Claim Missing Document
Check
Articles

Found 5 Documents
Search
Journal : RACIC : Rab Construction Research

IMPLEMENTASI LEAN CONSTRUCTION TOOLS PADA PROYEK PEMBANGUNAN JALAN TOL BALIKPAPAN - SAMARINDA Oryza Lhara Sari; Fitria Arwina Munawaroh; Andika A. I. Saputra; Raftonado Situmorang; Ian Isman Irfandi
Racic : Rab Construction Research Vol 7 No 1 (2022): RACIC (RAB CONSTRUCTION RESEARCH)
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v7i1.2512

Abstract

Lean contruction merupakan sebuah sistem manajemen konstruksi dengan tujuan untuk mereduksi waste (pemborosan). Jika dibandingkan dengan negara berkembang lainnya, penerapan lean construction di Indonesia masuk ke dalam kategori sangat kurang. Tujuan dilakukan penelitian yaitu mengetahui apakah metode lean construction telah diterapkan pada Proyek Pembangunan Jalan Tol Balikpapan - Samarinda. Metode penelitian yang digunakan yaitu metode analisis statistik deskriptif. Hasil yang diperoleh yaitu teknik lean construction telah diterapkan pada Proyek Pembangunan Jalan Tol Balikpapan - Samarinda, hal ini dilihat dari keseluruhan variabel memiliki nilai persentase diatas 68%, dimana sebanyak 3 variabel yaitu last planner system, 5S process, dan fail-safe for quality and safety dapat dikategorikan ke dalam kelompok selalu diterapkan, dan 3 variabel lainnya yaitu increased visualization, daily huddle meeting, dan first run study masuk ke dalam kategori sering diterapkan, tidak ada variabel yang masuk ke dalam kategori tidak diterapkan.
IDENTIFIKASI TINGKAT PEMAHAMAN KONTRAKTOR TERHADAP BIM (BUILDING INFORMATION MODELING) DI RUANG LINGKUP KOTA BALIKPAPAN Raftonado Situmorang; Oryza Lhara Sari; Amirul Mu'minin Al Goviqqih
Racic : Rab Construction Research Vol 8 No 1 (2023): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v8i1.3411

Abstract

Currently, in Indonesia the world of construction is growing rapidly, then there is an increasing need for technology to streamline and streamline work in the construction sector. To overcome this, a system called Building Information Modeling (BIM) was created. Compared to conventional methods, the BIM system integrates construction work that can save time and money. To find out the obstacles of contractors in using BIM, this research was conducted to find out the level of understanding of contractors towards BIM and inhibiting factors in implementing BIM. The object of this research is contractors in Balikpapan City, both state-owned and private. By analyzing from various literature and respondents' sources, which make the foundation of this research takes place. In decision making of BIM implementation in Balikpapan City, the results of this research can be considered. The results of the research data analysis and discussion regarding the level of understanding as well as implementation barriers and solutions provided are the results obtained. In implementing the use of BIM, the level of understanding of contractors and practitioners is 0.43 or can be called 43% which means that contractors do not understand BIM. The biggest obstacle in implementing BIM from the analysis of the largest value of 4.4 is the lack of human resources capable of fully operating BIM. Synergizing between all private and state-owned parties to coordinate with each other and provide counseling on the use of BIM in the future is the solution to the obstacles.
RESPON RISIKO DAN MITIGASI RISIKO PADA FAKTOR-FAKTOR PENYEBAB WASTE KONSTRUKSI DENGAN MENGGUNAKAN PENDEKATAN LEAN CONSTRUCTION (STUDI KASUS: PROYEK X KAPUAS) Oryza Lhara Sari; Doni Rahman Maulana
Racic : Rab Construction Research Vol 8 No 2 (2023): DESEMBER
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v8i2.3446

Abstract

Waste is a problem that often occurs in construction projects. Waste is in the form of activities that utilize resources but do not produce the expected added value (value). Therefore, it is necessary to identify waste, in this research we identify the factors that cause construction waste in the rehabilitation project and improvement of irrigation networks in the working area of Block A, Kapuas Regency. Obtained 9 variables with 43 indicators of factors that cause waste which are the basis for this research. The method used is the severity index method to obtain the dominant and main factors causing waste. The results of this study are the dominant and main factors for the occurrence of waste, namely with codes A1, A6, B2, B3, B6, D4, E4, E6, F6, I12 with a moderate risk category, based on the severity index value, the dominant causative factor risk response is transfer.
PENILAIAN KONSEP GREEN BUILDING PADA GEDUNG LABORATORIUM TERPADU INSTITUT TEKNOLOGI KALIMANTAN SESUAI STANDAR GREENSHIP 1.2 Oryza Lhara Sari; Andika Ade Indra Saputra; Naila Anisa Dwigida Aprilla
Racic : Rab Construction Research Vol 8 No 2 (2023): DESEMBER
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v8i2.3469

Abstract

In the City of Balikpapan, the number of buildings that apply the green building concept and are certified according to the green building certification data still does not exist. Sustainable development at the Kalimantan Institute of Technology (ITK) is one of the largest in East Kalimantan. The development will have an impact on changes in environmental conditions. The application of the green building concept to the ITK building is expected to reduce the negative impact on environmental change. The focus of this research case study is the ITK Integrated Laboratory Building. The thing being reviewed is the application of green building in the ITK Integrated Laboratory building using the calculation parameters on Greenship for New Buildings Version 1.2. The method that will be used in this research is to evaluate the application of green building in the ITK Integrated Laboratory Building. The evaluation value of the application of green building in the ITK Integrated Laboratory building is 9.08 points or 8.99% which does not meet the requirements for implementing green building in accordance with the greenship 1.2 standard.
IDENTIFIKASI PENERAPAN GREEN BUILDING PADA BANGUNAN YANG SUDAH TERBANGUN DI KAWASAN INSTITUT TEKNOLOGI KALIMANTAN Raftonado Situmorang; Oryza Lhara Sari; Sherlia Sherlia
Racic : Rab Construction Research Vol 8 No 2 (2023): DESEMBER
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v8i2.3920

Abstract

Kampus Institut Teknologi Kalimantan (ITK) memiliki sekitar 7 gedung yang sudah terbangun. Gedung yang sudah terbangun ini diidentifikasi apakah bangunan yang ada sudah menerapkan Green Building atau tidak. Metode yang digunakan adalah metode quantitatif dengan menggunakan penilaian versi 1.1 dari Green Building Council Indonesia (GBCI). Penilaian ini dimulai dengan pengukuran data lapangan, yaitu pengukuran kualitas udara, tingkat pencahayaan, tingkat kebisingan, suhu dan kelembapan udara. Kemudian dilakukan survei kenyamanan pengguna Gedung kepada 30 persen dari jumlah populasi pengguna Gedung tetap. Tahapan selanjutnya adalah mengobservasi lapangan terkait kampanye yang dilakukan seperti kampanye penghematan energi, konservasi air, pemilahan sampah, pelarangan merokok, dan pengurangan kendaraan bermotor. Lalu mengumpulkan data sekunder terkait kebijakan, dan dokumen yang terkait lainnya. Hasil penilaian Green Building pada Gedung dikawasan ITK, Gedung A mendapatkan 26 poin, Gedung B mendapatkan 26 Poin, Gedung E mendapatkan 23 Poin, Gedung F mendapatkan 26 Poin, Gedung G mendapatkan 26 Poin, Gedung Laboratorium Terpadu 1 mendapatkan 23 Poin, dan Gedung Asrama Mahasiswa mendapatkan 28 Poin. Untuk predikat greenship yang didapatkan Gedung yang berada dikawasan ITK adalah tidak mendapatkan predikat peringkat greenship.