and the rainfall intensity is low. This causes the production of food crops can not be maximized, even crop failure. The limited water resources in East Nusa Tenggara Province can be optimized by doing construction the Manikin Dam. In water resources planning, realistic flood discharge is needed by using the Synthetic Unit Hidrograph Method. The purpose of this research is to analyze the design flood discharge using the Methods of Synthetic Unit Hidrograph Nakayasu, ITB-1, and Limantara in Manikin Watershed of Kupang Regency. The calculation of the design flood discharge is carried out after obtaining the design rainfall value by using Normal, Log Normal, Gumbel, and Log Pearson Type III distribution methods. The results obtained are tested for suitability and the design rainfall value that passed can be use in the calculation of the design flood discharge. The results showed that the design flood discharge from the calculation of Nakayasu SUH method is 1597,16 m3/sec, that the design flood discharge from the calculation of ITB-1 SUH method is 965,64 m3/sec, and that the design flood discharge from the calculation of Limantara SUH method is 401,32 m3/sec. Based on the results, the value of the calculation of Nakayasu SUH method is the most suitable method and the closest to the conditions in the Manikin watershed.Provinsi Nusa Tenggara Timur merupakan daerah kering dimana musim basah (hujan) relatif pendek dan intensitas curah hujan yang kecil. Hal ini menyebabkan terjadinya produksi tanaman pangan tidak dapat maksimal, bahkan gagal panen. Terbatasnya sumber daya air di Propinsi Nusa Tenggara Timur dapat dioptimalkan dengan melakukan pembangunan Bendungan Manikin. Pada perencanaan bidang sumber daya air, dibutuhkan data debit banjir yang realistis dengan menggunakan Metode Hidrograf Satuan Sintetis. Penelitian bertujuan untuk menganalisis debit banjir rancangan dengan menggunakan ketiga metode Hidrograf Satuan Sintetis yaitu HSS Nakayasu, ITB-1, dan Limantara pada DAS Manikin di Kabupaten Kupang. Perhitungan debit banjir rancangan dilakukan setelah mendapat nilai hujan rancangan dengan menggunakan metode distribusi Normal, Log Normal, Gumbel, dan Log Pearson Type III. Hasil yang diperoleh diuji kembali kesesuaiannya dan nilai hujan rancangan yang lolos digunakan dalam perhitungan debit banjir Damayanti, A. C. et al., Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 0 No. 0 (2021) p. 0-0 2 rancangan. Hasil penelitian menunjukkan bahwa nilai debit banjir rancangan perhitungan metode HSS Nakayasu sebesar 1597,16 m3 /det, debit banjir rancangan perhitungan metode HSS ITB-1 sebesar 965,64 m3 /det, dan debit banjir rancangan perhitungan metode HSS Limantara sebesar 401,32 m3 /det. Berdasarkan hasil analisis, nilai dari perhitungan metode HSS Nakayasu merupakan metode yang sesuai dan paling mendekati dengan kondisi di DAS Manikin.
Perbandingan Metode Alih Ragam Hujan Menjadi Debit dengan FJ. Mock dan NRECA di Sub DAS Amprong Kabupaten Malang Sahirah Masruroh; Ery Suhartanto; Donny Harisuseno
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 2 No. 2 (2022): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2022.002.02.26

Abstract

Abstract: A research on the conversion of rainfall into discharge located in the Amprong sub-watershed aims to compare the results of the modeling discharge FJ. Mock and NRECA on AWLR discharge data carried out with calibration and validation tests to determine the appropriate method for the characteristics of the Amprong sub-watershed. In this study the FJ. Mock method got the best value in the 6-year calibration data group with MAE = 0.180, NSE = 0.995, R = 0.998, and Kr = 0.44%. The best validation was in the 4-year validation data group with MAE = 2.099, NSE = 0.036, R = 0.853, and Kr = 2.89%. For parameters FJ. Mock values obtained i = 0.8, k = 0.01–1.77, m = 30%-50%, SMC = 200 mm, ISM = 50 mm, and Vn-1 = 50 mm. For NRECA the best value at 9-years of calibration was MAE = 2.241, NSE = 0.392, R = 0.627, and Kr = 1.97%. While the assessment obtained MAE = 1.473, NSE = 0.533, R = 0.968, and Kr = 0.42%. For the NRECA parameter, the PSUB value = 0.9 and the GWF value = 0.02-0.22. The most suitable method in this research is FJ. Mock. Abstrak: Penelitian tentang alih ragam hujan menjadi debit yang berlokasi di Sub DAS Amprong ini bertujuan untuk membandingkan hasil debit permodelan FJ. Mock dan NRECA terhadap data debit AWLR yang dilakukan dengan uji kalibrasi dan validasi untuk menentukan metode apa yang sesuai dengan karakteristik Sub DAS Amprong. Pada penelitian ini metode FJ. Mock didapatkan nilai terbaik pada kelompok data 6 tahun kalibrasi dengan nilai MAE = 0,180, NSE = 0,995, R = 0,998, dan Kr = 0,44%. Perhitungan validasi terbaik pada kelompok data 4 tahun validasi dengan nilai MAE = 2,099, NSE = 0,036, R = 0,853, dan Kr = 2,89%. Untuk parameter FJ. Mock didapatkan nilai i = 0,8, k = 0,01–1,77, m = 30%-50%, SMC = 200 mm, ISM = 50 mm, dan Vn-1 = 50 mm. Untuk NRECA nilai terbaik pada 9 tahun kalibrasi dengan nilai MAE = 2,241, NSE = 0,392, R = 0,627, dan Kr = 1,97%. Sedangkan perhitungan validasi didapatkan nilai MAE = 1,473, NSE = 0,533, R = 0,968, dan Kr = 0,42%. Untuk parameter NRECA didapatkan nilai PSUB = 0,9 dan nilai GWF = 0,02-0,22. Metode yang paling sesuai pada penelitian ini yaitu FJ. Mock.
Perbandingan Metode Alih Ragam Hujan Menjadi Debit dengan FJ. Mock dan NRECA di DAS Gandong Kabupaten Magetan Nurviana, Syelawati Citra Kartika; Suhartanto, Ery; Harisuseno, Donny
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 3 No. 1 (2023): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2023.003.01.03

Abstract

Abstract: The process of converting rainfall to discharge located in Gandong watershed is carried out using FJ. Mock and NRECA methods. After that, calibration and validation test was carried out using discharge data (AWLR) on modeled discharge, to find out which method was compatible with character Gandong watershed. The best result is NRECA method, with value when best calibration process in 8 years, produces value of MAE = 0.029, NSE = 0.982, R = 0.992, Kr = 1.11%. Best validation process in 1 year, produces value of MAE = 0.100, NSE = 0.857, R = 0.942, Kr = 5.15% with parameters value of PSUB = 0.98, GWF = 0.0001–0.003, reduction coefficient = 0.9, W0 = 1218.87 mm, initial groundwater storage = 200 mm. As well as for FJ. Mock method got best calibration in 7 years, produces value of MAE = 0.020, NSE = 0.993, R = 0.997, Kr = 0.69%. And best validation in 1 years, produces value of MAE = 0.787, NSE = -29.048, R = 0.405, Kr = 95.21% with parameters value of m = 30%-50%, i = 0.9, k = 0.034–0.988, SMC = 200 mm, ISM = 100 mm, Vn-1 = 100 mm.Abstrak: Proses pengalihragaman hujan ke debit yang berlokasi di DAS Gandong dilaksanakan memakai metode FJ. Mock dan NRECA. Setelah itu dilakukan uji kalibrasi dan validasi memakai data debit (AWLR) terhadap debit hasil permodelan untuk mengetahui metode mana yang memiliki kesesuaian dengan karakter dari DAS Gandong. Hasil terbaik pada penelitian ini adalah Metode NRECA dengan nilai ketika proses kalibrasi terbaik periode 8 tahun menghasilkan nilai MAE = 0.029, NSE = 0.982, R = 0.992, Kr = 1.11%.  Ketika proses validasi terbaik periode 1 tahun menghasilkan nilai MAE = 0.100, NSE = 0.857, R = 0.942, Kr = 5.15% dengan nilai parameter PSUB = 0.98, GWF = 0.0001–0.003, koefisien reduksi = 0.9, W0 = 1218.87 mm, nilai tampungan air tanah awal = 200 mm. Serta untuk metode FJ. Mock didapatkan kalibrasi terbaik periode 7 tahun menghasilkan nilai MAE = 0.020, NSE = 0.993, R = 0.997, Kr = 0.69%. Dan validasi terbaik periode 2 tahun menghasilkan nilai MAE = 0.787, NSE = -29.048, R = 0.405, Kr = 95.21% dengan nilai parameter m = 30%-50%, i = 0.9, k = 0.034–0.988, SMC = 200 mm, ISM = 100 mm, Vn-1 = 100 mm.
Kajian Evaluasi Genangan Menggunakan Metode SWMM (Storm Water Management Model) di Daerah Jalan Soekarno Hatta (RS UB Hingga Patung Pesawat), Kota Malang Novansyah Fajri; Ussy Andawayanti; Rahmah Dara Lufira
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 2 No. 2 (2022): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2022.002.02.22

Abstract

Soekarno Hatta Streets is located at Malang City, East Java Region at risk of flood. The population growth, regional development, and flat topography cause the drainage channel’s capacity inadequate for precipitation. This study is necessary to analyze the rainfall discharge with return period of 2 years (R2). Then, analyze the existing drainage channel’s capacity ability by modeling with help of the application EPA SWMM 5.1. After gaining the report of the model, there should be an evaluation of the existing drainage channel. J10 and J17 are the channels that need to be evaluated because those channels have inadequate capacity or overflow. The report shows that the flood discharge in J10 and J17 are 1,728m3/s and 0,358 m3/s. Accordingly to those conditions, the proper dimension for J10 and J17 channels are using a box culvert with dimensions 0,8 m and 0,6 m. The cost estimate for those constructions is Rp. 660.883.000,00.Jalan Soekarno Hatta yang berlokasi di Kota Malang, Provinsi Jawa Timur merupakan salah satu pusat kota yang sering terjadi genangan. Pertumbuhan penduduk dan perkembangan wilayah serta kondisi topografi yang cukup datar, menyebabkan kapasitas saluran drainase yang sudah ada tidak dapat menampung presipitasi yang tidak terinfiltrasi ke dalam tanah. Pada studi ini, diperlukan untuk menganalisis Intensitas Hujan Rancangan dengan kala ulang 2 tahun (R2). Kemudian menganalisis kemampuan kapasitas tampungan saluran drainase existing dengan memodelkan pada Aplikasi EPA SWMM 5.1. Setelah mendapatkan informasi dari pemodelan tersebut, maka diperlukan evaluasi terhadap saluran drainase existing. Saluran yang tidak memiliki kapasitas tampungan yang cukup atau meluap, akan didesain ulang dimensinya sebagaimana yang terjadi pada saluran J10 dan J17. Pada saluran J10 didapat debit luapan yang terjadi yaitu 1,728 m3/dt dan pada saluran J17 sebesar 0,358 m3/dt. Maka, diperlukannya evaluasi dimensi saluran pada J10 dan J17 dengan menggunakan box culvert dan dari masing – masing box culvert tersebut 0,8 m dan 0,6 m. Estimasi anggaran biaya yang diperlukan untuk pembangunan tersebut sebesar Rp. 660.883.000,00.
Perbandingan Metode Alih Ragam Hujan Menjadi Debit dengan FJ. Mock dan NRECA di DAS Welang Kabupaten Pasuruan Devita Putri Anindya; Ery Suhartanto; Jadfan Sidqi Fidari
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 2 No. 2 (2022): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2022.002.02.24

Abstract

The transformation of rain to discharge is a modeling process that converts rain data into discharge data. Discharge data in a watershed (DAS) is needed to determine the availability of water discharge in a river that will be used to meet the needs of living things around it. However, the availability of river flow data is often incomplete. Therefore, a change in the variety of rain to discharge is needed. This study aims to determine the results of the calculation of the conversion of rainfall into discharge at the Welang watershed location, Pasuruan Regency. The method used is the FJ. Mock and NRECA methods. The calculation results from these two methods will be compared with the AWLR data in the Welang watershed. From the results of the analysis, it was found that the most suitable method for calculating the transfer of rainfall into discharge in the Welang watershed is the FJ. Mock method with an NSE value of 0.629, a PBIAS value of 0.437, and a correlation coefficient (R) of 0.793. The use of the surrounding land influences the discharge condition in a watershed. The relationship between changes in land use and the condition of the annual average discharge of the Welang watershed shows that the discharge value tends to decrease in terms of comparisons in 2006, 2010, 2015, and 2020. Alih ragam hujan menjadi debit merupakan proses permodelan yang mengubah data hujan menjadi data debit. Data debit pada suatu daerah aliran sungai (DAS) diperlukan untuk mengetahui ketersediaan debit air pada suatu sungai yang akan dipergunakan untuk memenuhi kebutuhan makhluk hidup disekitarnya. Tapi pada kenyataannya ketersediaan data debit aliran sungai sering kali tidak lengkap, Maka dari itu dibutuhkan suatu alih ragam hujan menjadi debit. Pada studi ini bertujuan untuk mengetahui hasil perhitungan alih ragam hujan menjadi debit pada lokasi DAS Welang, Kabupaten Pasuruan. Metode yang digunakan adalah metode FJ. Mock dan NRECA. Hasil perhitungan dari kedua metode tersebut nantinya dibandingkan dengan data AWLR pada DAS Welang. Dari hasil analisis didapatkan bahwa metode yang paling sesuai untuk perhitungan alih ragam hujan menjadi debit pada DAS Welang adalah metode FJ. Mock dengan nilai NSE sebesar 0,629, nilai PBIAS sebesar 0,437 dan nilai koefisien korelasi (R) sebesar 0,793. Kondisi debit pada suatu DAS dipengaruhi oleh penggunaan lahan disekitarnya. Hubungan antara perubahan tata guna lahan dengan kondisi debit rerata tahunan DAS Welang menunjukkan nilai debit yang cenderung menurun, ditinjau dari perbandingan tahun 2006, 2010, 2015 dan 2020.
Studi Manajemen Konstruksi Proyek Pembangunan Infrastruktur Pengendali Banjir Sungai Welang di Kota Pasuruan Komala Candra, Yoggi Fracasnofa; Juwono, Pitojo Tri; Cahya, Evi Nur
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 3 No. 1 (2023): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2023.003.01.02

Abstract

The project must have a predetermined time and cost limit, therefore construction management is needed to overcome the problems that occur. Writing this study aims to analyze the acceleration of infrastructure development projects for flood control over the Welang River in Pasuruan City using the program. The main alternative to overcome the problem in this study is to increase the duration of working hours and add heavy equipment. In processing alternatives, they are assisted by using 3 methods, namely Gannt Chart, CPM (Critical Path Method), and PERT (Program Evaluation Review Technique). This method can facilitate the analysis of alternatives and work data in the program. The data used is secondary data sourced from implementing contractors such as planning data, unit price data, and contract data. An alternative analysis produces an S curve with help of a program to facilitate the comparison between the additional working hours and the number of heavy equipment. From the analysis results, the normal duration of the project is 165 days. The optimal result of the alternative scheduling is an increase in the duration of working hours with a decrease in the budget plan of 5,84% and an acceleration of work duration by 29,82%.Dalam proyek pasti memiliki batasan waktu dan biaya yang telah ditentukan, oleh karena itu dibutuhkan manajemen konstruksi untuk mengatasi masalah yang terjadi. Penulisan studi ini bertujuan untuk menganalisa percepatan proyek pembangunan infrastruktur pengendali banjir Sungai Welang di Kota Pasuruan dengan menggunakan program. Alternatif utama yang dilakukan untuk mengatasi masalah pada studi ini adalah dengan menambah durasi jam kerja dan penambahan alat berat. Dalam mengolah alternatif, dibantu menggunakan 3 metode yaitu Gannt Chart, CPM (Critical Path Method), dan PERT (Program Evaluation Review Technique). Metode tersebut dapat mempermudah analisa alternative dan data pekerjaan dalam program. Data analisa dari kontraktor pelaksana yaitu data perencanaan, data harga satuan, dan data kontrak. Analisa alternatif mengeluarkan kurva S dengan bantuan program untuk mempermudah perbandingan antara penambahan durasi jam kerja dan jumlah alat berat. Dari hasil analisa didapatkan, durasi normal proyek selama 165 hari. Hasil optimal dari alternatif penjadwalan adalah penambahan durasi jam kerja dengan penurunan rencana anggaran biaya sebesar 5,84% dan mengalami percepatan durasi pekerjaan sebesar 29,82%.
Pemodelan Aliran Sungai Jatiroto Menggunakan Software HEC-RAS 5.0.7 Rovita Yuniarti Arimbi; Sumiadi Sumiadi; Bambang Winarta
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 2 No. 2 (2022): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2022.002.02.23

Abstract

The Jatiroto River area, which is located on the border of Lumajang Regency and Jember Regency, is often hit by floods when the rainy season arrives. In 2022, floods hit the lower reaches of the Jatiroto River with an average water level of 30-50 cm. The influence of backwater from the Bondoyudo River downstream and discharge shipments from tributaries makes the cross-sectional capacity of the Jatiroto River unable to accommodate the incoming water discharge. The purpose of this flow modeling is to determine the point of the river section that occurs runoff so that it can be used as a recommendation for flood disaster prevention and mitigation plans.  Calibration of flow modeling to determine n Manning using observational discharge in the weir and historical data of flooding on December 23, 2018. The results of the flow simulation using HEC-RAS 5.0.7 obtained n Manning values of 0.025 and 0.023. The planned flood discharge used for modeling analysis of existing conditions is Q2th of 373.10 m3/sec. From the results of the simulation of the flow of existing conditions in Q2th that in some river sections there was an overflow of water, especially the downstream section.Wilayah Sungai Jatiroto yang terletak di perbatasan Kabupaten Lumajang dan Kabupaten Jember sering diterjang banjir ketika musim penghujan tiba. Tahun 2022 kejadian banjir menerjang wilayah bagian hilir Sungai Jatiroto dengan ketinggian air rata-rata 30-50 cm. Adanya pengaruh backwater dari Sungai Bondoyudo di bagian hilir dan kiriman debit dari anak sungai membuat kapasitas penampang Sungai Jatiroto tidak dapat menampung debit air yang masuk. Tujuan dari pemodelan aliran ini untuk mengetahui titik ruas sungai yang terjadi limpasan sehingga dapat dijadikan rekomendasi rencana pencegahan dan mitigasi bencana banjir. Kalibrasi pemodelan aliran untuk menentukan n Manning menggunakan debit pengamatan di bendung dan data historis banjir pada tanggal 23 Desember 2018. Hasil dari simulasi aliran menggunakan HEC-RAS 5.0.7 didapatkan nilai n Manning sebesar 0,025 dan 0,023. Debit banjir rencana yang digunakan untuk analisis pemodelan kondisi eksisting yaitu Q2th sebesar  373,10 m3/det. Dari hasil simulasi aliran kondisi eksisting Q2th bahwasanya di beberapa ruas sungai terjadi luapan air terutama ruas bagian hilir.