cover
Contact Name
Imam Suprayogi
Contact Email
drisuprayogi@eng.unri.ac.id
Phone
+6282275132941
Journal Mail Official
jvm@ejournal.unri.ac.id
Editorial Address
Jalan HR. Soebrantas, Kampus Bina Widya Km 12,5, Simpang Baru, Pekanbaru 28293
Location
Kota pekanbaru,
Riau
INDONESIA
Jurnal Vokasi Manajemen Dan Rekayasa Infrastruktur Sipil
Published by Universitas Riau
ISSN : -     EISSN : 30891558     DOI : https://doi.org/10.56208/jvmatriks
JVMATRIKS: Jurnal Vokasi Manajemen dan Rekayasa Infrastruktur Sipil adalah jurnal open access dan peer-review yang diterbitkan oleh Program Studi Diploma Tiga Teknik Sipil, Universitas Riau, Indonesia. Jurnal ini memediasi hasil kajian, penelitian dan pengembangan Ilmu Pengetahuan dan Teknologi di bidang Vokasi Manajemen Rekayasa Infrastruktur Sipil yang mencakup tema seperti berikut ini : 1. Struktur Kontruksi Bangunan 2. Teknologi Material Kontruksi 3. Teknik Manajemen Kontruksi 4. Teknik Hidrologi 5. Teknik Konstruksi Jalan dan Jembatan 6. Teknik Survey Pemetaan
Articles 19 Documents
Analisis Produktivitas Alat Excavator Pada Pekerjaan Galian Proyek Revitalisasi Danau Bakuok Kabupaten Kampar Dame Simamora; Bochari; Safridatul 'Audah; Joleha; Imam Suprayogi; Randhi Saily
Jurnal Vokasi Manajemen Dan Rekayasa Infrastruktur Sipil Vol. 2 No. 2 (2025): JULI - DESEMBER 2025
Publisher : Teknik Sipil Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56208/jvmatriks.v2i2.19

Abstract

Excavation activities require the support of heavy equipment to ensure effective and efficient field operations. The utilization of appropriate heavy machinery plays a crucial role in accelerating project execution and achieving predetermined construction targets. This research aims to analyze the productivity levels of various types of excavators and to estimate the duration of excavation work. The study employs both primary data, obtained through direct field observations, and secondary data, collected from interviews with relevant authorities. The research was conducted as part of the Lake Bakuok Revitalization Project (Phase III) in Aursati Village, Tambang District, Kampar Regency, Riau Province. The results indicate that the standard arm excavator achieved a productivity rate of 189.629 m³/hour, the long arm excavator recorded 97.332 m³/hour, while the amphibious excavator demonstrated a productivity of 48.150 m³/hour.
Inventarisasi Bangunan dan Fasilitas Perlengkapan Jalan Pada Jalan Garuda Sakti Mika Purba; Horas Saut MM; Sri Djuniati; Elianora; Dwi Visti Rurianti; Haji Gussyafri
Jurnal Vokasi Manajemen Dan Rekayasa Infrastruktur Sipil Vol. 2 No. 2 (2025): JULI - DESEMBER 2025
Publisher : Teknik Sipil Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56208/jvmatriks.v2i2.22

Abstract

Jalan Garuda Sakti is a provincial road that connects Pekanbaru City and Kampar Regency and serves as the boundary between inner-city and outer-city road segments. Road buildings and traffic equipment facilities are essential components in supporting road functionality, safety, and user comfort. This study aims to inventory the availability and identify the needs of road buildings and equipment facilities along both segments. A quantitative approach was employed through field surveys. The results indicate that no road buildings were available on either inner-city or outer-city segments. Of the nine types of road equipment facilities assessed, the inner-city segment was equipped with only two types, namely traffic signs and street lighting, while the outer-city segment had only traffic signs. The analysis of facility requirements shows that the inner-city segment requires roadside drainage channels, 17 street lighting units, 32 traffic signs, and two types of road markings. Meanwhile, the outer-city segment requires roadside drainage channels, 33 street lighting units, 28 traffic signs, and two types of road markings. Overall, the findings reveal that road buildings and equipment facilities are still inadequate in both segments, particularly in the outer-city area, highlighting the need for accelerated infrastructure development to improve traffic safety, comfort, and  mobility.
Analisa Produktifitas Alat Berat Pada Pekerjaan Timbunan Tanah Dan Perkerasan Berbutir Studi Kasus Jl.Kampus UNRI Fikhri Abdi Digdaya; Dwi Visti Rurianti; Sri Djuniati; Horas Saut MM; M M Shalahuddin; Haji Gussyafri
Jurnal Vokasi Manajemen Dan Rekayasa Infrastruktur Sipil Vol. 2 No. 2 (2025): JULI - DESEMBER 2025
Publisher : Teknik Sipil Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56208/jvmatriks.v2i2.23

Abstract

This study analyzes the productivity of heavy equipment used in embankment and granular pavement works on Jalan Kampus Universitas Riau. The efficiency of heavy equipment utilization plays an important role in determining project duration and operational costs in road construction. This research compares two alternatives of heavy equipment usage: the configuration applied by the project contractor and an alternative proposed by the author. The methodology includes field observations, primary and secondary data collection, and quantitative analysis of equipment productivity, work duration, and operational costs. The results show that the productivity of field equipment includes an Excavator CAT 320 GX of 90.888 m³/hour, Dump Truck Mitsubishi FE SHD 136PS of 2.452 m³/hour, Motor Grader CAT 120 of 554.850 m²/hour, Vibratory Roller SAKAI SV526 of 255.15 m²/hour, Water Tank Truck Mitsubishi Colt Diesel FE 74 HD of 97.2 m³/hour, and Bulldozer CAT D4C of 37.583 m³/hour. The total project duration is 65 working days with an operational cost of Rp2,898,885.96 per hour. Comparative analysis indicates that the alternative equipment configuration offers better time and cost efficiency, making it suitable as a reference for similar projects.
Analisis Kapasitas Penampang Modifikasi Sungai Pasca Pembangunan Pengamanan Tebing Sungai Kampar Desa Rumbio Dinda Safitri; Nurdin; Imam Suprayogi
Jurnal Vokasi Manajemen Dan Rekayasa Infrastruktur Sipil Vol. 2 No. 2 (2025): JULI - DESEMBER 2025
Publisher : Teknik Sipil Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56208/jvmatriks.v2i2.39

Abstract

The Kampar River, which flows through Rumbio Village, Kampar Regency, Riau Province, plays a vital role in the hydrological cycle and the sustainability of the surrounding ecosystem. However, the river is prone to flooding, especially during the rainy season, which necessitates technical interventions such as the construction of bank protection structures. This study aims to analyze the cross-sectional capacity of the river after the construction of the bank protection and to evaluate the potential increase in flow capacity through cross-section modification on the opposite side of the constructed bank protection. The methods used include field surveys with echosounder instruments to obtain depth and flow velocity data, calculation of cross-sectional area using the Mean Section method, and analysis of river discharge. The results showed that the highest recorded discharge was 19.47 m³/s, with a cross-sectional capacity of 51.69 m³/s after the construction of the bank protection. Following the cross-sectional modification, the maximum discharge increased to 49.54 m³/s, with a modified cross-sectional capacity of 157.98 m³/s. The study concludes that cross-sectional modification can serve as an effective solution to increase flow capacity and reduce the risk of flooding in the area surrounding the Kampar River in Rumbio Village
PEMANFAATAN SPENT BLEACHING EARTH (SBE) YANG TELAH DIEKSTRAKSI SEBAGAI BAHAN CAMPURAN PEMBUATAN BATU BATA DENGAN VARIASI 0%, 30%, 40%, 50%, dan 60%. Kelvin Ananda; Fakhri; Azhari; Andre Novan; Ermiyati
Jurnal Vokasi Manajemen Dan Rekayasa Infrastruktur Sipil Vol. 2 No. 2 (2025): JULI - DESEMBER 2025
Publisher : Teknik Sipil Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56208/jvmatriks.v2i2.41

Abstract

This study aims to utilize extracted Spent Bleaching Earth (SBE) waste as an additive material in the production of clay bricks. SBE waste is a by-product of the palm oil bleaching process, which is abundantly available and has the potential to cause environmental pollution if not properly managed. The variations of SBE content used in this research were 0%, 30%, 40%, 50%, and 60% of the total clay weight. Tests were conducted on the physical appearance, dimensions, porosity, and compressive strength of the resulting bricks. The results showed that the addition of SBE waste affected the color and surface texture of the bricks, where higher SBE content tended to decrease visual quality. The volume shrinkage values ranged from 35.24% to 39.34%, which still met the requirements of SNI 15-2094-2000. However, the compressive strength test results indicated a decrease as the SBE percentage increased, with the highest value of 2.70 MPa and the lowest of 1.76 MPa, both below the minimum SNI standard of 5 MPa (Class III). Overall, SBE waste can be utilized up to a 30% variation as an alternative additive material in brick production, but further optimization is required by reducing the mixture variation to meet the structural strength standards.
Analysis of Work Time Effectiveness in Light Gauge Steel Roof Frame Work Desi Yasri; Rahmat Saputra; Neri Puspita Sari
Jurnal Vokasi Manajemen Dan Rekayasa Infrastruktur Sipil Vol. 3 No. 1 (2026): JANUARI-JUNI 2026
Publisher : Teknik Sipil Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56208/jvmatriks.v3i1.46

Abstract

Construction labor productivity continues to be a global challenge, particularly in Indonesia, due to skilled labor shortages and resultant inefficiencies like idleness. Despite prior research on various construction tasks, a gap exists in understanding labor efficiency in modern light-gauge steel frame roof construction, which necessitates distinct work patterns. This study empirically investigates labor efficiency in light-gauge steel roof framing within a housing complex in Pekanbaru using the Work Sampling technique to ascertain the Labor Utilization Rate (LUR) and identify influencing factors. Findings indicate that design complexity significantly affects LUR, with Gable roofs (87.17%) demonstrating higher efficiency than Pyramid Hip roofs (84.36%). Team size and effective coordination are crucial, as Team C (three workers) achieved optimal output. Although essential contributory activities correlate positively with effective work, idle time, often due to fatigue or waiting, remains a challenge, particularly in complex tasks. This research provides critical insights and practical measures to enhance productivity in contemporary light-gauge steel roof construction.
Inventarisasi Bangunan dan Fasilitas Perlengkapan Jalan Pada Perbatasan Jalan Dalam dan Luar Kota Pekanbaru. Studi Kasus: Jalan Pasir Putih M. Ilham Maulana; Elianora Elianora; Horas Saut; Dwi Visti Rurianti; Merley Misriani; Sri Djuniati
Jurnal Vokasi Manajemen Dan Rekayasa Infrastruktur Sipil Vol. 3 No. 1 (2026): JANUARI-JUNI 2026
Publisher : Teknik Sipil Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56208/jvmatriks.v3i1.47

Abstract

Roads are a vital infrastructure that supports the smoothness of social, economic, educational, and mobility activities of the community. This research aims to inventory the buildings and road facilities within and outside the city, focusing on Pasir Putih Road. The method used is a field survey with a quantitative approach to calculate the percentage of component availability. The analysis results show that in urban road sections, facilities such as parking lots, drainage systems, and roadside channels are not yet available, while street lighting facilities reach 80%, traffic signs 90%, and road markings 100%. In rural road sections, the availability of facilities tends to be lower. These findings indicate the need for accelerated development and procurement of road facilities, especially in rural areas, to enhance transportation safety and comfort.
Penambahan Pasir Pantai terhadap Perubahan Nilai California Bearing Ratio (CBR) Pada Tanah Lempung Fathur Rozak; Ulfa Jusi; Ahmad Hamidi
Jurnal Vokasi Manajemen Dan Rekayasa Infrastruktur Sipil Vol. 3 No. 1 (2026): JANUARI-JUNI 2026
Publisher : Teknik Sipil Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56208/jvmatriks.v3i1.48

Abstract

Tanah lempung diketahui memiliki kemampuan daya dukung yang rendah akibat karakteristik plastisitas tinggi serta perubahan volume yang signifikan terhadap variasi kadar air. Penelitian ini dilakukan untuk menganalisis sejauh mana penambahan pasir pantai dapat memengaruhi nilai California Bearing Ratio (CBR) pada tanah lempung di wilayah Kota Pekanbaru Upaya stabilisasi tanah dilakukan dengan mencampurkan pasir pantai Ketaping dalam beberapa variasi proporsi, yakni 0%, 10%, 20%, 30%, dan 40% dari berat total tanah kering. Pengujian  mencakup analisis sifat fisik dan mekanik tanah, seperti kadar air, berat jenis, batas Atterberg, uji pemadatan menggunakan metode Standard Proctor, serta uji CBR dalam kondisi soaked dan unsoaked. Hasil penelitian memperlihatkan bahwa penambahan pasir pantai secara umum mampu meningkatkan nilai CBR dan kepadatan tanah, sekaligus menurunkan nilai indeks plastisitas tanah lempung. Nilai CBR tertinggi ditemukan pada campuran pasir pantai sebesar 40%, yang menunjukkan peningkatan signifikan dibandingkan dengan tanah asli tanpa campuran. Berdasarkan temuan tersebut, pasir pantai dapat dipertimbangkan sebagai material alternatif lokal yang efisien, ekonomis, dan ramah lingkungan untuk tujuan stabilisasi tanah lempung, khususnya di kawasan pesisir seperti Kota Pekanbaru
Subtitusi Sebagian Semen dengan Fly Ash pada Beton yang Terpapar Sulfat Ditinjau Terhadap Kuat Tekan Beton Zikra Nanda; Azhari Azhari
Jurnal Vokasi Manajemen Dan Rekayasa Infrastruktur Sipil Vol. 3 No. 1 (2026): JANUARI-JUNI 2026
Publisher : Teknik Sipil Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56208/jvmatriks.v3i1.50

Abstract

Provinsi Riau dengan lahan gambut yang cukup luas memiliki tantangan tersendiri dalam hal konstruksi khususnya konstruksi beton bertulang. Kandungan sulfatnya serta tingkat keasaman yang tinggi bisa berdampak buruk terhadap beton yang selanjutnya terhadap tulangannya. Oleh karena itu perlu perhatian tersendiri terhadap pembetonan di lahan gambut agar awet. Di sisi lain, fly ash sebagai limbah pembakaran batu bara pada tungku pembangkit listrik tenaga uap (PLTU) dinilai dapat meningkatkan kualitas beton dalam hal kekuatan, kekedapan air, ketahanan terhadap sulfat dan workability beton (Sofwan Hadi, 2000). Penelitian ini mengkaji bagaimana pengaruh substitusi sebagian semen dengan fly ash (abu terbang) terhadap kuat tekan beton yang terpapar sulfat. Fly ash dicampurkan sebanyak 30% dari berat semen. Dibuat juga sampel beton normal tanpa fly ash sebagai pembanding. Umur sampel divariasikan 7 hari, 14 hari, dan 28 hari. Setiap variasi dibuat 3 sampel yang direndam dalam air biasa & 3 sampel yang direndam dalam air sulfat untuk pendekatan simulasi paparan sulfat terhadap beton. Hasil penelitian menunjukkan bahwa paparan sulfat untuk hampir semua variasi perlakuan dapat mengurangi kekuatan beton baik pada beton normal maupun beton yang dicampur fly ash. Pada rendaman air biasa, kuat tekan beton beton yang dicampur fly ash lebih rendah dari beton normal. Pada rendaman air sulfat, substitusi fly ash berdampak positif terhadap kuat tekan beton pada umur-umur muda (7 hari & 14 hari) namun sebaliknya pada umur beton 28 hari.

Page 2 of 2 | Total Record : 19