Analisis Kerusakan Jalan dan Biaya Pemeliharaan pada Ruas Jalan Raya Stain, STA 0+000 – 3+050: Analysis of Road Damage and Maintenance Costs on the Stain Highway Section, STA 0+000 - 3+050 Gunawan, Gunawan; Metekohy, Selly; Marantika, Meyke
LITERA: Jurnal Ilmiah Mutidisiplin Vol. 2 No. 2 (2025): LITERA: Jurnal Ilmiah Multidisiplin
Publisher : Litera Academica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The road is a land transportation infrastructure that is very important in facilitating economic relations activities, both between one city and another, and between cities and villages and between one village and another. Good flexible pavement, must have quality and thickness which will not be damaged due to vehicle loads. Howefer, infrastructure that is burdened by high volumes of traffic and repeatedly will cause a decline in road quality. This study aims to assess the road pavement conditions and the level of road alignment on road sections to determine the type and level of road damage that occurs on the road, find and determine handling or maintenance based on damage. Calculating the value of road damage, to determine the condition of road damage and the level of road flatness is to use the pavement condition index (PCI) and presen serviceability index (PSI) methods. after going through several stages of data collection and data analysis using the pavement condition index (PCI) method and the present serviceability index (PSI), It can be concluded that the condition of the stained highway section with a length of 3050 m has 3 types of damage occurring. The results obtained from data analysis on damage to stained highway sections, obtained a PCI value of 68 with a moderate rating (fair) based on the pavement condition index (PCI) rating, while for the present serviceability index (PSI) the PSI value was 2 categorized as sufficient. In the budget plan for overlay work with a road length of 3050 m, the total work costs are obtained 9.276.317.158 (Four billion six hundred eighty seven million nine hundred and fifty thousand rupiah).
Analisis Produktivitas Penggunaan Alat Berat Excavator dan Dump Truck pada Proyek Pembangunan Jembatan Hutumuri Kecamatan Leitimur Selatan Kota Ambon: Analysis of the Productivity of the Use of Excavator and Dump Truck Heavy Equipment in the Hutumuri Bridge Construction Project in Leitimur Selatan District, Ambon City Huliselan, Kevin Michael Boudewin; Metekohy, Selly; Marantika, Meyke
LITERA: Jurnal Ilmiah Mutidisiplin Vol. 2 No. 3 (2025): LITERA: Jurnal Ilmiah Multidisiplin
Publisher : Litera Academica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Hutumuri Bridge Construction Project in Leitimur Selatan District, Ambon City has a budget of 2,333,110,000.00 with a planned implementation time of 120 calendar days in 2022. In the Hutumuri Bridge Construction Project Package II, in its implementation there were problems that arose in the implementation of this project, namely a decrease in heavy equipment work productivity influenced by the condition of the equipment, weather and terrain, ineffective use of heavy equipment, where during excavation work, the heavy equipment used at the project location, namely the excavator, was damaged due to the terrain and weather, as a result the bolts on the heavy equipment rusted and broke. The purpose of this study was to determine the production capacity, determine the time needed, and obtain the rental costs for excavators and dump trucks for the Hutumuri Bridge Construction Project in Leitimur Selatan District, Ambon City. The data collection method used by the author in this study is the Observation Method, the author conducted a field survey on the Project that was the object of the study, to obtain primary data in the form of documentation photos, and secondary data in the form of heavy equipment specifications, work drawings, time schedules. Based on the results of the calculation of the Productivity of the Use of Excavator and Dump Truck Heavy Equipment on the Hutumuri Bridge Construction Project, South Leitimur District, Ambon City, the productivity value of the PC 200 excavator heavy equipment was 14.56 m3 / hour and the dump truck was 5.47 m3 / hour on the Hutumuri Bridge Construction Project, South Leitimur District, Ambon City, the total time required for the excavator heavy equipment was 2.51 m3 / hour and the dump truck was 6.68 m3 / hour, and the rental cost for the excavator heavy equipment was Rp. 126,257.00 / hour and the dump truck was Rp. 566,859.00 / hour.
Dokumentasi Referensi Folklor Lisan di Negeri Rutong, Kecamatan Leitimur Selatan, Maluku Wuarlela, Mouren; Marantika, Meyke; Apalem, Delvia R.; Hiariej, Chrisanty
J-EDu: Journal - Erfolgreicher Deutschunterricht Vol 5 No 2 (2025): J-EDu: Journal - Erfolgreicher Deutschunterricht
Publisher : Universitas Pattimura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30598/J-EDu.5.2.84-94

Abstract

Verbal folklore reference documentation is one of the efforts to sustain and preserve oral folklore through the process of collecting, selecting, processing and storing in written descriptions. This study aims to describe the form and function of oral folklore in Negeri Rutong , South Leitimur District, Maluku. The research method used is a qualitative research method. The techniques used are observation and interview techniques to collect oral folklore data. The research results obtained include nicknames such as Talahattu Galoba; naming places such as Batu Minom Aer; traditional expressions such as ale makang isi, beta anana bone jua; traditional questions such as cigulu-cigulu satu, bu bale bu bale Bulan tabala, apakah itu?; Gandong Amalopu (Amakele Lopurisa) rhyme "Harutui Rutung"; folk tales such as the myth entitled Setang Galojo; and folk songs welcoming guests sung by Oyo. All of these oral folklore have a general function as an identity that strengthens the beliefs and culture of the people of Rutong country.
Analisis Pengaruh Contract Change Order (CCO) Terhadap Waktu Pelaksanaan Proyek Pembangunan Ruang Kelas Baru (RKB) Madrasah Tsanawiyah Negeri 6 Maluku Tengah Romroma, Deske; Saleh, La Mohamat; Marantika, Meyke
KOLONI Vol. 4 No. 3 (2025): SEPTEMBER 2025
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/koloni.v4i3.744

Abstract

Construction projects are one of the activities that have a certain period of time. However,The purpose of this study is to obtain what factors affect the Contract Change Order (CCO) on the implementation time and find out the presentation of the influence of free variables on the implementation time of the New Classroom Construction (RKB) project of Madrasah Tsanawiyah NEGERI 6 Central Maluku. The analysis method used in this study is with the help of the SPSS program version 20. In the New Classroom Construction Project (RKB) Madrasah Tsanawiyah NEGERI 6 Central Maluku there are several factors that affect the contract change order on the implementation time. Among them are construction factors, administrative factors, resources, natural events and the presentation of the influence of independent variables on implementation time, which is 83.4% and the remaining 16.6% is influenced by other variables that were not tested in this study
Perencanaan Anggaran Biaya Dan Penjadwalan Pembangunan Gedung Kelas Baru MTsN-01 Negeri Tulehu Kabupaten Maluku Tengah Lestaluhu, Asnin S. R.; Serang, Rudi; Marantika, Meyke
ULIL ALBAB : Jurnal Ilmiah Multidisiplin Vol. 3 No. 10: September 2024
Publisher : CV. Ulil Albab Corp

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56799/jim.v3i10.5275

Abstract

Perencanaan suatu proyek konstruksi, terdapat dua hal yang sangat mempengaruhi rencana anggaran biaya dan waktu pelaksaan proyek, kedua hal ini merupakan acuan untuk tahap pelaksaan proyek konstruksi tersebut dan sekaligus merupakan manajemen proyek yang harus diterapkan agar pekerjaan-pekerjaan dapat berjalan sesuai dengan jadwal yang direncanakan. Pada Perencanaan Anggaran Biaya dan Penjadwalan Pembangunan Gedung Kelas Baru Mtsn-01 Negeri Tulehu Kabupaten Maluku Tengah, agar memiliki rencana anggaran biaya, waktu pelaksaan dari gedung tersebut. Penelitian ini dilakukan untuk mengetahui rencana anggaran biaya dan jadwal waktu pelaksaan untuk memberikan gambaran terhadap rencana anggaran biaya dan waktu yang dibutuhkan untuk menyelesaikan Perencanaan Anggaran Biaya Pembangunan Gedung Kelas Baru Mtsn-01 Negeri Tulehu Kabupaten Maluku Tengah tersebut secara akurat. Teknik pengambilan data yang digunakan dalam penelitian ini adalah dengan observasi, studi dokumen dan studi kepustakaan. Sedangkan untuk metode analisa dalam penelitian ini dilakukan perencanaan anggaran biaya, dengan menggunakan metode SNI dan pengendalian proyek konstruksi (time schedule) dan kurva “S”. Berdasarkan hasil perhitungan Perencanaan Anggaran Biaya Dan Penjadwalan Pembangunan Gedung Kelas Baru Mtsn-01 Negeri Tulehu Kabupaten Maluku Tengah maka besar anggaran yang diperolah sebesar Rp. 5.039.500.000,00 dan berdasarkan nilai anggaran yang diperoleh maka waktu pelaksaan 203 hari kerja atau 29 bulan hari kerja.
The Application Of Reading Between The Lines Strategy To Increase Students Reading Comprehension Marantika, Meyke
Scholars: Jurnal Sosial Humaniora dan Pendidikan Vol. 2 No. 1 (2024): SCHOLARS: Jurnal Sosial Humaniora dan Pendidikan
Publisher : P3M POLITEKNIK NEGERI AMBON

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v2i1.2374

Abstract

Abstrak : Reading between the lines merupakan salah satu strategi reading comprehension yang harus diajarkan sebagai suatu comprehension skill yang penting bagi mahasiswa. Tujuan penelitian ini adalah untuk mengidentifikasi keefektifan Reading Between The Lines Strategy dalam kemampuan pemahaman membaca mahasiswa. Penulis menggunakan penelitian deskriptif dengan beberapa langkah yang penulis lakukan yaitu pertama mengumpulkan teori yang relevan untuk penelitian. Langkah kedua yaitu menjalankan pre-test untuk experiment class dan control class. Langkah ketiga yaitu mengajar reading comprehension dengan mengunakan Reading Between The Lines pada experiment class dan mengajar tanpa mengunakan Reading Between The Lines pada control class. Langkah keempat yaitu menjalankan post-test bagi experiment class dan control class. Setelah menganalisis data berdasarkan tes yang diberikan, hasil penelitian menunjukkan bahwa siswa pada kelompok eksperimen yang diajar dengan menerapkan Reading Between the lines memperoleh nilai lebih baik dibandingkan siswa pada kelompok kontrol yang diajar tanpa menerapkan Reading Between the lines. Kata kunci : Reading between the lines, Reading Comprehension skill
ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG LABORATORIUM TERPADU DAN PERPUSTAKAAN MAN 1 MALUKU TENGAH Ervina Azhari; Saleh, La Mohamat; Marantika, Meyke
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1906

Abstract

Construction projects are a series of activities related to the process of developing infrastructure within a predetermined time frame by estimating the time required to complete the project. Delays in project planning can occur due to various factors. This also happened in the construction of the Integrated Laboratory and Library Building Project at MAN 1 Central Maluku, which experienced delays caused by several factors, including delays in the project due to factors such as labor, materials, design, situation, equipment, finance, site characteristics, and external factors. However, the factors that significantly and dominantly influence the delays are not yet known. Therefore, the purpose of this research is to identify the significant and dominant factors causing project delays. The analytical method used is regression analysis, which includes T-tests and F-tests. Based on the research results, the significant factors influencing project delays are the lack of availability of labor (labor factor), delay in the delivery of materials (material factor), equipment productivity (equipment factor), and financial difficulties of the contractor (financial factor). The most dominant factor influencing project delays is the labor factor, with a beta value of 1.198, indicating a lack of labor availability.
OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN RUANG KELAS BARU MTSN 6 MALTENG Launuru, Julfirawati; Leuhery, Lenora; Marantika, Meyke
Journal Agregate Vol. 3 No. 1 (2024): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v3i1.1907

Abstract

The construction of the new classroom construction project at MTSN 6 Malteng was intended to be the object of this study because it was based on the background that occurred in the project, namely delays. Based on secondary data obtained from the project, the Budget Plan (RAB) and Time Schedule are used as project’s duration and normal costs of the project. Then the time cost trade-off method is applied which aims to be able to reduce the duration and find out the total cost needed so that the project can reach the planned time target so as not to experience delays. After accelerating with the addition of 3 hours, it could save time by 8,33% where the project cost is reduced by around 0,21%. Meanwhile, the addition of 2 hours could save time by 6,67% where the project cost is also reduced by around 0,17%. While the optimal duration and optimal costs were known in the alternative addition of 3 hours of overtime obtained 110 working days for IDR 2,992,374,365.55. Meanwhile, in addition to 2 hours of overtime, 112 working days were obtained for IDR 2,993,479,584.03.