Claim Missing Document
Check
Articles

Found 26 Documents
Search

ANALISIS FAKTOR-FAKTOR PENERAPAN PENGADAAN BARANG/JASA PEMERINTAH SECARA E-PROCUREMENT TERHADAP PENYERAPAN ANGGARAN DI KOTA SABANG Sawidar Sawidar; Muttaqin Muttaqin; Anita Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 1 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i1.10365

Abstract

Regulation of the President of the Republic of Indonesia Number 54 Year 2010 on Procurement of Government Goods/Services, has come to the fourth change, with the issuance of Presidential Regulation No. 4 of 2015. Sabang City Government has implemented this Presidential Regulation in fiscal year 2015 until now. If the procurement of goods/services runs well, it will increase the absorption of the budget. The purpose of this study is to identify the dominant variables applied in the procurement of electronic goods/services (e-procurement), as well as to analyze the relationship and influence of procurement factors of goods/services of government on e-procurement towards budget absorption in Procurement Unit ULP) Sabang City. The number of population in this study was 88 respondents. The results showed that the dominant variable applied in the procurement of goods/services of government by e-procurement is the access factor of information with the mean of 4.702. The quality factor of the system and accountability has a very weak relationship with Pearson coefficient of 0.001 and 0.191, transparency factor, market access and business competition, and procurement efficiency has a weak relationship with Pearson coefficient of 0.322, 0.226 and 0.201, while monitoring and auditing factors, and access to information has a moderate relationship with Pearson coefficient of 0.479 and 0.524 against budget absorption. The influence of government procurement/procurement factors on the budget absorption, which influences is the factor of transparency, accountability, and access factor of information with tcount greater than ttable and significance value lower than 0.05.
IDENTIFIKASI FAKTOR KINERJA KONTRAKTOR YANG PALING BERPENGARUH TERHADAP KEPUASAN STAKEHOLDERS DI DINAS CIPTA KARYA ACEH Mohammad R. Khadafi; Muttaqin Muttaqin; Anita Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 2, No 3 (2019): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v2i3.13464

Abstract

In the midst of increasingly fierce competition in the world of today's construction business, every construction company is required to be able to demonstrate the quality of its service so that it can excel in competition. As a company engaged in services/selling services, construction companies must have knowledge of the dimensions of service quality. There are five factors from the dimensions of service quality, namely tangible, reliability, responsiveness, assurance and empathy. If the performance can meet their expectations, the stakeholders will be satisfied and vice versa. This study aims to identify contractor performance factors that most influence stakeholder satisfaction in the Aceh Human Settlements Agency. This study used mixed methods, combining qualitative and quantitative approaches through questionnaires. The respondents are the stakeholders of the project stakeholders at Aceh Human Settlements Agency in 2016, which consists of the Budget User, Proxy of Budget User, Technical Officer (PPTK) and Technical Officer Assistant, which in total amounted to 32 respondents. Data processing methods use validity and reliability tests, while descriptive statistical analysis uses SPSS version 22 software. The results of the study showed that the contractor's performance factors that had the most influence on stakeholder satisfaction in the Aceh Human Settlements Agency were reliability factors with a mean value of 3.714, while the least influential factors were physical evidence factors with a mean value of 3.332
FAKTOR-FAKTOR PENERAPAN KESELAMATAN DAN KESEHATAN KERJA YANG MEMPENGARUHI KINERJA PROYEK KONSTRUKSI GEDUNG DI PROVINSI ACEH Bunial Bunial; Muttaqin Muttaqin; Anita Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 4 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i4.12463

Abstract

PT. Jamsostek stated that in 2012 everyday there are 9 workers who died due to accidents, while total work accident in the same year recorded 103,000 cases. Accidents to these workers will certainly make the productivity of project work decreased, as well as will impact on the poor performance of the project. This study aims to identify the dominant OSH factors applied in the implementation of building construction projects in Aceh Province, and to analyze the relationship and influence between the factors of OSH implementation on the performance of building construction projects in Aceh Province. This study uses qualitative methods through interviews and quantitative through the distribution of questionnaires. The number of research samples obtained by 68 contractor companies. The sampling technique used is purposive sampling. Data processing methods consist of test validity, and reliability, while data analysis consists of descriptive analysis, simple correlation and multiple linear regression. The results showed that the dominant K3 factor applied in the implementation of the building construction project in Aceh Province was a public protection factor with a mean of 4.632. The safety and work competence factors have a good relationship with Spearman coefficient of 0.451 and 0.429, the factors of equipment and work clothes, vehicle lanes, and equipment and machinery have a low correlation with Spearman coefficient of 0.328, 0.386, and 0.243, while fire, and sound, public protection, general, occupational health, and seriousness of the company have a very low relation with Spearman coefficient of 0.077, 0.130, 0.066, 0.107, 0.121, and 0.169 to the performance of building construction projects in Aceh Province. The influence of OSH implementation factors on the performance of building construction project in Aceh Province, which has significant effect is safety factor, equipment and work clothes, vehicle path, equipment and machinery, public protection, general, seriousness of company, and worker competence with tcount greater than ttable and significance value lower than 0.05.
Sosialisasi Mitigasi Kebencanaan Berbasis Masyarakat Di Desa Peunayong Anita rauzana Ruzana; Wira Dharma; M. Zardan
COMSEP: Jurnal Pengabdian Kepada Masyarakat Vol. 3 No. 1 (2022): COMSEP : Jurnal Pengabdian Kepada Masyarakat
Publisher : Asosiasi Dosen Akuntansi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (233.529 KB) | DOI: 10.54951/comsep.v3i1.215

Abstract

In an effort to reduce disaster risk, disaster management activities need to be implemented as part of people's daily lives. The disaster management paradigm that has developed is more focused on preventing risk from arising, namely at the pre-disaster stage or known as risk management. At this stage strengthening community capacity in dealing with disasters is a very important part. Strengthening community capacity can be established by increasing the active participation of the community in various disaster management activities in Peunayong village in Banda Aceh. Indonesia is an area with a fairly high level of disaster risk, especially on the island of Sumatra including Banda Aceh, because on the island of Sumatra, especially Banda Aceh is an area that often occurs earthquakes, this is because the territory of Indonesia is located between the four Eurasian plates, the Indo-Australian plate, the Philippine plate and the Pacific plate, earthquakes with a magnitude of 7 on the Richter Scale or more often occur in areas around the meeting between these plates, for example the earthquake accompanied by the tsunami in 2004 that hit Aceh, which resulted in many casualties, considering Indonesia's special territory Banda Aceh often experiences earthquakes, so training and counseling on disaster management (disaster mitigation) are needed for the people in Banda Aceh. This community service program is carried out so that the community can prepare themselves and add insight in dealing with disasters, namely by counseling and training the community on disaster management/disaster mitigation.
IDENTIFIKASI RISIKO BIAYA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG BAGI PERUSAHAAN KONTRAKTOR Alfa Taras Bulba; Anita Rauzana; Ikhlas Kurniawan
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 8, No 2 (2022): Jurnal Teknik Sipil dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (501.131 KB) | DOI: 10.35308/jts-utu.v8i2.6284

Abstract

One aspect that is needed in the implementation of infrastructure development is the availability of funds or capital from the government. Budget proposals from local governments are sometimes not the same as those approved by the legislature. area. The approved budget sometimes does not match the value of the Engineering Estimate work that has been generated from the DED planning. So this affects the execution of the work. There are several conditions that directly affect cost overruns in the implementation of building construction work. Some of these conditions include inadequate worker qualifications, procurement of materials that are sometimes not in accordance with the implementation time, natural conditions that sometimes delay the completion of work or natural disasters such as floods, inappropriate implementation methods, implementing management who do not understand the implementation conditions as well as several other conditions. In connection with these problems, this study wants to analyze the dominant risk factors that affect the cost of implementing building construction projects in Aceh Province. This research is a quantitative research. Based on this research, the dominant factor influencing the cost of implementing building construction projects in Aceh is force majeure with a mean value of 4.353.
Konservasi Penyu Di Pantai Pasi Jalang, Lhoknga, Kabupaten Aceh Besar Anita Rauzana; Lenni Fitri; Yekki Yasmin; Suwarno; Wira Dharma
COMSEP: Jurnal Pengabdian Kepada Masyarakat Vol. 3 No. 3 (2022): COMSEP : Jurnal Pengabdian Kepada Masyarakat
Publisher : Asosiasi Dosen Akuntansi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54951/comsep.v3i3.309

Abstract

The Lhoknga beach area is one of the areas in Aceh that has beautiful beaches and enormous potential for marine wealth, including turtles. This area is a paradise for turtles to lay their eggs. Turtles are reptiles living in the sea and whose existence has long been threatened by nature and human activities. Internationally, sea turtles are included in the 'red list' in the International Union for Conservation of Nature and Natural Resources (IUCN), which means that their existence in nature is threatened with extinction, so all forms of utilization and distribution must receive serious attention. Therefore, turtle conservation efforts are an essential and urgent program to protect and save turtle populations, especially in Indonesia because, in Indonesia, there are 6 out of 7 turtle species that still exist today. This activity has been completed at Lhoknga Beach by releasing 120 turtle hatchlings. It is hoped that this community service activity will be able to increase public awareness to participate together in preserving turtles and not hunting them anymore.
Effect of LSMC Implementation on Contractor Performance for National Road Construction In Aceh, Indonesia Alfa Taras Bulba; Anita Rauzana
Apollo: Journal of Tourism and Business Vol. 1 No. 3 (2023): September 2023
Publisher : CV. Media Digital Publikasi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58905/apollo.v1i3.49

Abstract

Performance Based Contract (PBC) which is used to replace traditional contracts in national road constructions in Indonesia has been improvised into the Long Segment Maintenance Contract (LSMC). Contractor role and risk influence contractor performance; hence, the LSMC was introduced to assist contractors in improving their organizations to enhance performance in undertaking national road construction projects. This study was conducted to investigate the relationship between LSMC and contractor performance in Aceh, Indonesia, with operational capabilities as the mediator. Data collection for this study was done through a questionnaire survey, which was carried out involving non-small contractor companies from grades 5 to 7. Questionnaires were sent to 104 respondents. From the 104 questionnaires disseminated, 100 were completed and deemed usable. The data were analysed by the PLS software, followed by SPSS. The findings showed a positive relationship between LSMC and contractor performance
PEMBINAAN STASIUN KERJA YANG ERGONOMIS BAGI PEKERJA KERAJINAN SOUVENIR ACEH DI KOTA BANDA ACEH Anita Rauzana; Wira Dharma; Mirza Irwansyah
Jurnal Abdimas Vol 21, No 2 (2017): December 2017
Publisher : Universitas Negeri Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15294/abdimas.v21i2.11231

Abstract

Pengembangan Usaha Kecil Menengah (UKM) melalui pendekatan pemberdayaan usaha, perlu memperhatikan aspek sosial dan budaya di masing-masing daerah, mengingat usaha kecil dan menengah pada umumnya tumbuh dari masyarakat secara langsung. Provinsi Aceh merupakan provinsi yang kaya dengan kerajinan tradisional seperti tas bordir Aceh, dompet, baju bordir khas Aceh, mukena, jilbab, peci, dan lain-lain.  Unit usaha mitra yang dipilih dalam pelaksanaan pengabdian masyarakat ini adalah Aceh Galeri Souvenir dan Pusaka Souvenir. .Keduanya merupakan perusahaan bidang kerajinan Aceh yang berkedudukan di Kota Banda Aceh. UKM tersebut mampu menghasilkan produk yang berpeluang ekspor atau yang secara tidak langsung dibawa keluar negeri yaitu negara Malaysia. Thailand, Amerika, Australia, Dubai, London, Afrika Selatan dan Singapura. Pembinaan dan Pengembangan yang dilakukan adalah dengan melakukan pembinaan/pembimbingan terhadap proses dan metode produksi agar lebih efektif melalui perencanaan stasiun kerja agar sesuai dengan karakter pekerja, kapasitas, alat dan ruang serta lingkungan kerja. Dalam kaitan dengan faktor ergonomi, dilakukan penataan ruang kerja. 
ANALISIS FAKTOR-FAKTOR PEMBENGKAKAN BIAYA (COST OVERRUN) YANG BERPENGARUH TERHADAP KETIDAKPASTIAN BIAYA (CONTINGENCY COST) PADA PROYEK IRIGASI DI KABUPATEN ACEH BESAR Bima Risandi; Masimin Masimin; Anita Rauzana
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The success of carrying out construction projects on time with an appropriate budget plan goals and expectations are project owners and contractors. But in fact frequently encountered problems emergence of cost overrun in construction projects during the implementation phase of the work, which is caused by several factors. To minimize the occurrence of the value of cost overrun on the next project, then each factor should be considered properly or always considered ditahap initial estimate, so it can be prevented or avoided. The purpose of this study was to analyze the dominant factor causes of cost overrun on irrigation projects, as well as to analyze the relationship and influence between the factors of cost overrun on contingency cost on irrigation projects in the district of Aceh Besar. Irrigation projects is observed which has been completed from 2010-2015. This study used interviews and questionnaires aimed to contractors in irrigation, ranging from qualifying K3, M1, M2 and B1. Total population gained as much as 46 contractors, through the equation Slovin the study sample was obtained as many as 32 contractors. The results showed that the dominant factor in the cause of the irrigation project cost overrun due to factors estimate, with a mean value of 4.397. Relationship factors toward contingency cost overrun on the cost of irrigation projects that have a relationship quite a factor of project documents with Pearson correlation coefficient between 0.400-0.700. Factors influence the cost overrun contingency cost on irrigation projects, the most influential factor is the project document, with a regression coefficient of 0.059.Abstrak: Keberhasilan melaksanakan proyek konstruksi tepat waktu dengan anggaran yang sesuai rencana adalah sasaran dan harapan pemilik proyek maupun kontraktor. Namun pada kenyataannya sering dijumpai permasalahan munculnya cost overrun pada proyek konstruksi selama tahap pelaksanaan pekerjaan, yang disebabkan oleh beberapa faktor. Untuk meminimumkan terjadinya nilai cost overrun pada proyek berikutnya, maka hendaknya setiap faktor diperhatikan dengan baik atau selalu dipertimbangkan ditahap estimasi awal, sehingga dapat dicegah atau dihindari. Tujuan penelitian ini adalah untuk menganalisis faktor dominan penyebab terjadinya cost overrun pada proyek irigasi, serta untuk menganalisis hubungan dan pengaruh antara faktor-faktor cost overrun terhadap contingency cost pada proyek irigasi di Kabupaten Aceh Besar. Proyek irigasi yang diamati adalah yang telah selesai dilaksanakan mulai dari tahun 2010-2015. Penelitian ini menggunakan wawancara dan kuesioner yang ditujukan kepada kontraktor bidang irigasi, mulai dari kualifikasi K3, M1, M2 dan B1. Jumlah populasi diperoleh sebanyak 46 perusahaan kontraktor, melalui persamaan Slovin maka sampel penelitian diperoleh sebanyak 32 kontraktor. Hasil penelitian menunjukkan bahwa faktor dominan penyebab terjadinya cost overrun proyek irigasi disebabkan faktor estimasi, dengan nilai mean sebesar 4,397. Hubungan faktor-faktor cost overrun terhadap contingency cost pada proyek irigasi yang mempunyai hubungan cukup adalah faktor dokumen proyek dengan nilai koefisien korelasi Pearson antara 0,400-0,700.  Pengaruh faktor-faktor cost overrun terhadap contingency cost pada proyek irigasi, yang paling berpengaruh adalah faktor dokumen proyek, dengan nilai koefisien regresi sebesar 0,059.
ANALISIS FAKTOR-FAKTOR PENGARUH KONFLIK (DISPUTE) TERHADAP KEBERHASILAN PROYEK KONSTRUKSI DI PROVINSI ACEH Rinaldy Rinaldy; Teuku Budi Aulia; Anita Rauzana
JURNAL TEKNIK SIPIL Vol 6, No 2 (2017): Volume 6, Nomor 2, Januari 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: In the implementation of projects often arise constraints, if the project objectives are not achieved properly. These problems if not managed properly then it will be a conflict (dispute) or disagreement between the elements involved in the implementation of the project. This study aims to identify the factors and the dominant factors that cause conflict in construction projects in the province of Aceh, as well as analyzing the forms of relationships and the influence of factors of conflict the success of construction projects in the province. Observed projects are construction projects that have been completed starting from the year 2008-2015, with funding coming from APBA and APBK.. Factors that cause conflicts in the implementation of construction projects in Aceh province was caused by the owner of factors, factors consultants, contractors factors, factors project conditions, the human factor, and the factor of the contract and specifications. The dominant factor causing conflicts in the implementation of construction projects in the province of Aceh is due to factors owner, with a mean value of 4.253. Relationship conflict factors to the success of construction projects in the province of Aceh, is to have a relationship with a very high correlation coefficient of 0.921. The influence factors of the conflict on the success of construction projects in the province of Aceh, the most influential factor is the condition of the project, with a regression coefficient of 1.021. This suggests that if the project conditions factor handled well, while other factors remain, then the success of construction projects in Aceh province will increase.Keywords : Conflict, success, construction projects, Aceh ProvinceAbstrak: Dalam pelaksanaan proyek sering muncul kendala, apabila tujuan proyek tidak tercapai sebagaimana mestinya. Permasalahan ini apabila tidak dikelola dengan baik maka akan menjadi konflik (dispute) atau perselisihan antara unsur-unsur yang terlibat dalam pelaksanaan proyek. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor serta faktor dominan yang menyebabkan terjadi konflik pada proyek konstruksi di Provinsi Aceh, serta menganalisis bentuk hubungan dan pengaruh faktor-faktor konflik terhadap keberhasilan proyek konstruksi di Provinsi Aceh. Proyek yang diamati adalah proyek konstruksi yang telah selesai dilaksanakan mulai dari tahun 2008-2015, dengan sumber dana yang berasal dari APBA dan APBK. Faktor-faktor penyebab terjadinya konflik dalam pelaksanaan proyek konstruksi di Provinsi Aceh adalah disebabkan oleh faktor owner, faktor konsultan, faktor kontraktor, faktor kondisi proyek, faktor sumber daya manusia, dan faktor kontrak dan spesifikasi. Faktor dominan penyebab terjadinya konflik dalam pelaksanaan proyek konstruksi di Provinsi Aceh adalah disebabkan faktor owner, dengan nilai mean sebesar 4,253. Hubungan faktor-faktor konflik terhadap keberhasilan proyek konstruksi di Provinsi Aceh, adalah mempunyai hubungan yang sangat tinggi dengan nilai koefisien korelasi sebesar 0,921. Pengaruh faktor-faktor konflik terhadap keberhasilan proyek konstruksi di Provinsi Aceh, yang paling berpengaruh adalah faktor kondisi proyek, dengan nilai koefisien regresi sebesar 1,021. Hal ini menunjukkan bahwa apabila faktor kondisi proyek ditangani dengan baik, sedangkan faktor-faktor lainnya tetap, maka keberhasilan proyek konstruksi di Provinsi Aceh akan semakin meningkat.Kata kunci : Konflik, keberhasilan, proyek konstruksi, Provinsi Aceh