Claim Missing Document
Check
Articles

STUDI ANALISIS HARGA AIR PDAM KABUPATEN BANGKALAN TERHADAP PENGEMBANGAN JARINGAN PIPA SISTEM PENYEDIAAN AIR MINUM DI KKJSM (KAWASAN KAKI JEMBATAN SISI MADURA) KECAMATAN LABANG Sandy, Dina Yunita; Juwono, Pitojo Tri; Lufira, Rahmah Dara
Jurnal Mahasiswa Jurusan Teknik Pengairan Vol 1, No 1 (2017)
Publisher : Jurusan Teknik Pengairan, Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (726.649 KB)

Abstract

STUDI ANALISIS HARGA AIR PDAM KABUPATEN BANGKALAN TERHADAP PENGEMBANGAN JARINGAN PIPA SISTEM PENYEDIAAN AIR MINUM DI KKJSM (KAWASAN KAKI JEMBATAN SISI MADURA) KECAMATAN LABANG Dina Yunita Sandy¹, Pitojo Tri Juwono², Rahmah Dara Lufira3 ¹Mahasiswa Program Sarjana Teknik Jurusan Teknik Pengairan Universitas Brawijaya ²Dosen Jurusan Teknik Pengairan Fakultas Teknik Universitas Brawijaya 3Dosen Jurusan Teknik Pengairan Fakultas Teknik Universitas Brawijaya Teknik Pengairan Universitas Brawijaya-Malang, Jawa Timur, Indonesia Jalan MT. Haryono 167 Malang 65145 Indonesia e-mail: dinaferiston@yahoo.co.id ABSTRAK KKJSM (Kawasan Kaki Jembatan Sisi Madura) adalah salah satu kawasan yang akan dikembangkan yang terletak di pesisir utara Jembatan Suramadu. Wilayah pengembangan KKJSM berada di Kecamatan Labang, meliputi desa Sukolilo Barat, Pangpong, Ba’engas, Labang, Morkepek, Petapan, Sendang Laok dan Sendang Dajah. Studi ini membahas tentang analisa ekonomi di KKJSM  (Kawasan Kaki Jembatan Sisi Madura) dengan memprediksikan biaya operasianal naik 10% setiap 5 (lima) tahun sekali. Dan dengan melakukan analisa hidrolika terlebih dahulu. Sistem Penyediaan Air Minum untuk KKJSM (Kawasan Kaki Jembatan Sisi Madura) memanfaatkan debit Sumber air Sungai Pocong sebesar 100 l/dt. Dari hasil simulasi menunjukkan hasil yang sama pada kondisi hidrauliknya yaitu, kecepatan berkisar 0,1 – 0,92 m/dt, headloss gradient berkisar 0,0 – 0,002 m/km, dan tekanan berkisar 0,69 – 1,97 atm. Rencana Anggaran Biaya (RAB) untuk pembangunan SPAM KKJSM sebesar Rp 59.455.272.200,00 Analisa ekonomi pada tingkat suku bunga 6,5% didapatkan bahwa nilai  BCR (Benefit Cost Ratio) sebesar 1,00 pada 5 (lima) tahun pertama, kedua, ketiga, keempat. NPV (Net Present Value) sebesar Rp 0/ tahun pada 5 (lima) tahun pertama, kedua, ketiga dan keempat. IRR (Internal Rate Return) sebesar 6,501% pada 5 (lima) tahun pertama, kedua, ketiga dan keempat. Analisa Pengembalian (Payback Period) selama 10,342 tahun pada 5 (lima) tahun pertama, kedua, ketiga dan keempat, dan harga air minimum B/C=1 pada 5 (lima) tahun pertama sebesar Rp 6.602,47/m³, pada 5 (lima) tahun kedua sebesar Rp 6.519,71/m³, pada 5 (lima) tahun ketiga sebesar Rp 5.135,98/m³, pada 5 (lima) tahun keempat sebesar Rp 5.055,29/m³.   Kata kunci: Air Minum, Sistem Jaringan Pipa, Rencana Anggaran Biaya, Analisa Ekonomi, Harga Air. ABSTRACT KKJSM ( Bridge Foot Region of Madura Side) is one of the area to be developed which is located on the coast north Bridge Suramadu . The development area of ​​KKJSM is located in District of Labang, covering the villages of West Sukolilo, Pangpong, Ba'engas, Labang, Morkepek, Petapan, Sendang Laok and Sendang Dajah. Studies this discuss about the analysis economy in KKJSM ( Bridge Foot Region Side of Madura) with predicted cost operations up 10% every 5 (five) years once . And with do analysis hydraulics first. System Water Supply for KKJSM ( Bridge Foot Region Side of Madura) utilizing discharge Pocong River water source amount 1 00 l / d t . The simulation results showed the same results on the condition hydraulic namely, speed ranges 0, 1 to 0.9 to 2 m / sec, headloss gradient ranging from 0.0 to 0.002 m / km, and a pressure range of 0, 69-1, 9 7 ATM. Budget Proposal (RAB) for SPAM KKJSM development amounted to Rp 59.455.272.200,00 Analysis economy on level tribe 6.5% interest found that the value of BCR ( Benefit Cost Ratio ) of 1.00 in 5 (five) years first , second , third , fourth . NPV ( Net Present Value ) of Rp 0 / year in 5 ( five ) first , second , third and fourth years. IRR ( Internal Rate Return ) of 6.501% in  first, second , third and fourth 5 ( five) years. Analysis Returns (Payback Period) for 10.342 years  in first , second , third and fourth 5 (five) years, and minimum water price B / C = 1 at first of 5 (five) years amount Rp 6,602.47 / m³, at second of 5 (five) years amount Rp 6,519.71 / m³, at 5 (five) third year amount Rp 5,135.98 / m³, at fourth of 5 (five) years amount Rp 5.055,29 / m³.   Keywords : Drinking Water , System Network Pipe , Plan Budget Cost , Analysis Economics , Water Prices.
STUDI EVALUASI SALURAN DRAINASE DAN ALTERNATIF PENANGANAN GENANGAN DI KECAMATAN TANDES KOTA SURABAYA Setyowati, Elfira Dyah; Ismoyo, M. Janu; Lufira, Rahmah Dara
Jurnal Mahasiswa Jurusan Teknik Pengairan Vol 1, No 1 (2017)
Publisher : Jurusan Teknik Pengairan, Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (660.626 KB)

Abstract

ABSTRAK Genangan yang sering terjadi di Kecamatan Tandes Kota Surabaya mengakibatkan kerugian bagi masyarakat dan lingkungan. Maka dari itu dibutuhkan studi untuk mengevaluasi saluran drainase yang ada dan perencanaan genangan yang solutif, efisien, dan berkelanjutan. Pada penelitian ini, direncanakan evaluasi saluran drainase dilokasi studi berdasarkan kapasitas eksisting dibandingkan dengan debit rancangan kala ulang 10 tahun. Penanganan genangan yang di sarankan ada 2 alternatif. Alternatif 1 yaitu perubahan dimensi, dan alternatif 2 yaitu perencanaan sistem pemanen air hujan. Hasil evaluasi didapatkan 9 dari 16 saluran yang tidak mencukupi untuk menampung dan mengalirkan debit rencana kala ulang 10 tahun, dengan total kelebihan air 13,062m3/dt. Untuk penanganan genangan, direncanakan penambahan dimensi untuk 9 saluran tersebut direncanakan  sistem pemanen air hujan di daerah tangkapan air  9 saluran dengan total 1153 bangunan. Biaya yang dibutuhkan untuk alternatif 1 yaitu sebesar Rp.38.224.083.300, sedangkan biaya yang dibutuhkan untuk alternatif 2 adalah sebesar Rp.60.785.985.900. Kata kunci : Genangan, drainase, pemanen air hujan, debit rancangan, evaluasi saluran ABSTRACT Inundation occurs in Tandes, Surabaya impacts eviromental and society damages. Therefore it needs study for evaluating exsisting urban drainage channels and planning for inundation issue handling that efficient, solutive, and sustainable. In this study, evaluation for the exsisting urban draiange channels in the catchment area in the location of study is analized by comparing the load capacity of each channel to design flood Q10. There are two alternativesplannedfor the inundation issue. First alternative is channel capasity increasement and the second alternative israin harvesting system. The result of this evaluation there are 9 of 16 channels that the capacities are not capable to collect and drain the load flow design for 10 years return period, gaining overflow 13,062m3/dt. For the inundation issue handling, designed capacity increasement for 9 uncapable channels and planned 1153 units of rain harvesting constructions planned only in the 9 channels with uncapable capacities catchment areas. The Cost for first alternative is Rp38.224.083.300 and for the second alternative is 60.785.985.900. Keywords : Inundation, urban draiange, rain harvesting, design flow, channel evaluation
PERBANDINGAN ANTARA MODEL ATURAN LEPASAN BERDASARKAN TAMPUNGAN DAN MODEL RULE CURVE UNTUK WADUK PENGGA soetopo, widandi; Limantara, Lily Montarcih; Suhardjono, Suhardjono; Andawayanti, Ussy; Lufira, Rahmah Dara; Huda, Qomarul; Anwar, Syamsul
Jurnal Teknik Pengairan: Journal of Water Resources Engineering Vol 6, No 2 (2015)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1610.801 KB)

Abstract

Abstrak : Penelitian ini untuk membandingkan an­ta­ra 2 alternatif aturan operasi waduk Pengga dalam mengatur debit lepasan guna memenuhi kebutuhan sepanjang tahun.  Waduk Pengga beroperasi dengan periode ½ bulanan.  Ada 2 alternatif yang disarankan untuk waduk Pengga, yaitu (1) aturan lepasan yang berdasarkan status tampungan waduk pada awal periode operasi, dan (2) rule curve sebagai batas bawah tampungan wa­duk pada setiap periode operasi.  A­tur­an operasi lepasan waduk dari masing-masing alternatif di­op­timasi untuk me­ning­kat­kan kinerjanya sampai mencapai batas maksimum, lalu dilakukan perbandingan antara kedua alternatif tersebut.  Sebelum dilakukan optimasi, dilakukan revisi terhadap struktur daripada ma­sing-masing aturan operasi untuk meningkatkan potensi perbaikan kinerja da­lam optimasi.  Pada aturan lepasan berdasarkan tampungan, revisi struktur di­pu­sat­kan pada peningkatan jumlah grid tampungan, sementara juga dicoba alternatif bentuk garis lepasan yang kontinyu disamping bentuk diskrit.  Sedangkan pada rule curve, re­vi­si struktur dipusatkan pada penambahan kurva-kurva sebagai batas bawah pelepasan bertingkat.  Untuk melakukan optimasi di­gu­nakan prosedur Evolutionary Solver yang ada pa­da perangkat Add-Ins Solver dari MS-Excel 2010.Kata kunci: aturan lepasan, status tampungan, rule curve. Abstract : This research is the comparison of two alternatives of operating rule of the Pengga Reservoir for regulating the releases to fulfill the annual water demand.  The Pengga Reservoir operate in half-month periods.  Two alternatives being proposed for the release operating rule of Pengga Reservoir, (1) the release rule based on the reservoir storage state at the beginning of operating period, and (2) the Rule Curve as the lower boundary of reservoir storage at every operating period.  The reservoir release operating rule of each alternative is optimized to improve its performance until attain the maximum limit, then the comparison is conducted between the two alternatives.  Before the optimization, structural revisions are done on each operating rule to enhance the potency of performance improvement in the optimization.  In the Release Rule based on storage, the revisions are focused on the expansion of number of storage grid, beside also the  trial shape of continuous release line instead of discrete.  As for the Rule Curve, the revisions are focused on the additional curves as the lower bounds of stepped release.  The undertaking of this optimization study will use the Evolutionary Solver procedure in Add-Ins Solver package of the MS-Excel 2010.Keywords: release rule, storage state, rule curve.
OPTIMASI DAN SIMULASI SISTEM PENYEDIAAN JARINGAN AIR BERSIH DI KECAMATAN KADEMANGAN KABUPATEN BLITAR Lufira, Rahmah Dara; Suhardjono, Suhardjono; Marsudi, Suwanto
Jurnal Teknik Pengairan: Journal of Water Resources Engineering Vol 3, No 1 (2012)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1330.888 KB)

Abstract

The purpose of this study was to determine how the effects in terms of technical and economic optimization if done the pipe and the pump head and the simulation of water pricing on water supply systems network in the Kademangan District Blitar Regency. While the purpose of this study contribute ideas to the relevant agencies so that it can be used as a reference whether for optimization and simulation of network systems providing clean water, decent built or not.The method used in this study is the analysis of water network with watercad software in order to obtain the total project cost incurred economic analysis was then performed to determine the magnitude of benefits that can be obtained after the project was built involved the comparison of Benefit Cost Ratio (B/C = 1), Net present Value (NPV), Internal Rate of Return (IRR), the breakeven point of investment and sensitivity analysis can then be used as the basis for tariff setting water prices.Based on the results of simulation and optimization of the selected alternatives are technically and economically feasible are alternative 2, which consists of GIP pipes with diameters ranging from 300 mm up to 2.54 km of water sources and PVC pipe 250 mm starting from the end of the pipe to the reservoir with GIP distance of 3.12 km. With a pump head of 130 m using a pump Grundfos SP 125 type 5A with a capacity of 25 l/s in 2 units. The total cost of investment needed to build a network of water supply system is Rp. 18,428,996,200 with the price of water that is suitable and economically viable is Rp. 10,500.Key Word: optimation, pipe system, simulation, alternative price of water
Analisa Uji Model Fisik Pelimpah Bendungan Sukahurip Di Kabupaten Pangandaran Jawa Barat Lufira, Rahmah Dara; Marsudi, Suwanto
Jurnal Teknik Pengairan: Journal of Water Resources Engineering Vol 6, No 1 (2015)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (505.13 KB)

Abstract

Pangandaran regency is located on West Java. Sukahurip Dam will be built to fulfill community needs of raw water supply. To solve this problem, the government is planning the construction of dams. Hydrauic analysis of physical models Sukahurip Dam spillway is one of the procedures to planning the dam. The purpose of the analysis of physical models Sukahurip Dam is researching and provide the best planning alternative for the performance improvement of hydraulics spillway based on the original design. Hydraulic analysis of physical models is based on original design. The final result of physical model is indicates that the design of the dam was safe but for the safety of scouring should be groundsill added on the downstream of stilling basin.Key words: Dams, Spillway, Scouring, Models test, Hydraulic
Studi Evaluasi Kebutuhan Air Irigasi Dan Penyusunan Jadwal Pembagian Air Irigasi Pada Daerah Irigasi Molek Kecamatan Kepanjen Kabupaten Malang Permana, Candra Dwi; Ismoyo, Janu; Lufira, Rahmah Dara
Jurnal Mahasiswa Jurusan Teknik Pengairan Vol 2, No 2 (2019)
Publisher : Jurusan Teknik Pengairan, Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAK : Daerah Irigasi Pakis terletak di Kecamatan Kepanjen, Kabupaten Malang yang kewenangannya berada di bawah UPTD SDA dan Irigasi Kepanjen. Pembangunan sektor pertanian di Kecamatan Kepanjen masih menjadi prioritas utama dalam sektor ekonomi dan kebutuhan pangan dalam penyediaan pangan dan penyerap tenaga kerja. Oleh karena itu diperlukan evaluasi kebutuhan air irigasi pada kondisi eksisting pada Jaringan Irigasi Molek berdasarkan Kriteria Perencanaan (KP) Irigasi menggunakan metode berbasis FPR (Faktor Palawija Relatif) dan LPR (Luas Palawija Relatif) dengan debit modus dan debit median sebagai debit andalan. Dalam studi ini juga membahas pembagian waktu giliran pemberian air pada tiap golongan dan mengukur kedalaman genangan air irigasi pada tiap petak. Dengan mengevaluasi kondisi eksisting, dapat diperoleh tingkat ketersediaan air terhadap kebutuhan air irigasi yang diperlukan bagi warga setempat khususnya warga Kecamatan Kepanjen.   Kata Kunci : Irigasi, FPR, LPR, SCL,SRI, sistem rotasi, jadwal pemberian air   ABSTRACT : Pakis Irrigation Area is located in Kepanjen District, Malang Regency whose authority is under the UPTD SDA and Kepanjen Irrigation. The development of the agricultural sector in Kepanjen Subdistrict is still a top priority in the economic sector and food needs in the provision of food and absorbing workers. Therefore it is necessary to evaluate irrigation water requirements in existing conditions on Molek Irrigation System based on Irrigation Planning Criteria (KP) using the FPR-based method (Relative Palawija Factor) and LPR (Relative Palawija Area) with modus flow and median flow as the mainstay discharge. In this study also discussed the distribution of turnaround time for giving water to each group and measuring the depth of irrigation water in each plot. By evaluating the existing conditions, we can obtain the level of water availability for irrigation water needs that are needed for local residents, especially residents of Kepanjen District.. Keywords : Irrigation, FPR, LPR, SCL, SRI, rotation system, water delivery schedule
Studi Sistem Drainase Di Sub DAS Kresek Kota Kediri Fitriana, Firda Maya; Ismoyo, M. Janu; Lufira, Rahmah Dara
Jurnal Mahasiswa Jurusan Teknik Pengairan Vol 2, No 2 (2019)
Publisher : Jurusan Teknik Pengairan, Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

 ABSTRAK: PadaJSistem Drainase di Sub DAS Kresek terdapat beberapa wilayah yang sering mengalami genangan terutama pada musim hujan. Lama genangan tersebut terjadi sekitar 1-2 jam setinggi 30 cm. Selain disebabkan karena curah hujan yang tinggi juga diakibatkan karena pengalihan fungsi saluran dari saluran irigasi beralih fungsi menjadi saluran drainase. Sistem Drainase Kali Kresek memiliki 15 saluran, dimana pada Sistem Drainase Kali Kresek ada 2 saluran,yang tidak mampu mengalirkan debit banjir rancangan,dengan kala ulang 5 tahun,.yaitu Saluran Jalan Letjen Sutoyo 3 dan Saluran Jalan Brigjen Pol. Imam Bachri. Dan hasil tersebut pada peta genangan, saluran tersebut juga tidak dapat mengalirkan debit banjir rancangan. Penanganan genangan pada sistem drainase kali kresek mengunakan sistem penanganan kombinasi. Pemilihan alternatif penanganan juga didasarkan pada lokasi dan debit banjir rancangan saluran yang diperlukan untuk reduksi genangannya. Penanganan genangan yang digunakan, yaitu rehabilitasi saluran dan pembuatan sumur tampungan. Kata Kunci: Sistem Drainase, Sub DAS Kresek, Genangan, Penanganan ABSTRACT: In theJdrainage system of Kresek Sub-watershed, several areas often experience inundation, especially during the rainy season. The inundation’s duration occurs around 1-2 hours as high as 30 cm. Besides being caused by heavy rainfall, it is also caused by the channel’s change of function from the irrigation channel to the drainage channel. The Drainage System of Kali Kresek has 15 channels, where 2 channels are unable to drain the design flood discharge with 5 year return-period, namely Letjen Sutoyo 3 channel and Brigjen Pol. Imam Bachri channel. The result on the inundation map indicates,that the channelbcannot drain the design,flood.discharge. In handling the inundation in the.Drainage System of Kali Kresek, it uses a combination handling system. The choice of alternative handling is also based on the location and the channel’s design flood discharge needed to reduce the inundation. The inundation handling used are the channels’s rehabilitation and the reservoir’s making. Keywords: Drainage System, Kresek Sub Watershed, Inundation, ndling.
ANALISIS ANGKA KEBUTUHAN NYATA OPERASI DAN PEMELIHARAAN SISTEM DRAINASE KELURAHAN KEPANJEN KECAMATAN KEPANJEN KABUPATEN MALANG Frinandy, Alvin; Suhartanto, Ery; Lufira, Rahmah Dara
Jurnal Mahasiswa Jurusan Teknik Pengairan Vol 2, No 2 (2019)
Publisher : Jurusan Teknik Pengairan, Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak: pada Kelurahan Kepanjen perkembangan infrastruktur pada saat ini membuat berubahnya tata guna lahan. Hal ini akan mempengaruhi sistem drainase yang ada pada kota kepanjen. Sitstem drainase yang kurang baik menyebabkan terjadinya genangan pada kelurahan kepanjen. Debit rencana yang digunakan menggunakan debit rencana (Qdesain) dengan kala ulang 5 tahun dan 10 tahun, hal ini berdasarkan perubahan tata guna lahan pada kota kepanjen yang begitu pesat. perhitungan debit rancangan menggunakan metode rasional. Hasil debit rancangan yang didapatkan akan dilakukan analisis dengan kapasitas saluran drainase eksisting pada lokasi studi. Hasil penelitian yang telah dilakukan terdapat 7 saluran drainase eksisting yang tidak dapat menampung debit banjir rencana dengan kala ulang 5 tahun dan 8 saluran drainase eksisting yang tidak dapat menampung debit banjir rencana dengan kala ulang 10 tahun.  Berdasarkan dari hasil penilaian kinerja sistem drainase menunjukan bahwa pada Kelurahan Kepanjen saat ini tergolong cukup, dengan nilai sebesar 7.600,04 poin (76%). Mengacu pada hasil analisa, alternatif penanganan masalah sistem drainase adalah mengadakan inspeksi rutin dua belas kali setiap 1 tahun dan melakukan pengerukan sedimen secara berkala 2-3 kali setahun sesuai dengan jenis saluran. Total biaya Angka Kebutuhan Nyata Operasi dan Pemeliharaan dalam satu tahun yang harus dikeluarkan sebesar Rp. 316.478.361,55.   Kata kunci: AKNOP, sistem drainase, operasi dan pemeliharaan, Kepanjen. Abstract: Infrastructure developments of Kepanjen Sub-District at this time made changes in land use. This will affected the existing drainage system in the city Kepanjen. Bad sitstem drainage caused water puddle on the Kepanjen Sub-District . Design Discharge that used  design discharge (Qdesigned) by period of 5 years and 10 years. it was based on changes in land use in the city Kepanjen so advanced. Calculation discharge design used rational method. The results of discharge design conducted analysis with capacity channel drainage existing in the study locations. The results of the study there were 7 existing drainage channel that cannot accommodate discharge flood plans with period of 5 years and 8 existing drainage channel that cannot accommodate discharge flood plans with period of 10 years. Based on the results of performance of drainage system showed that Kepanjen Sub-District currently was adequated enough,with value of 7.600,04 (76%).Referring to the results of analysis, alternative treatments the problems of drainage system are routine inspection tweleve times a year and dredging the sediment regulary 2-3 times a year according to the kind of channels.Total costs that should be spent for Real Needs of Operation and Maintenance in one year is Rp. 316.478.361,55. Keywords: Real Needs of Operation and Maintenance, drainage system, operation and maintenance, Kepanjen.
PENENTUAN HARGA AIR BERSIH UNTUK PENGEMBANGAN JARINGAN DISTRIBUSI AIR BERSIH DI KECAMATAN WONOASRI KABUPATEN MADIUN Hidayah, Mita Nur; Andawayanti, Ussy; Lufira, Rahmah Dara
Jurnal Mahasiswa Jurusan Teknik Pengairan Vol 3, No 2 (2020)
Publisher : Jurusan Teknik Pengairan, Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Air merupakan salah satu kebutuhan utama bagi manusia. Pemenuhan kebutuhan air bersih yang sehat bagi penduduk, mutlak diperlukan sepanjang sejarah hidup manusia. PDAM Unit Wonoasri merupakan salah satu unit yang dikelola oleh PDAM Tirta Dharma Purabaya Kabupaten Madiun. PDAM Unit Wonoasri melayani 7 desa yaitu Desa Sidomulyo, Jatirejo, Plumpungrejo, Wonoasri, Ngadirejo, Dimong, dan Sirapan. Pada kondisi eksisting tahun 2016 PDAM Unit Wonoasri melayani 1163 SR. Pada tahap pengembangan dilakukan penambahan pipa di Desa Tulungrejo, dengan panjang pipa distribusi air bersih 1,59 km. Dalam penelitian dilakukan evaluasi terhadap kondisi hidrolis eksisting berupa kontrol kecepatan (0,1 – 2,5 m/s), tekanan (0,5 – 8 atm), dan headloss gradient (0 – 15 m/km). Selain untuk mengetahui kinerja jaringan penyedia air bersih eksisting juga digunakan sebagai dasar pengembangan.  Simulasi jaringan distribusi air bersih dibantu oleh program WaterCAD. Dari analisa pengembangan dilakukan penambahan pompa baru, PRV, pergantian diameter, dan didapat bahwa sistem jaringan distribusi air bersih telah memenuhi standar. Nilai kecepatan maksimum adalah 0,75 m/s, nilai tekanan maksimum adalah 3,25 atm , dan nilai headloss gradient adalah sebesar 3,684 m/km. Dari hasil analisa ekonomi   diperoleh harga air sebesar Rp 2.877,65 didapat saat nilai B = C dan harga air Rp 3.200 didapat saat nilai B/C > 1,11.   Water is one of the main needs for humans. Compliance of healthy water needs for residents, absolutely necessary throughout the history of human life. Water is a primary need for humans. PDAM Unit Wonoasri is one of units of PDAM Tirta Dharma Purabaya Madiun Regency. PDAM Unit Wonoasri serves seven villages that are Sidomulyo village, Jatirejo, Plumpungrejo, Wonoasri, Ngadirejo, Dimong, and Sirapan. In 2016 the existing condition of PDAM Unit Wonoasri served 1163 SR. The development phase, additional pipeline network  was carried out in Tulungrejo village with 1,59 km of clean water distribution pipes. In this research, the evaluation was carried on the existing hydraulic condition in the form of velocity value control (0.1 – 2.5 m/s), pressure (0.5 – 8 atm), and Headloss gradient (0 – 15 m/km). In addition to knowing the performance of the clean water supply network, existing is also used as a basis for development. Simulation of network distribution of clean water carried out with the aid of WaterCAD  program. From the analysis of the development, need additional of new pumps, and pressure reducing valve, pipe diameter replacement, and found that the network distribution of clean water had met the standard.  The maximum speed value is 0,75 m/s, the maximum pressure is 3,25 atm, and the headloss gradient is 3,684 m/km . From the economic analysis the result of the calculation obtained water price is Rp 2.877,65 when B = C and the price of water is Rp 3.200 when B/C > 1,11.  
PENGEMBANGAN DAN ANALISA EKONOMI PENENTUAN HARGA AIR PADA JARINGAN DISTRIBUSI AIR BERSIH DI SUMBER WONOTAKAN KECAMATAN BERBEK KABUPATEN NGANJUK Sari, Devi Ratna_Resita; Andawayanti, Ussy; Lufira, Rahmah Dara
Jurnal Mahasiswa Jurusan Teknik Pengairan Vol 3, No 2 (2020)
Publisher : Jurusan Teknik Pengairan, Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Air sangat berperan penting dalam kehidupan manusia, dengan semakain meningkat laju pertumbuhan penduduk maka semakin meningkat kebutuhan air bersih. Dalam rangka memenuhi kebutuhan air bersih yang semakin meningkat, maka PDAM Kabupaten Nganjuk perlu mengkaji kembali kebutuhan air bersih untuk meningkatkan pelayanan dengan melakukan pengembangan jaringan distribusi air bersih di wilayah Kecamatan Berbek Kabupaten Nganjuk. Studi ini bertujuan untuk mengetahui kebutuhan air bersih selama 15 tahun mendatang serta menentukan harga air setelah adanya pengembangan. Untuk mengetahui hal tersebut maka dilakukan evaluasi jaringan eksisting dan pengembangan menggunakan program waterCAD v8i, serta penentuan harga air dengan analisa ekonomi menggunakan Benefit Cost Ratio, Net Present Value, Internal Rate Return, Analisa Payback, Analisa Sensitivitas. Hasil evalusai eksisting terdapat tekanan dan kecepatan yang tidak memenuhi kriteria, kemudian hasil simulasi pada tahap pengembangan dilakuka pergantian pipa, penambahan pompa baru, penambahan Pressure Reducer Valve (PRV), dan hasil analisa ekonomi Penetapan harga air sebesar Rp. 1.981 pada saat kondisi B=C dan harga air sebesar Rp. 2.200 pada saat B/C > 1,11   Water is an important for human life, with the increasing rate of population growth then increasing amount of water required. To know the amount of water required, Water Supply Company of Nganjuk needs to review the need for clean water to be able to improve services by developing clean water distribution networks in Berbek District area of ​​Nganjuk Regency. This study aims to determine the need for clean water for the next 15 years and  the water pricing after the development. To find this out, an evaluation of the existing network used the waterCAD v8i program, and water pricing with economic analysis used Benefit Cost Ratio, Net Present Value, Internal Rate Return, Payback Analysis, Sensitivity Analysis. The results of the existing evaluation contained pressure and speed that unqualified, the simulation results at the development stage by changing the pipes, add new pumps, add Pressure Reducer Valve (PRV), and economic analysis results. Determination of water prices is 1,981 IDK at the condition B = C and water price is 2,200 IDK at B / C> 1.11.
Co-Authors A.A. Ketut Agung Cahyawan W Adnan, Muhammad Fawwaz Aydin Adrianu, M Nafian Ahmad, Dicky Aldi Pamungkas Aldila Putri Rahayu Andawanti, Ussy Andawayanti, Ussy Anggun Setyaningrum Apritaputra, Rayza Widyadhana Arif, Khumaira Aufa Hanan A Azhar Adi Darmawan Beselly Putra, Sebrian Mirdeklis Denny Ahmad Fauzi Dewanti, Wahyuning Donny Harisuseno Emma Yuliani Ery Suhartanto Farliani, Danisa Putri Fitriana, Firda Maya Fitriani, Naila Zahro Frinandy, Alvin Habib Haidar, Fauzan Hamdani, Octasub'hi Ramadhan Haribwowo, Riyanto Hawari, Hirzi Hidayah, Mita Nur Ismoyo, Janu Janitra, Ezra Jauhari, M. Reza Kamila, Orin Syakira Karunianto Dhalame, Sammy Caesar Ken Diah Mangar Nastiti Kevin Caesar Perdhana, Dewana Nugraha Laksono Trisnantoro Larasati, Adinda Sylsi Lendi Dwi Pranoto Lilik Zuhriyah Lily Montarcih Limantara Linda Prasetyorini Lukman Hakim M. Amar Sajali M. Janu Ismoyo Moch Rizky Mohammad Bisri Mohammad Bisri Muhhammad Alfyan Rachmana Putra Napitupulu, Nehemia Napitupulu, Ruth Erditha Nastiti, Ken Diah Mangar Novansyah Fajri Nurhaliza, Salma Nurwijayanti Pambudi, Arya Danang Permana, Candra Dwi Pitojo Tri Juwono Pratama, Rizki Ramadani Pratama, Rizki Ramadhani Putri, Angelina Satya Qomarul Huda, Qomarul Rahayu, Aldila Putri Rayhan Yasmine Fathika Riyanto Haribowo Runi Asmaranto Sandi, Yohan Alfanii Sandy, Dina Yunita Santi Sari Sari, Devi Ratna_Resita Satwika Desantina Muktiningsih Satwika Desantina Muktiningsih Satwika Desantina Muktiningsih Satwika Desantina Muktiningsih, Satwika Desantina Setyowati, Elfira Dyah Shevananda Arifianto Sofriansyah, Rafi Satria Sri Wahyuni Suhardjono Suhardjono Suhartanto, Ery Sumiadi Sumiadi, Sumiadi Suwanto Marsudi Syah Putra, M. Raihan Ussy Andawayanti Ussy Andawayanti Ussy Andawayanti Utami, Rizki Tri Very Dermawan Widandi Soetopo