Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : Venus: Jurnal Publikasi Rumpun Ilmu Teknik

Analisis Kelayakan Pembangunan PLTS pada Kafe Pondok Juice Risse Entikaria Rachmanita; Syahrir Rojib; Nur Faizin; Ahmad Fahriannur
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 3 No. 3 (2025): Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v3i3.856

Abstract

Indonesia, which is located on the equator, has great potential to utilize solar energy, with an average solar radiation reaching 4.80 kWh/m² per day. This provides an advantage in the development of Solar Power Plants (SPP), one of which is through the installation of rooftop on the roof of the building as a source of electrical energy. This study aims to analyze the feasibility of SPP development by considering the techno-economic aspects of the Pondok Juice cafe. The total real electrical energy consumption required by the Pondok Juice cafe is 32,548 Wh/day. Assuming a system loss of 15%, the total electrical energy requirement that must be supplied by the SPP is 37,430.2 Wh/day. The initial investment projection is IDR 204,265,197, with operational and maintenance costs for 25 years of IDR 105,760,028. The investment feasibility analysis shows NPV of IDR 441,523,820.10, BCR 4.11, DPP ±5 years, and IRR 15.55%, which proves that this SPP planning is feasible to implement.