cover
Contact Name
Nyoman Gunantara
Contact Email
gunantara@unud.ac.id
Phone
+6281558140279
Journal Mail Official
gunantara@unud.ac.id
Editorial Address
Program Studi Teknik Elektro Fakultas Teknik - Universitas Udayana d/a. Kampus Bukit Jimbaran Bali - 80364 Phone/ Fax: +62 361 703315
Location
Kota denpasar,
Bali
INDONESIA
Jurnal SPEKTRUM
Published by Universitas Udayana
ISSN : 23023163     EISSN : 26849186     DOI : -
Jurnal SPEKTRUM is peer review journal, published four times a year by the Department of Electrical Engineering, Faculty of Engineering, Universitas Udayana. This journal discusses the scientific works containing results of research in the field of electrical, include: power systems, telecommunications, computers, informatics, controls, and electronics. Authors are expected to include original scientific papers in accordance with the scope of the discussion of this journal including all aspects of the theory and practice are used.
Articles 677 Documents
PERANCANGAN MODUL PEMBELAJARAN HURUF BRAILLE BERBASIS MIKROKONTROLER UNTUK MEMBANTU PROSES BELAJAR DISABILITAS NETRA I Putu Agus Padma Diana; I Gusti Agung Putu Raka Agung; Pratolo Rahardjo
Jurnal SPEKTRUM Vol 5 No 1 (2018): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (447.656 KB) | DOI: 10.24843/SPEKTRUM.2018.v05.i01.p03

Abstract

We design Braille-learning module based on microcontroller as a helping tool for Braille-learning process for people with vision disabillity. The main operating system used is Arduino ATMega 2560 as the input data processor and provide output commands according to planning. The result is a system consists of a push-button Keyboard for data input, DFPlayer mini for sound output and a LCD for character display. Braille-learning module can be used for 5.6 hours under standby keyboard module condtion and 5.04 hours in keyboard module condition suppressed with minimum or maximum mini DFPlayer volume.
RENCANA PEMASANGAN DISTRIBUTED GENERATION PADA JARINGAN DISTRIBUSI SERTA PENGARUHNYA TERHADAP PROFIL TEGANGAN DAN RUGI-RUGI DAYA A. A. T. B. Artawan; I W. Sukerayasa; W. G. Ariastina
Jurnal SPEKTRUM Vol 7 No 1 (2020): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (798.951 KB) | DOI: 10.24843/SPEKTRUM.2020.v07.i01.p24

Abstract

Jatiluwih feeder is a primary 20 kV distribution network with a peak demand of 1.85 MW. The feeder has a radial configuration with a length of 120 kmc. The extended length of the feeder causes a high voltage drop and power loss. One strategy to reduce voltage drop and power loss is by the installation of distributed generation (DG). The energy resource of the DG usually adopts local available renewable energy resources, such as solar power and hydro power. This paper discusses voltage profile and power loss due to the installation of DG on the distribution network. The analysis covered survey of the available renewable energy resources and power flow simulation. Power flow simulation was carried out in two scenarios, before and after the installation of DG. The simulation results showed that during peak daytime load, DG installation is able to reduce maximum voltage drop by 2,08 %, and increases the voltage from 344,4 V to 352,7 V. Besides that, the installation of DG is able to reduce the total power loss by 9,43 % or as much as 530 kW.
Rekonfigurasi Saluran Distribusi 20 kV Untuk Mengurangi Rugi-Rugi Daya dan Jatuh Tegangan Pada Penyulang Abang I Putu Arya Suardika; I Gede Dyana Arjana; Anak Agung Gede Maharta Pemayun
Jurnal SPEKTRUM Vol 5 No 2 (2018): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (451.527 KB) | DOI: 10.24843/SPEKTRUM.2018.v05.i02.p29

Abstract

The feeder of Abang is one of forty-one feeders in State Electrical Company (PT PLN) of east Bali Area. This feeder uses a configuration of radial type that serves consumers in the area of Padangkerta, Bias, Batannyuh, Kikian, Ababi, Datah, Kubu, Nusu, Tianyar and Ban. It has a line transect that is 212,8 kms in leght with a total of distribution subtatations of 167 transformers and its peaks load reaches 5669 kW. This conditions results in drop voltage of 16,255% and and power losses of 10,12%. Feeder reconfiguration is accomplished by two ways: the cutting of the network that is diverted to Subagan feeder and the planning of Kubu feeder. Reconfiguration by using a method of cutting the network shows a voltage correction of Abang feeder with the initial drop voltage of 16,255% to 3.05% and the initial power losses of 10,12% to 3,49%. The improvement of voltage and power losses occurring in this feeder is not followed by Subagan feeder, which experienced an initial rise in the percentage of drops voltage of 6,78% to 27,615% and its initial power losses of 3,89% to 13,28%. While reconfiguration with Kubu's feeder planning is able to repair the drop voltage of Abang feeder to 2.94% and its power losses to 3,41%. Meanwhile, Kubu’s feeder in accordance with the results of running the program ETAP that the value of drop voltage is 2,95% and power losses is 2,73%.
ANALISIS PERBANDINGAN ROUTING OSPF PADA JARINGAN MPLS DAN TANPA MPLS MENGGUNAKAN GNS3 I Gede Juliantara Putra; Pande Ketut Sudiarta; I Made Arsa Suyadnya
Jurnal SPEKTRUM Vol 4 No 1 (2017): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (318.523 KB) | DOI: 10.24843/SPEKTRUM.2017.v04.i01.p01

Abstract

Proses routing adalah proses pemilihan jalur paket data dari komputer sumber ke komputer tujuan. Suatu pengiriman paket data (routing) bekerja pada layer 3 OSI, akan tetapi terdapat suatu teknologi baru dalam pengiriman paket data pada layer 2,5 OSI yaitu MPLS. Oleh karena itu, dilakukan penelitian untuk mengetahui perbedaan routing paket data melalui jaringan MPLS dan tanpa MPLS. Metode yang digunakan dengan membangun simulasi jaringan menggunakan 12 router, 4 switch dan 4 vpcs pada emulator GNS3 dengan tiga perlakuan berbeda, yaitu: skema pengujian bitrate sejenis, bitrate tidak sejenis dan salah satu link pada interface terputus (disable) pada jaringan MPLS dan tanpa MPLS. Hasil pengujian tersebut menunjukkan bahwa tidak ada perbedaan rute paket data, hal ini dikarenakan penggunaan jaringan MPLS pada layer 2,5 OSI dalam proses pemilihan rute paket data akan mengikuti mekanisme routing OSPF pada layer 3 OSI.
STUDI PEMANFAATAN KOTORAN TERNAK UNTUK PEMBANGKIT LISTRIK TENAGA BIOGAS DI BALI Michael Candra Santoso; I. A. D. Giriantari; W. G. Ariastina
Jurnal SPEKTRUM Vol 6 No 4 (2019): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (180.06 KB) | DOI: 10.24843/SPEKTRUM.2019.v06.i04.p9

Abstract

In this journal, an analysis is carried out on the use of livestock manure for use as a biogas power plant in Bali Province. The purpose of this analysis is to find out how much potential electrical energy can be obtained from livestock manure to be developed into a biogas power plant in Bali Province. 8 types of livestock are used as analysis material including cattle, buffalo, goats, horses, sheep, pigs, chickens, and ducks. Livestock population data in Bali Province from 2013 to 2017 listed in the Livestock and Animal Health Statistics book obtained from the Directorate General of Animal Husbandry and Health (Ministry of Agriculture), is used as the base year of analysis to obtain the average value of the population level of each types of farm animals. The analysis of the total potential of electrical energy is done by calculating the total mass of manure per day, the percentage of dry matter content of each type of manure as well as the biogas that can be produced from each type of livestock according to the standards of the Ministry of Agriculture. The total potential of electrical energy can be obtained from the total amount of biogas produced, where 1 m3 of biogas can be converted into electrical energy of 4,7 kWh. Based on the results of the analysis conducted, the total biogas that can be produced is 246.130,81 m3 of biogas, or if it is converted into electrical energy equivalent to 1.156.814,81 kWh/day or around 1,16 GWh/day from the average total population livestock in Bali Province are 19.183.779 livestock.
Studi Pengaruh Jenis Refrigerant Terhadap Pemakaian Daya Listrik Pada Mesin Pengkondisian Udara (AC) I Nyoman Mudana; Yanu Prapto Sudarmojo; I Gusti Ngurah Janardana
Jurnal SPEKTRUM Vol 5 No 1 (2018): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (154.885 KB) | DOI: 10.24843/SPEKTRUM.2018.v05.i01.p21

Abstract

Air conditioning is strongly influenced by Refrigerant. R.22 refrigerant is currently still widely used with high level of electric power consumption. The purpose of this research is to analyze the influence of types of refrigerant to the electric power consumption of AC by measuring the electric power requirement of each Refrigerant (R.22, R.410, R.32, EnggasM60 and Isceon MO99). The results showed that R.410 uses 335 Watt with the total cost of Rp 42,210 / month, R.32 uses 328 Watt power with the total cost of Rp 41.328 / month, R.22 uses 271 Watt power with theotal cost of Rp 34.146 / month, Huffin M60 uses 262 Watt power with the total cost of Rp 33.012 / month. While Isceon M099 requires 262 Watt with the total cost of Rp 33.012 / month at the temperature of 24,4 ° C.
ANALISIS PERBANDINGAN OUTPUT DAYA LISTRIK PANEL SURYA SISTEM TRACKING DENGAN SOLAR REFLECTOR I B Kd Surya Negara; I Wayan Arta Wijaya; A A Gd Maharta Pemayun
Jurnal SPEKTRUM Vol 3 No 1 (2016): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (355.288 KB)

Abstract

Indonesia merupakan negara beriklim tropis yang memiliki intensitas radiasi matahari yang sangat besar dan intensitas radiasi tersebut berpotensi untuk dikembangkan menjadi Pembangkit Listrik Tenaga Surya. Efisiensi dari panel surya saat ini masih perlu pertimbangan lebih lanjut. Efisiensi panel surya yang rendah ini, berpengaruh pada hasil output daya listrik yang dihasilkan. Upaya untuk meningkatkan output daya listrik panel surya, yaitu dengan sistem tracking dan solar reflector. Penelitian ini bertujuan untuk mengetahui output daya listrik yang lebih maksimal. Metode dalam penelitian ini menggunakan sistem tracking yang pergerakannya berdasarkan waktu dan menggunakan solar reflector dengan cermin datar dan sudut reflector yang berbeda. Hasil dari perbandingan sistem tracking dengan solar reflector yaitu solar reflector menghasilkan output daya listrik lebih besar dibandingan dengan sistem tracking, dimana solar reflector menghasilkan output daya listrik sebesar 0.1224 Watt dan sistem tracking sebesar 0.1136 Watt.
OPTIMASI PENEMPATAN TITIK INTERKONEKSI DISTRIBUTED GENERATION (DG) PLTM MUARA PADA PENYULANG PANJI DENGAN METODE GENETIC ALGORITHM (GA) I Komang Wahyu Trisna Putra; Ngakan Putu Satriya Utama; I Nyoman Setiawan
Jurnal SPEKTRUM Vol 6 No 2 (2019): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (458.698 KB) | DOI: 10.24843/SPEKTRUM.2019.v06.i02.p19

Abstract

Salah satu Distributed Generation (DG) yang beroperasi di Bali adalah Pembangkit Listrik Tenaga Minihidro (PLTM) yang yang berada di Desa Sambangan, Kabupaten Buleleng. PLTM tersebut terhubung dengan salah satu penyulang di daerah Buleleng yaitu Penyulang Panji. PLTM tersebut memiliki kapasitas pembangkit sebesar 2 x 1,15 MW yang mampu membantu suplai daya listrik ke Penyulang Panji selain pasokan daya listrik dari Gardu Induk Pemaron. PLTM mampu memberikan pengaruh penurunan rugi daya (losses), namun penempatan titik interkoneksi yang kurang tepat dapat menyebabkan penurunan rugi-rugi daya yang kurang maksimal. Pada Penelitian ini dilakukan optimasi penempatan titik interkoneksi PLTM dengan metode Genetic Algorithm (GA) dan didapatkan lokasi terbaik titik interkoneksi PLTM berada pada bus 70 dengan rugi-rugi daya total sebesar 31 kW. Interkoneksi PLTM pada bus tersebut dapat menurunkan rugi-rugi daya aktif sebesar 5 kW dari total rugi-rugi daya awal saat kondisi eksisting yaitu pada bus 35 sebesar 36 kW menjadi 31 kW.
Analisis Unjuk Kerja Pemantauan Jaringan OpenNMS (Open Network Monitoring System) pada Jaringan TCP/IP Yohanes Hendra Nugroho; Nyoman Putra Sastra; Dewa Made Wiharta
Jurnal SPEKTRUM Vol 5 No 2 (2018): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (839.986 KB) | DOI: 10.24843/SPEKTRUM.2018.v05.i02.p20

Abstract

Dalam membangun jaringan pada suatu perusahaan atau universitas yang besar diperlukan sebuah manajemen jaringan untuk memudahkan dalam pengaturan dan pengawasan jaringan tersebut. Semakin kompleks jaringan multimedia yang dibangun, maka semakin sulit bagi administrator untuk melakukan pemantauan terhadap jaringan tersebut. Untuk itu, perlu dibangun sebuah sistem monitoring yang bertujuan mempermudah dalam hal melakukan pemantauan dan juga pemeliharaan dan peningkatan kualitas jaringan. Dalam penelitian ini, dibangun sebuah sistem monitoring OpenNMS (Open Network Monitoring System) dengan tujuan untuk bisa memberi gambaran bagaimana OpenNMS bekerja memonitor jaringan yang ada. Pada penelitian ini, dianalisa kinerja dari perangkat-perangkat yang ada, berupa response time pada setiap service yang berjalan serta service SNMP untuk memonitor kualitas dari perangkat yang ada. Dibangun pula Bot yang berfungsi memberikan informasi yang dibutuhkan melalui aplikasi Telegram. Bot tersebut terintegrasi dengan OpenNMS dan dapat otomatis mengirim informasi alarm yang terpantau dari OpenNMS jika perangkat ataupun jaringan sedang terjadi masalah. Sehingga dari hasil penelitian ini, diharapkan memberikan kemudahan bagi administrator untuk memantau kinerja pada jaringan dan penggunaan alarm Bot Telegram untuk selalu memberikan informasi terbaru jika perangkat atau jaringan sedang mengalami down.
KETERSEDIAAN TENAGA LISTRIK SISTEM TRANSMISI 500 KV BALI PADA TAHUN 2030 Pasek Gede Guna Prabawa; I Ketut Wijaya; I Made Mataram
Jurnal SPEKTRUM Vol 3 No 2 (2016): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (807.753 KB)

Abstract

Ketersediaan tenaga listrik sistem transmisi Bali perlu dianalisis untuk mengetahui Bali masih dapat memenuhi beban puncak dari Tahun 2015 sampai Tahun 2030. Keandalan sistem transmisi Bali dianalisis menggunakan alat bantu Electric Transient and Analysis Program(ETAP) power station untuk menentukan nilai System Average Intteruption Frequency Index(SAIFI) dan System Average Interruption Duration Index(SAIDI). Permalan beban puncak sistem transmisi Bali dilakukan mulai pada Tahun 2015 sampai dengan Tahun 2030. Ketersediaan tenaga listrik dianalisis menggunakan neraca daya dengan kondisi N-1 atau kondisi dimana pembangkitan terbesar keluar dari sistem. Analisis keandalan sistem transmisi Bali diperoleh, nilai SAIFI sebesar 1.4264 kali/tahun dan nilai SAIDI sebesar 0.7124 jam/tahun. Analisis ketersediaan tenaga listrik sistem transmisi Bali Tahun 2030 diperoleh, Bali masih aman dengan suplai tenaga listrik sebesar 3959 MW dan cadangan sebesar 1727.7 MW.