Penilaian Green Building pada Gedung Laboratorium Terpadu II Institut Teknologi Kalimantan Choirunisa, Yulia; Sari, Oryza Lhara; Anindyta, Imma Sofi
Journal of Applied Civil Engineering and Infrastructure Technology Vol 6 No 2 (2025): Desember 2025
Publisher : Indonesian Society of Applied Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52158/jaceit.v6i2.874

Abstract

Efforts are essential to reduce emissions and environmental damage from construction activities, such as applying green concepts throughout the construction process. Institut Teknologi Kalimantan (ITK) is a sustainable development initiative in East Borneo that adopts these green concepts. Specifically, the Gedung Laboratorium Terpadu II at ITK was planned as a green building but hadn't undergone an assessment. This study assessed the building using the Greenship New Building Version 1.2 tool, revealing that it scored 25 points (24.75%), falling short of green building status. Recommendations for improvement included increasing vegetation, implementing energy and water efficiency measures, sourcing alternative water supplies, enhancing lighting systems, and improving waste treatment. These changes could elevate the building's green status to gold, with a 59.41% score.
Analysis of Smart Infrastructure Implementation in Facilities and Infrastructure of Supporting Hospital for Nusantara Capital City: Bahasa Indonesia Rahmad; Oryza Lhara Sari
Jurnal Teknik Sipil dan Lingkungan Vol. 10 No. 2: October 2025
Publisher : Departemen Teknik Sipil dan Lingkungan IPB

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29244/jsil.10.2.213-224

Abstract

As part of the 100 Smart Cities program and a buffer for the Nusantara Capital City (IKN), Balikpapan City is facing a population growth that has the potential to increase. This growth affects the quality of health services at Hospital X in Balikpapan City, where physical and digital infrastructure needs to be improved to accommodate the needs of patients and visitors. Infrastructure challenges include improving waste management facilities and infrastructure that are still inadequate in line with the increase in patients, as well as the lack of facilities for people with disabilities throughout the hospital area. Therefore, the purpose of this study is to analyze the application of the smart infrastructure concept based on the priority level of variables between mobility, energy management, networks and telecommunications, waste and waste management, and health variables, so that it is expected to provide quality from the existing physical and digital infrastructure to staff workers, patients, and hospital visitors. The results of the analysis using the Analytical Hierarchy Process method obtained a priority scale based on the weight value obtained is Mobility (0.252) with the implementation of a smart parking system (0.208), Energy Management (0.208) with the implementation of smart renewable energy (0.354), Waste and Waste Management (0.197) with the implementation of smart waste bins (0.353), Network and Telecommunication (0.195) with the implementation of automatic attendance using fingerprints (0.369), and Health (0.149) with the implementation of medical sensors to monitor chronic disease patients (0.237).
Analisis Take Off Quantity dengan Pendekatan BIM dan Diagram Pareto pada Pekerjaan Struktur Gedung Kejaksaan Kota Balikpapan Sari, Oryza Lhara; Nugroho, Tri Yulianto
CIVED Vol. 10 No. 2 (2023): June 2023
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v10i2.411

Abstract

BIM (Building Information Modeling) merupakan sebuah metode yang merepresentasikan pekerjaan konstruksi terintegrasi yang dapat menghemat waktu dan biaya dibandingkan metode konvensional. Di Indonesia, penerapan teknologi BIM sangat kurang dan masih dikembangkan. Penelitian ini bertujuan untuk memperoleh perbandingan volume dan biaya antara metode perhitungan manual dengan BIM dan menentukan pekerjaan yang memiliki potensi kesalahan dan deviasi terbesar. Penelitian menggunakan studi kasus pada proyek pembangunan Gedung Kantor Kejaksaan Negeri Kota Balikpapan. Penelitian dimulai mengumpulkan gambar kerja, data rincian volume pekerjaan dokumen kontrak, perhitungan manual, laporan harian dan wawancara. Penelitian ini menggunakan software BIM Revit dan Cubicost untuk melakukan permodelan 3D. Permodelan 3D menghasilkan output berupa data take of quantity pekerjaan pengecoran, tulangan, bekisting dan fabrikasi baja. Data take of quantity dari BIM menjadi acuan komparasi metode perhitungan manual dan akan dianalisa faktor penyebab perbedaannya dengan metode Pareto. Berdasarkan hasil perbandingan dan grafik Pareto, didapatkan besaran deviasi perhitungan BIM dengan Jenis-jenis pekerjaan yang memiliki deviasi perhitungan terbesar berdasarkan adalah pekerjaan pengecoran (kolom, balok, dan pelat), pekerjaan bekisting (tangga dan dinding), dan pekerjaan pembesian (kolom, balok, pelat, pilecap dan dinding struktur). Total biaya pekerjaan pada pekerjaan tersebut sebesar Rp 553.374.788,00.
Analysis of the Existing Conditions of Balikpapan Permai Market Towards Smart Living Market and SNI Through Revitalization Sari, Oryza Lhara; Rahmat, Rahmat; Pratama, Maryo Inri; Mustofa, Umar
CIVED Vol. 10 No. 3 (2023): September 2023
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v10i3.500

Abstract

Traditional markets are often associated with unhygienic conditions and limited facilities. This makes consumers uncomfortable shopping in traditional markets and results in traditional markets losing out to modern markets. Therefore, it is important for traditional markets to be empowered in order to maintain their sustainability and existence. Balikpapan Permai Market is one of the existing markets in Balikpapan and has various problems related to the quality and physical and non-physical conditions of the market. The purpose of this research is to find out the supporting factors of Balikpapan Permai Market revitalization by using smart living approach and SNI 8152:2021 Pasar Rakyat. Smart living will review in terms of harmony, health, mobility, security, and building, while SNI 8152:2021 Pasar Rakyat will review in terms of general requirements, technical requirements, and management requirements. The method used in this writing is a qualitative method by conducting several stages of research. The results of this research are supporting factors that make Balikpapan Permai Market needs revitalization by reviewing the existing conditions and opinions from the head of UPT market, traders, and market visitors.
Evaluation and Implementation of SNI 8152:2021, Smart Living and Smart Environment at Pandansari Market, Balikpapan City Sari, Oryza Lhara; Nashrullah, Ahmad; Mustofa, Umar; Pratama, Maryo Inri
CIVED Vol. 11 No. 1 (2024): March 2024
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v11i1.537

Abstract

The conditions of traditional markets are dirty and irregular, supporting the fact that people prefer to shop in modern places. Nowadays, it needs to be realised that the only centre of trade is no longer in traditional markets, the increasing number of modern markets can make traditional markets need to survive in competition so as not to be eroded by the times. There is a need for innovation in traditional markets to advance the market economy so that traditional markets can compete with other markets. Pandansari Market is one of the markets located in Balikpapan City and has various problems related to the quality and physical and non-physical conditions of the market. The goal of this research is to find out the supporting factors of Pandansari Market revitalisation by using smart living approach and SNI 8152:2021 People's Market. Smart living will review in terms of harmony, health, and mobility. Smart environment will review in terms of infrastructure, protection, and energy. Meanwhile, SNI 8152:2021 Public Market will review in terms of general requirements, technical requirements, and management requirements. The method used in this writing is a qualitative method by conducting several stages of research. The results of this study are the supporting factors that make Pandansari Market necessary for revitalisation through a review of existing conditions and opinions from the UPT market, traders, and market visitors.
PENANGANAN FAKTOR PENYEBAB WASTE DENGAN MENGGUNAKAN PENDEKATAN LEAN CONSTRUCTION (STUDI KASUS: PEMBANGUNAN JEMBATAN SEI ALALAK BANJARMASIN): Handling the Factors that Cause Waste by using the Lean Construction Approach (Case Study: Sei Alalak Bridge Construction Banjarmasin) Sari, Oryza Lhara; Situmorang, Raftonado; Septiana, Nadia
Spektrum Sipil Vol 10 No 2 (2023): SPEKTRUM SIPIL
Publisher : Jurusan Teknik Sipil Fakultas Teknik Universitas Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29303/spektrum.v10i2.271

Abstract

Lean Construction atau konstruksi ramping merupakan sebuah metode yang beberapa tahun terakhir digunakan para penyedia jasa konstruksi untuk meminimalkan waste yang terjadi dengan tujuan meningkatkan nilai tambah (value). Dari hasil identifikasi sebelumnya pada proyek Pembangunan Jembatan Sei Alalak Banjarmasin, terdapat 3 faktor penyebab waste yang paling berpengaruh yaitu: cuaca buruk, pengawasan pembuatan beton mulai dari penimbangan berat material hingga batching plan, dan dokumen pengujian. Untuk mengetahui penanganan waste tersebut, maka digunakan beberapa tools yang ada pada lean construction dengan menyebarkan kuisioner kepada para ahli (expert). Dengan menggunakan tools yang ada pada lean construction maka strategi penanganan yang didapatkan yaitu 1. cuaca tidak mendukung: last planner system, increased visualization, first run studies, daily huddle meeting; 2. pengawasan pembuatan beton mulai dari penimbangan berat material sampai dengan batching plant: last planner system, daily huddle meeting, fail-safe quality and safety; 3. dokumen pengujian: last planner system, increased visualization, daily huddle meeting, 5S process.
Penilaian Manajemen Risiko K3 menggunakan Metode Severity Index pada Proyek Pembangunan Gedung Laboratorium Terpadu II ITK Hanun, Fauziah; Situmorang, Raftonado; Fauzi, Ardiansyah; Sari, Oryza Lhara
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 9 No. 2 (2025)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v9i2.17007

Abstract

ITK II is an integrated laboratory building construction project currently does not involve identifying hazards, risk assessment, determining risk levels, or comprehensive risk control. The results of observations and interviews by the author show that dangers can arise due to workers' implementation, actions, and unsafe conditions. Based on these conditions, it is necessary to carry out a risk analysis with the aim of knowing what risks may occur, knowing the dominant risk level, and knowing the dominant risk response, as well as providing recommendations for effective risk control on the ITK II Integrated Laboratory Building Construction Project. The approach applied in this research includes a qualitative approach, namely at the survey, observation, interview, and distribution of questionnaire stages, and a quantitative approach is used to assess the probability and impact of risks, sort risks from highest to lowest, categorize risks, and design mitigation. risk.  The severity index method is used to calculate the probability and impact of an event. The calculation is carried out based on responses from respondents using a Likert scale and validated by experts. Then, an analysis of the risk response to the dominant risks is carried out. In the relevance test, the results obtained were 22 relevant variables and 3 irrelevant variables. Furthermore, during the validity test and reliability test, the results of the two tests obtained for each variable were valid and reliable. After that, the risk level was calculated, and 15 dominant sub-risks were obtained with a probability and impact matrix value of 9 in the "high" risk category. Risk responses that can be given are: placing safety signs in the work area, using PPE, increasing signs in each corner of the project, holding short meetings to discuss worker safety aspects regularly before starting work, wearing anti-slip shoes when working in a work environment where there is a risk of slipping, and carrying out regular field supervision.
SOSIALISASI KESELAMATAN BERLALU LINTAS UNTUK PENGENDARA PEMULA Yanti, Rossana Margaret Kadar; Saputra, Andika Ade Indra; Hadid, Muhammad; Apriani, Dyah Wahyu; Putri, Andina Prima; Sari, Oryza Lhara
Jurnal Pengabdian Masyarakat Sabangka Vol 1 No 03 (2022): Jurnal Pengabdian Masyarakat Sabangka
Publisher : Pusat Studi Ekonomi, Publikasi Ilmiah dan Pengembangan SDM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62668/sabangka.v1i03.164

Abstract

Kota Balikpapan merupakan salah satu kota dengan angka kecelakaan lalu lintas (lakalantas) tinggi. Lakalantas di Kota ini didominasi kalangan usia produktif (Polresta Balikpapan, 2018). Pada Tahun 2017 tercatat jumlah lakalantas di salah satu jalan di Kota Balikpapan yaitu jalan Soekarno Hatta mencapai 47 kasus. Berdasarkan angka lakalantas yang terus meningkat, maka perlu dilakukan tindakan pencegahan. Banyaknya pelanggaran berlalulintas pada anak usia remaja dan usia produktif dikarenakan pada usia tersebut rasa ingin tahu dan ingin mencoba sangat tinggi, sehingga banyak sekali pelanggaran lalu lintas ini dilanggar oleh remaja dan usia produktif. Beberapa pelanggaran ini terjadi akibat pendidikan mengenai disiplin berlalu lintas yang langka dikalangan anak-anak baik di lingkungan keluarga maupun sekolah. Dengan adanya kondisi ini, perlu dilakukan sosialisasi keselamatan pada pengendara pemula kepada siswa di SMK AIRLANGGA Balikpapan. Kegiatan ini dilakukan dengan tujuan agar pengendara pemula memiliki kesadaran dan pengetahuan berkendara dengan baik, aman, serta akan selalu terdorong untuk tertib pada peraturan lalu lintas yang ada. Kegiatan ini dilakukan dengan tiga tahapan meliputi tahap persiapan berupa administrasi, alat dan bahan, serta materi; dilanjutkan dengan tahap pelaksanaan sosialisasi; dan evaluasi. Proses berjalannya kegiatan ini cukup baik terbukti dengan banyaknya jumlah peserta yang hadir dan keaktifan peserta pada saat pelaksanaan sosialisasi.
PENGEMBANGAN KAWASAN PESISIR DENGAN MEMANFAATKAN RUANG TERBUKA SEBAGAI TAMAN REKREASI DAN SISTEM PENGELOLAAN JARINGAN PERSAMPAHAN YANG LAYAK PADA RT 8 KELURAHAN MANGGAR BARU Lhara Sari, Oryza; Putri, Andina Prima; Yanti, Rossana Margaret Kadar; Apriani, Dyah Wahyu
Jurnal Pengabdian Masyarakat Sabangka Vol 2 No 03 (2023): Jurnal Pengabdian Masyarakat Sabangka
Publisher : Pusat Studi Ekonomi, Publikasi Ilmiah dan Pengembangan SDM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62668/sabangka.v2i03.573

Abstract

Manggar Baru is one of the sub-districts in East Balikpapan District, Balikpapan City. According to the 2012-2032 RTRW of Balikpapan City, Manggar Baru is planned to become a minapolitan and tourism area based on the geographical conditions which are located along the coast. Optimizing the potential of coastal areas is carried out by developing existing land or open spaces into proper beach tourism and can be enjoyed by residents and visitors. Based on the results of a survey that has been conducted, Kampung Nelayan RT 8 Kelurahan Manggar Baru has unfavorable solid waste conditions. Overcoming this problem regarding waste regulations, several things can be done, namely managing existing waste conditions through the provision of infrastructure such as garbage dumps in front of every house in RT 8 to make it easier to collect and sort waste. Then, conduct outreach to the surrounding community regarding education on waste management based on its type and utilization. One of the uses of waste that can be developed is to use plastic bottles or other plastic waste to make eco bricks. In addition, the results of the ecobrick that has been made can be used as material to build a vertical garden. The garden area can be used to develop toga plants for the local community. Seeing the waste problems that occur in RT 8, it is necessary to empower the community in managing waste. Community empowerment can be carried out using the Asset-Based Community Development (ABCD) approach which first takes inventory of assets owned by the community to be used as resources in waste management. The community empowerment methods that require participation include Rapid Rural Appraisal (RRA), Participatory Rapid Appraisal (PRA), Participatory Learning and Action (PLA) and Participatory Training. It is hoped that some of the solutions described above can be a way out of existing problems and can have an impact on both the surrounding community and the people who come to use these facilities.
ANALISIS FAKTOR DOMINAN YANG BERPENGARUH TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK X DI IKN Rahmawati, Fitri; Sari, Oryza Lhara
JURNAL REKAYASA Vol. 14 No. 2 (2024): Jurnal REKAYASA
Publisher : Fakultas Teknik Sipil dan Perencanaan. Universitas Bung Hatta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Aktivitas pembangunan di Pulau Kalimantan saat ini sedang mengalami peningkatan karena adanya rencana pemindahan ibu kota dengan nama resmi Ibu Kota Nusantara (IKN). Pemindahan ini memicu berbagai persiapan, terutama di sektor pembangunan infrastruktur yang dilaksanakan melalui proyek konstruksi. Berkaitan dengan waktu penyelesaian proyek yang memegang kunci utama agar tidak terjadi pembengkakan biaya dan pengurangan mutu, kinerja waktu adalah suatu proses yang digunakan untuk mengetahui perbandingan antara jadwal waktu yang telah direncanakan dengan waktu sebenarnya penyelesaian proyek (pekerjaan aktual). Mengingat pentingnya waktu penyelesaian pada sebuah proyek, penelitian ini akan dilakukan di Proyek XYZ di IKN yang pada masa pelaksanaannya menunjukkan adanya penurunan progres kerja proyek. Penelitian ini menggunakan kuesioner sebagai alat penelitian dan pengolahan data menggunakan metode kuantitatif dengan analisis regresi linear berganda. Hasil penelitian menunjukkan faktor paling dominan yang dapat memengaruhi kinerja waktu menurut perspektif pelaksana pada proyek adalah Faktor Keuangan (X5) dengan nilai Beta sebesar 0.540. Berdasarkan hasil analisis ini didapatkan rekomendasi ahli terkait faktor dominan yang ada agar dapat diterapkan pada proyek dengan melakukan pengelolaan keuangan yang baik oleh perusahaan, termasuk memiliki dana cadangan, kemampuan mencari modal tambahan, perencanaan penggunaan dana yang baik, melengkapi persyaratan administrasi pencairan termin proyek, memaksimalkan sumber daya yang ada, serta mengawasi jalannya proyek secara berkala.